Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2015”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Arctic Ocean Primary Productivity: The Response of Marine Algae to Climate Warming and Sea Ice Decline

Autotrophic single-celled algae living in sea ice (ice algae) and water column (phytoplankton) are the main primary producers in the Arctic Ocean. Through photosynthesis, they transform dissolved inorganic carbon into organic material. Consequently, primary production provides a key ecosystem service by providing energy to the entire food web in the oceans. Primary productivity is strongly dependent upon light availability and the presence of nutrients, and thus is highly seasonal in the Arctic. The melting and retreat of sea ice during spring are strong drivers of primary production in the Arctic Ocean and its adjacent shelf seas, owing to enhanced light availability and stratification (Barber et al. 2015; Leu et al. 2015; Ardyna et al. 2017). Recent studies have emphasized that primary production occurs under lower light conditions and earlier in the seasonal cycle than previously recognized (Randelhoff et al. 2020). Other studies suggest that increased nutrient supply have also influenced overall production (Henley et al. 2020; Lewis et al. 2020). Furthermore, while declines in Arctic sea ice extent over the past several decades (see essay Sea Ice) have contributed substantially to shifts in primary productivity throughout the Arctic Ocean, the response of primary production to sea ice loss has been both seasonally and spatially variable (e.g., Tremblay et al. 2015; Hill et al. 2018). Here we present satellite-based estimates of algal chlorophyll-a (occurring in all species of phytoplankton), based on ocean color, and subsequently provide calculated primary production estimates. These results are shown for ocean areas with less than 10% sea ice concentration and, therefore, do not include production by sea ice algae or under-ice phytoplankton blooms, which can be significant (e.g., Lalande et al. 2019).

K. E. Frey↗

Sea Ice Extents Continue to Set New Records: Arctic, Antarctic, and Global Results

The multi-channel satellite passive-microwave record of Earth’s sea ice coverage, extending back to the late 1970s, has long revealed declining sea ice coverage in the Arctic but through 2015 revealed an overall increase rather than decrease in Antarctic sea ice coverage. Following major decreases in Antarctic sea ice since 2015, the 42-year 1979-2020 satellite dataset now shows losses in sea ice coverage in both hemispheres, and this is convincingly demonstrated by the enumeration of monthly and yearly record high and record low sea ice extents experienced over the course of the 42 years. In fact, one of the most convincing statistics on the declining Arctic sea ice cover is the fact that since 1986 the Arctic has not experienced a single monthly record high sea ice extent in any month but has experienced 93 monthly record lows. In contrast, all 12 calendar months have their 42-year Antarctic monthly record high sea ice extents in the period 2007-2015, while 8 of the 12 calendar months have had Antarctic record lows since 2015. Globally, every calendar month has registered a new monthly record low within the past 5 years. These results are complemented (and somewhat tempered) by quantification of the range of monthly and yearly sea ice extent values over the 42 years. For instance, although the Arctic’s lowest September monthly average sea ice extent (in 2012) is 53% lower than its highest September monthly average sea ice extent (in 1980), the other months have far smaller percent differences between their lowest and highest Arctic values. For yearly average sea ice extents, the Arctic’s lowest value (in 2020) is 18% lower than its highest value (in 1982), the Antarctic’s lowest value (in 2017) is 16% lower than its highest value (in 2014), and the global lowest value (in 2019) is only 12% lower than its highest value (in 1982).

