Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2010”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

From Policy to Compliance: Federal Energy Efficient Product Procurement

Federal buyers are required to purchase energy-efficient products in an effort to minimize energy use in the federal sector, save the federal government money, and spur market development of efficient products. The Federal Energy Management Program (FEMP)’s Energy Efficient Product Procurement (EEPP) Program helps federal agencies comply with the requirement to purchase energy-efficient products by providing technical assistance and guidance and setting efficiency requirements for certain product categories. Past studies have estimated the savings potential of purchasing energy-efficient products at over $500 million per year in energy costs across federal agencies.1 Despite the strong policy support for EEPP and resources available, energy-efficient product purchasing operates within complex decision-making processes and operational structures; implementation challenges exist that may hinder agencies’ ability to comply with purchasing requirements. The shift to purchasing green products, including energy-efficient products, relies on “buy in” from a variety of potential actors throughout different purchasing pathways. Challenges may be especially high for EEPP relative to other sustainable acquisition programs given that efficient products frequently have a higher first cost than non-efficient ones, which may be perceived as a conflict with fiscal responsibility, or more simply problematic for agency personnel trying to stretch limited budgets. Federal buyers may also face challenges in determining whether a given product is subject to EEPP requirements. Previous analysis on agency compliance with EEPP, conducted by the Alliance to Save Energy (ASE), shows that federal agencies are getting better at purchasing energy-efficient products. ASE conducted two reviews of relevant solicitations for product and service contracts listed on Federal Business Opportunities (FBO), the centralized website where federal agencies are required to post procurements greater than $25,000. In 2010, ASE estimated a compliance rate of 46% in 2010, up from an estimate of 12% in 2008. Our work updates and expands on ASE’s 2010 analysis to gauge agency compliance with EEPP requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Life Cycle Inventories and Life Cycle Assessments of Photovoltaic Systems

Life Cycle Assessment (LCA) is a structured, comprehensive method of quantifying material- and energyflows and their associated impacts in the life cycles of products (i.e., goods and services). One of the major goals of IEA PVPS Task 12 is to provide guidance on assuring consistency, balance, transparency and quality of LCA to enhance the credibility and reliability of the results. The current report presents the latest consensus LCA results among the authors, PV LCA experts in North America, Europe and Asia. At this time consensus is limited to five technologies for which there are well-established and up-to-date LCI data: mono- and multi-crystalline Si, CdTe CIGS, and high concentration PV (HCPV) using III/V cells. The LCA indicators shown herein include Energy Payback Times (EPBT), Greenhouse Gas emissions (GHG), criteria pollutant emissions, and heavy metal emissions. Life Cycle Inventories (LCIs) are necessary for LCA and the availability of such data is often the greatest barrier for conducting LCA. The Task 12 LCA experts have put great efforts in gathering and compiling the LCI data presented in this report. These include detailed inputs and outputs during manufacturing of cell, wafer, module, and balance-of-system (i.e., structural- and electrical- components) that were estimated from actual production and operation facilities. In addition to the LCI data that support the LCA results presented herein, data are presented to enable analyses of various types of PV installations; these include operational data of rooftop and ground-mount PV systems and country-specific PV-mixes. The LCI datasets presented in this report are the latest that are available to the public describing the status in 2011 for crystalline Si, 2010-2011 for CdTe, 2010 for CIGS, and 2010 for HCPV technology. This report provides an update of the life cycle inventory data in Section 5 of the previous report: V. Fthenakis, H. C. Kim, R. Frischknecht, M. Raugei, P. Sinha, M. Stucki , 2011, Life Cycle Inventories and Life Cycle Assessment of Photovoltaic Systems, International Energy Agency(IEA) PVPS Task 12, Report T12-02:2011. Updates are provided for the crystalline silicon PV global supply chain (Section 5.1), thin film PV module manufacturing (Sections 5.2-5.3), PV mounting structures (Section 5.5), and country-specific electricity grid mixes (Section 5.9). Other sections of this report are the same as in the previous report. Electronic versions of the updated tables in Section 5 are available at IEA PVPS (http://www.iea-pvps.org; select Task 12 under Archive) and treeze Ltd (http://treeze.ch; under Publications).

