Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FUNCTION TEST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Overview of Integrated Random Vibration Testing of the NASA Orion Crew Survival Suit

The launch ascent and abort random vibration environments from NASA’s Orion spacecraft drove the need to test the NASA Orion Crew Survival Suit as an integrated system with exposure to the design levels. In order to properly characterize component responses, a series of integrated tests were designed to incorporate the interaction between a crew member, suit, seat, and the attenuation system. The first Development Test (2017) included human subjects, and was performed with early development seat and suit components, and low level inputs. It provided a baseline for frequency response and behavior of the integrated system. The next two tests, Development Test (2019) and Qualification Test (2020), used manikin surrogates to represent the crew member and increasing levels of component hardware fidelity in order to test to higher input levels. Testing was performed at NASA Johnson Space Center (JSC) and Kennedy Space Center (KSC) Vibration Labs and provided the input levels required to represent the ascent and abort vehicle profiles as well as recorded component response behavior from accelerometer instrumentation and high speed cameras. Inspection of the suit and related components showed that for all seat orientations, and input environments, no damage occurred. Additional pre and post-test checks confirmed the functionality of all suited hardware. Response data of the suited components generally showed heavy attenuation across most of the tested frequency range. Transmissibility plots showed some amplification of components at lower frequency ranges. Overall this series of integrated tests showed that 1) the use of surrogate manikins in the tests were adequate for representing crew in a vibration environment, 2) full vibration levels for ascent and abort were heavily attenuated in the suit components and were non-damaging, and 3) the suit and related components are qualified for the Orion random vibration environments.

Jeffrey D Suhey↗

Overview of Integrated Random Vibration Testing of the NASA Orion Crew Survival Suit

The launch ascent and abort random vibration environments from NASA’s Orion spacecraft drove the need to test the NASA Orion Crew Survival Suit as an integrated system with exposure to the design levels. In order to properly characterize component responses, a series of integrated tests were designed to incorporate the interaction between a crew member, suit, seat, and the attenuation system. The first Development Test (2017) included human subjects, and was performed with early development seat and suit components, and low level inputs. It provided a baseline for frequency response and behavior of the integrated system. The next two tests, Development Test (2019) and Qualification Test (2020), used manikin surrogates to represent the crew member and increasing levels of component hardware fidelity in order to test to higher input levels. Testing was performed at NASA Johnson Space Center (JSC) and Kennedy Space Center (KSC) Vibration Labs and provided the input levels required to represent the ascent and abort vehicle profiles as well as recorded component response behavior from accelerometer instrumentation and high speed cameras. Inspection of the suit and related components showed that for all seat orientations, and input environments, no damage occurred. Additional pre and post-test checks confirmed the functionality of all suited hardware. Response data of the suited components generally showed heavy attenuation across most of the tested frequency range. Transmissibility plots showed some amplification of components at lower frequency ranges. Overall this series of integrated tests showed that 1) the use of surrogate manikins in the tests were adequate for representing crew in a vibration environment, 2) full vibration levels for ascent and abort were heavily attenuated in the suit components and were non-damaging, and 3) the suit and related components are qualified for the Orion random vibration environments.

Jeffrey Suhey↗

Performance Evaluation of Hierarchical Controls for Advanced Distribution Management System-Centered Grid Operations: Preprint

This paper presents a hardware-in-the-loop (HIL) platform to evaluate the performance of voltage regulation using an advanced distribution management system (ADMS) for grid operations to control legacy and grid-edge voltage control devices and coordinate with distributed energy management systems (DERMS) to manage high penetrations of photovoltaics (PV) on a utility distribution system. The HIL platform provides realistic laboratory testing, including accurate modeling (legacy devices, grid-edge devices, and PV) of the real-world distribution system from a utility partner, a real controller (ADMS), software controller DERMS, hardware grid-edge devices, and standard communications protocols. The test results show proper functionalities of the integrated platform and the performance of voltage regulation of the coordinated control systems. Based on laboratory testing, the utility can set up the same grid-automation system to manage DERs, legacy devices, and grid-edge devices to achieve their system-level control and operation objectives (e.g., voltage regulation), thus de-risking potential issues (e.g., instability) for field deployment.