sea ice↗

Reports From EXPORTS Modeling and Data-Mining Activities

EXPORTS -EXport Processes in the Ocean from RemoTe Sensing is NASA’s large field campaign focusing on development of a predictive understanding of the export, fate and carbon cycle impacts of the global net primary production. This co-funded program (NSF, private funding1, and international participation) was conceived in 2013, with EXPORTS Science plan published in 2016 (Siegel et al 2016, EXPORTS Writing Team 2015) and its implementation plan finalized in 2016 (EXPORTS Science Definition Team 2016). More details are presented in Siegel et al (2021). EXPORTS campaign is structured as a multiyear effort (Figure 1). It started with “Pre-EXPORTS” modeling and data-mining activity followed by a first phase with two major field programs and a second synthesis and modeling phase. The “Pre-EXPORTS” projects, total of 6 of them (Table 1), funded under A.3 Ocean Biology and Biogeochemistry 2015 call, helped to plan the field campaign (Resplandy et al 2019, Rousseaux & Gregg 2017), and supporting further global synthesis with datasets mined from the literature (e.g. Bisson et al (2020), Bisson et al (2018), Kramer and Siegel (2019)), directly responding to objectives outlined in Science Plan (see section 6 in Team (2015)) and Implementation team (see Figure 1 in Team (2016)). This document presents a compilation of the final reports of the Pre-EXPORTS funded projects, in hope of synthesizing the outcomes, and insuring the legacy of this program. Each of these reports contains a list of published papers, and reader should refer to them to see results in details.

Brandi J. McCarty↗

Investigating Drivers of Particulate Matter Pollution Over India and the Implications for Radiative Forcing With GEOS-Chem-TOMAS15

Ambient fine particulate matter (PM 2.5 ) concentrations in India frequently exceed 100 μg/m 3 during fall and winter pollution episodes. We use the GEOS-Chem chemical transport model with the TwO-Moment Aerosol Sectional microphysics scheme with 15 size bins (TOMAS15) to assess PM 2.5 composition and impacts on radiation and cloud condensation nuclei (CCN) during pollution episodes as compared to the seasonal (October-December) average. We conduct high resolution (0.25° × 0.3125°) nested-domain simulations over India for short-duration, high-PM2.5 episodes in the fall of 2015 and 2017. The simulations capture the magnitude and spatial patterns of pollution episodes measured by surface monitors (r PM2.5 = 0.69) although aerosol optical depth is underestimated. During the episodes, near-surface organic matter (OM), black carbon (BC), and secondary inorganic aerosol concentrations increase from seasonal averages by up to 36, 7, and 7 μg/m 3 , respectively. Episodic aerosol increases enhance cooling by lowering the top-of-atmosphere clear-sky direct radiative effect (DRE TOA ) during the 2015 episode (−6 W/m 2 ), with a smaller impact during the 2017 episode (−1 W/m 2 ). Differences in DRE TOA reflect larger increases in scattering aerosols in the column during the 2015 episode (+17 mg/m 2 ) than in 2017 (+13 mg/m 2 ), while absorbing aerosol column enhancements are smaller (+3 mg/m2) in both years. Changes in shortwave radiation at the surface (SW sfc ) are spatially similar to DRE TOA and mostly negative during both episodes. CCN enhancements (0.2% supersaturation) during these episodes occur across the western Indo-Gangetic Plain, coincident with higher PM 2.5 concentrations. Changes in DRE TOA , SW sfc , and CCN during high-PM 2.5 episodes may have implications for crops, the hydrologic cycle, and surface temperature.

PM2.5↗

The Temporal Brightening of Uranus’ Northern Polar Hood from HST/WFC3 & HST/STIS Observations

Hubble Space Telescope Wide-Field Camera 3 (HST/WFC3) observations spanning 2015 to 2021 confirm a brightening of Uranus' north polar hood feature with time. The vertical aerosol model of Irwin et al. (2023, https://doi.org/10.1038/s41550-023-02047-0) (IRW23), consisting of a deep haze layer based at ∼5 bar, a 1–2 bar haze layer, and an extended haze rising up from the 1–2 bar layer, was applied to retrievals on HST Space Telescope Imaging Spectrograph (STIS) (HST/STIS) observations (Sromovsky et al., 2014, 2019, https://doi.org/10.1016/j.icarus.2014.05.016, https://doi.org/10.1016/j.icarus.2018.06.026) revealing a reduction in cloud-top CH4 volume mixing ratio (VMR) (i.e., above the deep ∼5 bar haze) by an average of 0.0019 ± 0.0003 between 40–80◦N (∼10% average reduction) from 2012 to 2015. A combination of latitudinal retrievals on the HST/WFC3 and HST/STIS data sets, again employing the IRW23 model, reveal a temporal thickening of the 1–2 bar haze layer to be the main cause of the polar hood brightening, finding an average increase in integrated opacity of 1.09 ± 0.08 (∼33% increase) at 0.8 µm north of ∼45°N, concurrent with a decrease in the imaginary refractive index spectrum of the 1–2 bar haze layer north of ∼40°N and longwards of ∼0.7 µm. Small contributions to the brightening were found from a thickening of the deep aerosol layer, with an average increase in integrated opacity of 0.6 ± 0.1 (58% increase) north of 45°N between 2012 and 2015, and from the aforementioned decrease in CH4 VMR. Our results are consistent with the slowing of a stratospheric meridional circulation, exhibiting subsidence at the poles.

