Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Configuration Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Development of the Mobile Systems for Conditioning of Disused Sealed Radioactive Sources in Serbia - 20105

Sealed radioactive sources (SRS) are being used worldwide in the field of medicine, agriculture, industry and research. They can be found in mobile as well as stationary devices. SRS contains radioactive material that is (a) permanently sealed in a capsule or (b) closely bounded and in a solid form. The capsule or material of an SRS should be strong enough to maintain leak tightness under the conditions of use and purpose for which the source was designed, also in case of accidents. In this case only emitted radiation is utilized. Firstly, the hazard from external radiation has to be considered, but the possibility of contamination due to fracture of the capsule should not be disregarded. The radioactive sources are composed of the radiating isotope contained in the filling medium, the single or double isotope holder that partially or totally surrounds the filling medium, the outer cover that contains the parts mentioned above and the capsule closed airtightly by welding or using some other method. The capsule must be tested for leakage periodically. If the SRS is no longer needed (e.g. replaced by a different technique) or it becomes useless for the intended application (e.g. the activity becomes too weak, the equipment containing the source works poorly or becomes obsolete, the source is damaged or leaking) it is considered disused. Disused sealed radioactive sources (DSRS) are typically conditioned and disposed if a facility is available. If the disposal option is not available, conditioned DSRS should be stored under proper conditions. In some cases, the radionuclide(s) in DSRS can be recovered/recycled or the DSRS can be repurposed for other applications. Conditioning of DSRS ensures containment of the radioactive material, provides confinement for leaking sources, provides sufficient radiation shielding, reduces storage/disposal volume by allowing consolidation of multiple sources into a single storage/disposal container, facilitates transport operations and contributes to safety and security as well. Typically, conditioning technologies are deployed either as permanently installed stationary systems in centralized or mobile on-site waste processing facilities, or in a mobile configuration. Centralized stationary facilities provide a single processing location for multiple users that requires transport of the waste to the facility. On the other hand, mobile systems may be provided for the selection and application of the optimum technology for a specific waste stream (such as DSRS) by bringing the process to the point where the waste is generated. In addition, mobile systems could offer additional flexibility by sharing equipment among multiple waste generating sites for processing campaigns that vary in duration, from very short periods to several years. The term 'mobile processing system' refers to any radioactive waste processing system or component which is designed to be transportable and which is not considered permanently installed. Two mobile system for conditioning of disused sealed radioactive sources are developed in the Public Company Nuclear Facilities of Serbia. Development of these mobile systems was supported by SRB9005 national project via Technical Cooperation of the IAEA. The first mobile system, built inside the 20 feet ISO container, will be used for conditioning of DSRS category 3 to 5. The second mobile system, built inside the 7 m long vehicle (Iveco Daily Van), will be used for dismantling of ionizing smoke detectors mostly with Am-241 sources. Designs of the mobile systems were defined in cooperation with two companies from Belgium (Belgoprocess and Leniko) and a Croatian company Ekoteh as well as with the support of the IAEA experts. The generic safety assessment and operational procedures for the mobile systems are developed. Based on safety assessment the acceptance criteria and operational limits and conditions are established. Operational procedures include: (a) equipment and material requirements, (b) assembling procedure of the mobile unit, (c) procedure for acceptance of devices for dismantling and conditioning, (d) dismantling procedure for devices to recover the DSRS, (e) characterization of DSRS, (f) encapsulation procedure of DSRS, (g) disassembling procedure of the mobile unit, and (h) keeping records, identification and traceability. In addition, radiation safety, health safety, security and emergency preparedness plans are prepared. The generic safety assessment and operational procedures could be updated with site specific requirements, DSRS inventory, and different needs for future customers. Developed mobile systems could be used in all situations when it is feasible to perform conditioning of DSRS on the spot in the county and worldwide. Development of these mobile units was just the first step to create the Reference Center for Radioactive Waste Treatment and Disused Radioactive Sources Conditioning for Small Facilities which can become a regional training center in the future, and/or as a tool for comprehensive national search and secure programmes. In the next phases development of e-learning platforms and blended learning packages as well as application for the IAEA Qualified Technical Centre (QTC) for the management of DSRS is foreseen. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Relationship Between Dose Rate and Decay Heat for Spent Nuclear Fuel Casks

