Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Turf Conversion Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings as a result of water conservation measures (WCMs) in energy performance contracts associated with converting turfgrass or other water-intensive plantings to water-wise and sustainable landscapes. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Cooling Tower (Evaporative Cooling System) Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with cooling tower efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Cooling Tower (Evaporative Cooling System) Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with cooling tower efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Screening IMS Seismic Detections using Dynamic Correlation Processor: Progress report for 2020

LLNL completed the FY20 workplan entailing application of the Dynamic Correlation Processor (DCP) to International Monitoring System (IMS) primary seismic data in 2019 and 2020. The effective analysis period was curtailed to January 1 through November 12, 2019 due to a data compression change that rendered later data unusable. Fixing the data compression error is a priority for our data source, and we plan to extend the period of data analysis when the fix is implemented. We found that the percentage overlap between detections generated by the International Data Centre (IDC) DFX software and detections generated by DCP varied widely by station. Overlap is 30-40% at some stations, suggesting that a large percentage of DFX detections could be screened (removed) from the detection-event association algorithm. However, detection overlap was much lower, a few percent, at many stations and the percentage overlap was low at stations known to have many mines and other local sources of seismicity. Unexpectedly low detection overlap at many stations prompted us to examine results for the ARCES station in detail. There is considerable mine activity near ARCES, but our initial FY20 analysis found only ~2% DCP/DFX detection overlap. Differences in the pre-processing (e.g. beam recipes) used by DCP and DFX appear to be the cause of low detection overlap at ARCES. DCP uses wideband filters to improve detector robustness and the IDC uses narrow-band pre-filtering to improve sensitivity. After reprocessing ARCES using the IDC beam recipe, DCP/DFX overlap increased to ~74%. This result shows that we must reprocess the IMS network using the IDC station-specific beam recipes if we are to effectively screen DFX detections and improve automatic event building performance at the IDC.

58 GEOSCIENCES↗

Time- and Energy-Resolved Coupled Saturn Radiation Environments Simulations Using the Integrated Tiger Series (ITS) Code

Using a newly developed coupling of the ElectroMagnetic Plasma In Realistic Environments (EMPIRE) code with the Integrated Tiger Series (ITS) code, radiation environment calculations have been performed. The effort was completed as part of the Saturn Recapitalization (Recap) program that represents activities to upgrade and modernize the Saturn accelerator facility. The radiation environment calculations performed provide baseline results with current or planned hardware in the facility. As facility design changes are proposed and implemented as part of Saturn Recap, calculations of the radiation environment will be performed to understand how the changes impact the output of the Saturn accelerator.

43 PARTICLE ACCELERATORS↗

Historical Documentation of Buildings 0460 and 0463 at Technical Area 16 (Volume 1)

This report provides documentation as a standard mitigation measure to the adverse effects that occurred by the demolition of theses historic properties. To mitigate the adverse effects, LANL has followed Section 106 process contained in 36 CFR 800.6, resolution of adverse effects. In addition to these regulations and within this report, LANL has implemented the standards for documenting and reporting in accordance with the A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (CRMP), LA-UR-19-21590, formerly LA-UR-15-27624. These standard reporting measures include archival-quality digital photographs of the building’s interior, exterior, outside landscape; updating LANL historic building survey forms including 11 in. x 17 in. copies (in a reduced scale) of key original and as-built drawings; identification and documentation of historically significant equipment and artifacts; a comprehensive list of LANL architectural drawings; construction-history maps of TA-16 including current Register Eligible and Ineligible Buildings; and a detailed use history of the building and technical division associated with its operation.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Dynamic Modeling, Trajectory Optimization, and Linear Control of Cable-Driven Parallel Robots for Automated Panelized Building Retrofits

