Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUNCHES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Higher-Order-Mode Effects in Tesla-Type Superconducting RF Cavities on Electron Beam Quality

We report the direct observations of the correlation of higher order modes (HOMs) generated by off-axis electron beam steering in TESLA-type SCRF cavities and sub-macropulse beam centroid shifts (with the concomitant effect on averaged beam size and emittance). The experiments were performed at the Fermilab Accelerator Science and Technology (FAST) facility using its unique configuration of a PC rf gun injecting beam into two separated 9-cell cavities in series with corrector magnets and beam position monitors (BPMs) located before, between, and after them. The ~100-kHz oscillations with up to 300-μm amplitudes at downstream locations were observed in a 3-MHz micropulse repetition rate beam with charges of 500 and 1000 pC/b, although the effects were much reduced at 100 pC/b. The studies were based on HOM detector circuitry targeting the first and second dipole passbands, rf BPM bunch-by-bunch data, and imaging cameras viewing multi-slit images for emittance assessments at 33 MeV. Initial calculations reproduced a key feature of the phenomena. In principle, these results may be scaled to cryomodule configurations of major accelerator facilities.

43 PARTICLE ACCELERATORS↗

Status Update of a Harmonic Kicker Development for JLEIC

The Jefferson Lab Electron-Ion Collider (JLEIC) is an asymmetric high luminosity ring-ring collider proposed as the next major R&D facility for the nuclear physics community. Both of JLEIC?s electron and ion collider rings have high beam current with gaps serving the pur-poses of beam abort, ion clearing, etc. Those gaps will cause time-varying beam loading in the storage RF cavi-ties, and may result in modulation of cavity RF phase/voltage and cyclic shift of collision point, which could lead to significant luminosity loss. We studied a few approaches to mitigate the RF phase modulation and IP shift, such as correcting the RF phase/voltage modula-tion with traditional LLRF feedback, one-turn feedback (OTFB), or RF feedforward (FF); optimizing the bunch fill pattern to limit the RF phase/voltage modulation to a small fraction of the bunch trains in the collider ring; or matching the RF phase modulation in the two rings. The preliminary results are discussed in this paper.

Guo, Jiquan↗

Undulator Radiation Generated by a Single Electron

The facilities providing single electron beams are currently being commissioned at Fermilab and will be at SLAC. Recently, Fermilab’s IOTA ring routinely demonstrated circulation of a single electron at 100 MeV beam energy. Alternatively, SLAC is working on constructing LCLS-II an X-ray FEL driven by a 4 GeV SRF linac. A parasitic beamline, S30XL, is planned that will extract 4 GeV dark current from between the primary LCLS-II electron bunches. The dark current will be delivered to End Station A and can work independently of LCLS-II experiments. The dark current will be bunched at a frequency of 46 MHz while extracted current varied from single electrons to 10’s of nA. In the present paper, we estimate the feasibility of propagating single electron beams through a conventional undulator, placed in the IOTA and S30XL beamlines. We explore the possible observable effects and experimental parameters range. In addition, we focus on potential applications of such beams in systems for high fidelity quantum measurements.

43 PARTICLE ACCELERATORS↗

Observation of Polarization-Dependent Changes in Higher-Order Mode Responses as a Function of Transverse Beam Position in Tesla-Type Cavities at FAST

Higher-order modes (HOMs) in superconducting rf cavities present problems for an electron bunch traversing the cavity in the form of long-range wakefields from previous bunches. These may dilute the emittance of the macropulse average, especially with low emittance beams at facilities such as the European X-ray Free-electron Laser (XFEL) and the upgraded Linac Coherent Light Source (LCLS-II). Here we present observations of HOMs driven by the beam at the Fermilab Accelerator Science and Technology (FAST) facility. The FAST facility features two independent TESLA-type cavities (CC1 and CC2) after a photocathode rf gun followed by an 8-cavity cryomodule. The HOM signals were acquired from cavities using bandpass filters of 1.75 ± 0.15 GHz, 2.5 ± 0.2 GHz, and 3.25 ± 0.2 GHz and recorded using an 8-GHz, 20 GSa/s oscilloscope. The frequency resolution obtained is sufficient to separate polarization components of many of the HOMs. These HOM signals were captured from CC1 and cavities 1 and 8 of the cryomodule for various initial trajectories through the cavities, and we observe correlations between trajectory, HOM signals, and which polarization component of a mode is affected.