Decay heat and dose rate are two important limits used for determining the allowable contents of spent fuel (SNF) in dry storage systems and transportation packages. While the decay heat limit is used to maintain fuel cladding integrity and ensure retrievability, dose rates are used to demonstrate compliance with regulatory requirements on radiation protection. Because both dose rate and decay heat result from decay of radioisotopes in SNF, this study is an attempt to examine the relationship between dose rate and decay heat for a given cask design. Dose rates were evaluated for 198 cask configurations, that include various SNF system designs (e.g., storage, transfer, transport), SNF characteristics (e.g., fuel types, burnup, cooling time), and loading maps (e.g., uniform loading, zone loading), while a constant decay heat was maintained. The decay heat was calculated using US Nuclear Regulatory Commission (NRC) Regulatory Guide (RG) 3.54, Revision 2, and verified using ORIGEN sequence within SCALE code system. The ORIGEN outputs were used as source terms in the dose analysis using 198 different configurations. A computer script was developed to calculate the cooling time necessary to achieve a given decay heat for a given enrichment, assembly average burnup, assembly mass, and in-core history using a rootfinder algorithm. Initially the computer script was developed to provide cooling time and burnup calculations directly to the analysis of dose rates and decay heats, so a comparison between Used Nuclear Fuel-Storage Transportation and Disposal Analysis Resource Data System (UNF-ST&DARDS) results and RG3.54 data was made; results are included in the appendix to this document. However, an iterative approach was used to compute cooling time, and its accuracy did not depend on the results of the RG3.54r2 algorithm, although the algorithm was still used. The results of the evaluation presented herein clearly demonstrate that a given decay heat does not correspond to a unique dose rate for a variety of cask and package designs. There is no clear pattern to develop a correlation between decay heat and the source terms. Depending on burnup, enrichment, cask type, and loading pattern, dose rates varied for the exact same decay heat—in some cases by 400% for a given cask. For cases in which decay heat was held constant through selection of the appropriate cooling time, dose rates would decrease with increasing burnup, and in other cases, dose rates would increase. The large variation in dose rates for a constant decay heat indicates that casks loaded based on decay heat—that is allowing any burnup, cooling time, and enrichment combinations that yield the qualified decay heat limit(s) —cannot ensure that an Independent Spent Fuel Storage Installation or a spent fuel transportation package will meet the regulatory limits set forth by the respective regulations, i.e., 10 CFR 72 or 10 CFR 71.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and testing of a sensitive heat-flow calorimeter for measuring radioactive waste in 55-gallon (US) drums - 15334

A sensitive large volume calorimeter for measuring the thermal power generated by the radioactive decay of heat producing materials in 55-gallon drums has been developed and tested. The technology is applicable to the measurement of all radionuclides that decay by alpha or beta decay such as waste or product material containing plutonium, tritium and americium. It is also relevant to the measurement of drums where gamma rays from radioactive decay are captured locally in attenuating materials and the resulting rate of thermal energy deposition (sample thermal power) is of sufficient magnitude for a calorimetry measurement. The initial application of the drum calorimeter is for measuring and characterizing plutonium-bearing waste drums. The calorimeter design has optimised the two characteristics of high thermal sensitivity and reduced measurement times. In order to achieve these characteristics for large volume drums, the heat-flow method of operation was chosen in a single measurement chamber configuration. Using a drum-lifting device, the waste drum is positioned on a sliding platform and subsequently moved by the operator inside an octagonal inner chamber, which acts as the heat sink. The heat-sink chamber has significant thermal inertia and remains effectively at a constant temperature throughout the duration of a drum measurement. The octagonal inner measurement chamber is constructed inside a multi-layer external thermal enclosure, which provides both thermal insulation and significant thermal inertia. The external thermal enclosure isolates the measurement process from the effects of changes in the external ambient temperature. During a measurement, heat flows from the drum being measured to the heat sink. This heat-flow is measured by a series of thermopile sensor assemblies, which are positioned between the waste drum and the heat sink. A high sensitivity of greater than 200 μV/mW (microvolts per milliwatt) has been achieved using multiple close-coupled thermopile sensors in each assembly. Reduced measurement times are achieved by positioning the thermopile sensor assemblies close to the drum surface in order to reduce the thermal transport delay. The instrument incorporates a calibrated precision power supply, which requires annual recalibration and is traceable to national standards. It is used to power a calibration heater that has been built into a calibration and test drum. The calibration and test drum is used both to calibrate the instrument and provide periodic confirmation of correct operation. Measurements of calorimeter performance are reported for a range of drum thermal powers. Long-term temperature drift measurements are used to provide estimates of the minimum detectable drum thermal power and hence the minimum detectable activity for both plutonium and tritium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aging Behavior of Viton{sup R} O-Ring Seals in the 9975 Shipping Package - 12594

The Savannah River Site (SRS) is storing plutonium (Pu) materials in the K-Area Materials Storage (KAMS) facility. The Pu materials were packaged according to the DOE-STD-3013 standard and shipped to the SRS in Type B 9975 packages. The robust 9975 shipping package was not designed for long-term product storage, but it is a specified part of the storage configuration and the KAMS facility safety basis credits the 9975 design with containment. Within the 9975 package, nested stainless steel containment vessels are closed with dual O-ring seals based on Viton{sup R} GLT or GLT-S fluoro-elastomer. The aging behavior of the O-ring compounds is being studied to provide the facility with advanced notice of nonconformance and to develop life prediction models. A combination of field surveillance, leak testing of surrogate fixtures aged at bounding service temperatures, and accelerated-aging methodologies based on compression stress-relaxation and oxygen consumption analysis is being used to evaluate seal performance. A summary of the surveillance program relative to seal aging behavior is presented. The aging behavior of fluoro-elastomer seals based on Viton{sup R} GLT and GLT-S is being studied to develop life prediction models in support of long-term storage of plutonium materials in the 9975 shipping packages at the Savannah River Site. Field surveillance data in combination with accelerated-aging data suggest a significant lifetime for the seals. Typical storage conditions are not anticipated to challenge the leak-tightness of the seals for many years. Early life prediction models based on compression stress relaxation indicate a seal lifetime of ∼12 years at the maximum service temperature predicted (93 deg. C). Seal lifetimes at lower, more realistic conditions are likely significantly longer. Service life predictions based on CSR data are thus far conservative relative to predictions based on time to leakage failure. Surveillance data on packages examined after 6 years in storage show only minor compression set of the O-rings and no significant degradation. Surveillance and testing will continue as needed to validate and refine life prediction models. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Minimum Detectable Activity for Tomographic Gamma Scanning System

