Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

NASA/DOD Aerospace Knowledge Diffusion Research Project. Paper 34: Users and uses of DOD technical reports: A report from the field

The NASA/DoD Aerospace Knowledge Diffusion Research Project attempts to understand the information environment in which U.S. aerospace engineers and scientists work, the information-seeking behavior of U.S. aerospace engineers and scientists, and the factors that influence the use of scientific and technical information (STI) (Pinelli, Barclay, and Kennedy, 1991). Such an understanding could (1) lead to the development of practical theory, (2) contribute to the design and development of aerospace information systems, and (3) have practical implications for transferring the results of federally funded aerospace research and development (R&D) to the U.S. aerospace community. This paper presents data from two information-seeking behavior studies involving U.S. aerospace engineers and scientists that were undertaken as Phase 1 activities of the NASA/DoD Aerospace Knowledge Diffusion Research Project. Responses from three groups of respondents - DoD, other government, and industry - are presented for two sets of selected questions. One set focuses on DoD technical reports: their use and importance, reasons for non-use, the factors affecting their use, the sources used to find out about them and the sources used to physically obtain them, and the quality of DoD technical reports. The second set focuses on information sources used in problem solving: the use of U.S. government technical reports in problem solving and the information sources used to find out about U.S. government technical reports.

Pinelli, Thomas E.↗

Noncoherent Symbol Synchronization Techniques

Traditional methods for establishing symbol synchronization (sync) in digital communication receivers assume that carrier sync has already been established, i.e., the problem is addressed at the baseband level assuming that a 'perfect' estimate of carrier phase is available. We refer to this approach as coherent symbol sync. Since, for NRZ signaling, a suppressed carrier sync loop such as an I-Q Costas loop includes integrate-and-dump (I and D) filters in its in-phase (1) and quadrature (Q) arms, the traditional approach is to first track the carrier in the absence of symbol sync information, then feed back the symbol sync estimate to these filters, and then iterate between the two to a desirable operating level In this paper, we revisit the symbol sync problem by examining methods for obtaining such sync in the absence of carrier phase information, i.e., so-called noncoherent symbol sync loops. We compare the performance of these loops with that of a well-known coherent symbol sync loop and examine the conditions under which one is preferable over the other.

digital communications↗

UAS Integration into the NAS Project

The goal of the UAS Integration in the NAS Project is to contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS This goal will be accomplished through a two-phased approach of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Technical objectives include: PHASE 1: a) Validating the key technical areas identified by this project. System-level analyses, a State of the Art Analysis (SOAA), and a ConOps will identify the challenges and barriers preventing routine UAS access to the NAS. b) Developing a national roadmap and gap analysis identifying specific deliverables in the area of operations, procedures, and technologies that will impact future policy decisions. PHASE 2: a) Provide regulators with a methodology for developing airworthiness requirements for UAS and data to support development of certifications standards and regulatory guidance. b) Provide systems-level integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and Pilot Aircraft Interfaces (PAIs) in operationally relevant environments

Bauer, Jeff↗

Permanent magnetism of intermetallic compounds between light and heavy transition-metal elements

First-principle calculations are used to investigate the intrinsic magnetic properties of intermetallic alloys of the type XMn, where X is a 4d or 5d element and M is Fe or Co. Emphasis is on the hexagonal C14 Laves-phase 1:2 and 1:5 alloys, the latter crystallizing in the CaCu5 structure. These series are of interest in permanent magnetism from fundamental and practical viewpoints, respectively. In the former, the unit cells form a prototypical motif where a heavy atom with high spin-orbit coupling and magnetocrystalline anisotropy is surrounded by many somewhat smaller M atoms with high magnetization, and the latter are Laves-phase derivatives of renewed interest in permanent magnetism. Our DFT calculations predict magnetic moments, magnetizations and anisotropies, as well as formation energies. The results are analyzed across the 4d and 5d series, especially with respect to hybridization effects between 3d and 4d/5d bands.

