Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Engineer Shuttle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Data relay system for Space Shuttle and payload pre-launch checkout

Engineering requirements and design characteristics of the coherent throughput relay system which supports the East Coast prelaunch checkout of NASA's Space Shuttle and its payloads are presented. Link requirements and design constraints are reviewed, and gain/loss analysis is given. Group delay distortion is considered and isolation and antenna siting are discussed. The systems controlling various aspects of the relays are examined.

O'Donnell, Hugh B.↗

Onboard Determination of Vehicle Glide Capability for Shuttle Abort Flight Managment (SAFM)

When one or more main engines fail during ascent, the flight crew of the Space Shuttle must make several critical decisions and accurately perform a series of abort procedures. One of the most important decisions for many aborts is the selection ofa landing site. Several factors influence the ability to reach a landing site, including the spacecraft point of atmospheric entry, the energy state at atmospheric entry, the vehicle glide capability from that energy state, and whether one or more suitable landing sites are within the glide capability. Energy assessment is further complicated by the fact that phugoid oscillations in total energy influence glide capability. Once the glide capability is known, the crew must select the "best" site option based upon glide capability and landing site conditions and facilities. Since most of these factors cannot currently be assessed by the crew in flight, extensive planning is required prior to each mission to script a variety of procedures based upon spacecraft velocity at the point of engine failure (or failures). The results of this preflight planning are expressed in tables and diagrams on mission-specific cockpit checklists. Crew checklist procedures involve leafing through several pages of instructions and navigating a decision tree for site selection and flight procedures - all during a time critical abort situation. With the advent of the Cockpit Avionics Upgrade (CAU), the Shuttle will have increased on-board computational power to help alleviate crew workload during aborts and provide valuable situational awareness during nominal operations. One application baselined for the CAU computers is Shuttle Abort Flight Management (SAFM), whose requirements have been designed and prototyped. The SAFM application includes powered and glided flight algorithms. This paper describes the glided flight algorithm which is dispatched by SAFM to determine the vehicle glide capability and make recommendations to the crew for site selection as well as to monitor glide capability while in route to the selected site. Background is provided on Shuttle entry guidance as well as the various types of Shuttle aborts. SAFM entry requirements and cockpit disp lays are discussed briefly to provide background for Glided Flight algorithm design considerations. The central principal of the Glided Flight algorithm is the use of energy-over-weight (EOW) curves to determine range and crossrange boundaries. The major challenges of this technique are exo-atmospheric flight, and phugoid oscillations in energy. During exo-atmospheric flight, energy is constant, so vehicle EOW is not sufficient to determine glide capability. The paper describes how the exo-atmospheric problem is solved by propagating the vehicle state to an "atmospheric pullout" state defined by Shuttle guidance parameters.

Straube, Timothy↗

Mass Analyzers Facilitate Research on Addiction

The famous go/no go command for Space Shuttle launches comes from a place called the Firing Room. Located at Kennedy Space Center in the Launch Control Center (LCC), there are actually four Firing Rooms that take up most of the third floor of the LCC. These rooms comprise the nerve center for Space Shuttle launch and processing. Test engineers in the Firing Rooms operate the Launch Processing System (LPS), which is a highly automated, computer-controlled system for assembly, checkout, and launch of the Space Shuttle. LPS monitors thousands of measurements on the Space Shuttle and its ground support equipment, compares them to predefined tolerance levels, and then displays values that are out of tolerance. Firing Room operators view the data and send commands about everything from propellant levels inside the external tank to temperatures inside the crew compartment. In many cases, LPS will automatically react to abnormal conditions and perform related functions without test engineer intervention; however, firing room engineers continue to look at each and every happening to ensure a safe launch. Some of the systems monitored during launch operations include electrical, cooling, communications, and computers. One of the thousands of measurements derived from these systems is the amount of hydrogen and oxygen inside the shuttle during launch.

Source record↗

NASA's Space Launch System Progress Toward the Launch Pad

NASA’s Space Launch System (SLS) took a substantial step toward the launch site in2020 with the move of the Artemis I core stage from the manufacturing site to the test stand as the program plans for a 2021 launch. (Fig. 1) SLS is NASA’s evolvable super-heavy-lift launch vehicle to support deep space exploration. It is based on evolutionary improvement to existing proven propulsion systems. Its twin solid rocket boosters employ a five-segment motor based on the four-segment space shuttle motor. Its four RS-25 main engines will operate at thrust levels higher than those in the space shuttle program. The core stage is anew design that will support propellant tanks for the engines and serve as the attach point for the boosters. Modern streamlined manufacturing processes and materials have been incorporated into the initial configuration with planned onramps for improved performance and/or affordability in subsequent versions. The primary role of SLS is to anchor the transportation for NASA’s Artemis Program to return humans to the Moon and build on the exploration that began during the Apollo Program. This paper will discuss progress to date for the SLS Program and look ahead to important milestones in 2020 and beyond.