For any radiation measurement system, it is useful to explore and establish the detection limits and a minimum detectable activity (MDA) for the radionuclides of interest, even if the system is to be used at far higher values. The MDA serves as an important figure of merit, and often a system is optimized and configured so that it can meet the MDA requirements of a measurement campaign. The non-destructive assay (NDA) systems based on gamma ray analysis are no exception and well established conventions, such the Currie method, exist for estimating the detection limits and the MDA. However, the Tomographic Gamma Scanning (TGS) technique poses some challenges for the estimation of detection limits and MDAs. The TGS combines high resolution gamma ray spectrometry (HRGS) with low spatial resolution image reconstruction techniques. In non-imaging gamma ray based NDA techniques measured counts in a full energy peak can be used to estimate the activity of a radionuclide, independently of other counting trials. However, in the case of the TGS each “view” is a full spectral grab (each a counting trial), and each scan consists of 150 spectral grabs in the transmission and emission scans per vertical layer of the item. The set of views in a complete scan are then used to solve for the radionuclide activities on a voxel by voxel basis, over 16 layers of a 10x10 voxel grid. Thus, the raw count data are not independent trials any more, but rather constitute input to a matrix solution for the emission image values at the various locations inside the item volume used in the reconstruction. So, the validity of the methods used to estimate MDA for an imaging technique such as TGS warrant a close scrutiny, because the pair-counting concept of Currie is not directly applicable. One can also raise questions as to whether the TGS, along with other image reconstruction techniques which heavily intertwine data, is a suitable method if one expects to measure samples whose activities are at or just above MDA levels. The paper examines methods used to estimate MDAs for a TGS system, and explores possible solutions that can be rigorously defended.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

Energy implications of mechanical and mechanical–biological treatment compared to direct waste-to-energy

Highlights: • Compared systems achieve primary energy savings between 34 and 140 MJ{sub primary}/100 MJ{sub input} {sub waste.} • Savings magnitude is foremost determined by chosen primary energy and materials production. • Energy consumption and process losses can be upset by increased technology efficiency. • Material recovery accounts for significant shares of primary energy savings. • Direct waste-to-energy is highly efficient if cogeneration (CHP) is possible. - Abstract: Primary energy savings potential is used to compare five residual municipal solid waste treatment systems, including configurations with mechanical (MT) and mechanical–biological (MBT) pre-treatment, which produce waste-derived fuels (RDF and SRF), biogas and/or recover additional materials for recycling, alongside a system based on conventional mass burn waste-to-energy and ash treatment. To examine the magnitude of potential savings we consider two energy efficiency levels (state-of-the-art and best available technology), the inclusion/exclusion of heat recovery (CHP vs. PP) and three different background end-use energy production systems (coal condensing electricity and natural gas heat, Nordic electricity mix and natural gas heat, and coal CHP energy quality allocation). The systems achieved net primary energy savings in a range between 34 and 140 MJ{sub primary}/100 MJ{sub input} {sub waste}, in the different scenario settings. The energy footprint of transportation needs, pre-treatment and reprocessing of recyclable materials was 3–9.5%, 1–18% and 1–8% respectively, relative to total energy savings. Mass combustion WtE achieved the highest savings in scenarios with CHP production, nonetheless, MBT-based systems had similarly high performance if SRF streams were co-combusted with coal. When RDF and SRF was only used in dedicated WtE plants, MBT-based systems totalled lower savings due to inherent system losses and additional energy costs. In scenarios without heat recovery, the biodrying MBS-based system achieved the highest savings, on the condition of SRF co-combustion. As a sensitivity scenario, alternative utilisation of SRF in cement kilns was modelled. It supported similar or higher net savings for all pre-treatment systems compared to mass combustion WtE, except when WtE CHP was possible in the first two background energy scenarios. Recovery of plastics for recycling before energy recovery increased net energy savings in most scenario variations, over those of full stream combustion. Sensitivity to assumptions regarding virgin plastic substitution was tested and was found to mostly favour plastic recovery.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Dynamic Waste Isolation Pilot Plant Performance Assessment Tool - 12490