Kumar, P↗

Dynamic Contingency Analysis Tool 2.0 User Manual with Test System Examples

This document introduces Version 2 of the Dynamic Contingency Analysis Tool (DCAT) software package developed by Pacific Northwest National Laboratory and serves as a guide for using this package to conduct cascading failure simulations for the electric power system. The DCAT is an open-platform and publicly available software; it is intended to help develop applications that aim to improve the capabilities of power system planning engineers to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. Outputs from the DCAT will support finding mitigating actions to reduce the risk of cascading outages in technically sound and effective ways. This manual provides detailed instructions on how to use this tool on multicore Windows workstations or servers. In the public version of DCAT, several improvements have been made over the previous version: (1) it was modularized; (2) a graphical user interface (GUI) was developed; (3) a new version of the MPjobs parallel processing module was incorporated; and (4) a batch-processing function was added. The features of the DCAT GUI are described, including some examples of how to use the GUI to perform simulations. A full explanation of the DCAT methodology is available in the Phase 1 report.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Considerations for Distributed Energy Resource Integration in Puerto Rico: DOE Multi-Lab Grid Modeling Support for Puerto Rico; Analytical Support for Interconnection and IEEE Std 1547-2018 National Renewable Energy Laboratory (Task 3.0)

To ensure the sustainable long-term recovery of Puerto Rico's electric power grid from hurricanes María and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, the U.S. Department of Energy (DOE) convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. A resilient electric grid is vital to Puerto Rico's security, economy, and way of life, and it will provide the foundation for essential services that people and businesses on the island rely on every day. This report shows progress for a grid modeling task under the DOE-sponsored project that is a collaboration among the National Renewable Energy Laboratory (NREL) and other national laboratories. In Phase 1 of the multilab effort to support Puerto Rico's recovery, NREL provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliably, safety, or security. This Phase 2 report focuses on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico. This report is intended to familiarize the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provides considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard (RPS) goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers (IEEE) 1547-2018 interconnection standard.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Human Factors in the Design of the Crew Exploration Vehicle (CEV)

NASA s Space Exploration vision for humans to venture to the moon and beyond provides interesting human factors opportunities and challenges. The Human Engineering group at NASA has been involved in the initial phases of development of the Crew Exploration Vehicle (CEV), Orion. Getting involved at the ground level, Human Factors engineers are beginning to influence design; this involvement is expected to continue throughout the development lifecycle. The information presented here describes what has been done to date, what is currently going on, and what is expected in the future. During Phase 1, prior to the contract award to Lockheed Martin, the Human Engineering group was involved in generating requirements, conducting preliminary task analyses based on interviews with subject matter experts in all vehicle systems areas, and developing preliminary concepts of operations based on the task analysis results. In addition, some early evaluations to look at CEV net habitable volume were also conducted. The program is currently in Phase 2, which is broken down into design cycles, including System Readiness Review, Preliminary Design Review, and Critical Design Review. Currently, there are ongoing Human Engineering Technical Interchange Meetings being held with both NASA and Lockheed Martin in order to establish processes, desired products, and schedules. Multiple design trades and quick-look evaluations (e.g. display device layout and external window size) are also in progress. Future Human Engineering activities include requirement verification assessments and crew/stakeholder evaluations of increasing fidelity. During actual flights of the CEV, the Human Engineering group is expected to be involved in in-situ testing and lessons learned reporting, in order to benefit human space flight beyond the initial CEV program.

Whitmore, Mihriban↗

Susceptibility of the Colorado River basin to megadroughts in a warming climate. Final Report.

During the course of the project, we completed the following: Task 1: Off-line model simulations. We proposed to extend Maurer’s data sets through at least 2005 (to include extreme drought years in the Colorado basin). Task 2: Coupled model implementation. We proposed to implement the “standard” climate version of WRF, as used by collaborator Ruby Leung in NARCCAP simulations (see Section 5.4), and perform tests to assure that model output for runs equivalent to NARCCAP Phase 1 (reanalysis boundary conditions) are consistent. We proposed do test sensitivity to higher spatial resolution. Task 3: Retrospective coupled model simulations. We proposed to compare the climatology of key land surface and atmospheric variables from the retrospective RCM and GCM runs, as well as 1/8-degree as the historical North American Land Data Assimilation System dataset (Maurer et al., 2002) to evaluate the ability of each of the RCMs and GCMs to reproduce characteristics of observed climate. Task 4: Future climate simulations. We proposed to follow the approach from Task 3 in analysis of a 21st Century simulation, which was to be performed using the coupled WRF-VIC simulations over the Colorado River basin. Task 5: Diagnostic studies, including partially coupled model runs. We proposed to perform further diagnostic studies of the nature of land hydrologic feedbacks as they are predicted to affect runoff response to climate change in the Colorado River basin. Task 6: Evaluation of conditions in post-2000 drought years.

