Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Method of Determining the Reliability of Real-Time In-reactor Monitoring of VVER

A methodological approach and the basic tenets for evaluating the reliability of in-reactor monitoring of VVER are presented. The method is based on the statistical analysis of indications in real time and includes methods for evaluating the admissible maximum error of the measurement channels used for monitoring as well as the average value and admissible deviation of indications in groups of parallel monitoring channels, as well as a method of evaluating reliability by comparing the values of a parameter with the regime values. In comparing the indications of a monitoring channel with the indications of other parallel channels, the median value is proposed as the baseline value. The developed method is implemented in the Diagnostika SVRK special software, which has been successfully tested during the commissioning of the No. 1 unit at the Novovoronezh NPP-2.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

2011 Status of the Automatic Alignment System for the National Ignition Facility

Automated alignment for the National Ignition Facility (NIF) is accomplished using a large-scale parallel control system that directs 192 laser beams along the 300-m optical path. The beams are then focused down to a 50-micron spot in the middle of the target chamber. The entire process is completed in less than 50 minutes. The alignment system commands 9,000 stepping motors for highly accurate adjustment of mirrors and other optics. 41 control loops per beamline perform parallel processing services running on a LINUX cluster to analyze high-resolution images of the beams and their references. This paper describes the status the NIF automatic alignment system and the challenges encountered as NIF development has transitioned from building the laser, to becoming a research project supporting a 24 hour, 7 day laser facility. NIF is now a continuously operated system where performance monitoring is increasingly more critical for operation, maintenance, and commissioning tasks. Equipment wear and the effects of high energy neutrons from fusion experiments are issues which alter alignment efficiency and accuracy. New sensors needing automatic alignment assistance are common. System modifications to improve efficiency and accuracy are prevalent. Handling these evolving alignment and maintenance needs while minimizing the impact on NIF experiment schedule is expected to be an on-going challenge for the planned 30 year operational life of NIF.

42 ENGINEERING↗

Cone Beam Computed Tomography Image Guidance System for a Dedicated Intracranial Radiosurgery Treatment Unit

Purpose: Image guidance has improved the precision of fractionated radiation treatment delivery on linear accelerators. Precise radiation delivery is particularly critical when high doses are delivered to complex shapes with steep dose gradients near critical structures, as is the case for intracranial radiosurgery. To reduce potential geometric uncertainties, a cone beam computed tomography (CT) image guidance system was developed in-house to generate high-resolution images of the head at the time of treatment, using a dedicated radiosurgery unit. The performance and initial clinical use of this imaging system are described. Methods and Materials: A kilovoltage cone beam CT system was integrated with a Leksell Gamma Knife Perfexion radiosurgery unit. The X-ray tube and flat-panel detector are mounted on a translational arm, which is parked above the treatment unit when not in use. Upon descent, a rotational axis provides 210 Degree-Sign of rotation for cone beam CT scans. Mechanical integrity of the system was evaluated over a 6-month period. Subsequent clinical commissioning included end-to-end testing of targeting performance and subjective image quality performance in phantoms. The system has been used to image 2 patients, 1 of whom received single-fraction radiosurgery and 1 who received 3 fractions, using a relocatable head frame. Results: Images of phantoms demonstrated soft tissue contrast visibility and submillimeter spatial resolution. A contrast difference of 35 HU was easily detected at a calibration dose of 1.2 cGy (center of head phantom). The shape of the mechanical flex vs scan angle was highly reproducible and exhibited <0.2 mm peak-to-peak variation. With a 0.5-mm voxel pitch, the maximum targeting error was 0.4 mm. Images of 2 patients were analyzed offline and submillimeter agreement was confirmed with conventional frame. Conclusions: A cone beam CT image guidance system was successfully adapted to a radiosurgery unit. The system is capable of producing high-resolution images of bone and soft tissue. The system is in clinical use and provides excellent image guidance without invasive frames.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