The Waste Isolation Pilot Plant (WIPP) Performance Assessment (PA) methodology comprises a toolbox used to demonstrate regulatory compliance of the repository after facility closure. The PA framework rests upon an extensive suite of computational codes. In some cases, significant alteration of code inputs is a tedious and difficult task. Due to the nature of the application for which they are used, PA codes used in support of WIPP regulatory compliance demonstration must satisfy stringent quality assurance requirements. Consequently, many of the coding practices used during original code development are still implemented today. A more efficient workflow configuration has the potential to alleviate difficulties associated with extensive code input modifications. Here, this potential is assessed via an implementation of a more flexible scientific workflow system for a subset of the codes used in WIPP PA. The scientific workflow approach taken here for a dynamic PA system enables users from disparate backgrounds to dramatically shorten the time between hypothesis and analysis by decreasing the amount of a priori knowledge, from a range of disciplines, needed to execute the code. Having smaller iteration times allows for more ideas to be tested and explored, which leads to safer and more optimized systems. Note that these high-level, dynamic tools are intended only for initial scoping studies on the personal computer of a researcher. Full, regulatory compliance calculations may occur only within a qualified computing environment. However, the WIPP PA tools here may guide future research and indicate regions of the analysis space that are worth further study. This next generation of PA software provides the ability to perform scoping investigations of repository performance quickly and easily, and has an accessible and useful interface to a variety of users, such as fuel cycle systems designers, domain experts such as repository modelers, and policy makers. The purview of this project allows for many opportunities for future work. Foremost among these is the desire to implement the full BRAGFLO suite within the workflow. This will entail porting or wrapping Genmesh, Matset, LHS, and ICSet within Python. Moreover, unifying the two GUIs into a single driver application would be a natural next step. Once the BRAGFLO suite is completed, other portions of WIPP PA could be implemented with corresponding and inter-operable work-flows. Likely first candidates for this are those codes that are similarly computationally intensive, such as the one used to generate complementary cumulative distribution functions used to demonstrate regulatory compliance (code CCDFGF). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Transporting Saltstone Samples Prior to Set

The Saltstone Sampling and Analyses Plan provides a basis for the quantity (and configuration) of saltstone grout samples required for conducting a study directed towards correlation of the Performance Assessment (PA) related properties of field-emplaced samples and samples processed and cured in the laboratory. The testing described in the saltstone sampling and analyses plan will be addressed in phases. The initial testing (Phase I) includes collecting samples from the process room in the Saltstone Production Facility (SPF) and transporting them to Savannah River National Laboratory (SRNL) where they will cure under a temperature profile that mimics the temperature in the Saltstone Disposal Unit (SDU) and then be analyzed. SRNL has previously recommended that after the samples of fresh (uncured) saltstone are obtained from the SPF process room, they are allowed to set prior to transporting them to SRNL for curing. The concern was that if the samples are transported before they are set, the vibrations during transport may cause artificial delay of structure development which could result in preferential settling or segregation of the saltstone slurry. However, the results of this testing showed there was no clear distinction between the densities of the cylinder sections for any of the transportation scenarios tested (1 day, 1 hour, and 0 minutes set time prefer to transportation) . The bottom section of each cylinder was the densest for each transportation scenario, which indicates some settling in all the samples. Triplicate hydraulic conductivity measurements on samples from each set of time and transportation scenarios indicated that those samples transported immediately after pouring had the highest hydraulic conductivity. Conversely, samples that were allowed to sit for an hour before being transported had the lowest hydraulic conductivity. However, the hydraulic conductivities of all three samples fell within an acceptable range. Based on the cured property analysis of the three samples, there is no clear conclusion about transporting the samples before they are set; however, experience with saltstone grout indicates the samples should sit and develop some structure before being transported to SRNL for curing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Transmission and Infrastructure Northern Ohio (OH)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energy-delivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Waste Encapsulation and Storage Facility Stabilization and Ventilation Project-18121

Department of Energy contractor CH2M HILL Plateau Remediation Company (CH2M) is responsible for the safe and compliant operation of the Waste Encapsulation and Storage Facility (WESF), a nuclear materials storage facility at Hanford containing 1,936 highly radioactive capsules containing cesium and strontium. The capsules are currently stored under approximately 4 m (13 ft) of water. The water shields workers from radiation and helps cool the capsules. WESF is a large, concrete structure nominally 48 m (160 ft) long, 30 m (98 ft) wide and 12 m (40 ft) high with the pool cells being approximately 4 m (13 ft) below grade level. It is a robust facility with walls ranging from 0.3 m to 1 m (1 ft to 3 ft) thick. While the capsules are currently in a safe configuration, WESF is an aging facility, and DOE and CH2M are modifying the facility to ensure continued safe and compliant operations and to support the eventual transfer of capsules to dry storage. Dry storage would eliminate the possibility of a release of radioactive material in the unlikely event of a major earthquake that might result in loss of pool storage water and overheating and breach of one or more capsules. The project was divided into two major deliverables: 1) Ventilation: replacement of the existing ventilation system which included a below-grade high efficiency particulate air (HEPA) filter pit with an above grade HEPA filter skid and new fans and ducting. 2) Stabilization: grouting deactivated facility hot cells and other void spaces to the maximum extent practical to reduce material at risk from legacy contamination. The aging ventilation system relied on HEPA filters that exceeded their operational life. Due to the high levels of radionuclide contamination, replacing the filters was impractical and highly hazardous. CH2M installed a new ventilation system to provide safe and compliant ventilation for future operations. The project used an existing, unused ventilation skid that was designed for another project. Repurposing the unused skid presented additional technical challenges to modify the system for the project specific requirements. The new system is above ground, easier to maintain and is built to current standards. New connections inside the facility were installed to allow the new ventilation to operate effectively. The stabilization project is unique in that core drilling and grouting was performed in an operating Hazard Category 2 nuclear facility, which brought forth safety basis and environmental regulatory challenges. The hot cells were isolated from all existing support utilities including electrical, process chemicals, manipulator ports, instrument air, etc. to seal the hot cells and prevent highly contaminated supernate or grout from leaking into adjacent galleries. A high flow grout was used to maximize the distance between injection ports. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impacts of Crust Properties on the Waste Feed Delivery of Hanford Tanks with Flammability Concerns - 18161