14 SOLAR ENERGY↗

AGR-1 Irradiated Compact 6-1-1 PIE Report: Evaluation of As-Irradiated Fuel Performance Using Leach Burn Leach, IMGA, Materialography, and X-ray Tomography

The AGR-1 irradiation test train consisted of six independently monitored capsules. All capsules contained twelve compacts in three stacks of four compacts each [Pope 2010]. Compact 6-1-1 was located in capsule 6, at the top of the test train. The compact was in stack 1 (one of the two stacks closest to the core) in position 1 (at the bottom of the 4 compact stack). Compact 6-1-1 was identified in the fabrication data package as LEU01-46T-Z32 [Hunn et al. 2006]. Details of the compact fabrication and measured properties can be found in that data package. The compact lot was made using TRISO-coated particles designated as AGR-1 Baseline fuel. These particles contained 19.7% enriched mixed uranium oxideuranium carbide (UCO) kernels with a O/U atomic ratio of ~1.36 and a C/U atomic ratio of ~0.33 [Pope 2010]. Details of the coated particle fabrication and measured properties can be found in the data package for the AGR-1 Baseline particles [Hunn and Lowden 2006]. The compact was irradiated at the INL Advanced Test Reactor (ATR) to an average calculated burn-up of 15.1% fissions per initial metal atom (FIMA) and an average calculated fast fluence of 3.0 x 10 25 n/m 2 [Sterbentz 2011] at a calculated volume averaged and time averaged temperature of approximately 1111°C [Hawkes 2012]. Capsules were disassembled and preliminary compact and graphite holder inspection was performed [Demkowicz et al. 2011]. Compact 6-1-1 was shipped to ORNL and post-irradiation examination (PIE) was performed according to examination plan PLN-3624 [Demkowicz 2010-2]. All the examination plan objectives listed below were completed except item 6, which was deleted due to limited funding. 1. Determine the inventory of fission products retained in the compact matrix, but not contained by the SiC and determine the number of exposed kernels or particles with defective SiC layers using the deconsolidation-leach-burn-leach method. 2. Gamma count all particles to quantify 137Cs inventory for comparison with calculated values and gamma spectrometric measurements made on the whole compact. Also, attempt to quantify the inventory of any other fission products for which gamma emissions are observed. 3. Characterize each particle based on the 137 Cs/ 144 Ce ratio to identify particles with low Cs retention that may be the result of a failed SiC coating. 4. Gamma count a subset of particles to determine the 110m Ag inventory for comparison with calculated values and gamma spectrometric measurements made on the whole compact. Also, attempt to quantify the inventory of other fission products observed. 5. Microscopically inspect selected particles to determine the condition of the kernels and coatings. This could include kernel migration, coating microstructures and defects, fission product attack of the SiC layer, and fission product migration in the coating layers. 6. Perform high temperature fission product release tests on a subset of particles in order to calibrate the collection efficiency of the Core Conduction Cooldown Test Facility (CCCTF) deposition cup for selected fission products. Gamma count particles before and after the heating test to quantify the released fission product fractions. 7. Archive remaining particles for later use. Compact 6-1-1 LBL began with compact deconsolidation in the Building 3525 hot cell, followed by two nitric acid leaches of the particles and matrix residue using a Soxhlet extraction apparatus. The matrix residue was then burned and the ash was leached twice with boiling nitric acid. The deconsolidated particles underwent an IMGA analysis to determine gamma-emitting isotope inventories for individual particles; the most conspicuous elements with reduced inventories, indicating fission product release, were silver and europium. During the IMGA analysis, particles with low silver were identified and a subset of these was set aside for materialography and x-ray. After the completion of the IMGA study, about 10% of the particles (421) were set aside as an archive and the remainder burned back and leached twice in the Soxhlet apparatus. Figure 1 shows a flow chart detailing the PIE of Compact 6-1-1.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Destructive PIE and Safety Testing of Six AGR-2 UO 2 Capsule 3 Compacts