The construction industry faces a growing need for automation to reduce costs, improve accuracy and productivity, and address labor shortages. One area that stands to benefit significantly from automation is panelized prefabricated building envelope retrofits, which can improve a building’s energy efficiency in heating and cooling interior spaces. In this paper, we propose using cable-driven parallel robots (CDPRs), which can effectively lift and handle large objects, to install these panels. However, implementing CDPRs presents significant challenges because of their nonlinear dynamics, complex trajectory planning, and precise control requirements. To tackle these challenges, this work focuses on a new application of established control and trajectory optimization theories in a CDPR simulation of a building envelope retrofit under real-world conditions. We first model the dynamics of CDPRs, highlighting the critical role of damping in system behavior. Building on this dynamic model, we formulate a trajectory optimization problem to generate feasible and efficient motion plans for the robot under operational and environmental constraints. Given the high precision required in the construction industry, accurately tracking the optimized trajectory is essential. However, challenges such as partial observability and external vibrations complicate this task. To address these issues, a Linear Quadratic Gaussian control framework is applied, enabling the robot to track the optimized trajectories with precision. Simulation results show that the proposed controller enables precise end effector positioning with errors under 4 mm, even in the presence of external wind disturbances. Through comprehensive simulations, our approach allows for an in-depth exploration of the system’s nonlinear dynamics, trajectory optimization, and control strategies under controlled yet highly realistic conditions. The results demonstrate the feasibility of CDPRs for automating panel installation and provide insights into their practical deployment.

CDPR↗

Recovery Act Milestones

Every 100 days, the Department of Energy is held accountable for a progress report on the American Recovery and Reinvestment Act. Update at 200 days, hosted by Matt Rogers, Senior Advisor to Secretary Steven Chu for Recovery Act Implementation.

1703↗

2015 China Green Low-Carbon City scorecard

In China’s rapid urbanization and industrialization, cities are playing important roles in helping the country reach its climate change mitigation goal of peaking CO2 emissions around 2030, and improving environmental quality. During the 12th Five-Year Plan (12th FYP) period (2011–2015), Chinese cities set ambitious goals and implemented diverse policies aimed at transitioning to a greener economy. The Chinese central government also set targets on a number of indicators, such economic energy intensity and carbon intensity (e.g., CO2 per unit GDP), and air quality (e.g., PM2.5 concentration). These targets are helpful for tracking implementation of individual policies or progress at a sectoral level. However, a more comprehensive and integrated approach is needed to assess progress and capture the multi-dimensional aspects of Chinese cities’ transition to a greener economy, an approach that offers comparison with international best practices, as well as working with data availability in China’s statistical system. This paper presents the development of a China Green LowCarbon City Index2 (CGLCCI, or City Index) and its application to 115 Chinese cities – the largest assessment of Chinese cities to date. The GCLCCI includes 23 key indicators across seven categories: economy, energy, industry, buildings, transportation, environment and land use, and climate policy and outreach. This paper applied the CGLCCI to benchmark the green and low-carbon development status of 115 Chinese cities in the year 2015. Data for the analysis came from government and publicly available data sources. The CGLCCI methodology provides a standardized method to benchmark each indicator, calculate overall city scores, and rank the cities.3 The results showed that the low-carbon transition in Chinese cities is still in its early stages. Compared to the best practices benchmarks, the 2015 City Index scores ranged from a low of 28 to a high score of 70 in 2015 (maximum score is 100). This paper also presents three top-performing cities in different stages of development and discusses how their scores across the index categories. Creating a green low-carbon index that relies on publicly available data in China, and regularly evaluating city performance, can encourage Chinese cities to learn best practices from each other, and to strengthen their goals and implementation efforts toward a green low-carbon transition.

Zhang, Jingjing↗

Impact of Quaternary-Pumped Storage Hydropower on Frequency Response of U.S. Western Interconnection with High Renewable Penetrations: Preprint

As renewable penetration increases in the United States, maintaining stability and reliability of low-inertia power grid by providing sufficient frequency control capability becomes a challenge. Advanced pumped storage hydro technologies (APSH) will be expected to play an important role for future grid as not only an energy supplier, but also as an ancillary services provider. This paper studies the impact of using quaternary pumped storage hydropower (Q-PSH), as one of the newly proposed APSH technology, to provide primary frequency response. To quantify the impact of Q-PSH on frequency response of the U.S. Western Interconnection, a user-defined dynamic model of Q-PSH is developed on the GE Positive Sequence Load Flow (PSLF) platform and is implemented in a set of detailed U.S. Western Electricity Coordination Council (WECC) planning cases in which renewable penetration levels are 20%, 40%, 60% and 80%. Simulation results show that Q-PSH can help improve frequency nadir and settling frequency comparing to the conventional PSH.

