Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

STS-61 Space Shuttle mission report

The STS-61 Space Shuttle Program Mission Report summarizes the Hubble Space Telescope (HST) servicing mission as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the fifty-ninth flight of the Space Shuttle Program and fifth flight of the Orbiter vehicle Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET designated as ET-60; three SSME's which were designated as serial numbers 2019, 2033, and 2017 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-063. The RSRM's that were installed in each SRB were designated as 360L023A (lightweight) for the left SRB, and 360L023B (lightweight) for the right SRB. This STS-61 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 8, Appendix E. That document requires that each major organizational element supporting the Program report the results of its hardware evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of the STS-61 mission was to perform the first on-orbit servicing of the Hubble Space Telescope. The servicing tasks included the installation of new solar arrays, replacement of the Wide Field/Planetary Camera I (WF/PC I) with WF/PC II, replacement of the High Speed Photometer (HSP) with the Corrective Optics Space Telescope Axial Replacement (COSTAR), replacement of rate sensing units (RSU's) and electronic control units (ECU's), installation of new magnetic sensing systems and fuse plugs, and the repair of the Goddard High Resolution Spectrometer (GHRS). Secondary objectives were to perform the requirements of the IMAX Cargo Bay Camera (ICBC), the IMAX Camera, and the Air Force Maui Optical Site (AMOS) Calibration Test.

Fricke, Robert W., Jr.↗

Modeling actions and operations to support mission preparation

This paper describes two linked technology development projects to support Space Shuttle ground operations personnel, both during mission preparation analysis and related analyses in missions. The Space Propulsion Robust Analysis Tool (SPRAT) will provide intelligent support and automation for mission analysis setup, interpretation, reporting and documentation. SPRAT models the actions taken by flight support personnel during mission preparation and uses this model to generate an action plan. CONFIG will provide intelligent automation for procedure analyses and failure impact analyses, by simulating the interactions between operations and systems with embedded failures. CONFIG models the actions taken by crew during space vehicle malfunctions and simulates how the planned action sequences in procedures affect a device model. Jointly the SPRAT and CONFIG projects provide an opportunity to investigate how the nature of a task affects the representation of actions, and to determine a more general action representation supporting a broad range of tasks. This paper describes the problems in representing actions for mission preparation and their relation to planning and scheduling.

Malin, Jane T.↗

STS-66 Mission Highlights Resource Tape

This video contains the mission highlights of the STS-66 Space Shuttle Atlantis Mission in November 1994. Astronauts included: Don McMonagle (Mission Commander), Kurt Brown, Ellen Ochoa (Payload Commander), Joe Tanner, Scott Parazynski, and Jean-Francois Clervoy (collaborating French astronaut). Footage includes: pre-launch suitup, entering Space Shuttle, countdown and launching of Shuttle, EVA activities (ATLAS-3, CRISTA/SPAS, SSBUV/A, ESCAPE-2), on-board experiments dealing with microgravity and its effects, protein crystal growth experiments, daily living and sleeping compartment footage, earthviews of various meteorological processes (dust storms, cloud cover, ocean storms), pre-landing and land footage (both from inside the Shuttle and from outside with long range cameras), and tracking and landing shots from inside Mission Control Center. Included is air-to-ground communication between Mission Control and the Shuttle. This Shuttle was the last launch of 1994.

Source record↗

The spacelab scientific missions: A comprehensive bibliography of scientific publications

November 1993 represented the 10-year anniversary of the flight of Spacelab 1 mission, with the first precursor mission (OSTA-1) being launched 2 years earlier. Since that time, a total of 27 Shuttle missions has been flown, using the Spacelab system as a facility for conducting scientific research in space. The missions flown to date have allowed a total of approximately 500 Principle Investigator class investigations to be conducted in orbit. These investigations have constituted major scientific efforts in astronomy/astrophysics, atmospheric science, Earth observation, life sciences, microgravity science, and space plasma physics. An initial survey of the scientific products gleaned from Spacelab missions already flown was sent to the Principle Investigators. In that survey, information was gathered from the investigators on the scientific highlights of their investigations and statistical measurements of overall success -- such as papers published. This document is a compilation of the papers that have been published to date in referred literature.