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program’s second irradiation experiment (AGR-2) was irradiated in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from June 2010 to October 2013 (Collin 2014). The fuel compacts in this experiment held either tristructural isotropic (TRISO)-coated spherical kernels of uranium oxide (UO2) or TRISO-coated kernels containing both uranium carbide and uranium oxide phases (UCO). There were six separately monitored and controlled capsules in the AGR-2 test train. Capsule 3 held twelve compacts containing UO2-TRISO particles fabricated by BWX Technologies Nuclear Operations Group. The AGR-2 TRISO particles were fabricated in a pilot-scale fluidized-bed chemical vapor deposition (FB-CVD) furnace with a coating chamber inner diameter of 150 mm (Phillips, Barnes, and Hunn 2010), which was a change from the first irradiation experiment (AGR-1) particles that had been coated in a lab-scale FB-CVD coating system with a chamber inner diameter of 50 mm (Lowden 2006). The TRISO particles were overcoated with resinated graphite flake at Oak Ridge National Laboratory (ORNL), and the overcoated particles were pressed into one-inch-long, half-inch-diameter cylinders (Hunn, Montgomery, and Pappano 2010). Each cylindrical compact held an average of 1,543 TRISO particles with 9.6% enriched UO2 kernels that had a nominal diameter of 500 μm (Hunn, Savage, and Silva 2012). Capsule 3 compacts were irradiated to average calculated burnups of 9.01–10.69% fissions per initial metal atom (FIMA), and the average calculated fluences of fast neutrons with energies E n > 0.18 MeV were 3.05–3.53×10 25 n/m 2 (Sterbentz 2014). The calculated time-average, volume-average Capsule 3 compact temperatures were 996–1,062°C. However, Capsule 3 compact temperatures varied several hundred degrees across each compact, and the timeaverage minimum (TA min ) and time-average maximum (TA max ) temperatures were between 889–999°C and 1,072–1,105°C, respectively (Hawkes 2014). After irradiation, the AGR-2 test train was transferred from ATR to the INL Materials and Fuels Complex for inspection and disassembly (Ploger, Demkowicz, and Harp 2015). The initial inspection included dimensional metrology of the compacts and graphite fuel holders. Like all the AGR-2 compacts, the compacts in Capsule 3 shrank slightly during irradiation, as expected, with an average length reduction of 1.07–1.24% and an average diameter reduction of 0.13–0.41%. Post-irradiation examination (PIE) of the capsule components was completed to measure select fission products ( 90 Sr, 110m Ag, 134 Cs, 137 Cs, 144 Ce, and 154 Eu) outside the compacts (Stempien and Demkowicz 2020). This involved gamma counting of the graphite and graphoil spacers at the top and bottom of each capsule, acid leaching for radiochemical analysis of fission products on the metallic capsule components, and burn-leach analysis of the graphite holders. The total amount of 110mAg measured on the Capsule 3 components was 13% of the calculated capsule inventory. This was significantly lower than the amount of 110m Ag measured on the three UCO capsule components, which ranged from 32–70%. The lower 110m Ag release in Capsule 3 was likely due to lower peak temperatures compared with the UCO fuel capsules (Hawkes 2014). Measured inventories of the other select fission products were also lower in Capsule 3.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Utility-Scale Solar Data Update (2020 Edition) [Slides]

Berkeley Lab’s 2020 update of utility-scale solar data and trends provides an overview of key trends in the U.S. market, with a focus on 2019. Highlights of this year’s update include: More than 4.5 GWAC of utility-scale solar (i.e., ground-mounted solar projects larger than 5 MWAC) achieved commercial operations in 2019, bringing cumulative capacity to 29 GWAC. Projects are spread across all 10 regions that we track, though more heavily concentrated in the sunniest regions. The median installed cost of projects that came online in 2019 fell to $\$$1.4/WAC ($\$$1.2/WDC), down 20% from 2018 and down by more than 70% from 2010. 77% of projects and 88% of capacity added in 2019 used single-axis tracking. Average capacity factors range from 17% in the least-sunny regions to 30% where it is sunniest. Single-axis tracking adds roughly five percentage points to capacity factor in the regions with the strongest solar resource. Nationwide average levelized power purchase agreement (PPA) prices fell to $\$$24/MWh in 2019, down 17% from 2018 and more than 80% since 2010. Thirty-nine projects (totaling 4.2 GWAC) in our PPA price sample include battery storage (totaling 2.3 GWAC and 9.5 GWh). In the “lower 48” states, a number of these recent PV+battery PPAs have been inked in the mid-$\$$20/MWh range (levelized in 2019 dollars).Not including the 30% investment tax credit (ITC), the median levelized cost of energy (LCOE) from utility-scale PV has declined by 85% since 2010, to $\$$40/MWh in 2019. When the 30% ITC is included within the LCOE calculation, the median LCOE closely tracks the median PPA price over time. In higher-penetration markets like CAISO, the value of solar has been declining, but falling PPA prices have largely kept pace, preserving solar's net value. At the end of 2019, there were nearly 370 GW of solar in interconnection queues from all 7 ISOs and 30 additional utilities across the country. Nearly a third of this proposed solar capacity is paired with battery storage.

14 SOLAR ENERGY↗

SECARB Additional Data and Support for the EA or EIS Review

Contents include the following: 1) Phase I Cultural Resources Survey of Six Well Sites, SECARB Tract, Mobile County, Alabama, May 3, 2010; 2) SECARB Phase III Anthropogenic Test Project–Electric Transmission Line Supplemental Environmental Information Volume, May 2010; 3) SECARB Phase III Anthropogenic Test Project–Pipeline Supplemental Environmental Information Volume (Revised), May 2010; and 4) Environmental Assessment for the Southeast Regional Carbon Sequestration Partnership–Phase III Anthropogenic Test Project, March 2011.