Thurman-Keup, Randy Michael↗

Machine Learning Training for HOM reduction and Emittance Preservation in a TESLA-type Cryomodule at FAST

Low emittance electron beams are of high importance at facilities like the LCLS-II at SLAC. Emittance dilution effects due to off-axis beam transport for a TESLA-type cryomodule (CM) have been shown at the Fermilab Accelerator Science and Technology facility. The results showed the correlation between the electron beam-induced cavity high-order modes (HOMs) and submacropulse centroid slewing and oscillation downstream of the CM. Mitigation of emittance dilution can be achieved by reducing the HOM signals and the variances in the submacropulse beam positions downstream of the CM. Here we present a Machine Learning based optimization and model construction for HOM signal level reduction using Neural Networks and Gaussian Processes. To gather training data we performed experiments using single bunch and 50 bunch electron beams with charges up to 125 pC/b. We measured HOM signals of all cavities and beam position with a set of BPMs downstream of the CM. The beam trajectory was changed using V/H125 corrector set located upstream of the CM. The results presented here will inform the LCLS-II injector commissioning and will serve as a prototype for HOM reduction and emittance preservation.

43 PARTICLE ACCELERATORS↗

An Overview of RF Systems for the EIC

The Electron Ion Collider (EIC) to be constructed at Brookhaven National Laboratory in the USA will be a complex system of accelerators providing high luminosity, high polarization, variable center of mass energy collisions between electrons and protons or ions. To achieve this a variety of RF systems are required. They must provide for capture, formation and storage of Ampere-class beams in the electron and hadron storage rings (ESR and HSR), fast acceleration of high-charge polarized electron bunches in the rapid cycling synchrotron (RCS), provision of cold high current electron bunches in the high-energy cooler ERL and precise high-gradient crabbing of electrons and hadrons either side of the interaction point. The challenges include strong HOM damping in the storage ring cavities and cooler ERL, very high fundamental mode power in the ESR and cooler injector, extremely stable low-noise operation of the crab cavities, mitigation of transient beam loading from gaps, and operating over a wide range of energies and beam currents. We describe the high-level system parameters and principal design choices made and progress on the R&D plan to develop these state of the art systems.

Rimmer, R. A.↗

PIP-II 800 MeV Proton Linac Beam Pattern Generator

The PIP2 IT Beam Pattern Generator is the system that synchronizes beam injection and the RF systems between the PIP2 LINAC to the Booster. The RF frequencies of these two accelerator systems are not harmonically related. Synchronization is accomplished by controlling two MEBT Beam Choppers, which select 162.5MHz beam bunches from the LEBT and RFQ to produce an appropriate reduced beam bunch pattern that enables bucket-to-bucket transfer to the Booster RF at 46.46MHz (84th harmonic). This chopping pattern also reduces the beam current to an average of 2mA over the Booster injection, matching the Linac nominal beam current. The BPG also generates the RF frequency/phase reference which the Booster will phase lock to during injection. The BPG is fully programmable, allowing for arbitrary beam patterns with adjustable timing parameters, having a fine adjustment resolution of 38ps. The latter is accomplished using digital signal processing techniques. This paper discusses the design of the BPG, its construction, test results, and operational experience after being integrated into the PIP2 IT test accelerator and concludes with a discussion of the system’s performance and future plans.

43 PARTICLE ACCELERATORS↗

The Design of a High Charge Polarized Preinjector for the Electron-Ion Collider

The design of the electron pre-injector of the Electron-Ion Collider (EIC) project to generate 4 x 7 nC bunch has been advancing to meet the requirements for injection into the Rapid Cycling Synchrotron (RCS). The major challenges are high charge transport and achieving small energy spread from 3 GHz traveling-wave plate(TWP). The designed preinjector includes the polarized electron source, bunching section, TWP Linac, zigzag phase space manipulation and spin rotator. In this report, we will discuss the RF frequency selection and the way to reduce energy spread down to 0.2% by longitudinal phase space manipulate. We will also report the results of beamline simulation using space charge code and the conceptual design of spin rotator.