ADMS↗

Iodine Sorbent Performance in FY 2012 Deep Bed Tests

Nuclear fission results in the production of fission products and activation products, some of which tend to be volatile during used fuel reprocessing and evolve in gaseous species into the reprocessing facility off-gas systems. Analyses have shown that I-129, due to its radioactivity, high potential mobility in the environment, and high longevity (half life of 15.7 million years), can require control efficiencies of up to 1,000x or higher to meet regulatory emission limits. Iodine capture is an important aspect of the Separations and Waste Forms Campaign Off-gas Sigma Team (Jubin 2011, Pantano 2011). Deep-bed iodine sorption tests for both silver-functionalized Aerogel and silver zeolite sorbents were performed during Fiscal Year 2012. These tests showed that: • Decontamination factors were achieved that exceed reasonably conservative estimates for DFs needed for used fuel reprocessing facilities in the U.S. to meet regulatory requirements for I-129 capture. • Silver utilizations approached or exceeded 100% for high inlet gas iodine concentrations, but test durations were not long enough to approach 100% silver utilization for lower iodine concentrations. • The depth of the mass transfer zone was determined for both low iodine concentrations (under 10 ppmv) and for higher iodine concentrations (between 10-50 ppmv); the depth increases over time as iodine is sorbed. • These sorbents capture iodine by chemisorption, where the sorbed iodine reacts with the silver to form very non-volatile AgI. Any sorbed iodine that is physisorbed but not chemically reacted with silver to form AgI might not be tightly held by the sorbent. The portion of sorbed iodine that tends to desorb because it is not chemisorbed (reacted to form AgI) is small, under 1%, for the AgZ tests, and even smaller, under 0.01%, for the silver-functionalized Aerogel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Space Station Multi-Element Integrated Test

The International Space Station offers a unique challenge for integrated testing since the entire station is not launched as an integrated vehicle. The ISS design evolved for over 10 years from the station Freedom program that was based on a "ship and shoot" approach. Ship and shoot assumed the program would accept the hardware for launch and integrate the vehicle on orbit without any ground element-to-element integrated testing. Element-to-Element powered-on integrated testing is needed to identify operational problems on the ground rather than once the hardware is on orbit. The industry is accustomed to testing an integrated vehicle and then verifying it is ready for its operational missions. These tests require ground element emulators to represent on-orbit elements. The ISS Multi-Element Integrated Tests (MEIT) are element-to-element integrated tests bringing together hardware representing several flights. The major purpose of these tests is: 1) Element-to-Element interface compatibility, 2) Systems end-to-end operability and functionality and 3) utilize on-orbit procedures with the crew and mission control center. Execution of these tests is critical since the hardware is available for only a limited period of time. Test configurations are defined which test specific interfaces or functionality. These tests develop operational confidence in the Element-to-Element interfaces and identify major problems on the ground to avoid on-orbit anomalies that could threaten mission success, element survivability or assembly activities. This paper addresses the MEIT process, configurations and lessons-learned from these tests.

Filler, Russell E.↗

Integrated Boosting and Hybridization for Extreme Fuel Economy and Downsizing

The objective of this project was to develop, demonstrate, and evaluate commercialization of a highly efficient downsized engine by electrification of the air delivery and waste heat recovery system and optimizing energy usage to achieve significant fuel economy improvement at a commercially viable cost. The system consists of an Electrically Assisted Variable speed Supercharger (EAVS), driven by an electric motor and the engine through a planetary gear train, that provides engine boost pressure and provides the mild hybrid functions of engine start/stop, torque assist, and brake energy recovery. In the exhaust path of the engine is the electric Waste Heat Recovery (eWHR) system, a roots-based expander driven by another electric motor, that enables exhaust gas energy recovery along with controlled back pressure on the engine. The two electric motors are powered by a 48V rechargeable lithium-ion battery. Further, the EAVS system coupled to an EGR valve enables very precise high exhaust recirculation rates to control the NOx emissions. Through two budget periods, the project team of Eaton, Isuzu, Southwest Research Institute and AVL designed and developed the EAVS and eWHR systems, integrated with an Isuzu diesel engine, and validated the target fuel economy performance and emissions by engine dynamometer testing and vehicle level simulations. GT Power model-based analyses results were used to size the EAVS and eWHR systems for the 1.9L Isuzu Spark engine. The two systems were built and the functional testing was carried out to verify the boosting performance of the superchargers. Following the baseline engine dynamometer testing, the two systems were integrated with the engine and the fuel economy performance and emissions were determined by combined steady state and transient testing over three drive cycles, namely, FTP75, NEDC and HWFET. The EAVS/eWHR system demonstrated 4% improvement in fuel economy for the NEDC cycle in engine dyno testing, correlating well with vehicle simulation results (5.3%). The simulation results indicated that the combination of hybrid functions and drivetrain optimization, fuel economy improvement of more than 20% was feasible with the system. The commercialization study to evaluate the cost of the system and the scalability for different engine/vehicle classes was planned for the final budget period but not completed as the project was closed at the end of budget period two.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hybrid anatomo-functional imaging of coronary artery disease: Beneficial irrespective of its core components