99 GENERAL AND MISCELLANEOUS↗

High performance sapphire windows

High-quality, wide-aperture optical access is usually required for the advanced laser diagnostics that can now make a wide variety of non-intrusive measurements of combustion processes. Specially processed and mounted sapphire windows are proposed to provide this optical access to extreme environment. Through surface treatments and proper thermal stress design, single crystal sapphire can be a mechanically equivalent replacement for high strength steel. A prototype sapphire window and mounting system have been developed in a successful NASA SBIR Phase 1 project. A large and reliable increase in sapphire design strength (as much as 10x) has been achieved, and the initial specifications necessary for these gains have been defined. Failure testing of small windows has conclusively demonstrated the increased sapphire strength, indicating that a nearly flawless surface polish is the primary cause of strengthening, while an unusual mounting arrangement also significantly contributes to a larger effective strength. Phase 2 work will complete specification and demonstration of these windows, and will fabricate a set for use at NASA. The enhanced capabilities of these high performance sapphire windows will lead to many diagnostic capabilities not previously possible, as well as new applications for sapphire.

Bates, Stephen C.↗

Optical surface contouring for non-destructive inspection of turbomachinery

Detection of stress cracks and other surface defects during maintenance and in-service inspection of propulsion system components, including turbine blades and combustion compartments, is presently performed visually. There is a need for a non-contact, miniaturized, and fully fieldable instrument that may be used as an automated inspection tool for inspection of aircraft engines. During this SBIR Phase 1 program, the feasibility of a ruggedized optical probe for automatic and nondestructive inspection of complex shaped objects will be established. Through a careful analysis of the measurement requirements, geometrical and optical constraints, and consideration of issues such as manufacturability, compactness, simplicity, and cost, one or more conceptual optical designs will be developed. The proposed concept will be further developed and a prototype will be fabricated during Phase 2.

Modarress, Dariush↗

The strain induced band gap modulation from narrow gap semiconductor to half-metal on Ti{sub 2}CrGe: A first principles study

The Heusler alloy Ti{sub 2}CrGe is a stable L2{sub 1} phase with antiferromagnetic ordering. With band-gap energy (∼ 0.18 eV) obtained from a first-principles calculation, it belongs to the group of narrow band gap semiconductor. The band-gap energy decreases with increasing lattice compression and disappears until a strain of −5%; moreover, gap contraction only occurs in the spin-down states, leading to half-metallic character at the −5% strain. The Ti{sub 1}, Ti{sub 2}, and Cr moments all exhibit linear changes in behavior within strains of −5%– +5%. Nevertheless, the total zero moment is robust for these strains. The imaginary part of the dielectric function for both up and down spin states shows a clear onset energy, indicating a corresponding electronic gap for the two spin channels.

36 MATERIALS SCIENCE↗

Constraints on the neutrino parameters by future cosmological 21 cm line and precise CMB polarization observations

Observations of the 21 cm line radiation coming from the epoch of reionization have a great capacity to study the cosmological growth of the Universe. Besides, CMB polarization produced by gravitational lensing has a large amount of information about the growth of matter fluctuations at late time. In this paper, we investigate their sensitivities to the impact of neutrino property on the growth of density fluctuations, such as the total neutrino mass, the effective number of neutrino species (extra radiation), and the neutrino mass hierarchy. We show that by combining a precise CMB polarization observation such as Simons Array with a 21 cm line observation such as Square kilometer Array (SKA) phase 1 and a baryon acoustic oscillation observation (Dark Energy Spectroscopic Instrument:DESI) we can measure effects of non-zero neutrino mass on the growth of density fluctuation if the total neutrino mass is larger than 0.1 eV. Additionally, the combinations can strongly improve errors of the bounds on the effective number of neutrino species σ (N{sub ν}) ∼ 0.06−0.09 at 95 % C.L.. Finally, by using SKA phase 2, we can determine the neutrino mass hierarchy at 95 % C.L. if the total neutrino mass is similar to or smaller than 0.1 eV.

