Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Modeling Payload Stowage Impacts on Fire Risks On-Board the International Space Station

The purpose of this presentation is to determine the risks of fire on-board the ISS due to non-standard stowage. ISS stowage is constantly being reexamined for optimality. Non-standard stowage involves stowing items outside of rack drawers, and fire risk is a key concern and is heavily mitigated. A Methodology is needed to account for fire risk due to non-standard stowage to capture the risk. The contents include: 1) Fire Risk Background; 2) General Assumptions; 3) Modeling Techniques; 4) Event Sequence Diagram (ESD); 5) Qualitative Fire Analysis; 6) Sample Qualitative Results for Fire Risk; 7) Qualitative Stowage Analysis; 8) Sample Qualitative Results for Non-Standard Stowage; and 9) Quantitative Analysis Basic Event Data.

Anton, Kellie e.↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Marginal Recurrence Requiring Salvage Radiotherapy After Stereotactic Body Radiotherapy for Spinal Metastases

Introduction: We sought to quantify and identify risk factors associated with margin recurrence (MR) requiring salvage radiotherapy after stereotactic body radiation therapy (SBRT) for spinal metastases. Methods: We retrospectively reviewed patients with spinal metastases who were treated with single-fraction SBRT between 2006 and 2009. Gross tumor was contoured, along with either the entire associated vertebral body(ies) or the posterior elements, and included in the planning target volume. No additional margins were used. MR was defined as recurrent tumor within one vertebral level above or below the treated lesion that required salvage radiotherapy. Only patients who presented for 3-month post-SBRT follow-up were included in the analysis. Fine and Gray competing risk regression models were generated to identify variables associated with higher risks of MR. MR was plotted using cumulative incidence analysis. Results: SBRT was delivered to 208 lesions in 149 patients. Median follow-up was 8.6 months, and median survival was 12.8 months. The median prescribed dose was 14 Gy (10-16 Gy). MR occurred in 26 (12.5%) treated lesions, at a median time of 7.7 months after SBRT. Patients with paraspinal disease at the time of SBRT (20.8% vs. 7.6% of patients; p = 0.02), and those treated with <16 Gy (16.3% vs. 6.3% of patients, p = 0.14) had higher rates of MR. Both variables were associated with significantly higher risk of MR on multivariate analysis. Conclusion: SBRT for spinal metastases results in a low overall rate of MR. The presence of paraspinal disease at the time of SBRT and a dose of <16 Gy were associated with higher risks of MR.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

ER Line Phase II Project Risk Assessment Report

The purpose of this risk and opportunity assessment is to report the potential cost impacts from technical and programmatic risks (TPR) and opportunities. This analysis will determine the cost contingency for these TPR impacts. The approach taken to manage risk is consistent with risk and opportunity management guidance contained in DOE Order 413.3B, Project Management for the Acquisition of Capital Assets, the DOE Guide 413.3-7, Risk Management Guide and LANL’s Project Management Procedure AP-350-204 Risk and Opportunity Management.

Engineering(42)↗

Enhancements to the RAVEN code in FY16

The RAVEN code has been under development at the Idaho National Laboratory since 2012. Its main goal is to create a multi-purpose platform for the deploying of all the capabilities needed for Probabilistic Risk Assessment, uncertainty quantification, data mining analysis and optimization studies. RAVEN has currently reached a good level of maturity in terms of deployed state-of-art and advanced capabilities. The main subject of this report is to show the activities that have been recently accomplished: • Implementation of ensemble modeling for time-series, and • initial implementation of model validation for surrogate models, and • advanced visualization capability for topology based data analysis The development of ensemble modeling for time-series has been performed in order to begin tackling the needs of those RISMC applications that need to communicate 1-Dimensional information (e.g. power histories, etc.) among different models. In this document the implementation details and an application example is reported. The second subject of this report is about the initial development of methods, within the RAVEN framework, to assess the validity of the predictive capabilities of surrogate models. Indeed, after the construction of a surrogate tight to a certain physical model, it is crucial to assess the goodness of its representation, in order to be confident with its prediction. In this initial activity, a cross-validation technique has been employed. This report will highlight the implementation details and proof its correct implementation by an application example. The final subject of this report is about the implementation of advanced visualization capability in RAVEN, for interactive data analysis. Indeed, RAVEN offers several post-processing capabilities that can structurally decompose data extracted from experimental results offering both data clustering/partitioning and dimensionality reduction techniques. A disadvantage of the workflow available in RAVEN is that it treats these as black box operations and the user is expected to know specific information about their data including the number of partitions to expect in some cases or the “correct” parameter settings for a particular algorithm. In order to overcome this limitation, it has been added an interactive user interface that can be run in RAVEN to explore different parameter settings on the fly specifically for the topological post-processor and allows the user to explore the data interactively. The design of this user interface is generalizable to other algorithms and can be used as a model to generate more dynamic and user-friendly visualization capabilities within RAVEN.