Torr, Marsha↗

ORION: A Supersynchronous Transfer Orbit mission

ORION F1 was launched on 29th November 1994 on an Atlas IIA launch vehicle. It was designed, built and delivered in-orbit by Matra Marconi Space Systems Plc and was handed over to ORION Satellite Corporation on 20th January 1995 at its on-station longitude of 37.5 deg W. The mission differed significantly from that of any other geostationary communications satellite in that the Transfer Orbit apogee altitude of 123,507 km was over three times geosynchronous (GEO) altitude and one third of the way to the moon. The SuperSynchronous Transfer Orbit (SSTO) mission is significantly different from the standard Geostationary Transfer Orbit (GTO)mission in a number of ways. This paper discusses the essential features of the mission design through its evolution since 1987 and the details of the highly successful mission itself including a detailed account of the attitude determination achieved using the Galileo Earth and Sun Sensor (ESS).

Walters, I. M.↗

Trajectory design for a lunar mapping and near-Earth-asteroid flyby mission

In August, 1994, the unusual asteroid (1620) Geographos will pass very close to the Earth. This provides one of the best opportunities for a low-cost asteroid flyby mission that can be achieved with the help of a gravity assist from the Moon during the years 1994 and 1995. A Geographos flyby mission, including a lunar orbiting phase, was recommended to the Startegic Defense Initiative (SDI) Office when they were searching for ideas for a deep-space mission to test small imaging systems and other lightweight technologies. The goals for this mission, called Clementine, were defined to consist of a comprehensive lunar mapping phase before leaving the Earth-Moon system to encounter Geographos. This paper describes how the authors calculated a trajectory that met the mission goals within a reasonable total Delta-V budget. The paper also describes some refinements of the initially computed trajectory and alternative trajectories were investigated. The paper concludes with a list of trajectories to fly by other near-Earth asteroids during the two years following the Geographos opportunity. Some of these could be used if the Geographos schedule can not be met. If the 140 deg phase angle of the Geographos encounter turns out to be too risky, a flyby of (2120) Tantalus in January, 1995, has a much more favorable approach illumination. Tantalus apparently can be reached from the same lunar orbit needed to get to Geographos. However, both the flyby speed and distance from the Earth are much larger for Tantalus than for Geographos.

Dunham, David W.↗

Orbit determination covariance analysis for the Deep Space Program Science Experiment mission

To define an appropriate orbit support procedure for the DSPSE mission, detailed permission orbit determination covariance analyses have been performed for the translunar and trans-Geographos mission phases. Preliminary analyses were also performed for the lunar mapping mission phase. These analyses are designed to assess the tracking patterns and the amount of tracking data needed to obtain orbit solutions of required accuracy for each mission phase and before and after each major orbit perturbation, such as orbit maneuvers and flybys of the Earth and Moon. In addition to operational orbit determination procedures, these analyses identify major error sources, estimate their contribution to orbital errors, and address possible strategies to reduce orbit determination error. For the lunar orbit phase, several lunar gravity error modeling approaches have been investigated. The covariance analysis results presented in this paper will serve as a guide for providing orbit determination support for the DSPSE mission.

Beckman, M.↗

STS-44 Mission Highlights Resource Tape. Part 2 of 2

In this second part of a two part video set of the mission of STS-44, an in-orbit press conference was held. The astronauts (Cmdr. Fred Gregory, Pilot Tom Hendricks, Payload Specialist Tom Hennen, and Mission Specialists Jim Voss, Story Musgrave, and Mario Runco) conversed via satellite with the Johnson Press Center at the Johnson Space Center, Houston, Texas. Journalists asked questions regarding the mission, the status of the mission's experiments, the problems with living in a microgravity environment, upcoming NASA space programs, and future objectives of the Space Shuttle missions.