In Search of the Economic Sustainability of Hadron Therapy: The Real Cost of Setting Up and Operating a Hadron Facility

Purpose: To determine the treatment cost and required reimbursement for a new hadron therapy facility, considering different technical solutions and financing methods. Methods and Materials: The 3 technical solutions analyzed are a carbon only (COC), proton only (POC), and combined (CC) center, each operating 2 treatment rooms and assumed to function at full capacity. A business model defines the required reimbursement and analyzes the financial implications of setting up a facility over time; activity-based costing (ABC) calculates the treatment costs per type of patient for a center in a steady state of operation. Both models compare a private, full-cost approach with public sponsoring, only taking into account operational costs. Results: Yearly operational costs range between €10.0M (M = million) for a publicly sponsored POC to €24.8M for a CC with private financing. Disregarding inflation, the average treatment cost calculated with ABC (COC: €29,450; POC: €46,342; CC: €46,443 for private financing; respectively €16,059, €28,296, and €23,956 for public sponsoring) is slightly lower than the required reimbursement based on the business model (between €51,200 in a privately funded POC and €18,400 in COC with public sponsoring). Reimbursement for privately financed centers is very sensitive to a delay in commissioning and to the interest rate. Higher throughput and hypofractionation have a positive impact on the treatment costs. Conclusions: Both calculation methods are valid and complementary. The financially most attractive option of a publicly sponsored COC should be balanced to the clinical necessities and the sociopolitical context.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Comparison of 3-dimensional dose reconstruction system between fluence-based system and dose measurement-guided system

COMPASS system (IBA Dosimetry, Schwarzenbruck, Germany) and ArcCHECK with 3DVH software (Sun Nuclear Corp., Melbourne, FL) are commercial quasi-3-dimensional (3D) dosimetry arrays. Cross-validation to compare them under the same conditions, such as a treatment plan, allows for clear evaluation of such measurement devices. In this study, we evaluated the accuracy of reconstructed dose distributions from the COMPASS system and ArcCHECK with 3DVH software using Monte Carlo simulation (MC) for multi-leaf collimator (MLC) test patterns and clinical VMAT plans. In a phantom study, ArcCHECK 3DVH showed clear differences from COMPASS, measurement and MC due to the detector resolution and the dose reconstruction method. Especially, ArcCHECK 3DVH showed 7% difference from MC for the heterogeneous phantom. ArcCHECK 3DVH only corrects the 3D dose distribution of treatment planning system (TPS) using ArcCHECK measurement, and therefore the accuracy of ArcCHECK 3DVH depends on TPS. In contrast, COMPASS showed good agreement with MC for all cases. However, the COMPASS system requires many complicated installation procedures such as beam modeling, and appropriate commissioning is needed. In terms of clinical cases, there were no large differences for each QA device. The accuracy of the compass and ArcCHECK 3DVH systems for phantoms and clinical cases was compared. Both systems have advantages and disadvantages for clinical use, and consideration of the operating environment is important. The QA system selection is depending on the purpose and workflow in each hospital.

61 RADIATION PROTECTION AND DOSIMETRY↗

Operational experience with the CDF Run II Silicon Detector

The CDF Run II Silicon Detector is the largest operating silicon detector in High Energy Physics. Its 722,000 channels spread over 7 m{sup 2} of silicon micro-strip sensors allow precision tracking and vertexing. The CDF silicon detector played a critical role in the discovery of B{sub s} mixing and is used extensively for the current Higgs Boson searches. Over the last 7 years, the detector efficiency has remained stable at 95% after the Run II commissioning period. The infrastructure (cooling, power supplies) problems dealt with are discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Free electron lasers: Present status and future challenges