Mitigation of flammability concerns within Hanford waste tanks is essential to Safe Storage and Waste Feed Delivery sub-functions of the River Protection Project Mission. The tanks that have a higher propensity for the generation, retention, and release of flammable gas are considered Waste Group A tanks. Group A tanks include 241-SY-103, 241-AN-103, 241-AN-104, 241-AN-105, and 241-AW-101. Successful mitigation of flammability concerns in these tanks is necessary, as they are critical to the completion of the River Protection Project Mission as indicated in the Integrated Waste Feed Delivery Plan. The benchmark for examination of tank flammability issues is 241-SY-101. Studies of Tank 241-SY-101 gas release events showed that the mechanism of gas retention and release was highly dependent on the volume and configuration of a floating crust layer. Beginning in 1993, 241-SY-101 underwent water additions and mixer pump operations resulting in dissolution of the crust. These efforts mitigated the flammability concerns of the tank. A similar mitigation approach was recommended for Tank 241-SY103 and is recommended for the other Waste Group A tanks. However, this recommended mitigation will be more or less effective based on the expected thickness of the crust present in each of the Group A tanks. Considerations of flammable gas generation and release mechanisms were essential in the development of a successful mitigation strategy for Tank 241-SY-101, and will be essential in the development of future mitigation strategies. Because crust properties are difficult to measure, tank surface level trends and current temperature profiles are evaluated to understand crust properties. 241-AN-103 and 241-AW-101 are the only two tanks with a net increase in surface level, indicating a higher generation and retention of flammable gas. Additionally, these are the two tanks with the thickest crusts, which causes both a higher retention of gas and a reduced evaporation rate. Given the current temperature profile, crust thickness for 241-AW-101 was re-evaluated to be 145 cm (57 in) ± 30 cm (12 in) which is different from its historic value. This gives 241-AW-101 the thickest crust, second only to 241-SY-101 prior to mitigation. The crust thickness for 241-AN-103, however, retains its historic value of 89 cm (35 in) ± 16 cm (6 in). These crust properties suggest modifications to the mitigation strategy are needed for each tank. For example, 241-AN-103 and 241-AW-101 will require additional water to dissolve the crust layer before flammability concerns are mitigated and further operations could commence. Implementation of the modified mitigation strategies will mitigate flammability issues and help fulfill the Safe Storage and Waste Feed Delivery sub-functions of the River Protection Project Mission safely and efficiently. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and testing of a combined neutron and gamma assay system for measuring fissile material in fuel and waste items - 15340

A combined neutron and gamma ray assay system for the measurement of fissile material in both fuel and waste items has been designed, modelled, developed and tested. The purpose of the system is to measure and characterize a wide range of fissile materials including uranium, plutonium, americium and mixed oxide fuel arising from a variety of processes and facilities across the United Kingdom. Dounreay Site Restoration Limited at Dounreay currently stores these items form the United Kingdom Nuclear Decommissioning Authority's un-irradiated fuel inventory. This inventory comprises historic materials from ex-United Kingdom Atomic Energy Authority nuclear fuel projects and experiments together with fast reactor fuel materials and some commercial fuel items as delivered to Dounreay for recovery. The combined assay system has been designed and constructed to support the operation of a fuel processing facility, which will be operated at Dounreay to treat these historic legacy fuel materials, making them suitable for long term storage. Appropriate characterization of the fissile material is required for safety, criticality control and nuclear materials safeguards purposes prior to final disposition. The system consists of both gamma ray and neutron measurement components. The results of a neutron measurement are combined with the gamma ray isotopic ratio measurement results to generate the assay result for the fissile material being characterized. The gamma ray component of the system employs a safeguards quality high purity Germanium detector with electro-mechanical cooling and the measurements of fissile material containers are made in a shielded chamber with a tin and copper graded lining. Containers of fissile material are rotated during the gamma ray measurement and a variable automatic steel collimator aperture mechanism is employed to adjust the measured count rate to control detector dead time. Gamma ray spectra are analysed using the plutonium and uranium isotopic ratio code PC/FRAM. The gamma ray system can also be configured to perform a direct assay of small quantities of uranium bearing material. For this assay measurement a series of cadmium filters can be positioned in front of the detector to reduce the contribution from 59 keV gamma rays from Am-241. In addition to gamma ray isotopic measurements, both active and passive neutron assay is performed by the system. The neutron-measuring component consists of a thick walled cylindrical polyethylene chamber, which provides neutron moderation for 30 one-inch diameter He-3 detector tubes located in re-entrant channels in the polyethylene moderator. Two removable polyethylene-inserts incorporating lower plug assemblies are provided, one with and one without a cadmium lining. Also two top plug units are provided, again one with cadmium and one without a cadmium liner. The Neutron Subsystem can be operated both as a passive and as an active neutron coincidence counter. In both fast and thermal active neutron mode, the neutron component employs two americium-beryllium (Am-Be) alpha-n neutron sources, one positioned in the top and the other in the bottom plug unit. The neutron sources are removed when the counter is operated in passive mode. Passive neutron detection efficiency and active neutron performance has been modelled using the MCNP Monte Carlo computer simulation code as part of the design process. In the absence of fissile samples, operation of the gamma ray component of the system has been tested initially using calibrated Eu-152 and Ba-133 gamma ray sources and the use of archived spectra from fissile material measurements. Initial testing of the neutron system has employed a calibrated Cf-252 spontaneous fission neutron source. Neutron testing has been confirmed using further MCNP simulations. The results of test measurements with the system are presented and compared with the results of MCNP measurement simulations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modular Undersea Compressed Air Energy Storage (UCAES) System

