Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “task management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Quality of Service for Real-Time Applications Over Next Generation Data Networks

This project, which started on January 1, 2000, was funded by NASA Glenn Research Center for duration of one year. The deliverables of the project included the following tasks: Study of QoS mapping between the edge and core networks envisioned in the Next Generation networks will provide us with the QoS guarantees that can be obtained from next generation networks. Buffer management techniques to provide strict guarantees to real-time end-to-end applications through preferential treatment to packets belonging to real-time applications. In particular, use of ECN to help reduce the loss on high bandwidth-delay product satellite networks needs to be studied. Effect of Prioritized Packet Discard to increase goodput of the network and reduce the buffering requirements in the ATM switches. Provision of new IP circuit emulation services over Satellite IP backbones using MPLS will be studied. Determine the architecture and requirements for internetworking ATN and the Next Generation Internet for real-time applications.

Ivancic, William↗

Using Social Media and Mobile Devices to Discover and Share Disaster Data Products Derived From Satellites

Data products derived from Earth observing satellites are difficult to find and share without specialized software and often times a highly paid and specialized staff. For our research effort, we endeavored to prototype a distributed architecture that depends on a standardized communication protocol and applications program interface (API) that makes it easy for anyone to discover and access disaster related data. Providers can easily supply the public with their disaster related products by building an adapter for our API. Users can use the API to browse and find products that relate to the disaster at hand, without a centralized catalogue, for example floods, and then are able to share that data via social media. Furthermore, a longerterm goal for this architecture is to enable other users who see the shared disaster product to be able to generate the same product for other areas of interest via simple point and click actions on the API on their mobile device. Furthermore, the user will be able to edit the data with on the ground local observations and return the updated information to the original repository of this information if configured for this function. This architecture leverages SensorWeb functionality [1] presented at previous IGARSS conferences. The architecture is divided into two pieces, the frontend, which is the GeoSocial API, and the backend, which is a standardized disaster node that knows how to talk to other disaster nodes, and also can communicate with the GeoSocial API. The GeoSocial API, along with the disaster node basic functionality enables crowdsourcing and thus can leverage insitu observations by people external to a group to perform tasks such as improving water reference maps, which are maps of existing water before floods. This can lower the cost of generating precision water maps. Keywords-Data Discovery, Disaster Decision Support, Disaster Management, Interoperability, CEOS WGISS Disaster Architecture

Spaceport Command and Control System Software Development

There is an immense challenge in organizing personnel across a large agency such as NASA, or even over a subset of that, like a center's Engineering directorate. Workforce inefficiencies and challenges are bound to grow over time without oversight and management. It is also not always possible to hire new employees to fill workforce gaps, therefore available resources must be utilized more efficiently. The goal of this internship was to develop software that improves organizational efficiency by aiding managers, making employee information viewable and editable in an intuitive manner. This semester I created an application for managers that aids in optimizing allocation of employee resources for a single division with the possibility of scaling upwards. My duties this semester consisted of developing frontend and backend software to complete this task. The application provides user-friendly information displays and documentation of the workforce to allow NASA to track diligently track the status and skills of its workforce. This tool should be able to prove that current employees are being effectively utilized and if new hires are necessary to fulfill skill gaps.

SCCS↗

Panel Session 100: Implementing Technically-Based Cleanup; US DOE Balancing Regulatory and Fiscal Complexity

Cleanup on the Hanford Site (located in Richland, Washington, USA) is moving away from along the Columbia River, where significant cleanup work has been completed, to the Central Plateau. The Central Plateau contains many high-hazards and risks, requiring significant resources to mitigate. The panelists discussed how to expedite efficient cleanup, recognizing stakeholder, regulatory and financial obligations and constraints. Questions: How do you see progress on the Hanford Site continue? How do we expedite cleanup? How do we communicate risk across the cleanup process? How do budget fluctuations influence planning? What are your views on the new contract approach, based on task orders negotiated separately, which will require regulator flexibility?.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Argillite And Crystalline Disposal Research: Accomplishments And Path-Forward.