Arjuna James↗

Harnessing Vehicle Automation for Public Mobility -- An Overview of Ongoing Efforts

This presentation takes a look at the efforts to harness automated vehicle technology for public transport. The European CityMobil2 is the leading demonstration project in which automated shuttles were, or are planned to be, demonstrated in several cities and regions. The presentation provides a brief overview of the demonstrations at Oristano, Italy (July 2014), LaRochelle, France (Dec 2014), Lausanne, Switzerland (Apr 2015), Vantaa, Finland (July 2015), and Trikala, Greece (Sept 2015). In addition to technology exposition, the objectives included generating a legal framework for operation in each location and gaging the reaction of the public to unmanned shuttles, both of which were successfully achieved. Several such demonstrations are planned throughout the world, including efforts in North America in conjunction with the GoMentum Station in California. These early demonstration with low-speed automated shuttles provide a glimpse of the possible with a fully automated fleet of driverless vehicle providing a public transit service.

33 ADVANCED PROPULSION SYSTEMS↗

GlobalSums, Version 1.x

This code is a set of global sums to support the paper "Computational Reproducibility for Production Physics Applications" submitted to the Numerical Reproducibility at Exascale (NRE 2015) workshop at the 2015 Supercomputing conference, Nov. 20, 2015

Robey, Robert↗

Distributed Fiber Optic Arrays: Integrated Temperature and Seismic Sensing for Detection of CO 2 Flow, Leakage and Subsurface Distribution (Final Report)

This report describes the seismic and heat-pulse monitoring equipment, surveys, results and accomplishments of the fiber optic (FO) project funded by the U.S. Department of Energy (DOE) under Agreement Number DE-FE0012700. The formal title of the project is “Distributed Fiber Optic Arrays: Integrated Temperature and Seismic Sensing for Detection of CO 2 Flow, Leakage and Subsurface Distribution.” The project focuses on the field acquisition of FO data using Distributed Acoustic Sensing (DAS) arrays for subsurface imaging of geologic structure and to track the CO 2 migration in the injection interval using time-lapse techniques. A second component of the project uses a novel heat-pulse monitoring method that relies on Distributed Temperature Sensing (DTS) to evaluate near-field leakage of CO 2 or brine in and around the wellbore. The Southeast Regional Carbon Sequestration (SECARB) partnership hosted the project at the Anthropogenic Test site near Citronelle, Alabama after the original site host, the Kansas Geological Survey (KGS), experienced significant delays in permitting its CO 2 injection well at the Wellington Oil Field site in Kansas. The KGS project was later terminated in 2017 before an injection permit issued. A second field trial was planned for the Livingston Oil Field, located in Louisiana, but the site host ran into financial troubles and the project was terminated in 2015. A replacement field-site host was not found for the Livingston field trial. Both the Wellington, Kansas and Livingston, Louisiana projects were funded by DOE. A novel sensor platform referred to as the Modular Borehole Monitoring (MBM) system deployed at the Citronelle field site was utilized by the FO project. Two different seismic sensor technologies were incorporated in the Citronelle MBM system design including: (1) a semi-permanent, tubing-deployed, 18-level geophone array with custom hydraulic clamps; and (2) two, single mode optical fibers for Distributed Acoustic Sensing (DAS). Incorporation of the 18-level geophone array in the MBM system provided an ideal opportunity to compare the DAS response to conventional geophones. A heat-pulse monitoring system consisting of two, multi-mode optical fibers for Distributed Temperature Sensing (DTS) and copper heater element were also incorporated into the MBM package. This report provides an overview of the design of the MBM, DAS, and DTS equipment and the surveys performed during the study. The heat-pulse monitoring technique was used to diagnose a completion problem with observation well D-9-8 #2 where the MBM system was installed in 2012, thus successfully demonstrating its application for leak detection. In 2015, CO 2 unexpectedly arrived at the observation well approximately one year after CO 2 injection and heat-pulse monitoring ended. It was determined at this time that saltwater intrusion had likely penetrated the stainless-steel capillary tube containing the fibers and copper heater elements, thus preventing the heater from being used. DTS measurements indicated that the fiber had also degraded probably due to hydrogen darkening. It is recommended that the capillary tube be constructed of a more corrosive resistant material (e.g., Inconel) in the future should it be deployed in similar harsh downhole environments. Geophysical imaging of the subsurface and monitoring of the CO 2 were successful using DAS in the vertical seismic profile (VSP) survey configuration. A high resolution VSP image of the subsurface was obtained in 2014 using DAS, which exceeded our expectations in comparison to a lower resolution image obtained by SECARB in 2012 using an 80-level geophone array. A time-lapse image of the redistribution of CO 2 after injection ended in September 2014 was obtained using two DAS VSP surveys from June 2014 and December 2015, thus successfully demonstrating its application. DAS data were also acquired during a crosswell seismic survey conducted in 2014. Unfortunately, the DAS technique was not success in the crosswell survey configuration because the noise level was too high, increasing by a factor of ten, over the high frequency output (100-1,200) of the piezoelectric source.