79 ASTRONOMY AND ASTROPHYSICS↗

Crump Geyser Exploration and Drilling Project. High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling

The Crump Geyser Exploration and Drilling Project – High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling ran from January 29, 2010 to September 30, 2013. During Phase 1 of the project, collection of all geophysical surveys was completed as outlined in the Statement of Project Objectives. In addition, a 5000-foot full sized exploration well was drilled by Ormat, and preexisting drilling data was discovered for multiple temperature gradient wells within the project area. Three dimensional modeling and interpretation of results from the geophysical surveys and drilling data gave confidence to move to the project into Phase 2 drilling. Geological and geophysical survey interpretations combined with existing downhole temperature data provided an ideal target for the first slim-hole drilled as the first task in Phase 2. Slim-hole 35-34 was drilled in September 2011 and tested temperature, lithology, and permeability along the primary range-bounding fault zone near its intersection with buried northwest-trending faults that have been identified using geophysical methods. Following analysis of the results of the first slim-hole 35-34, the second slim hole was not drilled and subsequent project tasks, including flowing differential self-potential (FDSP) surveys that were designed to detail the affect of production and injection on water flow in the shallow aquifer, were not completed. NGP sold the Crump project to Ormat in August 2014, afterwards, there was insufficient time and interest from Ormat available to complete the project objectives. NGP was unable to continue managing the award for a project they did not own due to liability issues and Novation of the award was not a viable option due to federal award timelines. NGP submitted a request to mutually terminate the award on February 18, 2015. The results of all of the technical surveys and drilling are included in this report. Fault interpretations from surface geology, aeromag, seismic, and gravity data sets are in good agreement, illustrating two or more major range-bounding faults and buried northwest trending faults. The intersections of these fault systems provide the primary targets for drilling.

15 GEOTHERMAL ENERGY↗

Magnetospheric Multiscale (MMS) Mission Commissioning Phase Orbit Determination Error Analysis

The Magnetospheric MultiScale (MMS) mission commissioning phase starts in a 185 km altitude x 12 Earth radii (RE) injection orbit and lasts until the Phase 1 mission orbits and orientation to the Earth-Sun li ne are achieved. During a limited time period in the early part of co mmissioning, five maneuvers are performed to raise the perigee radius to 1.2 R E, with a maneuver every other apogee. The current baseline is for the Goddard Space Flight Center Flight Dynamics Facility to p rovide MMS orbit determination support during the early commissioning phase using all available two-way range and Doppler tracking from bo th the Deep Space Network and Space Network. This paper summarizes th e results from a linear covariance analysis to determine the type and amount of tracking data required to accurately estimate the spacecraf t state, plan each perigee raising maneuver, and support thruster cal ibration during this phase. The primary focus of this study is the na vigation accuracy required to plan the first and the final perigee ra ising maneuvers. Absolute and relative position and velocity error hi stories are generated for all cases and summarized in terms of the ma ximum root-sum-square consider and measurement noise error contributi ons over the definitive and predictive arcs and at discrete times inc luding the maneuver planning and execution times. Details of the meth odology, orbital characteristics, maneuver timeline, error models, and error sensitivities are provided.

Chung, Lauren R.↗

Reverberation Chamber Uniformity Validation and Radiated Susceptibility Test Procedures for the NASA High Intensity Radiated Fields Laboratory

The NASA Langley Research Center's High Intensity Radiated Fields Laboratory has developed a capability based on the RTCA/DO-160F Section 20 guidelines for radiated electromagnetic susceptibility testing in reverberation chambers. Phase 1 of the test procedure utilizes mode-tuned stirrer techniques and E-field probe measurements to validate chamber uniformity, determines chamber loading effects, and defines a radiated susceptibility test process. The test procedure is segmented into numbered operations that are largely software controlled. This document is intended as a laboratory test reference and includes diagrams of test setups, equipment lists, as well as test results and analysis. Phase 2 of development is discussed.