01 COAL, LIGNITE, AND PEAT↗

Final Science Report of the Joint Center for Artificial Photosynthesis (JCAP)

The Joint Center for Artificial Photosynthesis (JCAP) was designated as the U.S. Department of Energy (DOE) Fuels from Sunlight Energy Innovation Hub on July 22, 2010, and began operations according to a cooperative agreement between the DOE and the California Institute of Technology on September 30, 2010. The cooperative agreement was renewed on September 30, 2015. This final science report outlines JCAP research activities from September 30, 2010 to September 30, 2021.

08 HYDROGEN↗

Hanford Site Pollinator Study

Pollinators (animals that facilitate plant reproduction by moving pollen from flower to flower) are vital to the health of the world’s ecosystems (Potts et al. 2010). Insects are the most common type of pollinator throughout the majority of the world. The mutualistic relationship of plants and pollinating insects has evolved on every continent from Antarctica to Australia (Kevan 1972, Potts et al. 2010). By enabling successful plant reproduction, pollinating insects support the health of nearly all other organisms in the environment that rely on healthy plant populations for food and shelter. Of the insect pollinators, bees are the most important group of pollinators worldwide (Kearns et al. 1998, Michener 2007). Within the last century, rapid declines in both wild and managed bee populations have been recorded throughout the world (Kearns et al. 1998, Goulson et al. 2005, Biesmeijer et al. 2006). Bee declines are believed to be caused by a combination of stressors including habitat loss, pesticide use, and disease (Cane and Tepedino 2001, Furst et al. 2014). Habitat loss and fragmentation are major causes of bee population declines, especially for wild bees as they rely on flowering plants for forage and nesting (Potts et al. 2010, Winfree et al. 2009). Wild bees can have maximum foraging ranges as small as 150 m, making local habitat structure especially important (Gathmann and Tscharntke 2002). When humans remove native vegetation from the environment they are removing valuable bee food and nesting resources and are contributing to habitat loss and fragmentation, which negatively affects bee populations (Biesmeijer et al. 2006). The greatest abundance of wild bees is suspected to be in semi-desert, arid environments, especially within western North America (Linsley 1958, Koh et al. 2016). This habitat classification matches the environment of the Hanford Site and surrounding Columbia River Basin, suggesting the Hanford Site may have abundant wild bee populations. Native bees are the primary insect pollinators of the Columbia River Basin (Tepedino and Griswold 1995). Although butterflies and moths play a role in pollination in the Columbia River Basin, they are much less efficient at transferring pollen and tend to visit flowering species only for nectar (Tepedino and Griswold 1995). Many species of native bees, honey bees, bumble bees, and butterflies have been documented on the Hanford Site (see Zack 1997); however, pollination-specific studies focusing on Hanford Site insects are uncommon. Over 600 species of bee are known to occur in this region, with the actual number believed to be much higher due to under sampling (Tepedino and Griswold 1995; Niwa et al. 2001). Arid lands of western North America have high proportions of specialized bees that are typically restricted to small geographic areas, making the Hanford Site and the surrounding region especially vulnerable to species loss when habitats are removed (Tepedino 1979).

54 ENVIRONMENTAL SCIENCES↗

Planetary Boundary-Layer Height (PBLHT) Value-Added Product: Remote-Sensing Retrievals