The intention of this document is to provide a path-forward for research and development (R&D) for two host rock media-specific (argillite and crystalline) disposal research work packages within the Used Fuel Disposition Campaign (UFDC). The two work packages, Argillite Disposal R&D and Crystalline Disposal R&D, support the achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program. These two work packages cover many of the fundamental technical issues that will have multiple implications to other disposal research work packages by bridging knowledge gaps to support the development of the safety case. The path-forward begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclear-fuel-and-high-levelradioactive- waste). The path-forward will be maintained as a living document and will be updated as needed in response to available funding and the progress of multiple R&D tasks in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program. This path forward is developed based on the report of “Used Fuel Disposition Campaign Disposal Research and Development Roadmap (FCR&D-USED- 2011-000065 REV0)” (DOE, 2011). This document delineates the goals and objectives of the UFDC R&D program, needs for generic disposal concept design, and summarizes the prioritization of R&D issues.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of Deterministic and Statistical Models for Water Quality Compliance Forecasting in the San Joaquin River Basin, California

Model selection for water quality forecasting depends on many factors including analyst expertise and cost, stakeholder involvement and expected performance. Water quality forecasting in arid river basins is especially challenging given the importance of protecting beneficial uses in these environments and the livelihood of agricultural communities. In the agriculture-dominated San Joaquin River Basin of California, real-time salinity management (RTSM) is a state-sanctioned program that helps to maximize allowable salt export while protecting existing basin beneficial uses of water supply. The RTSM strategy supplants the federal total maximum daily load (TMDL) approach that could impose fines associated with exceedances of monthly and annual salt load allocations of up to $1 million per year based on average year hydrology and salt load export limits. The essential components of the current program include the establishment of telemetered sensor networks, a web-based information system for sharing data, a basin-scale salt load assimilative capacity forecasting model and institutional entities tasked with performing weekly forecasts of river salt assimilative capacity and scheduling west-side drainage export of salt loads. Web-based information portals have been developed to share model input data and salt assimilative capacity forecasts together with increasing stakeholder awareness and involvement in water quality resource management activities in the river basin. Two modeling approaches have been developed simultaneously. The first relies on a statistical analysis of the relationship between flow and salt concentration at three compliance monitoring sites and the use of these regression relationships for forecasting. The second salt load forecasting approach is a customized application of the Watershed Analysis Risk Management Framework (WARMF), a watershed water quality simulation model that has been configured to estimate daily river salt assimilative capacity and to provide decision support for real-time salinity management at the watershed level. Analysis of the results from both model-based forecasting approaches over a period of five years shows that the regression-based forecasting model, run daily Monday to Friday each week, provided marginally better performance. However, the regression-based forecasting model assumes the same general relationship between flow and salinity which breaks down during extreme weather events such as droughts when water allocation cutbacks among stakeholders are not evenly distributed across the basin. A recent test case shows the utility of both models in dealing with an exceedance event at one compliance monitoring site recently introduced in 2020.

54 ENVIRONMENTAL SCIENCES↗

IEA Bioenergy Task 40 Sustainable International Bioenergy Trade: Securing Supply and Demand (Country Report 2014—United States)

Logistical barrier are tied to feedstock harvesting, collection, storage and distribution. Current crop harvesting machinery is unable to selectively harvest preferred components of cellulosic biomass while maintaining acceptable levels of soil carbon and minimizing erosion. Actively managing biomass variability imposes additional functional requirements on biomass harvesting equipment. A physiological variation in biomass arises from differences in genetics, degree of crop maturity, geographical location, climatic events, and harvest methods. This variability presents significant cost and performance risks for bioenergy systems. Currently, processing standards and specifications for cellulosic feedstocks are not as well-developed as for mature commodities. Biomass that is stored with high moisture content or exposed to moisture during storage is susceptible to spoilage, rotting, spontaneous combustion, and odor problems. Appropriate storage methods and strategies are needed to better define storage requirements to preserve the volume and quality of harvested biomass over time and maintain its conversion yield. Raw herbaceous biomass is costly to collect, handle, and transport because of its low density and fibrous nature. Existing conventional, bale-based handling equipment and facilities cannot cost-effectively deliver and store high volumes of biomass, even with improved handling techniques. Current handling and transportation systems designed for moving woodchips can be inefficient for bioenergy processes due to the costs and challenges of transporting, storing, and drying high-moisture biomass. The infrastructure for feedstock logistics has not been defined for the potential variety of locations, climates, feedstocks, storage methods, processing alternatives, etc., which will occur at a national scale. When setting up biomass fuel supply chains, for large-scale biomass systems, logistics are a pivotal part in the system. Various studies have shown that long-distance international transport by ship is feasible in terms of energy use and transportation costs, but availability of suitable vessels and meteorological conditions (e.g., winter time in Scandinavia and Russia) need to be considered. However, local transportation by truck (both in biomass exporting and importing countries) may be a high-cost factor, which can influence the overall energy balance and total biomass costs.