frequency response↗

An Information Template for Evaluating the Relative Priority of Remediation Projects that Pose a Risk to Receptors - 18674

The U.S. Department of Energy (DOE) has one of the largest remediation tasks in the world, in terms of the number of sites, the complexity of individual sites, the number of remediation projects at individual sites, and the full range of stakeholders involved. The question of how to decide what projects to initiate, at any point of time and how to prioritize the deployment of resources for these tasks, occurs both within and among sites. The Consortium for Risk Evaluation developed a Risk-informed Prioritization Framework for Oak Ridge Reservation. Our goal was to develop a risk-informed methodology for prioritizing remediation projects for the Department of Energy's Oak Ridge Reservation that can be adapted to other remediation projects elsewhere. The heart of the framework is a template that includes information about each site necessary to make prioritization decisions. The information in the template describes the environment (hazard, pathway, consequences), the receptors (workers, public, ecological) and the risk management considerations (cost, risk reduction effectiveness, capacity, efficiency and sequencing). The questions in the template provide a wide range of information that managers and regulators need to make decisions, and that Tribes and the public need to evaluate the efficacy of remediation decisions. Completing the template will also help identify data gaps, model parameters needed, and the agencies or individuals responsible for obtaining the information. The information presented in the Template will be useful for regulators (DOE, Environmental Protection Agency, states, Tribes), managers and workers at the sites, trustees of natural resources, site neighbors, and the general public, but more importantly, provides an example of information needed to rate the priority of remediation projects. DOE, other federal and state trustees, and regulators were included in all phases of the development, including the scope, overseeing its development, and evaluation of projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-J-186: Acquiring and Assessing Upright CBCT Images for Future Treatment Planning

Purpose: To acquire upright CBCT images using the onboard imager of a Varian TrueBeam. An easy to implement upright imaging protocol could allow for widespread upright radiation therapy which would greatly benefit certain patients. These include thoracic cancer patients (because lung volume increases in a seated position) and patients who experience substantial discomfort during supine treatment. Methods: To acquire upright CBCT images, the gantry head remained stationary at 0 degrees with the KV imager arms extended to their lateral positions. Phantoms were placed upright at the end of the treatment couch. During a scan, the couch rotated from 270 to 90 degrees while continuous fluoroscopic projections were taken by the onboard imager. To extend the field-of-view, this sequence was performed twice: once with the KV detector longitudinally offset +14.5cm and once with it longitudinally offset −14.5cm. The resulting two image sets were stitched together before reconstruction. The imaging beam parameters were chosen to deliver a dose similar to that given during a simulation CT. Image quality was evaluated for spatial linearity, high and low contrast resolution, and HU linearity using CatPhan and anthropomorphic phantoms. A deformable registration technique was used to evaluate HU mapping from a simulation CT. Results: Spatial linearity and high contrast resolution were maintained in upright CBCT when compared to simulation CT. However, low contrast resolution and HU linearity degraded. Streak artifacts were caused by the limited 180 degree arc of the couch, and the stitching process created a sharp artifact at the center of the reconstruction. The deformable registration was robust in the HU mapping even with these artifacts and the loss of HU linearity. Conclusions: The image quality obtained from upright CBCT was sufficient for treatment planning. The success of this novel technique is an important step towards a future clinical protocol. This project was funded in part by Varian Medical Systems, Inc.

60 APPLIED LIFE SCIENCES↗

Environmental Monitoring Plan (Revision 6)

The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 458.1, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies.