The planetary boundary layer (PBL) is fundamental to numerous atmospheric processes, including aerosol mixing and transport, cloud evolution, and precipitation formation. A critical parameter in these studies is the PBL height (PBLHT). This vertical depth is essential for characterizing PBL structures in numerical simulations and serves as a primary metric for estimating flux exchanges between the Earth’s surface and the atmosphere. Radiosonde (SONDE) observations provide high-vertical-resolution measurements of temperature and moisture profiles and are widely used to estimate PBLHT (Liu and Liang 2010, Seidel et al. 2010). The U.S. Department of Energy Atmospheric Radiation Measurement (ARM) User Facility’s PBLHT value-added product (VAP) for radiosonde measurements, known as PBLHTSONDE, applies three commonly used methods—the Heffter (1980) method, the Liu and Liang (2010) method, and the bulk Richardson number approach (Seibert et al. 2000)—to derive PBLHT. The PBLHTSONDE VAP operates routinely at ARM observatories and mobile facilities, with data available from the ARM Data Center shortly after sounding observations are collected (Sivaraman et al. 2013). However, radiosonde observations are limited by their low temporal resolution. Most stations launch soundings only twice daily, which constrains the ability to investigate and characterize the temporal evolution of the PBL using radiosonde data alone. The use of continuous remote-sensing observations provides high temporal resolution of PBLHT estimates. These observations include aerosol lidars (Dang et al. 2019, Su et al. 2020), Doppler lidar (DL; Tucker et al. 2009, Krishnamurthy et al. 2021), and water vapor and/or temperature lidars and radiometers (Turner et al. 2014). These observations provide valuable data on the PBL’s thermodynamic properties (e.g., water vapor and/or temperature lidars and radiometers), dynamic properties (e.g., DL), and distribution of tracer substances (e.g., aerosol lidars), all of which can be used to estimate PBLHT. ARM developed PBLHT estimates from the micropulse lidar (MPL; PBLHTMPL), Doppler lidar (PBLHTDL), and combined Raman lidar (RL)/atmospheric emitted radiance interferometer (AERI) thermodynamic profiles (PBLHTTHERMO). Each estimate captures different physical characteristics of the boundary layer—aerosol tracers, vertical velocity turbulence, and thermodynamic structure—and exhibits distinct strengths and limitations depending on the PBL regime and time of day. In addition, the ARM ceilometer (CEIL) provides three potential PBLHT candidates derived from the vendor's built-in algorithm. Building on these individual retrievals, ARM developed the PBLHTBEML VAP, which combines the four remote-sensing-based estimates with ancillary meteorological variables using the machine learning approach of Zhang et al. (2025) to produce a best-estimate PBLHT at 10-minute resolution.

54 ENVIRONMENTAL SCIENCES↗

Final Report - MEA and Stack Durability for PEM Fuel Cells

Proton exchange membrane fuel cells are expected to change the landscape of power generation over the next ten years. For this to be realized one of the most significant challenges to be met for stationary systems is lifetime, where 40,000 hours of operation with less than 10% decay is desired. This project conducted fundamental studies on the durability of membrane electrode assemblies (MEAs) and fuel cell stack systems with the expectation that knowledge gained from this project will be applied toward the design and manufacture of MEAs and stack systems to meet DOE’s 2010 stationary fuel cell stack systems targets. The focus of this project was PEM fuel cell durability – understanding the issues that limit MEA and fuel cell system lifetime, developing mitigation strategies to address the lifetime issues and demonstration of the effectiveness of the mitigation strategies by system testing. To that end, several discoveries were made that contributed to the fundamental understanding of MEA degradation mechanisms. (1) The classically held belief that membrane degradation is solely due to end-group “unzipping” is incorrect; there are other functional groups present in the ionomer that are susceptible to chemical attack. (2) The rate of membrane degradation can be greatly slowed or possibly eliminated through the use of additives that scavenge peroxide or peroxyl radicals. (3) Characterization of GDL using dry gases is incorrect due to the fact that fuel cells operate utilizing humidified gases. The proper characterization method involves using wet gas streams and measuring capillary pressure as demonstrated in this project. (4) Not all Platinum on carbon catalysts are created equally – the major factor impacting catalyst durability is the type of carbon used as the support. (5) System operating conditions have a significant impact of lifetime – the lifetime was increased by an order of magnitude by changing the load profile while all other variables remain the same. (6) Through the use of statistical lifetime analysis methods, it is possible to develop new MEAs with predicted durability approaching the DOE 2010 targets. (7) A segmented cell was developed that extend the resolution from ~ 40 to 121 segments for a 50cm2 active area single cell which allowed for more precise investigation of the local phenomena in a operating fuel cell. (8) The single cell concept was extended to a fuel size stack to allow the first of its kind monitoring and mapping of an operational fuel cell stack. An internal check used during this project involved evaluating the manufacturability of any new MEA component. If a more durable MEA component was developed in the lab, but could not be scaled-up to ‘high speed, high volume manufacturing’, then that component was not selected for the final MEA-fuel cell system demonstration. It is the intent of the team to commercialize new products developed under this project, but commercialization can not occur if the manufacture of said new components is difficult or if the price is significantly greater than existing products as to make the new components not cost competitive. Thus, the end result of this project is the creation of MEA and fuel cell system technology that is capable of meeting the DOEs 2010 target of 40,000 hours for stationary fuel cell systems (although this lifetime has not been demonstrated in laboratory or field testing yet) at a cost that is economically viable for the developing fuel cell industry. We have demonstrated over 2,000 hours of run time for the MEA and system developed under this project.