09 BIOMASS FUELS↗

Prioritizing and Managing Technology Needs to Meet River Protection Project Mission Objectives - 16462

Over 56 million gallons of radioactive waste are stored in 177 large underground tanks at the Hanford Site, located in southeastern Washington State. This nuclear waste resulted from plutonium production for the nation's nuclear defense program. The River Protection Project (RPP) mission is to: - Safeguard and safely manage waste stored in the Hanford tanks, - Treat the waste using the Waste Treatment and Immobilization Plant (WTP), - Ensure safe disposition of the waste to protect the Columbia River and the environment. Each aspect of the mission requires some application of technology in order to meet the mission objectives. The RPP Technology Roadmap document presents a comprehensive, integrated assessment of the technology-related advances needed to ensure successful completion of the Hanford tank waste cleanup mission. This paper describes the development of the RPP Technology Roadmap, summarizes its content, describes integration and collaboration with the Department of Energy's national laboratories to support the work identified, and defines how priorities were identified to ensure near-term RPP mission commitments can be accomplished while preserving the longer term technology development elements necessary for mission completion. The Challenge - Managing a wide variety of technology needs that involve multiple organizations, contractors, and national laboratories presents additional challenges when funding constraints are factored in. A process was needed to ensure the technology needs supporting near term mission priorities were appropriately identified, prioritized, and supported through the fiscal year planning process. Additionally, the national laboratory resources necessary to support many of the technologies require coordination to ensure the most appropriate resources are applied at the appropriate level without duplication or contradiction of effort. The Solution - The RPP Technology Roadmap was developed with the primary purposes to: - Identify technology related items needed to support or enhance the River Protection Project (RPP) mission, - Prioritize technology needs to support fiscal year planning processes, - Organize National laboratory support of the RPP mission and communicate needs to the participating contractors. The Technology Roadmap is consistent with Department of Energy (DOE) Hanford mission priorities and is also in alignment with other Hanford Site technical initiatives and policy and planning documents. The Technology Roadmap highlights the current estimated technology needs and identifies where planning shortfalls exist and where national laboratory participation is needed to support mission success. This information assists fiscal year planning and national laboratory contracting processes to ensure that technology needs are supported. In addition to supporting the RPP baseline mission, the Technology Roadmap provides a basis for strategic planning by identifying opportunities to use technology solutions to enhance mission efficiency. This waste management paper describes the innovative and collaborative processes used to develop, validate, and communicate the results so the project owners and the national laboratories can most effectively plan work scope and resources. A discussion of the following processes is included: - Technology needs and task owner identification, - Functional area grouping and area lead identification, - Needs prioritization, - High priority needs ranking (including validation), - Results compilation and planning gap identification, - Results presentation by project and functional area, - National laboratory coordination and collaboration. Application - The process used to develop the RPP technology roadmap is applicable to any site where multiple national laboratories and contractors are involved in identifying and implementing technology based solutions. This process is also applicable to the DOE HQ role to provide prioritization and coordination of the nationwide technology development activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing work flow and logistic at waste processing facilities using the waste compliance and tracking system - 15392

Work flow and logistics at a busy radioactive waste processing complex or permitted treatment, storage, and disposal facility (TSDF) can pose a monumental challenge. An efficient operation requires good communication between engineering, logistics, and waste operators. The Los Alamos National Laboratory (LANL) has implemented an application that facilitates seamless communication of work flow requirements, between engineering, logistics, and waste operations personnel in the field. The Waste Compliance and Tracking System (WCATS), a comprehensive waste management system designed at LANL, provides four key elements to support logistics: (a) the container work path, (b) directed unit operation requests, (c) notification of pending operations, and (d) real-time status tools for office and field workers. The combination of these elements allows everyone to function as a team, with a shared knowledge of what is needed to accomplish facility objectives. The first element is like a road map indicating which unit operations are needed and in what sequence they should be performed; this is referred to as a 'work path'. It automatically routes a waste item or container from operation to operation. For example, a given work path might indicate that waste items require radiological survey, radioassay, and a technical review, in that order. When the work path is assigned to a container, the system enforces the correct order of operations. Directed unit operation 'requests', the second element, fills a gap between pre-planned, formal 'work path' activities and the need for flexibility to direct preparatory operations or deal with unexpected issues, like staging or mining containers in preparation for a shipment or transferring containers from one storage unit to another to clear a path for building maintenance. Logistics engineers prepare these 'requests', and the system monitors the status and completion of the work. The third element, notifications, allows team members to subscribe to and receive notice that an operation is pending, initiated, or complete. This functionality supports a range of communication options, including e-mail, cell phone, pager, or application in-box messaging. Notifications allow waste operations personnel to multi-task, and remain in the loop on the status of facility-wide activities. Finally, the fourth element provides tools that communicate work path pending operations and directed requests to field workers on their mobile computer, allowing them to mine or pick containers from storage units, and leverage the capabilities of a bar-code scanner to avoid selection mistakes. Oversight and summary tools are provided, allowing logistics personnel to monitor work path and request task status, identify work-flow bottlenecks, and maximize the efficiency of waste operations. The Waste Compliance and Tracking System (WCATS) provides an innovative, comprehensive set of tools that allow large-scale radioactive waste processing facilities to manage logistics, maximize efficient use of the workforce, and create a team environment, where everyone from management to the waste handlers have an understanding of the work load and what needs to be accomplished. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decontamination and Decommissioning Activities of a Radiopharmaceuticals Production Facility - 18067

