Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STAGE SEPARATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Supernovae in luminous arcs

The giant luminous arcs seem to be images of galaxies distorted by foreground clusters acting as gravitational lenses, with galaxies close to the cusps of gravitational lens caustic. The part of a galaxy located inside a cusp has three images of itself within an arc. The arcs are very blue, so the galaxies may be in a stage of active star formation with supernovae exploding every few years. If a supernova goes off inside a cusp it will be observed thrice, at three positions. The apparent magnitudes of the supernovae images may be M(R) roughly 20-23. The arrival time differences between the images can be as short as a few weeks or even days, whereas for ordinary lenses on a cluster scale the differences can be decades to centuries. Simple relations between the ratios of the arrival time differences, magnifications, and image separations are predicted.

Kovner, Israel↗

Fault injection experiments using FIAT

The results of several experiments conducted using the fault-injection-based automated testing (FIAT) system are presented. FIAT is capable of emulating a variety of distributed system architectures, and it provides the capabilities to monitor system behavior and inject faults for the purpose of experimental characterization and validation of a system's dependability. The experiments consist of exhaustively injecting three separate fault types into various locations, encompassing both the code and data portions of memory images, of two distinct applications executed with several different data values and sizes. Fault types are variations of memory bit faults. The results show that there are a limited number of system-level fault manifestations. These manifestations follow a normal distribution for each fault type. Error detection latencies are found to be normally distributed. The methodology can be used to predict the system-level fault responses during the system design stage.

Barton, James H.↗

Mathematical modeling of a thermovoltaic cell

A new type of battery named 'Vaporvolt' cell is in the early stage of its development. A mathematical model of a CuO/Cu 'Vaporvolt' cell is presented that can be used to predict the potential and the transport behavior of the cell during discharge. A sensitivity analysis of the various transport and electrokinetic parameters indicates which parameters have the most influence on the predicted energy and power density of the 'Vaporvolt' cell. This information can be used to decide which parameters should be optimized or determined more accurately through further modeling or experimental studies. The optimal thicknesses of electrodes and separator, the concentration of the electrolyte, and the current density are determined by maximizing the power density. These parameter sensitivities and optimal design parameter values will help in the development of a better CuO/Cu 'Vaporvolt' cell.

White, Ralph E.↗

An integrated autonomous rendezvous and docking system architecture using Centaur modern avionics

The avionics system for the Centaur upper stage is in the process of being modernized with the current state-of-the-art in strapdown inertial guidance equipment. This equipment includes an integrated flight control processor with a ring laser gyro based inertial guidance system. This inertial navigation unit (INU) uses two MIL-STD-1750A processors and communicates over the MIL-STD-1553B data bus. Commands are translated into load activation through a Remote Control Unit (RCU) which incorporates the use of solid state relays. Also, a programmable data acquisition system replaces separate multiplexer and signal conditioning units. This modern avionics suite is currently being enhanced through independent research and development programs to provide autonomous rendezvous and docking capability using advanced cruise missile image processing technology and integrated GPS navigational aids. A system concept was developed to combine these technologies in order to achieve a fully autonomous rendezvous, docking, and autoland capability. The current system architecture and the evolution of this architecture using advanced modular avionics concepts being pursued for the National Launch System are discussed.

Nelson, Kurt↗

A mathematical model of a CuO/Cu Vaporvolt cell

A new type of battery named 'Vaporvolt' cell is in the early stage of its development. A mathematical model of a CuO/Cu 'Vaporvolt' cell is presented that can be used to predict the potential and the transport behavior of the cell during discharge. A sensitivity analysis of the various transport and electrokinetic parameters indicates which parameters have the most influence on the predicted energy and power density of the 'Vaporvolt' cell. This information can be used to decide which parameters should be optimized or determined more accurately through further modeling or experimental studies. The optimal thicknesses of electrodes and separator, the concentration of the electrolyte, and the current density are determined by maximizing the power density. These parameter sensitivities and optimal design parameter values will help in the development of a better CuO/Cu 'Vaporvolt' cell.