Source record↗

Comparison of predicted and actual orbital lifetimes for the SEDS-2 mission

This paper documents a series of estimates of the orbital lifetime of the SEDS-2 flight configuration made prior to the mission. These estimates were made with program LTIME, which has been in use at MSFC for a number of years. Because of the unusual configuration of upper-stage/tether/endmass flown on this mission, and the type of assumptions and inputs used in LTIME, the effective area used in the drag calculation had to be estimated in an unusual way. The final pre-flight predicted lifetime was 28.35 days. In the actual flight, the tether was cut approximately 5 days into the mission. The instrumented endmass plus about 12 km of tether rapidly reentered the atmosphere, and the Delta II Second Stage plus the remaining 8 km of tether reentered on mission day 60. Tracking data was used to reconstruct reentry sequences for the two parts of the configuration after the cut. The predicted lifetimes for the endmass plus tether-fragment were in the range of 0.2 to 2.8 days, depending on the perigee altitudes assumed. The predicted lifetime of the upper-stage plus tether was 56.4 days, which corresponds to reentry on mission day 61, in good agreement with the actual reentry on day 60.

Evans, Steven W.↗

Flight Dynamics Mission Support and Quality Assurance Process

This paper summarizes the method of the Computer Sciences Corporation Flight Dynamics Operation (FDO) quality assurance approach to support the National Aeronautics and Space Administration Goddard Space Flight Center Flight Dynamics Support Branch. Historically, a strong need has existed for developing systematic quality assurance using methods that account for the unique nature and environment of satellite Flight Dynamics mission support. Over the past few years FDO has developed and implemented proactive quality assurance processes applied to each of the six phases of the Flight Dynamics mission support life cycle: systems and operations concept, system requirements and specifications, software development support, operations planing and training, launch support, and on-orbit mission operations. Rather than performing quality assurance as a final step after work is completed, quality assurance has been built in as work progresses in the form of process assurance. Process assurance activities occur throughout the Flight Dynamics mission support life cycle. The FDO Product Assurance Office developed process checklists for prephase process reviews, mission team orientations, in-progress reviews, and end-of-phase audits. This paper will outline the evolving history of FDO quality assurance approaches, discuss the tailoring of Computer Science Corporations's process assurance cycle procedures, describe some of the quality assurance approaches that have been or are being developed, and present some of the successful results.

Oh, InHwan↗

High Leverage Space Transportation System Technologies for Human Exploration Missions to the Moon and Beyond

The feasibility of returning humans to the Moon by 2004, the 35th anniversary of the Apollo 11 landing, is examined assuming the use of existing launch vehicles (the Space Shuttle and Titan 4B), a near term, advanced technology space transportation system, and extraterrestrial propellant--specifically 'lunar-derived' liquid oxygen or LUNOX. The lunar transportation system (LTS) elements consist of an expendable, nuclear thermal rocket (NTR)-powered translunar injection (TLI) stage and a combination lunar lander/Earth return vehicle (LERV) using cryogenic liquid oxygen and hydrogen (LOX/LH2) chemical propulsion. The 'wet' LERV, carrying a crew of 2, is configured to fit within the Shuttle orbiter cargo bay and requires only modest assembly in low Earth orbit. After Earth orbit rendezvous and docking of the LERV with the Titan 4B-launched NTR TLI stage, the initial mass in low Earth orbit (IMLEO) is approx. 40 t. To maximize mission performance at minimum mass, the LERV carries no return LOX but uses approx. 7 t of LUNOX to 'reoxidize' itself for a 'direct return' flight to Earth followed by an 'Apollo-style' capsule recovery. Without LUNOX, mission capability is constrained and the total LTS mass approaches the combined Shuttle-Titan 4B IMLEO limit of approx. 45 t even with enhanced NTR and chemical engine performance. Key technologies are discussed, lunar mission scenarios described, and LTS vehicle designs and characteristics are presented. Mission versatility provided by using a small 'all LH2' NTR engine or a 'LOX-augmented' derivative, either individually or in clusters, for outer planet robotic orbiter, small Mars cargo, lunar 'commuter', and human Mars exploration class missions is also briefly discussed.