58 GEOSCIENCES↗

AGC-4 Experiment Irradiation Monitoring Data Qualification Final Report

The Graphite Technology Development Program ran a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. This report focuses on the fourth experiment, Advanced Graphite Creep 4 (AGC 4). The Advanced Reactor Development (ARD) Technology Development Office (TDO) Program for research and development activities require documentation of qualified monitoring data to design and license the first high-temperature reactor nuclear plant. Qualified data meets the requirements for use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements and provide no useable information. Trend data may not meet all requirements but still provide some useable information. Use of Trend data requires assessment of how any deficiencies affect a particular use of the data. AGC-4 began with Advanced Test Reactor (ATR) Cycle 157D on May 30, 2015. After irradiating the graphite for two cycles, the capsule was removed from the reactor after ATR Cycle 158A, which ended on January 2, 2016, due to interference with another experiment. Irradiation was resumed with Cycle 162A on October 7, 2017 after the interfering experiment was removed from the reactor. AGC-4 irradiation completed by the end of Cycle 166B on January 10, 2020. Between Cycles 162A and 166B, AGC-4 capsule was removed from the reactor core during two Powered Axial Locator Mechanism (PALM) Cycles 163A and 165A to avoid overheating. All thermocouples (TCs) have functioned throughout the AGC-4 experiment. A total of 9,256,184 out of all 11,167,213 temperature records (or 82.9%) are Qualified for use by the ARD Program and 1,911,029 missing values are Failed. Argon, helium, and total gas flow data were within expected ranges, except only eight out-of-range values occurred during outages. A total of 21,240,627 out of all 22,288,5103 gas flow rates (or 92.8%) are Qualified for use by the ARD Program and 1,644,476 are Failed records mostly due to missing values. Discharge gas line moisture values were consistently low during full ATR power, except for 162B, when moisture content was increasing to more than 200 ppmv by the end of this cycle. During outages, moisture content reached as high as 700 ppmv. 1,089,941 out of a total of 1,107,331 moisture values (or 98.4%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 17,390 missing moisture values are Failed. Graphite creep specimens were subjected to one of three loads: 393, 491, or 589 lbf. For a brief period during Cycle 157D between 12:19 on June 2, 2015, and 08:23 on June 11, 2015, the load cells were wired incorrectly, resulting in missing stack load data. Missing stack loads were estimated from measured ram pressures using regression equations developed from the existing data from Cycle 157D. Estimated stack loads during this period are considered to be an accurate representation of actual load applied to the stacks. These loads deviate slightly from the planned loads. This deviation does not prevent the data from being Qualified for use but must be taken into account when analyzing the effect of load on creep. 6,095,728 out of a total of 6,403,985 moisture values (or 95.2%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 308,257 missing load values are Failed. Stack displacement increased consistently throughout the eight cycles, with total displacement reached highest value of 2.4 in by the end of irradiation. During ATR outages, a set of pneumatic rams raised the stacks of graphite creep specimens to ensure the specimens were not stuck within the test train. This stack raising was performed seven times throughout irradiation. All stacks were raised successfully each time. 4,744,974 out of a total of 6,094,513 displacement values (or 77.9%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 1,349,539 displacement values are Failed mostly due to missing values. Analyses were conducted on correlations between TCs to look for trends and step changes that might indicate instrument degradation or failure. Correlation analysis was used to identify instances when TCs form short circuits, referred to as virtual junctions, which result in TCs reporting temperatures from some location in the capsule other than the location where they were intended to read. No evidence of virtual junctions was found. Analyses were also conducted on control charts of temperature differences of between two TCs, which are expected to behave consistently throughout the entire irradiation period. Upward or downward trend over time indicates at least one TC in the pair was drifted. Examining control charts for all 66 possible pairs out of twelve TCs installed in the AGC-4 capsules reveal no clear drift failures occurred, except unstable behavior of two TCs in Zone 3, TC-7 and TC-8, over irradiation time. In conclus