On May 2012, Best Medical Belgium S.A. (BMB), a manufacturer of pharmaceutical products located on the nuclear site of Fleurus, was declared bankrupt. According to the Belgian law, ONDRAF/NIRAS (Belgian Radioactive Waste Management Agency) was entrusted with the clean-up and decommissioning operations of the former BMB facilities, nowadays known as 'ONDRAF Site Fleurus' (ONSF). In June 2015, ONSF launched a Decontamination and Decommissioning (D and D) program, for which Tractebel: - Supports the definition of the clean-up and decommissioning strategies; - Drafts the Final Decommissioning Plan (FDP) and Safety Analysis Report (SAR) that will be submitted to FANC/AFCN (Belgian Federal Agency for Nuclear Control) in order to get the License for decommissioning; - Drafts the technical specifications of the public tendering process related to the D and D program; - Ensures the day to-day follow-up of the D and D activities on site. Four nuclear buildings are part of the D and D activities. One of them, building 14 (B14), represents the most challenging and extensive task with the clean-up of highly contaminated areas and its further decommissioning up to the final state. This building features two cyclotrons (CGR and IBA cyclotrons) successively used to produce radioisotopes, as well as hot cells and glove boxes used for their purification and the conditioning of the final pharmaceutical product. The present paper aims at presenting the most recent development steps of the clean-up phase regarding the adaptations of existing facilities and the upcoming activities in preparation of the decommissioning activities. To allow the sorting and the treatment of the radioactive material identified in the physical and radiological inventory, several workshops have been implemented within the B14 building in order to deal with radioactive materials arising from the clean-up and D and D activities. Following the conceptual design phase, Tractebel has actively monitored the on-site activities for the construction of those workshops such as: - The modification of the civil works; - The revamping of the ventilation system; - The installation of dedicated lifting equipment and workstations equipped with cutting devices; - The assembly of a docking station for filling the radioactive packages. The removal of the activated concrete surrounding the IBA cyclotron requires the erection of a containment structure and an extension structure. The containment structure, composed of light metallic beams, is located above the cyclotron and its irradiation zones. For operational security reasons and working efficiency, the cutting process of the concrete ceilings and walls will be performed from the top inside the containment structure by means of an eight tons overhead bridge crane. Concrete blocks resulting from the cutting process will then be lifted, without any loss of containment, towards the extension zone of the nuclear zone of the IBA cyclotron for further resizing, sorting and evacuation towards the identified waste routes. To prepare this task which will be performed during the decommissioning phase, Tractebel sets up the necessary technical specifications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WE-E-12A-01: Medical Physics 1.0 to 2.0: MRI, Displays, Informatics