Kawanami, Makoto↗

An Intercomparison Between Radar Reflectivity and the IR Cloud Classification Technique for the TOGA-COARE Area

Satellite infrared (IR) and visible (VIS) images from the Tropical Ocean Global Atmosphere - Coupled Ocean Atmosphere Response Experiment (TOGA-COARE) experiment are investigated through the use of Clustering Analysis. The clusters are obtained from the values of IR and VIS counts and the local variance for both channels. The clustering procedure is based on the standardized histogram of each variable obtained from 179 pairs of images. A new approach to classify high clouds using only IR and the clustering technique is proposed. This method allows the separation of the enhanced convection in two main classes: convective tops, more closely related to the most active core of the storm, and convective systems, which produce regions of merged, thick anvil clouds. The resulting classification of different portions of cloudiness is compared to the radar reflectivity field for intensive events. Convective Systems and Convective Tops are followed during their life cycle using the IR clustering method. The areal coverage of precipitation and features related to convective and stratiform rain is obtained from the radar for each stage of the evolving Mesoscale Convective Systems (MCS). In order to compare the IR clustering method with a simple threshold technique, two IR thresholds (Tir) were used to identify different portions of cloudiness, Tir=240K which roughly defines the extent of all cloudiness associated with the MCS, and Tir=220K which indicates the presence of deep convection. It is shown that the IR clustering technique can be used as a simple alternative to identify the actual portion of convective and stratiform rainfall.

Carvalho, L. M. V.↗

Assessment and Control of Spacecraft Charging Risks on the International Space Station

Electrical interactions between the F2 region ionospheric plasma and the 160V photovoltaic (PV) electrical power system on the International Space Station (ISS) can produce floating potentials (FP) on the ISS conducting structure of greater magnitude than are usually observed on spacecraft in low-Earth orbit. Flight through the geomagnetic field also causes magnetic induction charging of ISS conducting structure. Charging processes resulting from interaction of ISS with auroral electrons may also contribute to charging albeit rarely. The magnitude and frequency of occurrence of possibly hazardous charging events depends on the ISS assembly stage (six more 160V PV arrays will be added to ISS), ISS flight configuration, ISS position (latitude and longitude), and the natural variability in the ionospheric flight environment. At present, ISS is equipped with two plasma contactors designed to control ISS FP to within 40 volts of the ambient F2 plasma. The negative-polarity grounding scheme utilized in the ISS 160V power system leads, naturally, to negative values of ISS FP. A negative ISS structural FP leads to application of electrostatic fields across the dielectrics that separate conducting structure from the ambient F2 plasma, thereby enabling dielectric breakdown and arcing. Degradation of some thermal control coatings and noise in electrical systems can result. Continued review and evaluation of the putative charging hazards, as required by the ISS Program Office, revealed that ISS charging could produce a risk of electric shock to the ISS crew during extra vehicular activity. ISS charging risks are being evaluated in ongoing ISS charging measurements and analysis campaigns. The results of ISS charging measurements are combined with a recently developed detailed model of the ISS charging process and an extensive analysis of historical ionospheric variability data, to assess ISS charging risks using Probabilistic Risk Assessment (PRA) methods. The PRA analysis (estimated frequency of occurrence and severity of the charging hazards) are then used to select the hazard control strategy that provides the best overall safety and mission success environment for ISS and the ISS crew. This paper presents: 1) a summary of ISS spacecraft charging analysis, measurements, observations made to date, 2) plans for future ISS spacecraft charging measurement campaigns, and 3) a detailed discussion of the PRA strategy used to assess ISS spacecraft charging risks and select charging hazard control strategies