Coronary artery disease (CAD) is the most common and important cause of ischemic heart disease, with major implications on global morbidity and mortality. Non-invasive testing is crucial in the diagnostic and prognostic work-up of patients with or at risk of CAD, and also to guide decision making in terms of pharmacologic and revascularization therapy. The traditional paradigm is to view anatomic (i.e., coronary computed tomography) and functional imaging (e.g., myocardial perfusion scintigraphy) tests as opposing alternatives. Such approach is too reductionist and does not capitalize on the strengths of each type of test while risking to overlook the inherent limitations. The combination of anatomic and functional tests in a logic of hybrid imaging holds the promise of overcoming the limitations inherent to anatomic and functional testing, enabling more accurate diagnosis, prognosis, and guidance for revascularization in patients with CAD.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Functional Data Analysis in NTCP Modeling: A New Method to Explore the Radiation Dose-Volume Effects

Purpose/Objective(s): To describe a novel method to explore radiation dose-volume effects. Functional data analysis is used to investigate the information contained in differential dose-volume histograms. The method is applied to the normal tissue complication probability modeling of rectal bleeding (RB) for patients irradiated in the prostatic bed by 3-dimensional conformal radiation therapy. Methods and Materials: Kernel density estimation was used to estimate the individual probability density functions from each of the 141 rectum differential dose-volume histograms. Functional principal component analysis was performed on the estimated probability density functions to explore the variation modes in the dose distribution. The functional principal components were then tested for association with RB using logistic regression adapted to functional covariates (FLR). For comparison, 3 other normal tissue complication probability models were considered: the Lyman-Kutcher-Burman model, logistic model based on standard dosimetric parameters (LM), and logistic model based on multivariate principal component analysis (PCA). Results: The incidence rate of grade ≥2 RB was 14%. V{sub 65Gy} was the most predictive factor for the LM (P=.058). The best fit for the Lyman-Kutcher-Burman model was obtained with n=0.12, m = 0.17, and TD50 = 72.6 Gy. In PCA and FLR, the components that describe the interdependence between the relative volumes exposed at intermediate and high doses were the most correlated to the complication. The FLR parameter function leads to a better understanding of the volume effect by including the treatment specificity in the delivered mechanistic information. For RB grade ≥2, patients with advanced age are significantly at risk (odds ratio, 1.123; 95% confidence interval, 1.03-1.22), and the fits of the LM, PCA, and functional principal component analysis models are significantly improved by including this clinical factor. Conclusion: Functional data analysis provides an attractive method for flexibly estimating the dose-volume effect for normal tissues in external radiation therapy.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Power Take-off System for Marine Renewable Devices