08 HYDROGEN↗

China's Top-1000 Energy-Consuming Enterprises Program:Reducing Energy Consumption of the 1000 Largest Industrial Enterprises in China

In 2005, the Chinese government announced an ambitious goal of reducing energy consumption per unit of GDP by 20% between 2005 and 2010. One of the key initiatives for realizing this goal is the Top-1000 Energy-Consuming Enterprises program. The energy consumption of these 1000 enterprises accounted for 33% of national and 47% of industrial energy usage in 2004. Under the Top-1000 program, 2010 energy consumption targets were determined for each enterprise. The objective of this paper is to evaluate the program design and initial results, given limited information and data, in order to understand the possible implications of its success in terms of energy and carbon dioxide emissions reductions and to recommend future program modifications based on international experience with similar target-setting agreement programs. Even though the Top-1000 Program was designed and implemented rapidly, it appears that--depending upon the GDP growth rate--it could contribute to somewhere between approximately 10% and 25% of the savings required to support China's efforts to meet a 20% reduction in energy use per unit of GDP by 2010.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ConocoPhillips Sweeny IGCC/CCS Project

Under its Industrial Carbon Capture and Sequestration (ICCS) Program, the United States (U.S.) Department of Energy (DOE) selected ConocoPhillips Company (ConocoPhillips) to receive funding through the American Recovery and Reinvestment Act (ARRA) of 2009 for the proposed Sweeny Integrated Gasification Combined Cycle (IGCC)/Carbon Capture and Storage (CCS) Project (Project) to be located in Brazoria County, Texas. Under the program, the DOE is partnering with industry to demonstrate the commercial viability and operational readiness of technologies that would capture carbon dioxide (CO{sub 2}) emissions from industrial sources and either sequester those emissions, or beneficially reuse them. The primary objective of the proposed Project was to demonstrate the efficacy of advanced technologies that capture CO{sub 2} from a large industrial source and store the CO{sub 2} in underground formations, while achieving a successful business venture for the entity (entities) involved. The Project would capture 85% of the CO{sub 2} produced from a petroleum coke (petcoke) fed, 703 MWnet (1,000 MWgross) IGCC power plant, using the ConocoPhillips (COP) proprietary and commercially proven E-Gas{trademark} gasification technology, at the existing 247,000 barrel per day COP Sweeny Refinery. In addition, a number of other commercially available technologies would be integrated into a conventional IGCC Plant in a unique, efficient, and reliable design that would capture CO{sub 2}. The primary destination for the CO{sub 2} would be a depleted natural gas field suitable for CO{sub 2} storage ('Storage Facility'). COP would also develop commercial options to sell a portion of the IGCC Plant's CO{sub 2} output to the growing Gulf Coast enhanced oil recovery (EOR) market. The IGCC Plant would produce electric power for sale in the Electric Reliability Council of Texas Houston Zone. The existing refinery effluent water would be treated and reused to fulfill all process water needs. The DOE ICCS program adopts a two-phase approach. During the 7-month Phase 1 period, ConocoPhillips further defined the Project by advancing the preliminary design, permits, and contracts. In addition, ConocoPhillips was developing a Phase 2 renewal application to seek continued DOE funding for the Project's design, construction, and early operations. The DOE and ConocoPhillips entered into a Phase1 Cooperative Agreement (DOE Award Number DE-FE0001859) on November 16, 2009, agreeing to share cost on a 50/50 basis during the Phase 1 period, with a DOE budget of $2,989,174. On April 7, 2010, ConocoPhillips informed the DOE that it would not participate in Phase 2 of the DOE ICCS program. The company believes that enabling legislation and regulations at both the federal and state levels will not be approved and implemented in time to make a final investment decision such that the Project would be substantially constructed by September 30, 2015, the end of the AARA funding period. Considering current price assumptions, the Project would not generate investment level returns. ConocoPhillips elected not to submit a Phase 2 renewal application, which was due on April 16, 2010. This Final Scientific/Technical Report provides an overview of the Project, including highlights and benefits of the proposed carbon capture and storage project scope, sites, and technologies. It also summarizes the work accomplishments during the Phase 1 period from November 16, 2009 to June 16, 2010. Due to ConocoPhillips decision not to submit the Phase 2 renewal application and not to enter into related agreements, certain information regarding the proposed CO{sub 2} storage facility cannot be publicly reported due to confidentiality agreements.