With the scientific successes of the soft X-ray FLASH facility in Germany and the recent spectacular commissioning of the Linac Coherent Light Source at SLAC, free electron lasers are poised to take center stage as the premier source of tunable, intense, coherent photons of either ultra-short time resolution or ultra-fine spectral resolution, from the far infrared to the hard X-ray regime. This paper examines the state of the art in FEL performance and the underlying enabling technologies. It evaluates the state of readiness of the three basic machine architectures—SASE FELs, seeded FELs, and FEL oscillators—for the major X-ray science user facilities on the 5–10 years time scale and examines the challenges that lie ahead for FELs to achieve their full potential throughout the entire spectral range. In soft and hard X-rays, high longitudinal coherence, in addition to full transverse coherence, will be the key performance upgrade; ideas using laser-based or self-seeding or oscillators can be expected to be qualitatively superior to today&#x27;s SASE sources. Short pulses, from femtoseconds to attoseconds, can be realistically envisioned. With high repetition rate electron sources coupled to superconducting radiofrequency linear accelerators, unprecedented average beam brightness will be possible and many users would be served simultaneously by a single accelerator complex.

43 PARTICLE ACCELERATORS↗

Nonintrusive Emittance Measurement of 1GeV H- Beam with a Laser

A laser wire based transverse phase space measurement system has been developed at the Spallation Neutron Source (SNS). The system allows a nonintrusive measurement of 1GeV hydrogen ion (H-) beam at the high energy beam transport (HEBT). This paper describes the design, installation, and measurement performance of the system. Major technical challenges in the implementation and commissioning of the nonintrusive phase space diagnostics at high brightness particle accelerator facilities are discussed.

43 PARTICLE ACCELERATORS↗

Synchroscan streak camera imaging at a 15-MeV photoinjector with emittance exchange

At the Fermilab A0 photoinjector facility, bunch-length measurements of the laser micropulse and the e-beam micropulse have been done in the past with a fast single-sweep module of the Hamamatsu C5680 streak camera with an intrinsic shot-to-shot trigger jitter of 10 to 20 ps. We have upgraded the camera system with the synchroscan module tuned to 81.25 MHz to provide synchronous summing capability with less than 1.5-ps FWHM trigger jitter and a phase-locked delay box to provide phase stability of {approx}1 ps over 10s of minutes. These steps allowed us to measure both the UV laser pulse train at 263 nm and the e-beam via optical transition radiation (OTR). Due to the low electron beam energies and OTR signals, we typically summed over 50 micropulses with 0.25-1 nC per micropulse. The phase-locked delay box allowed us to assess chromatic temporal effects and instigated another upgrade to an all-mirror input optics barrel. In addition, we added a slow sweep horizontal deflection plug-in unit to provide dual-sweep capability for the streak camera. We report on a series of measurements made during the commissioning of these upgrades including bunch-length and phase effects using the emittance exchange beamline and simultaneous imaging of a UV drive laser component, OTR, and the 800-nm diagnostics laser.

43 PARTICLE ACCELERATORS↗

The sPHENIX Micromegas Outer Tracker

The sPHENIX Time Projection Chamber Outer Tracker (TPOT) is a Micromegas based detector. It is a part of the sPHENIX experiment that aims to facilitate the calibration of the Time Projection Chamber, in particular the correction of the time-averaged and beam-induced distortions of the electron drift. Here, this paper describes the detector mission, setup, construction, installation, commissioning and performance during the first year of sPHENIX data taking.

47 OTHER INSTRUMENTATION↗

Modeling, design and thermal performance of a BIPV/T system thermally coupled with a ventilated concrete slab in a low energy solar house: Part 2, ventilated concrete slab