54 ENVIRONMENTAL SCIENCES↗

Dynamic Contingency Analysis Tool

The Dynamic Contingency Analysis Tool (DCAT) is an open-platform and publicly available methodology to help develop applications that aim to improve the capabilities of power system planning engineers to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. Outputs from the DCAT will help find mitigation solutions to reduce the risk of cascading outages in technically sound and effective ways. The current prototype DCAT implementation has been developed as a Python code that accesses the simulation functions of the Siemens PSS/E planning tool (PSS/E). It has the following features: It uses a hybrid dynamic and steady-state approach to simulating the cascading outage sequences that includes fast dynamic and slower steady-state events. It integrates dynamic models with protection scheme models for generation, transmission, and load. It models special protection systems (SPSs)/remedial action schemes (RASs) and automatic and manual corrective actions. Overall, the DCAT attempts to bridge multiple gaps in cascading-outage analysis in a single, unique prototype tool capable of automatically simulating and analyzing cascading sequences in real systems using multiprocessor computers. While the DCAT has been implemented using PSS/E in Phase I of the study, other commercial software packages with similar capabilities can be used within the DCAT framework.

Source record↗

Development and implementation of energy efficiency standards and labeling programs in China: Progress and challenges

Over the last twenty years, with growing policy emphasis on improving energy efficiency and reducing environmental pollution and carbon emissions, China has implemented a series of new minimum energy performance standards (MEPS) and mandatory and voluntary energy labels to improve appliance energy efficiency. As China begins planning for the next phase of standards and labeling (S&L) program development under the 12th Five Year Plan, an evaluation of recent program developments and future directions is needed to identify gaps that still exist when compared with international best practices. The review of China’s S&L program development and implementation in comparison with major findings from international experiences reveal that there are still areas of improvement, particularly when compared to success factors observed across leading international S&L program. China currently lacks a formalized regulatory process for standard-setting and do not have any legal or regulatory guidance on elements of S&L development such as stakeholder participation or the issue of legal precedence between conflicting national, industrial and local standards. Consequently, China’s laws regarding standard-setting and management of the mandatory energy label program could be updated, as they have not been amended or revised recently and no longer reflects the current situation. While China uses similar principles for choosing target products as the U.S., Australia, EU and Japan, including high energy-consumption, mature industry and testing procedure and stakeholder support, recent MEPS revisions have generally aimed at only eliminating the bottom 20% efficiency of the market. Setting a firm principle based on maximizing energy savings that are technically feasible and economically justified may help improve the stringency of China’s MEPS program and reduce the need for frequent revisions. China also lacks robust survey data and relies primarily on market research data in relatively simple techno-economic analyses used to determine its efficiency standards levels rather than the specific sets of analyses and tools used internationally. Based on international experiences, inclusion of more detailed energy consumption surveys in the Chinese national census surveys and statistical reporting systems could help provide the necessary data for more comprehensive standard-setting analyses. In terms of stakeholder participation in the standards development process, stakeholder participation in China is limited to membership on technical committees responsible for developing or revising standards and generally do not include environmental groups, consumer associations, utilities and other NGOs. Increasing stakeholder involvement to broader interest groups could help garner more support and feedback in the S&L implementation process. China has emerged as a leader in a national verification testing scheme with complementary pilot checktesting projects, but it still faces challenges with insufficient funding, low local awareness amongst some regulatory agencies and resistance to check-testing by some manufacturers, limited product sampling scope, and testing inconsistency and incomparability of results. Thus, further financial and staff resources and capacity building will be needed to overcome these remaining challenges and to expand impacts evaluations to assess the actual effectiveness of implementation and enforcement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SU-E-T-256: Development of a Monte Carlo-Based Dose-Calculation System in a Cloud Environment for IMRT and VMAT Dosimetric Verification

Purpose: Intensity-modulated radiation therapy (IMRT) and volumetric-modulated arc therapy (VMAT) are techniques that are widely used for treating cancer due to better target coverage and critical structure sparing. The increasing complexity of IMRT and VMAT plans leads to decreases in dose calculation accuracy. Monte Carlo simulations are the most accurate method for the determination of dose distributions in patients. However, the simulation settings for modeling an accurate treatment head are very complex and time consuming. The purpose of this work is to report our implementation of a simple Monte Carlo simulation system in a cloud-computing environment for dosimetric verification of IMRT and VMAT plans. Methods: Monte Carlo simulations of a Varian Clinac linear accelerator were performed using the BEAMnrc code, and dose distributions were calculated using the DOSXYZnrc code. Input files for the simulations were automatically generated from DICOM RT files by the developed web application. We therefore must only upload the DICOM RT files through the web interface, and the simulations are run in the cloud. The calculated dose distributions were exported to RT Dose files that can be downloaded through the web interface. The accuracy of the calculated dose distribution was verified by dose measurements. Results: IMRT and VMAT simulations were performed and good agreement results were observed for measured and MC dose comparison. Gamma analysis with a 3% dose and 3 mm DTA criteria shows a mean gamma index value of 95% for the studied cases. Conclusion: A Monte Carlo-based dose calculation system has been successfully implemented in a cloud environment. The developed system can be used for independent dose verification of IMRT and VMAT plans in routine clinical practice. The system will also be helpful for improving accuracy in beam modeling and dose calculation in treatment planning systems. This work was supported by JSPS KAKENHI Grant Number 25861057.