Wang, E.↗

MEASUREMENTS OF BEAM-BEAM INTERACTIONS IN GEAR-CHANGING COLLISIONS IN DESIREE

In this work, we perform measurements on the interactions of colliding beams in a gear-changing system. Gear-changing was first demonstrated in DESIREE in May of 2020 and showed several promising avenues to measure beam-beam effects. DESIREE has a unique collision scheme where the beams are moving in the same direction, which provides for unique interactions. This experiment used a 4 on 3 gear changing system with one bucket in each ring left empty, this allows us to see the bunch profile while undergoing collisions. We then measured the bunch length over time and used a Fourier transform to extract longitudinal evolution data and compared it to baseline data of uncollided beams.

Nissen, E. A.↗

CONCEPT OF A POLARIZED POSITRON SOURCE FOR CEBAF

Positron beams would provide new and meaningful probes for the experimental program at the Thomas Jefferson National Accelerator Facility (JLab), including but not limited to future hadronic physics and dark matter experiments. Critical requirements involve generating positron beams with a high degree of spin polarization, sufficient intensity and a continuous-wave (CW) bunch train compatible with acceleration to 12 GeV at the Continuous Electron Beam Accelerator Facility (CEBAF). To address these requirements, a polarized positron injector based upon the bremsstrahlung of an intense CW spin polarized electron beam is considered*. First a polarized electron beam line provides >1 mA of polarized electrons at ~120 MeV to a high-power target for positron production. Next, a second beam line collects, shapes and aligns the spin of positrons for users. Finally, the positron beam is matched into the CEBAF acceptance for acceleration and transport to the end stations with energies up to 12 GeV. An optimized layout to provide positrons beams with intensity >100 nA (polarized) or intensity >3 µA (unpolarized) will be discussed in this poster.

Habet, S. H.↗

DESIGN UPDATE ON THE HSR INJECTION KICKER FOR THE EIC

The Electron-Ion Collider (EIC), the next-generation nuclear science facility, is under the design at the Brookhaven National Laboratory. The present RHIC rings will be reconfigured as the Hadron Storage Ring (HSR) for the EIC. Design of a stripline injection kicker for the HSR for beams with the rigidity of ~ 81 T-m poses some technical challenges due to the expected shorter bunch spacing, heating due to higher peak current and the larger number of bunches, and the required higher pulsed voltage. Recently, we updated its mechanical design to optimize the characteristic and beam coupling impedances. In addition, we incorporated the impedance tuning capability by introducing the kicker aperture adjustment mechanism. Finally, we incorporated high voltage FID feedthroughs (FC26) to this kicker. This paper reports the design and optimization updates of the HSR injection kicker including the impedance tuning capability, optimization of both the characteristic and the beam coupling impedances, and finally the incorporation of a high voltage feedthrough design.

HSR INJECTION KICKER FOR THE EIC∗↗

DESIGN AND OPTIMIZATION OF AN ERL FOR COOLING EIC HADRON BEAMS

The baseline scheme for hadron beam cooling in the Electron Ion Collider (EIC) calls for Coherent electron Cooling (CeC) of the hadrons with non-magnetized electrons at high energy (150 MeV electrons) and additional cooling via conventional bunched beam cooling using a precooler system. The electron beam parameters for these concepts are at or beyond the current state of the art, with electron bunch charges on the order of 1 nC and average currents on the order of 100 mA and requiring an Energy Recovery Linac (ERL) to produce such beams. Using specifications provided by BNL and JLab, physicists and engineers at Xelera Research are working on a complete design of an ERL system capable of cooling EIC hadrons.