01 COAL, LIGNITE, AND PEAT↗

Lignite Fuel Enhancement

Pulverized coal power plants which fire lignites and other low-rank high-moisture coals generally operate with reduced efficiencies and increased stack emissions due to the impacts of high fuel moisture on stack heat loss and pulverizer and fan power. A process that uses plant waste heat sources to evaporate a portion of the fuel moisture from the lignite feedstock in a moving bed fluidized bed dryer (FBD) was developed in the U.S. by a team led by Great River Energy (GRE). The demonstration was conducted with Department of Energy (DOE) funding under DOE Award Number DE-FC26-04NT41763. The objectives of GRE's Lignite Fuel Enhancement project were to demonstrate reduction in lignite moisture content by using heat rejected from the power plant, apply technology at full scale at Coal Creek Station (CCS), and commercialize it. The Coal Creek Project has involved several stages, beginning with lignite drying tests in a laboratory-scale FBD at the Energy Research Center (ERC) and development of theoretical models for predicting dryer performance. Using results from these early stage research efforts, GRE built a 2 ton/hour pilot-scale dryer, and a 75 ton/hour prototype drying system at Coal Creek Station. Operated over a range of drying conditions, the results from the pilot-scale and prototype-scale dryers confirmed the performance of the basic dryer design concept and provided the knowledge base needed to scale the process up to commercial size. Phase 2 of the GRE's Lignite Fuel Enhancement project included design, construction and integration of a full-scale commercial coal drying system (four FBDs per unit) with Coal Creek Units 1 and 2 heat sources and coal handling system. Two series of controlled tests were conducted at Coal Creek Unit 1 with wet and dried lignite to determine effect of dried lignite on unit performance and emissions. Wet lignite was fired during the first, wet baseline, test series conducted in September 2009. The second test series was performed in March/April 2010 after commercial coal drying system was commissioned. Preliminary tests with dried coal were performed in March/April 2010. During the test Unit 2 was in outage and, therefore, test unit (Unit 1) was carrying entire station load and, also, supplying all auxiliary steam extractions. This resulted in higher station service, lower gross power output, and higher turbine cycle heat rate. Although, some of these effects could be corrected out, this would introduce uncertainty in calculated unit performance and effect of dried lignite on unit performance. Baseline tests with dried coal are planned for second half of 2010 when both units at Coal Creek will be in service to establish baseline performance with dried coal and determine effect of coal drying on unit performance. Application of GRE's coal drying technology will significantly enhance the value of lignite as a fuel in electrical power generation power plants. Although existing lignite power plants are designed to burn wet lignite, the reduction in moisture content will increase efficiency, reduce pollution and CO{sub 2} emissions, and improve plant economics. Furthermore, the efficiency of ultra supercritical units burning high-moisture coals will be improved significantly by using dried coal as a fuel. To date, Great River Energy has had 63 confidentiality agreements signed by vendors and suppliers of equipment and 15 utilities. GRE has had agreements signed from companies in Canada, Australia, China, India, Indonesia, and Europe.

01 COAL, LIGNITE, AND PEAT↗

AGR-2 Data Qualification Interim Report

Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FIVE YEARS OF SYNTHESIS OF SOLAR SPECTRAL IRRADIANCE FROM SDID/SISA AND SDO /AIA IMAGES

In this paper we describe the synthetic solar spectral irradiance (SSI) calculated from 2010 to 2015 using data from the Atmospheric Imaging Assembly (AIA) instrument, on board the Solar Dynamics Observatory spacecraft. We used the algorithms for solar disk image decomposition (SDID) and the spectral irradiance synthesis algorithm (SISA) that we had developed over several years. The SDID algorithm decomposes the images of the solar disk into areas occupied by nine types of chromospheric and 5 types of coronal physical structures. With this decomposition and a set of pre-computed angle-dependent spectra for each of the features, the SISA algorithm is used to calculate the SSI. We discuss the application of the basic SDID/SISA algorithm to a subset of the AIA images and the observed variation occurring in the 2010–2015 period of the relative areas of the solar disk covered by the various solar surface features. Our results consist of the SSI and total solar irradiance variations over the 2010–2015 period. The SSI results include soft X-ray, ultraviolet, visible, infrared, and far-infrared observations and can be used for studies of the solar radiative forcing of the Earth’s atmosphere. These SSI estimates were used to drive a thermosphere–ionosphere physical simulation model. Predictions of neutral mass density at low Earth orbit altitudes in the thermosphere and peak plasma densities at mid-latitudes are in reasonable agreement with the observations. The correlation between the simulation results and the observations was consistently better when fluxes computed by SDID/SISA procedures were used.