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The French Geological Repository Project Cigeo - 12023

The French Agency for Radioactive Waste Management, ANDRA, was launched by law in 1991 to perform and develop the research programme for managing high level and intermediate level long-lived radioactive waste generated by the French nuclear fleet. After a 15-year intensive research programme, including the study of alternative solutions, an overall review and assessment of the results was organized, including a national public debate. As a result, the Parliament passed a Planning Act on radioactive waste management in 2006. Commissioning of a geological repository by 2025 was one of the most important decisions taken at that time. To reach this goal, a license application must be submitted and reviewed by the competent authorities by 2015. A detailed review and consultation process is, as well, defined in the Planning Act. Beside the legal framework the project needs to progress on two fronts. The first one is on siting. A significant milestone was reached in 2009 with the definition of a defined area to locate the underground repository facilities. This area was approved in March 2010 by the Government, after having collected the opinions and positions of all the interested parties, at both National and local levels. A new phase of dialogue with local players began to refine the implementation scenarios of surface facilities. The final site selection will be approved after a public debate planned for 2013. The second one is the industrial organization, planning and costing. The industrial project of this geological repository was called Cigeo (Centre Industriel de Stockage Geologique). Given the amount of work to be done to comply with the given time framework, a detailed organization with well-defined milestones must be set-up. Cigeo will be a specific nuclear facility, built and operated underground for over a hundred years. The consequence of this long duration is that the development of the repository facilities will take place in successive operational phases. The characteristics of the first waste packages received will determine the work and the corresponding investments by 2025 on the repository site. One of the main challenges will be to accommodate both activities of mining and nuclear operations at the same time and at the same location. From the technical standpoint, ventilation and fire risk cannot be managed through a simple transposition from current nuclear industry practices. The reversibility demand also leads to concrete proposals with regard to repository management flexibility and waste package retrievability. These proposals contribute to the dialogue with stakeholders to prepare for the public debate and a future law which will determine the reversibility conditions. New design developments are expected to be introduced in the application from the current studies conducted until 2014. The possibility of optimization beyond 2015 will be kept open taking into account the one hundred years operating time as well as the capability to integrate feedback gained from the first construction and operation works. The industrial committed work aims to reach the application stage by 2015. The license application procedure was defined by the 2006 Act. Subject to authorization, the construction might begin in 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Central Plateau Cleanup at DOE's Hanford Site - 12504