Koontz, Steve↗

Two-Stage Winch for Kites and Tethered Balloons or Blimps

A winch system provides a method for launch and recovery capabilities for kites and tethered blimps or balloons. Low power consumption is a key objective, as well as low weight for portability. This is accomplished by decoupling the tether-line storage and wind ing/ unwinding functions, and providing tailored and efficient mechanisms for each. The components of this system include rotational power input devices such as electric motors or other apparatus, line winding/unwinding reel(s), line storage reel(s), and independent drive trains. Power is applied to the wind/unwind reels to transport the tether line. Power is also applied to a line storage reel, from either the wind/unwind power source, the wind/unwind reel itself, or separate power source. The speeds of the two reels are synchronized, but not dependent on each other. This is accomplished via clutch mechanisms, variable transmissions, or independent motor controls. The speed of the storage reel is modulated as the effective diameter of the reel changes with line accumulation.

Miles, Ted↗

Lack of Benefit for the Addition of Androgen Deprivation Therapy to Dose-Escalated Radiotherapy in the Treatment of Intermediate- and High-Risk Prostate Cancer

Purpose: Assessment of androgen deprivation therapy (ADT) benefits for prostate cancer treated with dose-escalated radiotherapy (RT). Methods and Materials: From 1991 to 2004, 1,044 patients with intermediate- (n = 782) or high-risk (n = 262) prostate cancer were treated with dose-escalated RT at William Beaumont Hospital. Patients received external-beam RT (EBRT) alone, brachytherapy (high or low dose rate), or high dose rate brachytherapy plus pelvic EBRT. Intermediate-risk patients had Gleason score 7, prostate-specific antigen (PSA) 10.0-19.9 ng/mL, or Stage T2b-T2c. High-risk patients had Gleason score 8-10, PSA {>=}20, or Stage T3. Patients were additionally divided specifically by Gleason score, presence of palpable disease, and PSA level to further define subgroups benefitting from ADT. Results: Median follow-up was 5 years; 420 patients received ADT + dose-escalated RT, and 624 received dose-escalated RT alone. For all patients, no advantages in any clinical endpoints at 8 years were associated with ADT administration. No differences in any endpoints were associated with ADT administration based on intermediate- vs. high-risk group or RT modality when analyzed separately. Patients with palpable disease plus Gleason {>=}8 demonstrated improved clinical failure rates and a trend toward improved survival with ADT. Intermediate-risk patients treated with brachytherapy alone had improved biochemical control when ADT was given. Conclusion: Benefits of ADT in the setting of dose-escalated RT remain poorly defined. This question must continue to be addressed in prospective study.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Coherent spin dynamics of carriers in ferromagnetic semiconductor heterostructures with an Mn δ layer

The coherent spin dynamics of carriers in the heterostructures that contain an InGaAs/GaAs quantum well (QW) and an Mn δ layer, which are separated by a narrow GaAs spacer 2–10 nm thick, is comprehensively studied by the magnetooptical Kerr effect method at a picosecond time resolution. The exchange interaction of photoexcited electrons in QW with the ferromagnetic Mn δ layer manifests itself in magnetic-field and temperature dependences of the Larmor precession frequency of electron spins and is found to be very weak (several microelectron volts). Two nonoscillating components related to holes exist apart from an electron contribution to the Kerr signal of polarization plane rotation. At the initial stage, a fast relaxation process, which corresponds to the spin relaxation of free photoexcited holes, is detected in the structures with a wide spacer. The second component is caused by the further spin dephasing of energyrelaxed holes, which are localized at strong QW potential fluctuations in the structures under study. The decay of all contributions to the Kerr signal in time increases substantially when the spacer thickness decreases, which correlates with the enhancement of nonradiative recombination in QW.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Constraining Source Terms, Regional Attenuation Models, Geometric Spreading, and Site Terms for Eurasia

We develop and evaluate methods to separate seismic source, attenuation (Q), spreading, and site effects, to improve corrections for regional amplitudes. We use relative spectra for nearby, similar event pairs, to cancel path and site effects, and estimate reliable corner frequencies and relative moments. We process a large dataset for Eurasia. We compare source terms estimated from direct phases and L g coda to verify the results or flag discrepancies. We then fit source-corrected spectra to estimate Q, spreading, and site terms, and obtain a consistent set of absolute moments. At every stage, we compare our results to existing calibration terms, showing good agreement in many cases, but also serious errors that impact P/S discrimination, as shown for Iran. Our delivered results can be used as constraints in amplitude tomography analyses to improve calibration.