This paper is the second of two papers that describe the modeling and design of a building-integrated photovoltaic-thermal (BIPV/T) system thermally coupled with a ventilated concrete slab (VCS) adopted in a prefabricated, two-storey detached, low energy solar house and their performance assessment based on monitored data. The VCS concept is based on an integrated thermal-structural design with active storage of solar thermal energy while serving as a structural component - the basement floor slab ({proportional_to}33 m{sup 2}). This paper describes the numerical modeling, design, and thermal performance assessment of the VCS. The thermal performance of the VCS during the commissioning of the unoccupied house is presented. Analysis of the monitored data shows that the VCS can store 9-12 kWh of heat from the total thermal energy collected by the BIPV/T system, on a typical clear sunny day with an outdoor temperature of about 0 C. It can also accumulate thermal energy during a series of clear sunny days without overheating the slab surface or the living space. This research shows that coupling the VCS with the BIPV/T system is a viable method to enhance the utilization of collected solar thermal energy. A method is presented for creating a simplified three-dimensional, control volume finite difference, explicit thermal model of the VCS. The model is created and validated using monitored data. The modeling method is suitable for detailed parametric study of the thermal behavior of the VCS without excessive computational effort. (author)

14 SOLAR ENERGY↗

Radiation Accidents and Malicious Events – Scenarios and Scope of the Work of ICRP Task Group 120

The International Commission on Radiological Protection (ICRP) Task Group 120 (TG120) is developing ICRP recommendations for radiological protection for a wide range of radiation accidents and malicious events, complementing those given in ICRP Publication 146 (2020) for large nuclear accidents. The scope includes accidents involving criticalities, operating faults, and fires and explosions in nuclear facilities, inadvertent damage to sealed radiation sources, as well as malicious events, such as sabotage of nuclear facilities or materials, use of radiological dispersal devices, the contamination of food and drinking water supplies, and the deployment of nuclear weapons. A template has been designed to collate relevant information on a wide range of case studies and hypothetical malicious scenarios to ensure that the recommendations developed are broadly applicable and comprehensive. For all scenarios, a graded approach to protection is being taken, accepting that specific guidance may be required for some distinctive aspects, for example, protection during times of armed conflict. This paper provides an overview of the scenarios and scope of the work of TG120, including some of the radiological and non-radiological impacts of radiation emergencies, along the response and recovery timeline.

ICRP↗

Chapter 2: International Requirements for Large Integration of Renewable Energy Sources

Most European countries have concerns about the integration of large amounts of renewable energy sources (RES) into electric power systems, and this is currently a topic of growing interest. In January 2008, the European Commission published the 2020 package, which proposes committing the European Union to a 20% reduction in greenhouse gas emissions, to achieve a target of deriving 20% of the European Union's final energy consumption from renewable sources, and to achieve 20% improvement in energy efficiency both by the year 2020 [1]. Member states have different individual goals to meet these overall objectives, and they each need to provide a detailed roadmap describing how they will meet these legally binding targets [2]. At this time, RES are an indispensable part of the global energy mix, which has been partially motivated by the continuous increases in hydropower as well as the rapid expansion of wind and solar photovoltaic (PV). The International Energy Agency's 2012 edition of the World Energy Outlook stated that the rapid increases in RES integration are underpinned by falling technology costs as well as rising fossilfuel prices and carbon pricing, but RES integration is also encouraged by continued subsidies: from $88 billion globally in 2011 (compared to $523 billion in fossil-fuel subsidies in 2012 [3], with a share of $131 billion for electricity generation) to an estimated $240 billion in 2035 [4]. According to [3], in 2015 RES accounted for 22% of electricity generation, which was approximately the same level as gas and about one-half the level of coal.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Warm Dense Matter Experiments using the 3D ALE-AMR Code and the Move Toward Exascale Computing