John H Honeycutt↗

Development of the European Service Module Propulsion Subsystem for the Multi-Purpose Crew Vehicle

2013, NASA and the European Space Agency (ESA) entered into an international partnership to develop the European Service Module (ESM) for use on NASA's Multi-Purpose Crew Vehicle (MPCV), also known as Orion. The MPCV will be used as the principal spacecraft for future human space exploration missions beyond low earth orbit. The ESM Propulsion Subsystem (PSS) is a pressure-fed, bi-propellant propulsion system, being developed by Airbus Defense and Space under contract to ESA. For this effort, NASA is responsible for the traditional role of insight/oversight to ensure that the PSS delivered by Airbus meets all MPCV Program requirements. In addition, the NASA Propulsion team also has some unique responsibilities that are a result of the Implementing Agreement (IA) between NASA and ESA for development of the ESM. These responsibilities include: (1) providing the main engine and Thrust Vector Control (TVC) assembly for the PSS. This is being accomplished through the delta qualification and re-use the Space Shuttle Orbital Maneuvering System (OMS) engine and TVC assembly; (2) procurement and delivery of the Auxiliary engines (R-4Ds) for the PSS. These engines are being procured by NASA from Aerojet-Rocketdyne via Lockheed Martin, the prime contractor for the MPCV, per an Airbus-provided specification; and (3) conducting the integrated systems hot-fire test which will qualify the end-to-end PSS for flight on MPCV. This test is being conducted at the NASA White Sands Test Facility (WSTF) using an Airbus-provided test article known as the Propulsion Qualification Model (PQM).

Multi-Purpose Crew Vehicle↗

Oxygen/Alcohol Dual Thrust RCS Engines

A non-toxic dual thrust RCS engine offers significant operational, safety, and performance advantages to the space shuttle and the next generation RLVs. In this concept, a single engine produces two thrust levels of 25 and 870 lbf. The low thrust level is provided by the spark torch igniter, which, with the addition of 2 extra valves, can also be made to function as a vernier. A dual thrust RCS engine allows 38 verniers to be packaged more efficiently on a vehicle. These 38 vemiers improve translation and reduce cross coupling, thereby providing more pure roll, pitch, and yaw maneuvers of the vehicle. Compared to the 6 vemiers currently on the shuttle, the 38 dual thrust engines would be 25 to 40% more efficient for the same maneuvers and attitude control. The vernier thrust level also reduces plume impingement and contamination concerns. Redundancy is also improved, thereby improving mission success reliability. Oxygen and ethanol are benign propellants which do not create explosive reaction products or contamination, as compared to hypergolic propellants. These characteristics make dual-thrust engines simpler to implement on a non-toxic reaction control system. Tests at WSTF in August 1999 demonstrated a dual-thrust concept that is successful with oxygen and ethanol. Over a variety of inlet pressures and mixture ratios at 22:1 area ratio, the engine produced between 230 and 297 sec Isp, and thrust levels from 8 lbf. to 50 lbf. This paper describes the benefits of dual-thrust engines and the recent results from tests at WSTF.

Angstadt, Tara↗

STS-93 Flight Day 3 Highlights and Crew Activities

Commander Eileen Collins, Pilot Jeff Ashby, and Mission Specialists Cady Coleman, Steve Hawley and Michael Tognini were awakened with the song "Brave New Girls" performed by Teresa. Steve Hawley, the resident astronomer, continued to work with the Southwest Ultraviolet Imaging System (SWUIS) and collected images of targets associated with Mercury, Venus, Jupiter and the Moon. Collins and Ashby maneuvered Columbia in support of various experiments including observations made with the SWUIS telescope or the Midcourse Space Experiment (MSX), which used sophisticated sensors to collect ultraviolet, infrared, and visible light data of firings of the shuttle's orbital maneuvering system engines or primary reaction control system jets. Collins also conducted a conversation with students at the Harbor View Elementary School in Corona Del Mar, California using the Shuttle Amatuer Radio Experiment (SAREX) system. She also checked experiments associated with the Cell Culture Module (CCM) and the Biological Research in Canister (BRIC) payloads.

Source record↗

Study of solid rocket motors for a space shuttle booster. Volume 1: Executive summary

The design, development, production, and launch support analysis for determining the solid propellant rocket engine to be used with the space shuttle are discussed. Specific program objectives considered were: (1) definition of engine designs to satisfy the performance and configuration requirements of the various vehicle/booster concepts, (2) definition of requirements to produce booster stages at rates of 60, 40, 20, and 10 launches per year in a man-rated system, and (3) estimation of costs for the defined SRM booster stages.