The Power Take-off (PTO) System for Marine Renewable Devices (Project) envisioned the design, manufacture and testing of a generator that would ultimately be suitable for fully flooded seawater operation. This would require a generator design and bearing system capable of operating in the presence of seawater without corrosion. The original generator concept design focused on a switched reluctance electromagnetic design for the generator with the understanding that the switched reluctance design would be more robust and tolerant of a seawater medium. A trade study was conducted to prove that hypothesis, but the results of the study indicated that there was no benefit to adopting a switched reluctance design over a more conventional synchronous permanent magnet design. In addition, the novelty of the switched reluctance design added more technical risk to the Project than was warranted. ORPC’s cost of energy analyses pointed to reliability as being the most critical factor for achieving Project systems performance advancement (SPA) metrics. Consequently, the choice of a permanent magnet (PM) machine design over a potentially less reliable switched reluctance design was necessary to achieve the Project results. As a result, ORPC determined that a PM design was a more appropriate design to achieve the Project goals and ORPC selected a highly qualified PM generator firm for the design, manufacture and factory testing of the generator. The factory acceptance test (FAT) of the generator took place on March 20-22, 2017 and all tests were successfully passed. Developing a design for a driveline as part of the PTO system required a full understanding of the loads and operating conditions expected. Detailed analyses for developing turbine loads and subsequent definition of bearing specifications were performed using various analytical methods. Two candidate bearing designs were proposed as part of the Project. After initial design work had been completed, ORPC designed a representative full-scale driveline to validate the detailed design of the advanced driveline components. Full-scale components were manufactured, instrumented and tested, simulating actual system parameters. This full-scale bearing test was conducted at the University of Maine Advanced Structures and Composites Laboratory. The purpose of this test was to characterize the frictional losses associated with bearings and test the suitability and functionality of some commercially available shaft couplings and expansion bushings in cross-flow turbine drivelines. In parallel with component testing and dynamometer testing of the PTO system, ORPC performed design work to demonstrate how the advanced PTO system will be integrated with all ORPC turbine generator units (TGUs). The work would focus primarily on the TidGen® TGU and assess how the advanced PTO would be integrated into TidGen® 001 or other units, then field-deployed and tested in an open water environment under actual operational conditions. In addition to the benefits provided to the MHK industry in general, and ORPC in particular, the Project provided benefits to the general public, including the following: • Increased general awareness of the potential for generation of electricity from ocean energy resources • Demonstrated continuing advancements in the commercialization of MHK technologies, making them more likely to contribute to the electricity generation supply in America in the coming years • Continued awareness of the local economic benefits from the MHK industry through job creation and local spending • Confirmation of a path to improvements in availability, power-to-weight ratio (PWR) and reduction in levelized cost of energy (LCOE). All Project tasks were completed, and the Project objectives were accomplished. All project milestones and deliverables were met. The designs, methodologies, practices, testing, data, analysis and lessons learned from the Project are a step forward in the development of the U.S. MHK industry and provide a sound basis for ultimate commercialization of ORPC’s power systems. Based on the what was learned and demonstrated during the Project, ORPC has determined that the ORPC power systems have the potential of accelerating the commercialization of tidal and ocean current MHK power systems.

16 TIDAL AND WAVE POWER↗

Risk-Informed MultiPphysics BestEestimate Plus Uncertainties (BEPU) Application Development of RELAP5-3D Perturbation Model

The United States nuclear industry is facing a strong challenge to ensure maximum safety while enhancing economic benefit. Safety is a key parameter to all aspects related to light water reactor (LWR) nuclear power plants (NPPs), especially cost savings. Since the goal is to extend the lifetimes of these NPPs, the traditional deterministic safety concept may not guarantee a current economic asset. The Light Water Reactor Sustainability (LWRS) Program has been promoting a wide range of research and development (R&D) in this field to maximize the safety, economics, and performance of these NPPs through improved scientific understanding. One of the best practices to achieve this goal is to identify and optimize safety margins, which can lead to cost reduction. To do this, under the LWRS framework, the Risk-Informed Systems Analysis (RISA) Pathway will focus on the optimization of safety margin and minimization of uncertainties to ensure both safety and economics at the highest level. The RISA Pathway will provide enhanced capabilities for analyzing and characterizing LWR systems performance by developing and demonstrating methods, tools, and data to enable risk-informed margins management (RIMM). The goals of the RISA Pathway are twofold: (1) deploy the risk-informed tools and methods that enable better representation of safety margins and factors that contribute to cost and safety; and (2) conduct advanced risk assessment applications with industry to support margin management strategies that enable more cost-effective plant operation. The tools and methods provided by the RISA Pathway will support effective margin management for both active and passive safety systems, structures, and components (SSC) of an NPP. The tools and methods used in the RISA Pathway should have high confidence and highest technical maturity for and implementation to industry at its current setting. They should also have a capability to support risk-informed decision making for both probabilistic and deterministic elements of safety. The RISA Pathway will, therefore, perform a comprehensive assessment of verification and validation (V&V) status of RISA Toolkit to enhance credibility RISA Toolkit which be used by industry. This report summarizes RELAP5-3D development activities for best estimated and uncertainty (BEPU) capability to support ongoing RISA Pathway pilot projects for risk informed uncertainty quantification applications. Work scope includes (1) development of initial perturbation model for selected closure laws and (2) testing of suitable probability distribution functions (PDF) for the selected correlations. Developed BEPU modules are tested with selected separate effect cases and compared with conventional thermal-hydraulics model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The effect of sunshine testing on terrestrial solar cell system components