The discussion of Hanford's Central Plateau includes significant work in and around the center of the Hanford Site - located about 7 miles from the Columbia River. The Central Plateau is the area to which operations will be shrunk in 2015 when River Corridor cleanup is complete. This work includes retrieval and disposal of buried waste from miles of trenches; the cleanup and closure of massive processing canyons; the clean-out and demolition to 'slab on grade' of the high-hazard Plutonium Finishing Plant; installation of key groundwater treatment facilities to contain and shrink plumes of contaminated groundwater; demolition of all other unneeded facilities; and the completion of decisions about remaining Central Plateau waste sites. A stated goal of EM has been to shrink the footprint of active cleanup to less than 10 square miles by 2020. By the end of FY2011, Hanford will have reduced the active footprint of cleanup by 64 percent exceeding the goal of 49 percent. By 2015, Hanford will reduce the active footprint of cleanup by more than 90 percent. The remaining footprint reduction will occur between 2015 and 2020. The Central Plateau is a 75-square-mile region near the center of the Hanford Site including the area designated in the Hanford Comprehensive Land Use Plan Environmental Impact Statement (DOE 1999) and Record of Decision (64 FR 61615) as the Industrial-Exclusive Area, a rectangular area of about 20 square miles in the center of the Central Plateau. The Industrial-Exclusive Area contains the 200 East and 200 West Areas that have been used primarily for Hanford's nuclear fuel processing and waste management and disposal activities. The Central Plateau also encompasses the 200 Area CERCLA National Priorities List site. The Central Plateau has a large physical inventory of chemical processing and support facilities, tank systems, liquid and solid waste disposal and storage facilities, utility systems, administrative facilities, and groundwater monitoring wells. As a companion to the Hanford Site Cleanup Completion Framework document, DOE issued its draft Central Plateau Cleanup Completion Strategy in September 2009 to provide an outline of DOE's vision for completion of cleanup activities across the Central Plateau. As major elements of the Hanford cleanup along the Columbia River Corridor near completion, DOE believed it appropriate to articulate the agency vision for the remainder of the cleanup mission. The Central Plateau Cleanup Completion Strategy and the Hanford Site Cleanup Completion Framework were provided to the regulatory community, the Tribal Nations, political leaders, the public, and Hanford stakeholders to promote dialogue on Hanford's future. The Central Plateau Cleanup Completion Strategy describes DOE's vision for completion of Central Plateau cleanup and outlines the decisions needed to achieve the vision. The Central Plateau strategy involves steps to: (1) contain and remediate contaminated groundwater, (2) implement a geographic cleanup approach that guides remedy selection from a plateau-wide perspective, (3) evaluate and deploy viable treatment methods for deep vadose contamination to provide long-term protection of the groundwater, and (4) conduct essential waste management operations in coordination with cleanup actions. The strategy will also help optimize Central Plateau readiness to use funding when it is available upon completion of River Corridor cleanup projects. One aspect of the Central Plateau strategy is to put in place the process to identify the final footprint for permanent waste management and containment of residual contamination within the 20-square-mile Industrial-Exclusive Area. The final footprint identified for permanent waste management and containment of residual contamination should be as small as practical and remain under federal ownership and control for as long as a potential hazard exists. Outside the final footprint, the remainder of the Central Plateau will be available for other uses consistent with the Hanford Comprehensive Land-Use Plan (DOE 1999), while maintained under federal ownership and control. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remaking the US nuclear waste program: a window of opportunity for change? - 15352

John Kingdon's 1984 policy analytic approach is utilized to examine nuclear waste policy in the United States over the last three decades. Kingdon's premise concerning the merging of three process streams - the problem stream, the political stream, and the policy stream - to create a policy window, took place when major changes in U.S. management of high-level radioactive waste and spent nuclear fuel occurred in 1982 and 1987. These three streams have once again converged, with events beginning in 2006, creating an opportunity to move beyond the current Yucca Mountain stalemate by adopting the recommendations of the Blue Ribbon Commission (BRC) on America's Nuclear Future in 2012. Legislation introduced in the U.S. Senate in 2013 to redirect the waste program along the lines suggested by the BRC has been reintroduced as the Nuclear Waste Administration Act of 2015, S. 854. The authors examine key provisions of S. 854 and suggest amendments requiring written consent agreements with governors of all potential host states, including Nevada; the same requirements for commingled and separate defense waste facilities; and additional measures to enhance nuclear waste transportation safety, security, and public acceptance. The Nuclear Waste Informed Consent Act (S. 691, 2015; H.R. 1364, 2015) is also examined. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advancements in the H-Canyon Exhaust Ventilation System Inspections at the Savannah River Site - 16030