Medical Physics 2.0 is a bold vision for an existential transition of clinical imaging physics in face of the new realities of value-based and evidence-based medicine, comparative effectiveness, and meaningful use. It speaks to how clinical imaging physics can expand beyond traditional insular models of inspection and acceptance testing, oriented toward compliance, towards team-based models of operational engagement, prospective definition and assurance of effective use, and retrospective evaluation of clinical performance. Organized into four sessions of the AAPM, this particular session focuses on three specific modalities as outlined below. MRI 2.0: This presentation will look into the future of clinical MR imaging and what the clinical medical physicist will need to be doing as the technology of MR imaging evolves. Many of the measurement techniques used today will need to be expanded to address the advent of higher field imaging systems and dedicated imagers for specialty applications. Included will be the need to address quality assurance and testing metrics for multi-channel MR imagers and hybrid devices such as MR/PET systems. New pulse sequences and acquisition methods, increasing use of MR spectroscopy, and real-time guidance procedures will place the burden on the medical physicist to define and use new tools to properly evaluate these systems, but the clinical applications must be understood so that these tools are use correctly. Finally, new rules, clinical requirements, and regulations will mean that the medical physicist must actively work to keep her/his sites compliant and must work closely with physicians to ensure best performance of these systems. Informatics Display 1.0 to 2.0: Medical displays are an integral part of medical imaging operation. The DICOM and AAPM (TG18) efforts have led to clear definitions of performance requirements of monochrome medical displays that can be followed by medical physicists to ensure proper performance. However, effective implementation of that oversight has been challenging due to the number and extend of medical displays in use at a facility. The advent of color display and mobile displays has added additional challenges to the task of the medical physicist. This informatics display lecture first addresses the current display guidelines (the 1.0 paradigm) and further outlines the initiatives and prospects for color and mobile displays (the 2.0 paradigm). Informatics Management 1.0 to 2.0: Imaging informatics is part of every radiology practice today. Imaging informatics covers everything from the ordering of a study, through the data acquisition and processing, display and archiving, reporting of findings and the billing for the services performed. The standardization of the processes used to manage the information and methodologies to integrate these standards is being developed and advanced continuously. These developments are done in an open forum and imaging organizations and professionals all have a part in the process. In the Informatics Management presentation, the flow of information and the integration of the standards used in the processes will be reviewed. The role of radiologists and physicists in the process will be discussed. Current methods (the 1.0 paradigm) and evolving methods (the 2.0 paradigm) for validation of informatics systems function will also be discussed. Learning Objectives: Identify requirements for improving quality assurance and compliance tools for advanced and hybrid MRI systems. Identify the need for new quality assurance metrics and testing procedures for advanced systems. Identify new hardware systems and new procedures needed to evaluate MRI systems. Understand the components of current medical physics expectation for medical displays. Understand the role and prospect fo medical physics for color and mobile display devices. Understand different areas of imaging informatics and the methodology for developing informatics standards. Understand the current status of informatics standards and the role of physicists and radiologists in the process, and the current technology for validating the function of these systems.

07 ISOTOPE AND RADIATION SOURCES↗

SU-F-T-99: Data Visualization From a Treatment Planning Tracking System for Radiation Oncology

Purpose: A treatment planning process tracker database with input forms and a TV-viewable display webpage was developed and implemented in our clinic to collect time data points throughout the process. Tracking plan times is important because it directly affects the patient quality of care. Simply, the longer a patient waits after their initial simulation CT for treatment to begin, the more time the cancer has to progress. The tracker helps to drive workflow through the clinic, while the data collected can be used to understand and manage the process to find and eliminate inefficiencies. Methods: The overall process steps tracked are CT-simulation, mark patient, draw normal contours, draw target volumes, create plan, and review/approve plan. Time stamps for task completion were extracted and used to generate a set of clinic metrics, among which include average time for each step in the process split apart by type of treatment, average time to completion for plans started in a given week, and individual overall completion time per plan. Results: Trends have been tracked for fourteen weeks of clinical data (196 plans). On average, drawing normal contours and target volumes is taking 2–5 times as long as creating the plan itself. This is potentially an issue because it could mean the process is taking too long initially, and it could be forcing the planning step to be done in a short amount of time. We also saw from our graphs that there appears to be no clear trend on the average amount of time per plan week-to-week. Conclusion: A tracker of this type has the potential to provide insight into how time is utilized in our clinic. By equipping our dosimetrists, radiation oncologists, and physicists with individualized metric sets, the tracker can help provide visibility and drive workflow. Funded in part by CPRIT (RP140105).

60 APPLIED LIFE SCIENCES↗

Integrated Computational Materials Engineering (ICME) Tools for Optimizing Strength of Forged Al-Li Turbine Blades for Aircraft Engines Final Report CRADA No. TC02238.0

This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and LIFT Consortium to develop, implement and validate a defect physics-based model to predict mechanical properties of forged Al-Li alloys. LLNL task was to conduct dislocation dynamics simulations of the interaction of dislocations with the primary precipitates providing strength of proposed Al-Li alloys.

42 ENGINEERING↗

DE-EE0006714 Final Report-Project Icebreaker™

Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electrical System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.