58 GEOSCIENCES↗

Energy Deposition, Radiological and Thermal Studies for Linac-to-Booster Transfer Line Beam Absorber

The PIP-II Linac-to-Booster transfer line will transport the beam from the end of the superconducting Linac to the Injection Girder of the Booster. The transfer line consists of two arcs and a straight section in between (see Fig. 1). The straight section splits into two separate lines: Beam Absorber and Mu2e experiment lines. In this paper, results of energy deposition studies for the Beam Absorber, performed with MARS15 Monte Carlo code for normal operation, are presented. Also, corresponding thermal analyses with ANSYS code are described. According to PIP-II design parameters, the beam energy as high as 1 GeV is considered. Two beam power options were studied: (i) 50 kW as a conservative estimate for a permanent absorber; (ii) 5 kW as an option for a portable absorber required for a commissioning stage.

43 PARTICLE ACCELERATORS↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Vorticity imbalance and stability in relation to convection

A complete synoptic-scale vorticity budget was related to convection storm development in the eastern two-thirds of the United States. The 3-h sounding interval permitted a study of time changes of the vorticity budget in areas of convective storms. Results of analyses revealed significant changes in values of terms in the vorticity equation at different stages of squall line development. Average budgets for all areas of convection indicate systematic imbalance in the terms in the vorticity equation. This imbalance resulted primarily from sub-grid scale processes. Potential instability in the lower troposphere was analyzed in relation to the development of convective activity. Instability was related to areas of convection; however, instability alone was inadequate for forecast purposes. Combinations of stability and terms in the vorticity equation in the form of indices succeeded in depicting areas of convection better than any one item separately.

Read, W. L.↗

Akeno 20 km (2) air shower array (Akeno Branch)

As the first stage of the future huge array, the Akeno air shower array was expanded to about 20 sq. km. by adding 19 scintillation detectors of 2.25 sq m area outside the present 1 sq. km. Akeno array with a new data collection system. These detectors are spaced about 1km from each other and connected by two optical fiber cables. This array has been in partial operation from 8th, Sep. 1984 and full operation from 20th, Dec. 1984. 20 sq m muon stations are planned to be set with 2km separation and one of them is now under construction. The origin of the highest energy cosmic rays is studied.

Teshima, M.↗

GOES-R L1b Readiness Implementation and Management Plan

A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.

Validation Readiness↗

Development of Level 1b Calibration and Validation Readiness, Implementation and Management Plans for GOES-R

A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.

Validation↗

Rocket Propulsion Test Design and Analysis

As the small satellite launch vehicle (SSLV) market grows and NASA continues to prepare for upcoming missions in the Artemis program, John C. Stennis Space Center’s (SSC) testing facilities must adapt to the increasing demand in liquid rocket engine testing. The Rocket Propulsion Test Design and Analysis Project for this rotation focused in both of this areas through two separate subprojects, the creation of a Private Rocket Engine Database and the automatization of the A1-Set Point Prediction Model. To identify the testing requirements of future Stennis Space Center (SSC) costumers, an excel spread sheet was commissioned as a database to collect technical and non-technical features of over one hundred privately developed liquid and hybrid rocket engine. Similarly, The A-1 Set Point Sheet Model is used to satisfy Aerojet Rocketdyne’s testing requirements of Net Positive Suction Pressure (NPSP) for the RS-25 staged combustion cycle engine. To expand the capabilities of this prediction model, a feed back loop was programmed to automate the search of setpoints using Excel Visual Basic for Applications (VBA).

John Paul Ortiz↗