A facility safety envelope requires management of activities to ensure no unacceptable radiological or chemical hazards to the public, site worker and environment occur. While appropriate design and construction methods ensure an initial physical plant configuration, what actions must an operating Facility take to ensure the physical plant continues to meet a safety configuration throughout Facility life? While a physical walk down of the plant is a tried and true method to confirm conditions, what other methods must be used when a walk down is not possible? What inspection methods are used when balancing budget pressures against obtaining inspection data? The periodic inspections of the H-Canyon Exhaust Tunnel are performed remotely. The 2015 remote Tunnel inspection has been the most successful inspection to date. This presentation highlights the continued lessons learned with the most recent 2015 remote Tunnel inspection. These lessons learned are applicable to Facilities considering or performing remote inspections. The Recovery Crawler Project was tasked with determining if the 2014 Inspection Crawler could be retrieved, perform the retrieval if feasible and complete the inspection of the remaining sections of the exhaust tunnel that were not previously performed. The objectives for the project were met, the Inspection Crawler was deemed unusable and left in place and the Recovery Crawler performed the complete 143 meters (470 feet) of tunnel inspection and an additional 55 meters (180 feet) of exhaust tunnel inspection not previously completed. The remote inspection of a 60+ year operating Canyon Exhaust tunnel is a complex endeavor requiring close coordination of multiple organizations, adherence to Conduct of Operations, Radiological Safety, Worker Safety, etc. principles as well as alignment with Facility Safety Basis requirements. This paper discusses the challenges, actions required getting ready for the 2015 recovery and continued inspection and the hazards encountered performing the actual recovery/inspection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Development of the R79: A new Type B and IP-1-2-3 Transportation Cask for Historic Waste - 18570

In October 2014, Robatel began the design and development of a new Type B and IP-1-2-3 transportation cask, the R79. This cask is designed to transport 'historical' waste from nuclear power plants, nuclear research labs, and nuclear medical isotope production facilities. This 'historical' waste may consist of activated and/or contaminated components including irradiated metal from decommissioning activities, fuel assembly containers, consumables, dried residues, etc. It may also include dewatered ion exchange resins, dried concentrates (salt, metal oxide, sludge, etc.), and hydrogenous materials. The main isotopes in this waste are Co-60 and Cs-137. The cask is not designed to transport fissile material but a trace quantity of up to 22.5 g is allowed. For ease of loading and unloading, the cask is designed to handle waste prepackaged into standard drums. With a loading capacity of 300 kg (661 lb) and a volume of 350 L (12.3 ft{sup 3}), the R79 cask is well suited to carry small to medium-sized waste shipments. The cask body is constructed of 304L stainless steel, its impact limiters are filled with Robatel's FENOSOL{sup TM} foam, and the shielding material includes Robatel's PNT7{sup TM} compound for its thermal and neutron absorbing properties. The cask is loaded in a dry environment and is designed for road transportation. Some novel features were integrated into the design of this cask. With its impact limiters installed, the cask may be treated as a Type B container. Depending on the result of the gas generation analysis, the cask can be treated as either Type B(U) (no limit of the transport duration) or Type B(M) (transport duration limited to 2 weeks). With the impact limiters removed, the R79 cask functions as an industrial-type package (either IP-1, IP-2, or IP-3 depending on the content classification). This can be advantageous for a number of reasons. First, it takes less time for loading and unloading operations when the impact limiters are not installed. Secondly and more importantly, three industrial-type packages can be transported on the same conveyance compared to two Type B packages. These options allow the shipper more flexibility: if the content meets the lower radiation limits for an industrial type package, more waste can be transported on one shipment. If the content must be classified as Type B, the user only must install the impact limiters prior to shipment. The design and development of this cask was performed in 2015, with the first drop testing beginning in July 2015. The complete design documents were first submitted September 2015. Robatel completed the foam for the impact limiters in October 2016, with the completed impact limiters finished in March 2017. The end of manufacturing, delivery of the cask to our customer, and receipt of the regulatory certificate of approval is scheduled before the end of 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Economic and Societal Impact of Baseload Power Generation on Local Communities