79 ASTRONOMY AND ASTROPHYSICS↗

Compact Resolved Ejecta in the Nearest Tidal Disruption Event

Tidal disruption events (TDEs) occur when a star or substellar object passes close enough to a galaxy’s supermassive black hole to be disrupted by tidal forces. NGC 4845 (d = 17 Mpc) was host to a TDE, IGR J12580+0134, detected in 2010 November. Its proximity offers us a unique close-up of the TDE and its aftermath. We discuss new Very Long Baseline Array (VLBA) and Karl G. Jansky Very Large Array observations, which show that the radio flux from the active nucleus created by the TDE has decayed in a manner consistent with predictions from a jet-circumnuclear medium interaction model. This model explains the source’s broadband spectral evolution, which shows a spectral peak that has moved from the submillimeter (at the end of 2010) to GHz radio frequencies (in 2011–2013) to <1 GHz in 2015. The milliarcsecond-scale core is circularly polarized at 1.5 GHz but not at 5 GHz, consistent with the model. The VLBA images show a complex structure at 1.5 GHz that includes an east–west extension that is ∼40 mas (3 pc) long, as well as a resolved component that is 52 mas (4.1 pc) northwest of the flat-spectrum core, which is all that can be seen at 5 GHz. If ejected in 2010, the northwest component must have had v=0.96c over five years. However, this is unlikely, as our model suggests strong deceleration to speeds <0.5c within months and a much smaller, sub-parsec size. In this interpretation, the northwest component could have either a non-nuclear origin or be from an earlier event.

79 ASTRONOMY AND ASTROPHYSICS↗

Measured Laboratory and In-Use Fuel Economy Observed over Targeted Drive Cycles for Comparable Hybrid and Conventional Package Delivery Vehicles

In-use and laboratory-derived fuel economies were analyzed for a medium-duty hybrid electric drivetrain with 'engine off at idle' capability and a conventional drivetrain in a typical commercial package delivery application. Vehicles studied included eleven 2010 Freightliner P100H hybrids in service at a United Parcel Service facility in Minneapolis during the first half of 2010. The hybrids wereevaluated for 18 months against eleven 2010 Freightliner P100D diesels at the same facility. Both vehicle groups use the same 2009 Cummins ISB 200-HP engine. In-use fuel economy was evaluated using UPS's fueling and mileage records, periodic ECM image downloads, and J1939 CAN bus recordings during the periods of duty cycle study. Analysis of the in-use fuel economy showed 13%-29% hybridadvantage depending on measurement method, and a delivery route assignment analysis showed 13%-26% hybrid advantage on the less kinetically intense original diesel route assignments and 20%-33% hybrid advantage on the more kinetically intense original hybrid route assignments. Three standardized laboratory drive cycles were selected that encompassed the range of real-world in-use data. Thehybrid vehicle demonstrated improvements in ton-mi./gal fuel economy of 39%, 45%, and 21% on the NYC Comp, HTUF Class 4, and CARB HHDDT test cycles, respectively.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

MIX: a mosaic Asian anthropogenic emission inventory under the international collaboration framework of the MICS-Asia and HTAP

Here, the MIX inventory is developed for the years 2008 and 2010 to support the Model Inter-Comparison Study for Asia (MICS-Asia) and the Task Force on Hemispheric Transport of Air Pollution (TF HTAP) by a mosaic of up-to-date regional emission inventories. Emissions are estimated for all major anthropogenic sources in 29 countries and regions in Asia. We conducted detailed comparisons of different regional emission inventories and incorporated the best available ones for each region into the mosaic inventory at a uniform spatial and temporal resolution. Emissions are aggregated to five anthropogenic sectors: power, industry, residential, transportation, and agriculture. We estimate the total Asian emissions of 10 species in 2010 as follows: 51.3 Tg SO 2 , 52.1 Tg NO x , 336.6 Tg CO, 67.0 Tg NMVOC (non-methane volatile organic compounds), 28.8 Tg NH 3 , 31.7 Tg PM 10 , 22.7 Tg PM 2.5 , 3.5 Tg BC, 8.3 Tg OC, and 17.3 Pg CO 2 . Emissions from China and India dominate the emissions of Asia for most of the species. We also estimated Asian emissions in 2006 using the same methodology of MIX. The relative change rates of Asian emissions for the period of 2006–2010 are estimated as follows: –8.1 % for SO 2 , +19.2 % for NO x , +3.9 % for CO, +15.5 % for NMVOC, +1.7 % for NH 3 , –3.4 % for PM 10 , –1.6 % for PM 2.5 , +5.5 % for BC, +1.8 % for OC, and +19.9 % for CO 2 . Model-ready speciated NMVOC emissions for SAPRC-99 and CB05 mechanisms were developed following a profile-assignment approach.

54 ENVIRONMENTAL SCIENCES↗