Koppen, Sandra V.↗

Comparing Ecological Risk between D and D Facilities and Operating Facilities at the Hanford Site - 19531

Many countries are faced with a large remediation task resulting from World War II, the Cold War, and subsequent industrial development. In the U.S. the Department of Energy (DOE) faces the largest hazardous waste remediation tasks, with a commitment to protect human health and the environment during and following remediation. DoE's biggest challenge is remediation of the many remaining cleanup areas at the Hanford Site, Washington. Some Hanford sites have extensive ecological resources and ecosystems that require protection or restoration. We briefly 1) describe a rapid evaluation method for ecological resources on units slated for cleanup that allows comparison among the different areas at the Hanford Site, 2) examine some D4 (deactivation, decommissioning, decontamination and demolition) facilities and Operating facilities that require remediation, 3) describe potential ecological harm to resources on these sites, and 4) compare how risks from potential harm vary at the Hanford Site. The ecological evaluation includes three phases: 1) general steps (identify resource categories, identify cleanup areas), 2) ecological descriptions (describe resources on the site to be cleaned up), and 3) ecological ratings (rate the value of the resources on a scale that can be applied across remediation sites). After completion of these steps for the sites requiring cleanup, a comparison of potential risks can be made among types of facilities (e.g. D4 facilities, legacy waste sites, operating facilities). D4 facilities are those slated for deactivation, decommissioning, decontamination and demolition, while operating facilities at Hanford include waste treatment plants, sludge basins, waste trenches, Central Waste Complex, storage facilities, and disposal facilities, among others required to support the D4 and other remediation activities, before they too are remediated. Currently the potential harm to ecological (and eco-cultural) resources on the Hanford Site for remediation at D4 facilities is very low, but increases to very high (for reactors) during remediation when there is physical disruption, increased traffic and personnel, and possible increased contamination. Following remediation, the potential harm to ecological resources is low, and the value may increase due to restoration of native vegetation on sites that were largely industrial prior to remediation. In contrast, the potential harm to ecological resources at Operating Facilities was higher currently than for D4 facilities, but was low to medium following cleanup. The higher harm (risk) at D4 facilities partly derives from the location of the reactors near the Columbia River, a resource extremely important to Tribal Nations and to other peoples in the Northwestern United States, as well as for the iconic and threatened salmon populations. Methods described in this paper provide Congress, DOE managers, regulators, Tribes, and the general public with assurance that ecological and eco-cultural resources and the environment are being protected during and following remediation. The analysis of specific sites provides managers, regulators and the public with information to make cost-effective decisions about remediation that continues to enhance ecological value while protecting human health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maps of growing season gross primary production and net ecosystem exchange for Council Road Mile Marker 71, Seward Peninsula, Alaska, [2017-2023]

This data archive is in support of the Next-Generation Ecosystem Experiments in the Arctic (NGEE Arctic) publication "Integrating Characteristic Arctic Vegetation in a Land Surface Model Improves Representation of Carbon Dynamics Across a Tundra Landscape", by Murphy et al. (2025a). Murphy et al. (2025a) evaluated whether incorporating observed Arctic vegetation heterogeneity into ELM, the land model of the Department of Energy’s Energy Exascale Earth System Model (E3SM), improved simulations of tundra carbon cycling. The associated model archive can be found at Murphy et al. (2025b). The study focused on the spatial patterns and net landscape-level growing season productivity and carbon uptake. As part of this evaluation, observationally derived maps of average growing season (June–August) net ecosystem exchange (NEE) and gross primary production (GPP) were developed for the same domain. These maps, which form the dataset described here, integrate eddy covariance flux tower, remote sensing, and vegetation community data to provide spatially explicit benchmarks for model evaluation. The maps provide spatially explicit estimates of average growing season NEE and GPP across 13 tundra vegetation communities within the study domain. By combining flux tower observations with Airborne Visible-Infrared Imaging Spectrometer-Next Generation (AVIRIS-NG) hyperspectral imagery and drone-based normalized difference vegetation index (NDVI), these maps capture the heterogeneity of carbon fluxes associated with different Arctic vegetation types. While they represent average seasonal conditions rather than interannual variability, the maps provide a unique dataset for evaluating model performance, comparing vegetation community contributions to landscape-scale carbon cycling, and supporting regional analyses of Arctic carbon dynamics. This data archive contains 5 m resolution maps of vegetation communities, vegetation community average growing season GPP, and vegetation community average growing season NEE (three *.tif files), a User’s Guide (*pdf file), and Table 1 of the User’s Guide displaying vegetation community coverage and average growing season NEE and GPP values (*.csv file).