60 APPLIED LIFE SCIENCES↗

The Acceptance Strategy for Nuclear Power Plant In Indonesia

Indonesia has planned to build nuclear power plants. Some feasibility studies have been conducted intensively. However, the processes of NPP introduction are still uncertain. National Energy Plan in Indonesia, which has been made by some governmental agencies, does not yet give positive impact to the government decision to construct the nuclear power plant (NPP). This paper discusses the process of NPP introduction in Indonesia, which has been colored with debate of stakeholder and has delayed decision for go-nuclear. The technology paradigm is used to promote NPP as an alternative of reliable energy resources. This paradigm should be complemented with international politic-economic point of view. The international politic-economic point of view shows that structural powers, consisting of security, production, finance, and knowledge structures, within which the NPP is introduced, have dynamic characteristics. The process of NPP introduction in Indonesia contains some infrastructure development (R and D, legislation, regulation, energy planning, site study, public acceptance efforts, etc), but they need a better coherent NPP implementation program and NPP Acceptance Program. Strategic patterns for NPP acceptance described in this paper are made by considering nuclear regulation development and the interest of basic domestic participation. The first NPP program in Indonesia having proven technology and basic domestic participation is and important milestone toward and optimal national energy-mix.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Stereotactic, Single-Dose Irradiation of Lung Tumors: A Comparison of Absolute Dose and Dose Distribution Between Pencil Beam and Monte Carlo Algorithms Based on Actual Patient CT Scans

Purpose: Dose calculation based on pencil beam (PB) algorithms has its shortcomings predicting dose in tissue heterogeneities. The aim of this study was to compare dose distributions of clinically applied non-intensity-modulated radiotherapy 15-MV plans for stereotactic body radiotherapy between voxel Monte Carlo (XVMC) calculation and PB calculation for lung lesions. Methods and Materials: To validate XVMC, one treatment plan was verified in an inhomogeneous thorax phantom with EDR2 film (Eastman Kodak, Rochester, NY). Both measured and calculated (PB and XVMC) dose distributions were compared regarding profiles and isodoses. Then, 35 lung plans originally created for clinical treatment by PB calculation with the Eclipse planning system (Varian Medical Systems, Palo Alto, CA) were recalculated by XVMC (investigational implementation in PrecisePLAN [Elekta AB, Stockholm, Sweden]). Clinically relevant dose-volume parameters for target and lung tissue were compared and analyzed statistically. Results: The XVMC calculation agreed well with film measurements (<1% difference in lateral profile), whereas the deviation between PB calculation and film measurements was up to +15%. On analysis of 35 clinical cases, the mean dose, minimal dose and coverage dose value for 95% volume of gross tumor volume were 1.14 {+-} 1.72 Gy, 1.68 {+-} 1.47 Gy, and 1.24 {+-} 1.04 Gy lower by XVMC compared with PB, respectively (prescription dose, 30 Gy). The volume covered by the 9 Gy isodose of lung was 2.73% {+-} 3.12% higher when calculated by XVMC compared with PB. The largest differences were observed for small lesions circumferentially encompassed by lung tissue. Conclusions: Pencil beam dose calculation overestimates dose to the tumor and underestimates lung volumes exposed to a given dose consistently for 15-MV photons. The degree of difference between XVMC and PB is tumor size and location dependent. Therefore XVMC calculation is helpful to further optimize treatment planning.

62 RADIOLOGY AND NUCLEAR MEDICINE↗