Samples of FEP-encapsulated silicon solar cells and various potential encapsulation or cover materials were subjected to both accelerated and real-time testing. The durability of the samples was determined by measuring changes in solar cell output or optical transmission as a function of exposure. The tests revealed some problem areas in the structural integrity of the materials, e.g., delamination and cracking in FEP. These problems were probably related to defects in fabrication. FEP and Aclar had the least transmission loss after accelerated exposure equivalents of 5 and 3 years, respectively.

Forestieri, A. F.↗

Pivotal-Function Assessment Of Reliability Of Software

Approach developed to establish utility of pivotal functions for estimation and prediction of reliability of software. Improved estimates of reliability with statistical confidence obtained when relatively few testing data available. Pivotal functions effective tools for determination of confidence limits for reliability of software and prediction limits for time to next failure. Provides exact confidence and prediction limits regardless of how many bugs found in software.

Hayhurst, Kelly J.↗

SPOT 4 space magnetic recorder mechanisms

The design of the SPOT 4 satellite will be quite different from the previous ones. The design of the new magnetic tape recorder, which was derived from industrial knowledge and mission requirements; the main technical characteristics of the recorder; and the mechanical subsystems of the recorder and their locations and contributions to the final performance are all discussed. The philosophy of the development program, required to achieve the desired performance and reliability for each flight model, is described, and information on the schedule and current development is presented. The components of the tape plate system, (the transmission belts, tape rollers of the recorders, and reel hub ball bearings) which are subjected to heavy mechanical operation, fatigue, and wear in the thermal environment of the mission, are discussed. For each of the components, a description of its function in the recorder is given, as well as the mechanical stress imposed during the various operational phases. The quality testing program, which was used to verify the design safety margins, is described. Finally, the first test results of a functioning model of the flight system are presented.

Borrien, A.↗

Mitigating Upsets in SRAM-Based FPGAs from the Xilinx Virtex 2 Family

Static random access memory (SRAM) upset rates in field programmable gate arrays (FPGAs) from the Xilinx Virtex 2 family have been tested for radiation effects on configuration memory, block RAM and the power-on-reset (POR) and SelectMAP single event functional interrupts (SEFIs). Dynamic testing has shown the effectiveness and value of Triple Module Redundancy (TMR) and partial reconfiguration when used in conjunction. Continuing dynamic testing for more complex designs and other Virtex 2 capabilities (i.e., I/O standards, digital clock managers (DCM), etc.) is scheduled.

SEE testing↗

Performance Evaluation of Distributed Energy Resources Management System via Advanced Hardware-in-the-Loop Simulation: Preprint

This paper presents an advanced hardware-in-the-loop (HIL) platform to evaluate the performance of voltage regulation coordinated across advanced distribution management systems (ADMS), distributed energy management system (DERMS), and DERs. The HIL platform provides realistic laboratory testing, including accurate modeling of the real-world distribution system from a utility partner, real controller (ADMS and DERMs) and power (DERs) hardware, and standard communications protocols. The test results show proper functionalities of the integrated platform and performance of the peak load management of coordinated control systems. Based on the laboratory testing, the utility can set up the same grid automation system to manage DERs to achieve system-level control and operation objectives (e.g., peak load management), thus derisking potential issues (e.g., instability) for field deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

End-to-end test of the electron-proton spectrometer

A series of end-to-end tests were performed to demonstrate the proper functioning of the complete Electron-Proton Spectrometer (EPS). The purpose of the tests was to provide experimental verification of the design and to provide a complete functional performance check of the instrument from the excitation of the sensors to and including the data processor and equipment test set. Each of the channels of the EPS was exposed to a calibrated beam of energetic particles, and counts were accumulated for a predetermined period of time for each of several energies. The counts were related to the known flux of particles to give a monodirectional response function for each channel. The measured response function of the test unit was compared to the response function determined for the calibration sensors from the data taken from the calibration program.

Cash, B. L.↗