In the United States (US), energy from coal, natural gas, and nuclear power plants produced approximately 3,500 TWh of electricity and accounted for 85% of total net generation in 2015. In 2015, coal and natural gas power plants each contributed about 33% of all generation in the US. generation II nuclear power plants represents about 20% of all electricity produced in the US and 62.4% of emission-free electricity in 2015. As a byproduct of electricity, combustion fossil fuel plants release hazardous emissions such as CO{sub 2}, N{sub 2}O, NOx and SO{sub 2}. CO{sub 2}, CH{sub 4}, and N{sub 2}O. Many of these emissions are major greenhouse gases (GHG) that have been linked to contributing to global climate change. The release of NOx and SO{sub 2} have a negative impact on human health and contribute to smog and acid rain. As a result, communities are often subjected to negative externalities such as pollution, noise, undesirable visuals, and safety concerns when sited near power plants. Though nuclear power plants do not produce any air emissions, there are concerns of nuclear waste, radiation leaks into the environment, and Fukushima-level accidents. With electricity generation, there are economic, safety, and environmental tradeoffs between the three technologies. These factors can contribute to negative and positive externalities for communities that are sited near baseload power plants. Davis (2010) using the hedonic price method found that communities living within 2 miles of power plants experience a 3-7% decrease in housing values. There is further evidence that those that live even closer experience larger decreases. While several studies focus on hedonic price methods and health effects, none have investigated and compared the socioeconomic indicators of communities near baseload power plants. The goal of this work is to investigate and examine relationship between societal and economic community indicators with respect to distance and generation technology. From a cost benefit standpoint an argument can be made based on the externalities from these power plants. Positive externalities that improve median incomes and home values could mean added tax revenue for local municipalities and governments. Typically, comparisons between generating technologies are made using the levelized cost of electricity (LCOE) and life cycle GHG emissions, however the impacts on local communities can also be used as a metric when comparing technologies. (authors)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Physics of the Cosmos Program Annual Technology Report

What's in this Report? What's New? This fifth Program Annual Technology Report (PATR) summarizes the Programs technology development activities for fiscal year (FY) 2015. The PATR serves four purposes.1. Summarize the technology gaps identified by the astrophysics community;2. Present the results of this years technology gap prioritization by the PCOS Technology Management Board (TMB);3. Report on newly funded PCOS Strategic Astrophysics Technology (SAT) projects; and4. Detail progress, current status, and activities planned for the coming year for all technologies supported by PCOS Supporting Research and Technology (SRT) funding in FY 2015. .

PCOS↗

The Marriage of Residential Energy Codes and Rating Systems: Conflict Resolution or Just Conflict?

After three decades of coexistence at a distance, model residential energy codes and residential energy rating systems have come together in the 2015 International Energy Conservation Code. At the October, 2013, International Code Council’s Public Comment Hearing, a new compliance path based on an Energy Rating Index was added to the IECC. Although not specifically named in the code, RESNET’s HERS rating system is the likely candidate Index for most jurisdictions. While HERS has been a mainstay in various beyond-code programs for many years, its direct incorporation into the most popular model energy code raises questions about the equivalence of a HERS-based compliance path and the traditional IECC performance compliance path, especially because the two approaches use different efficiency metrics, are governed by different simulation rules, and have different scopes with regard to energy impacting house features. A detailed simulation analysis of more than 15,000 house configurations reveals a very large range of HERS Index values that achieve equivalence with the IECC’s performance path. This paper summarizes the results of that analysis and evaluates those results against the specific Energy Rating Index values required by the 2015 IECC. Based on the home characteristics most likely to result in disparities between HERS-based compliance and performance path compliance, potential impacts on the compliance process, state and local adoption of the new code, energy efficiency in the next generation of homes subject to this new code, and future evolution of model code formats are discussed.

Residential, Energy, Rating systems, HERS, 2015 IE↗