This project has been devoted to the design, optimization, and cost analysis of a unique power plant with integral energy storage. The proposed facility combines a novel underwater compressed air energy storage (UCAES) system with a customized gas turbine generator, providing exceptional power management and overall efficiency. Unlike conventional CAES, opportunities for underwater storage are plentiful and proximal to the power grid. The UCAES system provides coastal and island communities a practical means for managing the volatility of large-scale wind and solar power resources. The result is higher renewable energy absorption and improved electrical reliability with reduced fossil fuel consumption. The UCAES power plant is composed of three major subsystems: The underwater air containment system (ACS), the air transport pipe (ATP), and the land-based power conversion system (PCS). The underwater ACS is made up of modular concrete shell units, structurally optimized for minimal material usage while employing conventional production methods and equipment. Each shell is designed to receive and control loose fill or gravel, serving as the ballast. The static nature of the final structures make them an asset to marine habitats and includes features intended to permit safe and cost-effective deployment. The ATP Connects the ACS modules to each other and to the on-land power conversion system and utilizes high density polyethylene (HDPE) pipe for low cost and long life. The PCS Houses the turbine-generator ‘expander modules’, with peak capacity of 12.3 MWe each, engineered from existing gas turbine equipment and includes electrically driven commercial 3-stage intercooled centrifugal compressors, each nominally drawing 6.6 MWe when matching the turbine flow requirements. The subsystems listed above are designed with the intent to serve as building-blocks to achieve a peak power output rating in the 40 to 120 MWe range, with 0.25 to 4 hours of energy storage capacity. The modular facility with integral energy storage provides some remarkable transient maneuvers and load-following features unachievable by competing technologies. The system can operate as a dispatchable power plant with a fuel-to-electric efficiency over 41%; substantially better that the average existing Hawaiian peak power generation assets. Optimal efficiency can be maintained while load-following due to modular PCS design and is operable with a range of liquid or gaseous fuels while meeting the most stringent California (CARB) emission standards. The system can operate as a peaking energy plant in discharge mode. Power ramp-up equivalent to 215% of continuous load rating within 1 second accomplished by simply turning off the electric compressor(s). Contrarily, the system can offer energy absorption during periods of grid surplus generation. The electric compressors may be sequenced on to absorb power within seconds. More moderate transitions are easily achieved with standard compressor control functions. The system offers unique features as compared to energy storage systems. ‘Round-trip efficiency’, as calculated by industry standard methods, is in the 90% range. The PCS equipment has a mean-time between overhauls of 80,000 hours, with maintenance costs of less than $0.005/kW-hr of electricity delivered. The underwater ACS structures and piping employ materials and designs specified to achieve a 75 year life. With the underwater containment modules qualified as a marine habitat, there would be no decommissioning costs. In conjunction with the engineering work invested in the design of the UCAES power plant, Brayton Energy has employed a team of manufacturing specialists, marine construction engineers, and power industry experts to create a comprehensive economic model that captures the many site-related variables and configuration options. The cost results and methodology have been validated by suppliers, engineers, and deployment specialists through a detailed case study on Hawaii. While creation of the parametric cost model was based on inputs specific to Hawaii, the proposed construction and deployment steps were chosen to be general enough to allow extrapolation across locations world-wide. Analysis of the proposed system shows it to be a viable option and addresses the principal challenges described by the Department of Energy by offering competitive costs, validated safety and reliability, consideration of the regulatory environment, and utilization of industry accepted practices and equipment. The UCAES system is recommended for immediate consideration in Hawaii. Estimation of time to complete planning, design, and construction of the facility is anticipated to take 3 to 5 years. Other coastal and island communities world-wide should realize similar benefits; as the results presented in this report are considered generally transferable to other locations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fuel Cycle Research & Development Technical Monthly – May 2012