Source record↗

Core Stage TVC Systems Engineering Challenges in Reusing Heritage Hardware

The Space Launch System (SLS) Core Stage (CS) Thrust Vector Control (TVC) system is comprised of 8 mechanical feedback Shuttle heritage Type III TVC actuators and four RS-25 engines, each attached to a Shuttle heritage gimbal block/bearing. Two actuators are used to move each engine in two planes perpendicular to one another (i.e., pitch and yaw). The TVC system design leverages hardware from the Space Shuttle program as well as new hardware designed specifically for the Core Stage. The Space Shuttle heritage hardware directly reused on SLS includes the Orbiter TVC hydraulic servo-actuators (with two slight design modifications), the Orbiter hydraulic circulation pumps, the Orbiter gimbal block/bearing, and the Solid Rocket Booster hydraulic pumps. The Core Auxiliary Power Unit (CAPU) is derived from the Orbiter Auxiliary Power Unit (APU). The Orbiter and Solid Rocket Booster APU turbines are powered by hot gas produced by catalyzed hydrazine decomposition. On the SLS Core Stage, the CAPU turbine is spun using cold gas tapped-off from the RS-25 to CS liquid hydrogen autogenous pressurization line. While direct reuse or slight modification of existing hardware may seem to be a triple-win for a program in cost, schedule, and technical risk mitigation, those benefits can only be realized when its degree of application in a new system is carefully and thoughtfully managed. The heritage hardware reuse should be prescribed within the heritage design capability and reuse environments must lie within the envelope of heritage qualification testing. Despite the significant test and flight experience of the Shuttle heritage hardware components, successful integration with the newly designed CS TVC components and incorporation into the stage design proved to be a challenge which required re-qualification of the heritage hardware as well as thorough integrated testing to support flight certification. Examples of the challenges that were overcome include: re-qualifying heritage hardware to survive new shock and vibration environments, certifying performance of extensively modified heritage hardware, regenerating design insight due to lack of available heritage vendor data, showing compliance to modern structural design standards, translation of heritage requirements for analog avionics to modern digital avionics, and interfacing heritage mechanical hardware with newly designed avionics. This paper is the second installment in a seven-paper series surveying the design, engineering, test validation, and flight performance of the Core Stage Thrust Vector Control system. This paper will discuss several engineering challenges encountered during the development process for SLS CS TVC and how they were successfully overcome to reach flight readiness.

Thrust Vector Control↗

Space Launch System: Core Stage Thrust Vector Control Systems Engineering Challenges in Reusing Heritage Hardware

The Space Launch System (SLS) Core Stage (CS) Thrust Vector Control (TVC) system is comprised of 8 mechanical feedback Shuttle heritage Type III TVC actuators and four RS-25 engines, each attached to a Shuttle heritage gimbal block/bearing. Two actuators are used to move each engine in two planes perpendicular to one another (i.e., pitch and yaw). The TVC system design leverages hardware from the Space Shuttle program as well as new hardware designed specifically for the Core Stage. The Space Shuttle heritage hardware directly reused on SLS includes the Orbiter TVC hydraulic servo-actuators (with two slight design modifications), the Orbiter hydraulic circulation pumps, the Orbiter gimbal block/bearing, and the Solid Rocket Booster hydraulic pumps. The Core Auxiliary Power Unit (CAPU) is derived from the Orbiter Auxiliary Power Unit (APU). The Orbiter and Solid Rocket Booster APU turbines are powered by hot gas produced by catalyzed hydrazine decomposition. On the SLS Core Stage, the CAPU turbine is spun using cold gas tapped-off from the RS-25 to CS liquid hydrogen autogenous pressurization line. While direct reuse or slight modification of existing hardware may seem to be a triple-win for a program in cost, schedule, and technical risk mitigation, those benefits can only be realized when its degree of application in a new system is carefully and thoughtfully managed. The heritage hardware reuse should be prescribed within the heritage design capability and reuse environments must lie within the envelope of heritage qualification testing. Despite the significant test and flight experience of the Shuttle heritage hardware components, successful integration with the newly designed CS TVC components and incorporation into the stage design proved to be a challenge which required re-qualification of the heritage hardware as well as thorough integrated testing to support flight certification. Examples of the challenges that were overcome include: re-qualifying heritage hardware to survive new shock and vibration environments, certifying performance of extensively modified heritage hardware, regenerating design insight due to lack of available heritage vendor data, showing compliance to modern structural design standards, translation of heritage requirements for analog avionics to modern digital avionics, and interfacing heritage mechanical hardware with newly designed avionics. This paper is the second installment in a seven-paper series surveying the design, engineering, test validation, and flight performance of the Core Stage Thrust Vector Control system. This paper will discuss several engineering challenges encountered during the development process for SLS CS TVC and how they were successfully overcome to reach flight readiness.