The Neutralized Drift Compression Experiment II (NDCX II) is an induction accelerator planned for initial commissioning in 2012. The final design calls for a 3 MeV, Li+ ion beam, delivered in a bunch with characteristic pulse duration of 1 ns, and transverse dimension of order 1 mm. The NDCX II will be used in studies of material in the warm dense matter (WDM) regime, and ion beam/hydrodynamic coupling experiments relevant to heavy ion based inertial fusion energy. We discuss recent efforts to adapt the 3D ALE-AMR code to model WDM experiments on NDCX II. The code, which combines Arbitrary Lagrangian Eulerian (ALE) hydrodynamics with Adaptive Mesh Refinement (AMR), has physics models that include ion deposition, radiation hydrodynamics, thermal diffusion, anisotropic material strength with material time history, and advanced models for fragmentation. Experiments at NDCX-II will explore the process of bubble and droplet formation (two-phase expansion) of superheated metal solids using ion beams. Experiments at higher temperatures will explore equation of state and heavy ion fusion beam-to-target energy coupling efficiency. Ion beams allow precise control of local beam energy deposition providing uniform volumetric heating on a timescale shorter than that of hydrodynamic expansion. The ALE-AMR code does not have any export control restrictions and is currently running at the National Energy Research Scientific Computing Center (NERSC) at LBNL and has been shown to scale well to thousands of CPUs. New surface tension models that are being implemented and applied to WDM experiments. Some of the approaches use a diffuse interface surface tension model that is based on the advective Cahn-Hilliard equations, which allows for droplet breakup in divergent velocity fields without the need for imposed perturbations. Other methods require seeding or other methods for droplet breakup. We also briefly discuss the effects of the move to exascale computing and related computational changes on general modeling codes in fusion energy.

42 ENGINEERING↗

Status of MICE

The Muon Ionization Cooling Experiment (MICE) is an experiment currently under construction at the Rutherford Appleton Laboratory (RAL) in the UK. The aim of the experiment is to demonstrate the concept of ionization cooling for a beam of muons, crucial for the requirements of a Neutrino Factory and a Muon Collider. Muon cooling is achieved by measuring the reduction of the four dimensional transverse emittance for a beam of muons passing through low density absorbers and then accelerating the longitudinal component of the momentum using RF cavities. The absorbers are maintained in a focusing magnetic field to reduce the beta function of the beam and the RF cavities are kept inside coupling coils. The main goal of MICE is to measure a fractional drop in emittance, of order -10% for large emittance beams, with an accuracy of 1%(which imposes a requirement that the absolute emittance be measured with an accuracy of 0.1%). This paper will discuss the status of MICE, including the progress in commissioning the muon beam line at the ISIS accelerator at RAL, the construction of the different detector elements in MICE and the prospects for the future.

43 PARTICLE ACCELERATORS↗

Nuclear physics program at HIRFL

With the commissioning of HIRFL-CSR, HIRFL can provide heavy ion beams with energy covering the range of several MeV/u to 1 GeV/u. In this talk, the experiments on nuclear physics at different energies to be carried out with different experimental setups at HIRFL will be introduced.

43 PARTICLE ACCELERATORS↗

Edelweiss-II Dark Matter Search : Status and first results

EDELWEISS is a direct dark matter search experiment operating in the low radioactivity environment of the Modane Underground Laboratory. The experiment runs at very low temperature massive Ge detectors in order to identify nuclear recoils induced by elastic scattering of WIMPs from the galactic halo. The commissioning of the second phase of the experiment, involving more than 7 kg of Ge detector, has been completed in 2007. These ionization/heat detectors allow an event by event electronic/nuclear recoil discrimination. Preliminary results of a new type of bolometer with interdigitized electrodes for the charge collection with active rejection are presented.

79 ASTRONOMY AND ASTROPHYSICS↗

The ArDM - a ton-scale liquid argon experiment for direct Dark Matter Detection

The ArDM is a ton-scale double phase detector for the direct search of the Weakly Interacting Massive Particle (WIMPs) as Dark Matter candidates. The detector is based on a liquid Argon (LAr) target. The present goal is to assemble, fully characterize the detector on the surface and then operate it at an underground facility. The scintillation light and ionization charge produced by recoiling nuclei in WIMP-Ar collision can be measured independently. The discrimination of the WIMP induced nuclear recoils from the electron/gamma background is done using the pulse discrimination technique and the ratio between the produced light and charge. The experiment and the last results from the detector commissioning are presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