Management and Integration LANL - Initial coordination meetings with NE and NA-20 were held the first week of May. Additional meetings, to include NA-82 and the new Proliferation and Terrorism Risk Assessment task are scheduled for June. Work package planning as part of the NTD transition is ongoing. Microcalorimetry LANL - Some parts to attempt repair of a malfunctioning water chiller that has been holding up work on the current detector array have arrived. We will attempt to begin running the compressor/cryostat next week to resume work on commissioning the detector array. We have also been working on a backup plan to temporarily move our system to a different lab space. Completed data analysis and prepared a paper summarizing Pu measurements for peer-review journal. Two members of our team presented work at the SORMA West 2012 conference. Completed data analysis and prepared a milestone report summarizing the development of Monte Carlo tools to study systematic errors. Electrochemical Sensor INL - The second sensor test was stopped short due to the work stand-down. Some activities related to this work have resumed, but not all. The sensor used during the second test was removed from the furnace and it showed cracks and later crumbled when being rinsed for sample preparation. The sensor material will be submitted to SEM analysis once work is resumed in the facilities where analysis is performed. A third sensor test has started. Tests with different arrangements will continue and will be oriented based on post-test analysis of the first three sensor tests. Materials with different annealing temperatures will also be prepared for analysis. Lead slowing down spectrometer LANL - Continued work on perturbation method for LSDS analysis. We are running simulations to delineate issues and are checking additional data libraries to see whether there are differences in simulation results. Electrochemical sensor INL - The second sensor test was stopped short due to the work stand-down. Some activities related to this work have resumed, but not all. The sensor used during the second test was removed from the furnace and it showed cracks and later crumbled when being rinsed for sample preparation. The sensor material will be submitted to SEM analysis once work is resumed in the facilities where analysis is performed. A third sensor test has started. Tests with different arrangements will continue and will be oriented based on post-test analysis of the first three sensor tests. Materials with different annealing temperatures will also be prepared for analysis. Fast Neutron Multiplicity analysis INL - The University of Michigan team continues its work on the post-experiment analysis of the validation data from JRC ISPRA, as well as scoping studies using the simulation tool MCNPX-PoliMi. At INL, our new staff member working on this project is now working to model performance capabilities for the fast-neutrons scintillator design concepts. At INL our primary analysis approach is focused on the Feynman mean-to-variance approach. At the University of Michigan, the primary analysis approach is multiplicity coincidence analysis. Fast Neutron Imaging to Quantify Nuclear Materials ORNL - Completed additional measurements of the two 'trainer' configurations as well as calibration measurements with sources on an x-y stage. The imager was shipped to Pantex for an NA-22 obligation at the end of May. Lead Slowing Down Spectrometer LANL - Continued to look into He4 detector. A Swiss company was located that makes He4 detectors and associated electronics. Had a teleconference with them to assess the possible help we can get from them. We are also looking in to constructing one locally. Ongoing perturbation calculations are providing information on the fundamental systematic error limits of LSDS. In order to achieve separating the contribution of Pu and 235U to the signal, there will need to be tight controls on systematic errors. Multi-isotope Process Monitor PNNL - Attended a training call in advanced multivariate classification and analysis methods. These methods were applied to the multivariate analysis of fuel characteristics based on simulated gamma. Work continued on a computational framework to quantify the impact of gamma-ray counting statistical precision on principal component regression (PCR) analysis of a multi-component (i.e. multi-isotope) gammaray spectrum. Tests of the simulation framework are anticipated to begin in early June. Development of a proposal to instrument H-Canyon is being prepared in conjunction with SRNL and the NNSA's NGSI program is ongoing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Disposition of Radioisotope Thermoelectric Generators Currently Located at the Oak Ridge National Laboratory - 12232

Under the American Recovery and Reinvestment Act (ARRA), the U.S. Department of Energy (DOE) awarded SEC Federal Services Corporation (SEC) a 34-building demolition and disposal (D and D) project at the Oak Ridge National Laboratory (ORNL) that included the disposition of six Strontium (Sr-90) powered Radioisotope Thermoelectric Generators (RTGs) stored outside of ORNL Building 3517. Disposition of the RTGs is very complex both in terms of complying with disposal facility waste acceptance criteria (WAC) and U.S. Department of Transportation (DOT) requirements for packaging and transportation in commerce. Two of the RTGs contain elemental mercury which requires them to be Land Disposal Restrictions (LDR) compliant prior to disposal. In addition, all of the RTGs exceed the Class C waste concentration limits under Nuclear Regulatory Commission (NRC) Waste Classification Guidelines. In order to meet the LDR requirements and Nevada National Security Site (NNSS) WAC, a site specific treatability variance for mercury was submitted to the U.S. Environmental Protection Agency (EPA) to allow macro-encapsulation to be an acceptable treatment standard for elemental mercury. By identifying and confirming the design configuration of the mercury containing RTGs, the SEC team proved that the current configuration met the macro-encapsulation standard of 40 Code of Federal Regulations (CFR) 268.45. The SEC Team also worked with NNSS to demonstrate that all radioisotope considerations are compliant with the NNSS low-level waste (LLW) disposal facility performance assessment and WAC. Lastly, the SEC team determined that the GE2000 Type B cask met the necessary size, weight, and thermal loading requirements for five of the six RTGs. The sixth RTG (BUP-500) required a one-time DOT shipment exemption request due to the RTG's large size. The DOT exemption justification for the BUP-500 relies on the inherent robust construction and material make-up of the BUP- 500 RTG. DOE-ORO, SEC, and the entire SEC RTG team are nearing the conclusion of the Sr-90 RTG disposition challenge - a legacy now 50 years in the making. Over 600,000 Ci of Sr-90 waste await disposal and its removal from ORNL will mark an historical moment in the clean-up of the cold-war legacy in the ORNL central industrial area. Elimination (i.e., removal) of the RTGs will reduce security risks at ORNL and disposal will permanently eliminate security risks. The RTGs will eventually decay to benign levels within a reasonable timeframe relative to radiological risks posed by long-lived isotopes. The safety authorization basis at ORNL Building 3517 will be reduced enabling greater operational flexibility in future clean-out and D and D campaigns. Upon disposition the Department of Energy will realize reduced direct and indirect surveillance and maintenance costs that can be reapplied to accelerated and enhanced clean-up of the Oak Ridge Reservation. At present, waste profiles for the RTGs are developed and under review by NNSS RWAP staff and approval authorities. Disposition schedule is driven by the availability of compliant shipping casks necessary to safely transport the RTGs from ORNL to NNSS. The first disposal of the RCA RTG is expected in April 2012 and the remaining RTGs disposed in 2012 and 2013. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ion Exchange Column Thermal Modeling: Prevention of Process Effluent Boiling - 18577