Thrust Vector Control↗

RL10 ignition limits test for Shuttle Centaur

During routine development testing of the RL10A-3-3B engine a potential no-ignition condition was encountered when operating at certain propellant inlet conditions within the Shuttle Centaur G operating region. The conditions, the resulting investigative program, and methods to correct the potential problem are discussed. The Shuttle Centaur program was cancelled prior to completion of this effort. Although the RL10 engine in the Atlas Centaur vehicle is required by specification to operate over a wide range of propellant inlet conditions. The vehicle actually operates over a narrow range of conditions. This factor, combined with configuration differences between Atlas Centaur (or Titan Centaur) and the Shuttle Centaur RL10 engines, indicates the ignition problem does not exist for these vehicles. As a precautionary measure the vehicle manufacturer was requested to coordinate with Pratt and Whitney any anticipated changes in propellant inlet conditions from the current narrow range. An engineering change will be proposed for future RL10 deliveries to provide more consistent propellant flow to the igniter. This will permit operation of the engine throughout the wide range specification inlet conditions if desired.

Source record↗

Thermal design of the Space Shuttle External Tank

The history of the engineering and manufacturing requirements leading to the final Thermal Protection System (TPS) for the External Tank (ET) is presented. The thermal design for the ET must be optimized, based on considerations of cost, weight, and application of the TPS. The significant thermal requirements include the structural and component temperature limits, the propellant quality, the minimization of ice and frost, no air liquefaction, and no film boiling. The TPS materials selected to meet the requirements are a low density closed cell foam (CPR-488) and two light-weight ablators (SLA-56 and MA-25s). The first four flights of the Space Shuttle (1981) will measure and evaluate external environmental, structural, propulsion, electrical, and engine performance data. The ET will be instrumented to measure acoustics, pressures, heat transfer, vibration, temperatures, and structural strains. TPS weight reductions are planned for future ETs through the use of a comprehensive thermal instrumentation system.

Warmbrod, J. D.↗

Study of solid rocket motors for a space shuttle booster. Volume 1: Executive summary

The factors affecting the choice of the 156 inch diameter, parallel burn, solid propellant rocket engine for use with the space shuttle booster are presented. Primary considerations leading to the selection are: (1) low booster vehicle cost, (2) the largest proven transportable system, (3) a demonstrated design, (4) recovery/reuse is feasible, (5) abort can be easily accomplished, and (6) ecological effects are minor.

Vonderesch, A. H.↗

STS-111 Expedition Five Crew Training Clip

The STS-111 Expedition Five Crew begins with training on payload operations. Flight Engineer Peggy Whitson and Mission Specialist Sandy Magnus are shown in Shuttle Remote Manipulator System (SRMS) procedures. Flight Engineer Sergei Treschev gets suited for Neutral Neutral Buoyancy Lab (NBL) training. Virtual Reality lab training is shown with Peggy Whitson. Habitation Equipment and procedures are also presented.

Source record↗

Low-thrust vehicle concept studies

Part of NASA's orbit transfer vehicle propulsion program is devoted to the development of analytical tools to define propulsion system performance, weight, size, and other parameters, and to develop packing concepts for LSS mission propulsion and payload systems. Packing studies discussed relate to shuttle cargo bay constraints; low thrust engine profile and performance; large space frame concept and weight; low thrust vehicles stowed in shuttle, LSS payload capability, and weight distribution. Further study is needed to determine interactions among propulsion system, payload structures, and shuttle. Low thrust-to-weight ratios are desirable to maximize payload weights and deployed areas.

Smolak, G. R.↗

STS-110 Flight Day 3 Highlights

The STS-110 Flight Day 3 begins with a view from the flight deck of The Space Shuttle Atlantis. Commander Mike Bloomfield performs engine firing from Atlantis to meet with the International Space Station. The hatch between Space Shuttle Atlantis and the International Space Station opens and Expedition Four Commander Yury Onufrienko greets STS-110 Commander Michael Bloomfield and Mission Specialist Ellen Ochoa as they enter the station. Also, much live animation of the Space Shuttle Atlantis is presented, as seen from a camera aboard the I.S.S.

Source record↗

Study of solid rocket motor for space shuttle booster, volume 2, book 3, appendix A

A systems requirements analysis for the solid propellant rocket engine to be used with the space shuttle was conducted. The systems analysis was developed to define the physical and functional requirements for the systems and subsystems. The operations analysis was performed to identify the requirements of the various launch operations, mission operations, ground operations, and logistic and flight support concepts.

Source record↗