Gulliford, C.↗

Positron beams at Ce+BAF

Positron beams would provide a new and meaningful probe for the experimental program at the Thomas Jefferson National Accelerator Facility (JLab). The JLab Positron Working Group, formed in 2018 and now with over 250 members from 75 institutions, continues to develop an experimental program with high duty-cycle positron beams including but not limited to future hadronic physics and dark matter experiments. Critical requirements involve generating positron beams with a high degree of spin polarization, sufficient intensity and a continuous-wave (CW) bunch train compatible with acceleration to 12 GeV at the Continuous Electron Beam Accelerator Facility (CEBAF). In this presentation we describe a start-to-end layout for positron beams at 12 GeV CEBAF utilizing the Low Energy Research Facility (LERF) at Jefferson Lab to build two new injectors. A GaAs dc high voltage photo-gun first generates >1 mA of polarized electrons which are then accelerated to 80-150 MeV and directed to a high-power spinning W target for polarized bremsstrahlung and positron pair creation. A second injector then collects, bunches and accelerates the positrons to 123 MeV. The positron beams are transported by a new beam line and injected into the CEBAF acceptance for acceleration to the end stations with energies up to 12 GeV. The layout is optimized to provide Users with positron spin polarization >60% and intensity greater than >100 nA, and with higher intensities when polarization is not required.

Benesch, J.↗

Synchronization and phase locking of resonant magnet power supplies for Mu2e experiment at Fermilab

The Mu2e Experiment has stringent beam structure requirements; namely, it requires short (~200 ns) proton bunches separated by 1.5-2.0 $\mu$s. This beam structure will be produced using the Fermilab 8 GeV Booster, the 8 GeV Recycler Ring, and the Delivery Ring, which was formerly part of the antiproton accumulator system. Out of time beam is limited to a fraction of level of no more than $1\times 10^{-10}$, a requirement known as "extinction". Achieving this level of extinction requires a system of resonant magnets and collimators, phased such that only in time particles will pass through. The Mu2e magnet system involves two components: a 300 kHz component, timed such that the 600 kHz beam will pass through the collimators at the nodes, and a 4.5 MHz system to reduce the slewing of the in-time beam. These two systems must be precisely phase locked to the bunch rate coming from the Delivery Ring, which itself must be phased to match beam transfers coming from the Recycler. This poster describes the control system for the magnets, which is based on an Intel Arria FPGA, which handles phase locking of the magnets to the Delivery Ring, including the phase jumps required to match transfers from the Recycler.

43 PARTICLE ACCELERATORS↗

Modeling of standing wave RF cavities for tracking through multi-pass energy recovery linac

Short bunches, high current and multiple linac pass are all characteristics of Energy Recovery Linacs (ERLs), which may result in collective effects. They in turn, may affect the beam, degrading its quality, or even yield to instabilities causing a beam loss. To study and mitigate these effects one needs a numerical simulation code, that can take into account both the collective effects, as well as, particular ERL features, such as a multi-turn design that does not reach a steady state or the multiple passages of the beam through Radio-Frequency (RF) cavities at different energies. CODAL [1], a code developed by SOLEIL in collaboration with IJCLab, enables such studies. It is a 6 dimensional (6D) tracking code applying 'kicks' based on the integration of the local Hamiltonian for each element of the lattice. It is also capable of simulating space charge, wakefields and coherent synchrotron radiation. However, to correctly take into account the ERL dynamics, an upgrade had to be made to include the effect of a standing wave RF cavity in 6D. In this paper, we will concentrate on the implementation and benchmarking (with DESY’s tracking code ASTRA [2]) of both the longitudinal and the transverse models (by J.B. Rosenzweig and L. Serafini [3]), which we use to carry out tracking of fully analytical 6D RF cavity.

Bogacz, A.↗

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

Development of an ERL for Coherent Electron Cooling at the Electron-Ion Collider

The Electron-Ion Collider (EIC) is currently under development to be built at Brookhaven National Lab and requires cooling during collisions in order to mitigate the hadron beam emittance degradation due to intra-beam scattering and beam-beam effects. An Energy Recovery Linac (ERL) is being designed to deliver the necessary electron beam for Coherent electron Cooling (CeC) of the hadron beam, with an electron bunch charge of 1 nC and an average current of 100 mA; two modes of operation are being developed for 150 and 55 MeV electrons, corresponding to 275 and 100 GeV protons. The injector of this Strong Hadron Cooler ERL (SHC-ERL) is shared with the Pre-cooler ERL, which cools lower energy proton beams via bunched beam cooling, as used in the Low Energy RHIC electron Cooling (LEReC). This paper reviews the current state of the design.

Deitrick, K.↗