Borowski, Stanley K.↗

A Sundial-Atlas Precursor to the TIMED Mission: A Quick-Response Global Investigation into Coupled Lower Thermospheric, Ionospheric, and Mesospheric Physics

The SUNDIAL-ATLAS effort was a global-scale investigation which responded to the science priorities of the ITM Panel, the Integrated SPD Strategy Implementation Plan as a whole, and the need for potential cost-saving design criteria for the TIMED mission. The investigation focused on coupling processes in the ionospheric-thermospheric system, taking advantage of the timelines of the ATLAS-1 mission (March 1992), and the global-scale ground-based measurement and modeling activities of the SUNDIAL program. The collaborative SUNDIAL-ATLAS activity was the first opportunity for global measurements of the chemistry, kinetics, and electrodynamics which couple the E-, Fl-, and F2-regions into a single interactive system. As such, the program represented an important first step in studying global issues; and accordingly, was an important proof of concept experiment relevant to the strategic mission plans for the ITM community and the upcoming intermediate class satellite program called TIMED. To meet its projected goals, TIMED must perform a number of critical measurements and execute a number of correlations that were to be tried and tested for the first time in the SUNDIAL-ATLAS investigation. This was designed to include global correlations of thermospheric and ionospheric composition during quiet and disturbed conditions and the co-registration of global-scale ground-based measurements with along-track satellite diagnostics. The SUNDIAL component of the current investigation addressed this need by acquiring, reducing, and analyzing a multi-sensor database that complemented and extended that which was generated in the ATLAS mission (Atmospheric Laboratory for Applications and Science). The SUNDIAL data defined the state and condition of the global-scale ionosphere in the altitude range from 100 km to the F2-peak. These data specified the peak heights and densities of the E-, Fl-, and F2-regions, along with the global distributions of intermediate, descending, and sequential layers which play a critical role in the dynamo region of the lower ionospheric-thermospheric domain. The data were collected by the SUNDIAL network of more than 50 ground-based stations utilizing ionosondes, radars, photometers, Fabry-Perot interferometers, and total electron content measurements. The data were acquired during a three-week period centered on the eight-day ATLAS-1 mission, which provided image and photometric sensing of the altitude distributions of the major and minor ions and neutrals in the ITM system. This report focuses on the scientific contributions of the SUNDIAL component of the overall investigation. Specific findings are described in seven papers (attached) published in the Journal of Geophysical Research.

Szuszczewicz, E. P.↗

Mars Global Surveyor Mission: Environmental Assessment

This environmental assessment addresses the proposed action to complete the integration and launch the Mars Global Surveyor (MGS) spacecraft from Cape Canaveral Air Station (CCAS), Florida, during the launch window in November 1996. Mars Global Surveyor is part of the Solar System Exploration Program to the inner planets designed to maintain a sufficient level of scientific investigation and accomplishment so that the United States retains a leading position in solar system exploration through the end of the century. The Program consists of a specific sequence of missions, based on technological readiness, launch opportunities, rapidity of data return, and a balance of scientific disciplines. The purpose of the MGS mission would be to deliver a spacecraft platform to a low-altitude polar orbit around Mars where it would collect global observations of basic geological, geophysical, and climatological processes of the planet. To satisfy this purpose, the MGS mission would support a scientific set of objectives. Detailed global maps of surface topography, the distribution of minerals, the planet's mass, size, and shape, the characterization of Mars gravitational and magnetic fields, and the monitoring of global weather, collected over the period of one Martian year (about two Earth years), would help answer some of the questions about the evolution of Mars. Such an investigation would help scientists better understand the current state of water on Mars, the evolution of the planet's atmosphere, and the factors that led to major changes in the Martian climate. It would also provide much needed information on the magnetic field of Mars. Data collected from this mission would provide insight into the evolution of both Earth and the solar system, as well as demonstrate technological approaches that could be applicable to future Mars missions.