17 WIND ENERGY↗

Managing Dynamic Workflows in BEE

BEE is a powerful tool for: Managing and visualizing scientific workflows; Simplifying workflow execution on HPC and cloud platforms. BEE supports much of the CWL specification. Did not support execution of complex ”scattering” workflows. By introducing the PseudoTask: Can generate tasks to run on variable number of inputs; BEE is another step closer to supporting the entire CWL specification; BEE can now support parallelized workflows with scattering tasks.

97 MATHEMATICS AND COMPUTING↗

NCSP Activities at BNL (FY21) [Slides]

All 3 BNL NCSP (ND, AM, TS) tasks are reported as being on time and slightly under budget. Several COVID-19 related impacts are noted. The release of ENDF/B-VIII.1 has been delayed for 1 year to Feb 2024. New ENDF Library Manager appointment announced as Gustavo Nobre.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Space Station thermal storage/refrigeration system research and development

Space Station thermal loading conditions represent an order of magnitude increase over current and previous spacecraft such as Skylab, Apollo, Pegasus III, Lunar Rover Vehicle, and Lockheed TRIDENT missiles. Thermal storage units (TSU's) were successfully used on these as well as many applications for ground based solar energy storage applications. It is desirable to store thermal energy during peak loading conditions as an alternative to providing increased radiator surface area which adds to the weight of the system. Basically, TSU's store heat by melting a phase change material (PCM) such as a paraffin. The physical property data for the PCM's used in the design of these TSU's is well defined in the literature. Design techniques are generally well established for the TSU's. However, the Space Station provides a new challenge in the application of these data and techniques because of three factors: the large size of the TSU required, the integration of the TSU for the Space Station thermal management concept with its diverse opportunities for storage application, and the TSU's interface with a two-phase (liquid/vapor) thermal bus/central heat rejection system. The objective in the thermal storage research and development task was to design, fabricate, and test a demonstration unit. One test article was to be a passive thermal storage unit capable of storing frozen food at -20 F for a minimum of 90 days. A second unit was to be capable of storing frozen biological samples at -94 F, again for a minimum of 90 days. The articles developed were compatible with shuttle mission conditions, including safety and handling by astronauts. Further, storage rack concepts were presented so that these units can be integrated into Space Station logistics module storage racks. The extreme sensitivity of spacecraft radiator systems design-to-heat rejection temperature requirements is well known. A large radiator area penalty is incurred if low temperatures are accommodated via a single centralized radiator system. As per the scope of work of this task, the applicability of refrigeration system tailored to meet the specialized requirements of storage of food and biological samples was investigated. The issues addressed were the anticipated power consumption and feasible designs and cycles for meeting specific storage requirements. Further, development issues were assessed related to the operation of vapor compression systems in micro-gravity addressing separation of vapor and liquid phases (via capillary systems).

Dean, W. G.↗

Emergency medical services

When NASA was established in 1958, it was known that space flight would require efforts beyond those of NASA to ensure the health and safety of our astronauts. On 10 Aug. 1958, a Secretary of Defense memorandum was signed that assigned the first Department of Defense (DOD) Manager to provide support to NASA for Project Mercury. This established a chain of command through the Joint Chiefs of Staff to the Secretary of Defense. The current charter is dated 19 Mar. 1986 and assigns the DOD Manager responsibilities to the Commander and Chief, US Space Command. The DOD Managers charter has many support areas and among them are recovery of astronauts and medical support. Today these efforts support the Space Shuttle and Space Station Programs. Briefly, the program works with each organization tasking the other through a requirements document. Level of care, communications, and recovery requirements are established; NASA and the DOD provide the capability to meet them. NASA is also responsible for the specialized training and equipment needed to meet these requirements. A Shuttle launch a KSC requires an Emergency Medical Services (EMS) coordinator on console to facilitate communications, ensure proper coverage, and coordinate with area hospitals. A contingent of NASA medical personnel are assembled to provide triage and medical support capabilities. The DOD provides medical evacuation (MEDEVAC) helicopters with surgeons and pararescue specialists (PJ's) or emergency medical technicians (EMT's). Each helicopter is equipped with at least one doctor and one PJ/EMT per astronaut crew member. Transoceanic abort landing (TAL) sites and end of mission (EOM) sites have similar structures, with TAL sites utilizing fixed wingg aircraft for MEDEVAC. The DOD also supports contingency planning for the support and return of crew members from the Space Station Freedom. Much of this support has been directed at the recovery of crew members following the landing of an Assured Crew Return Vehicle.

Billica, Roger↗