Murphy, Bailey [ORNL] (ORCID:0000000203995221)↗

Building Towards Discovery: Preparing for New Physics at the LHC [Final papers]

Particle physics today is at a crossroads. The Standard Model (SM) has survived four decades of experimental scrutiny and spurred multiple landmark discoveries, culminating with the 2012 discovery of the Higgs boson at the Large Hadron Collider (LHC). Yet we know that this model is incomplete. We live in a universe dominated by matter and energy unaccounted for by the SM– and the Higgs boson itself is improbably light. It falls to the current generation of high-energy physicists to go beyond the model and enter a new era of discovery. Andeen is leading a new research group at the University of Texas at Austin (UT-Austin) that is endeavoring to reveal novel physical phenomena through the discovery of new particles with the ATLAS detector at the LHC. A key element of our experience thus far has been collaborating closely with theorists to identify both interesting new physics models. In addition we work closely with electrical engineers in detector development. Our approach is therefore unique in its integration of theory, analysis and instrumentation, and is encapsulated in a three-pronged strategy. First is the essential task of analyzing our rapidly expanding dataset. I am directing my group in searches for vector-like quarks (VLQs). Should they exist, these hypothetical particles would indicate physics scenarios beyond the SM. Experimental constraints suggest VLQs decay preferentially to a third generation quark and a Higgs, W or Z boson. Today at 13 TeV, both multi-lepton (electron and muon) and jet substructure signatures are sensitive to identifying the VLQ decay products. The large Run 2 dataset (collected through 2018) of up to 150 fb -1 will allow us to simultaneously use multi-lepton signatures with jet-substructure in searches for new physics. UT-Austin is well positioned to be a leader in this area. Prof. P. Onyisi’s postdoctoral researchers and graduate students are searching for ttH signatures in three- and four-lepton channels and we benefit from their experience. We are also aided by the availability of the Texas Advanced Computing Center, which provides us with easy access to several high performance computing (HPC) systems. My previous experience in VLQ searches propels the work today. I have published both the first investigation into the single production of top partners (signatures of composite Higgs Models) of any LHC experiment 1 as well as one of the first analyses utilizing jet-substructure techniques to search for the single production of vector-like quarks. 2 Adding to this is my group’s work with the Liquid Argon (LAr) calorimeter, the primary instrument we use in detecting electrons. Second, my group is contributing to the operations of the LAr calorimeter while preparing to install and commission new electronic hardware (the Phase 1 upgrade) to this crucial component of the ATLAS detector. I have played a leading role in the development of a critical, radiation-hard, high-speed Analog-to-Digital Convertor (ADC) that is essential inselecting data collected by the LAr calorimeter. 3 This upgrade will improve the e!ciency with which we can select events in our detector. Postdoctoral researcher N. Nikiforou (based at CERN May 2016 onward) and graduate students (one based at CERN from the start of 2018 onward, with one additional graduate students from summer 2018) are growing our already deep experience in the operation of the LAr calorimeter to prepare for installation and commissioning of the new trigger readout in 2018-2019. My group will then be positioned to be the first to exploit the potential of the improved triggers in our multi-lepton searches for new physics. Third, a suite of preparations for a major detector upgrade, scheduled to be completed in 2024, are underway. My group is building hardware that will improve the electronic readout of the ATLAS detector. I am partnering with a group in the Electrical and Computer Engineering (ECE) Department at UT-Austin (Prof. N. Sun) to employ his work at the cutting edge of ADC research. We will support an ECE grad student for the layout of this design, and collaborate with engineering groups at Nevis Laboratory and the Electrical Engineering Department (Prof. P. Kinget) at Columbia University to integrate our ADC with gain selection circuits. We will provide this critical component of the ASIC at the challenging boundary of the analog and digital signals in the LAr calorimeter readout chain. Furthermore UT-Austin will lead the testing of this device during development and production (approximately 55,000 four-channel chips). This effort compliments my work as the deliverables manager for the LAr front-end ASICs for the US ATLAS HL-LHC project and strengthens the US commitment to that upgrade.In so doing, my group at the UT-Austin will be at the forefront of efforts to probe the structure of the universe to an unmatched degree both at the current LHC and with its future upgrades. Through both the ongoing analysis of data at the ATLAS detector and improvements to the detector itself, an answer to what lies beyond the SM may come within our grasp. My background in instrumentation and analysis allows my group to establish a singular research effort on the ATLAS experiment. In addition to answering fundamental questions about the subatomic world, the technologies developed could advance the broader scientific community and result in valuable spin-offs.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