The Savannah River Site treats and disposes of legacy high-level waste, which resulted from 60 years of nuclear material production, medical research, and other nuclear related work. Complex mixtures of soluble and insoluble solids occupy tanks of which the South Carolina Department of Health and Environmental Control recognizes as the single largest environmental risk state-wide. The risk is reduced through removal, treatment, and solidification of decontaminated salt waste. Presently, SRS decontaminates the soluble salt component of the waste, a solution containing actinides and cesium, via implementation of the Actinide Removal Process and the Modular Caustic Side Solvent- Extraction Unit. Caustic solvent extraction is set to increase in scale by late 2018, with startup of the newly constructed Salt Waste Processing Facility. In conjunction with Salt Waste Processing Facility startup, Savannah River Remediation has been tasked by the Department of Energy to demonstrate modular ion exchange technology. The Tank Closure Cesium Removal project aims to demonstrate the feasibility of modular ion exchange processes for future Department of Energy applications. The Tank Closure Cesium Removal system is scheduled to begin operation in mid-2018. Dissolved salt solution, or influent, will be fed through a filter and ion exchange columns in lead-lag configuration, producing effluent. The effluent is fed to a separate high-level waste tank, for future disposition at Salt-stone Production Facility. Once the demonstration project is complete, the loaded ion exchange columns will be purged, dried, and placed in interim safe storage, awaiting final disposition. The ion exchange media selected for the Tank Closure Cesium Removal system is Honeywell UOP IONSIV{sup C} R-9120. The media is a prime candidate for separation of cesium from radioactive high-level waste. UOP R-9120{sup C} is inorganic and has high capacity, selectivity, and affinity for cesium. During operation, influent is fed to the ion exchange columns, contacting UOP R-9210{sup C} packed within the media vessel. Contact initiates loading of isotopes, and given ample time the solid phase (ion exchange media) and solution achieve thermodynamic equilibrium. UOP R-9120{sup C} is a prime candidate for separation of cesium and dissolved fission products. Although the properties of UOP R-9120{sup C} are favorable for separation, the same properties lead to accumulation of a heat source in the ion exchange bed. Cesium-137 and its daughter product, barium-137 m, generate a clear majority of heat (i.e. ∼ 94%). During operation salt solution flows through each column and transports heat from the ion exchange bed. Once operation is terminated, the effluent contained within the porous bed volume becomes essentially static. In the absence of engineering controls, the heat generated may boil the effluent. Rapid vaporization of aqueous salt solution would lead to bed over pressurization. Over pressurization and an associated release of high-level waste would result in adverse impacts to human health and the environment. This paper focuses on modeling the heat transfer associated with the Tank Closure Cesium Removal system ion exchange column. The model evaluates the maximum heat generation and the associated radionuclide loadings that prevent boiling within of the media vessel, under no flow conditions. A safety significant control, maintaining loadings less than the established loading limit ensures associated impacts to human health and the environment are prevented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

235-F GoldSim Fate and Transport Model: Uncertainty Quantification

Building 235-F was configured with two missions in mind: Actinide Billet Line (ABL) and the fabrication of Pu-238 oxide for space program applications. ABL produced Np-237 billets for use in SRS reactors, whereas the design process, fabrication, and examination of Pu-238 oxide powder occurred within the following areas, respectively: Plutonium Experimental Facility (PEF), Plutonium Fuel Form (PuFF), and Old Metallography Lab (OML). By 1990 production ceased and by 2006 de-inventory occurred; however, assays have shown significant holdup remains within ABL and PuFF. As a result, 235-F is a Category 2 nuclear facility, with plans to undergo deactivation and decommission (D and D) via In-Situ Disposal (ISD). The purpose of this project is to ensure United States Environmental Protection Agency (USEPA) groundwater radiation maximum contaminant level (MCL) and dosage standards are met during the D and D of 235-F by quantifying uncertainty through probabilistic modeling and evaluation of various ISD alternatives. GoldSim is a dynamic modeling software package with a graphical, object-oriented interface capable of capturing the influence of complex system input variability on probabilistic system outcomes. A GoldSim stochastic fate and transport model for 235-F was developed and matched with a PORFLOW deterministic model to simulate probabilistic release and flow of radionuclides from ABL and PuFF into the vadose zone, the Upper Three Runs (UTR) Aquifer, and UTR Creek. The GoldSim model was used to probabilistically evaluate four ISD scenarios against USEPA groundwater radiation MCLs and dosage standards. The deterministic 235-F GoldSim fate and transport model continues to be refined to match the results of the PORFLOW deterministic model to ensure the model accurately represents radionuclide movement through the groundwater system. The stochastic variables that are utilized within the GoldSim model are founded on the most current data; a conservative perspective is taken where needed. Alignment with the PORFLOW deterministic model, coupled with input stochastic variability, allows the probabilistic 235-F GoldSim model to capture the conservative breadth of possible outcomes for radionuclide fate within this particular system. This ensures that the USEPA MCLs and dosage limits hold even in the worst case scenarios.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