Source record↗

Deployer Performance Results for the TSS-1 Mission

Performance of the Tethered Satellite System (TSS) Deployer during the STS-46 mission (July and August 1992) is analyzed in terms of hardware operation at the component and system level. Although only a limited deployment of the satellite was achieved (256 meters vs 20 kilometers planned), the mission served to verify the basic capability of the Deployer to release, control and retrieve a tethered satellite. - Deployer operational flexibility that was demonstrated during the flight is also addressed. Martin Marietta was the prime contractor for the development of the Deployer, under management of the NASA George C. Marshall Space Flight Center (MSFC). The satellite was provided by Alenia, Torino, Italy under contract to the Agencia Spaziale Italiana (ASI). Proper operation of the avionics components and the majority of mechanisms was observed during the flight. System operations driven by control laws for the deployment and retrieval of the satellite were also successful for the limited deployment distance. Anomalies included separation problems for one of the two umbilical connectors between the Deployer and satellite, tether jamming (at initial Satellite fly-away and at a deployment distance of 224 meters), and a mechanical interference which prevented tether deployment beyond 256 meters. The Deployer was used in several off-nominal conditions to respond to these anomalies, which ultimately enabled a successful satellite retrieval and preservation of hardware integrity for a future re-flight. The paper begins with an introduction defining the significance of the TSS-1 mission. The body of the paper is divided into four major sections: (1) Description of Deployer System and Components, (2) Deployer Components/Systems Demonstrating Successful Operation, (3) Hardware Anomalies and Operational Responses, and (4) Design Modifications for the TSS-1R Re-flight Mission. Conclusions from the TSS-1 mission, including lessons learned are presented at the end of the manuscript.

Marshall, Leland S.↗

STS-78 Mission Highlights Resource Tape

The flight crew of the STS-78 mission, Cmdr. Terence T. Henricks, Pilot Kevin R. Kregel, Payload Cmdr. Susan J. Helms, Mission Specialists Richard M. Linnehan, Charles E. Brady, Jr., and Payload Specialists Jean-Jacques Favier, Pd.D. and Robert B. Thirsk, M.D., present a video mission over-view of their space flight. Images include: pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Following an on-time launch, the crew of Endeavor are shown setting up a variety of experiments that will operate for much of the mission.

Source record↗

STS-76 Mission Highlights Resource Tape

The flight crew of the STS-76 mission, Cmdr. Kevin P. Chilton, Pilot Richard A. Searfoss, and Mission Specialists Shannon W. Lucid, Linda M. Godwin, Michael R. Clifford, and Ronald M. Sega, present a video mission over-view of their space flight. Images include: pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Once in orbit, various view of the Mir Space Station can be seen as the shuttle begins its approach and docking. There several views of Godwin and Clifford as they spent six hours spacewalking in Atlantis's cargo bay and on the exterior of the Mir's docking module. The mission ending re-entry and landing can also be seen.

Source record↗

Effect of Departure Delays on Manned Mars Mission Selection

This study determines the effect on the initial mass in low Earth orbit (IMLEO) of delaying departure from Mars and Earth by 5, 15, and 30 days, once a nominal mission to Mars has been selected. Additionally, the use of a deep-space maneuver (DSM) is considered in order to alleviate the IMLEO penalties. Three different classes of missions are analyzed, using chemical and nuclear thermal propulsion systems in the 2000-2025 time frame: opposition, conjunction, and fast-transfer conjunction. The results indicate that Mars and Earth delays can lead to large IMLEO penalties. Opposition and fast-transfer conjunction-class missions have the highest IMLEO penalties, upwards of 432.4 and 1977.3 metric tons (mt), respectively. Conjunction-class missions, on the other hand, tend to be insensitive to Mars and Earth delays, having IMLEO penalties under 103.5 mt. As expected, nuclear thermal propulsion had significantly lower IMLEO penalties than chemical propulsion. The use of a DSM does not significantly reduce the penalties. The results of this study can enable mission designers to incorporate the influence of off-nominal departure conditions of the interplanetary trajectory in the overall conceptual design of a Mars transfer vehicle.

Desai, Prasun N.↗

The Evolution of Mission Architectures for Human Lunar Exploration

Defining transportation architectures for the human exploration of the Moon is a complex task due to the multitude of mission scenarios available. The mission transportation architecture recently proposed for the First Lunar Outpost (FLO) was not designed from carefully predetermined mission requirements and goals, but evolved from an initial set of requirements, which were continually modified as studies revealed that some early assumptions were not optimal. This paper focuses on the mission architectures proposed for FLO and investigates how these transportation architectures evolved. A comparison of the strengths and weaknesses of the three distinct mission architectures are discussed, namely (1) Lunar Orbit Rendezvous, (2) staging from the Cislunar Libration Point, and (3) direct to the lunar surface. In addition, several new and revolutionary architectures are discussed.

Everett, S. F.↗