97 MATHEMATICS AND COMPUTING↗

Bench-Scale Development of Promoted High-Capacity Structured Sorbents (Final Technical Report)

The project objective was to develop high-capacity structured sorbent capable of achieving low CO 2 removal from air. The sorbent framework consists of an amine-functionalized onto hydrophobic polymer backbone with an added promoter. The functionalized amine provides high CO 2 capacity and adsorption rates and the polymer backbone to reduce water uptake. For the sorbent development, multiple functionalized amines and promoters were assessed to select a candidate that achieved high CO 2 capacity, high adsorption rate, and high stability. A sorbent-coated filter design was selected as the structured sorbent, which provides high sorbent loading capacity and contains an electrically conductive nonwoven filter substrate that can be Joule-heated to provide efficient utilization of available electricity for sorbent regeneration. A commercial partner operated a pilot filter manufacturing line to produce the filter panels coated with the developed sorbent. A 1 kg CO 2 /day bench unit was designed and fabricated to test the structured filter sorbent. The key achievements from the structured sorbent development activity were demonstrating that existing filter industrial-scale processes can be used for manufacturing Susteon’s structured sorbent and completing a proof-of-concept demonstration of the commercially manufactured structured sorbent filters for CO 2 capture from air with direct, Joule-heated regeneration. A techno-economic assessment with sensitivity analysis was conducted on a 100,000 TPY facility with 85% operating capacity. Through sorbent optimization and process design improvements, it is estimated that the cost of capture was reduced from $\$$349/tCO 2 to $\$$241/tCO 2 . The TEA projects further reductions to $165/tCO 2 through enhancements in CO 2 adsorption rate and sorbent capacity and reducing manufacturing and scale up risks. A life cycle analysis was conducted on the same 100,000 TPY facility and confirmed that the facility’s electricity demand drives its greenhouse gas impact. It was determined that electricity supplied through the current grid mix would result in net-positive CO 2 emissions and that achieving net-negative emissions is only possible by powering the system with renewable electricity or fossil fuel sources equipped with carbon capture and sequestration.

36 MATERIALS SCIENCE↗

Life Qualification of Hall Thrusters By Analysis and Test

High power Hall thrusters under development for deep space robotic and human exploration missions have demanding lifetime and operational requirements that make thruster life qualification challenging. The required burn times make it infeasible to conduct multiple tests with durations exceeding the life requirement, and complex wearout phenomena and the need for power throttling during missions complicate analyses and testing. The traditional qualification approach, a single life test that typically demonstrates 50 to 100% margin on the required lifetime, does not provide enough information to demonstrate low failure risk. It is a weak source of statistical information about the location of the peak in the failure probability distribution and provides no information on the width of the distribution. Testing does provide information that can be used to validate physics-based models of failure processes, however, and the combination can be used to assess mission risk. Validated, conservative, deterministic analysis can be used to demonstrate that most failure processes have such large margins that more detailed analysis is unnecessary. For a subset of the failure modes a more detailed probabilistic analysis is required. Pole erosion in a 12.5 kW Hall thruster is used as a detailed example of this qualification process.

Brophy, John R.↗

Root Cause Analysis of the Data Refinement Process – Medical Conditions Capability Resource Tables

The medical system for spaceflight thus far has been designed to support missions in low earth orbit (LEO). Crew capabilities are limited and heavily dependent on the team of medical support staff at Mission Control Center (MCC) to guide diagnosis and management. However, missions to the Moon and Mars will suffer from several constraints that will make this ground support focused approach to care ineffective. In order to update and modify medical system design, NASA has relied on Probabilistic Risk Assessment (PRA) modeling to mitigate medical risk through trade space analysis. Specifically, capability resource tables (CRT’s) were developed to create a dataset of resources required to manage a list of accepted medical conditions significant in exploration spaceflight. With 120 conditions, this dataset contained hundreds of capabilities and thousands of resources with tens of thousands of cells of data. Initially these tables were built in excel for high throughput during development, but ultimately had to be transferred, managed, and modified into the Evidence Library database for modeling purposes. The process of collating and reviewing the Evidence Library revealed numerous errors in the dataset that had to be corrected through iterative changes. Several error types emerged during this process and can be broken into specific classifications defined as “input”, “transcription”, “structural”, “branching”, and “information”. In reviewing these error types through the root cause analysis (RCA) approach, we were able to identify the contributors to these errors which included single data review points, changing product end goals, limited software selection, time constraints and several others. By reviewing and evaluating the underlying causes we can provide possible system improvements that can be implemented for current and future data management in PRA model inputs.

A. Anderson↗

Vermont Wildland Fires: Investigating the Role of Antecedent Conditions and Recent Environmental Trends in Exacerbating Fire Risk and Potential in Vermont

Under a changing climate, increases in dry conditions and extreme heat events are projected to exacerbate wildfire risk in the northeastern U.S. In recent years, Vermont has observed higher annual temperatures, more frequent heatwaves, increased annual precipitation, extreme flood events, and decreased snowfall. The mechanisms through which environmental factors contribute to increased fire risk in humid environments, such as Vermont, are poorly understood. The team partnered with the National Weather Service, the Vermont Division of Forests, and the University of Vermont to investigate phenological trends and antecedent conditions influencing wildland fire risk. For the phenological analysis, from 2001 to 2023, vegetation data, phenological dates, and snow water equivalent (SWE) values were accessed from Landsat 5Thematic Mapper (TM), Landsat 7Enhanced Thematic Mapper Plus (ETM+), Landsat 8Operational Land Imager (OLI), Landsat 9OLI-2, the Moderate Resolution Imaging Spectroradiometer (MODIS), and the Snow Data Assimilation System (SNODAS), respectively. For the antecedent condition analysis, from 2008 to 2023, soil moisture, Environmental Stress Index, wind speed, minimum relative humidity, and daily precipitation data were obtained from the Global Land Data Assimilation System (GLDAS), SERVIR, gridMET Wind, gridMET Humidity, and NClimGrid, respectively. The study found that green-up dates over the study period remain relatively stable, while snowmelt dates appear increasingly variable. Minimum relative humidity was the most significant environmental variable correlated with wildfire risk in Vermont. Results from this study will inform the National Weather Service's preparation of fire forecasts before prescribed burns and support community outreach by the Vermont Agency of Natural Resources.

Wildland Fire↗

Three Dimensional Analysis of Pier Extension and Guide Wall Design Alternatives to Mitigate Local Scour Risk at the BNSF Railroad Bridge Downstream of the Prado Dam

The primary objectives of the computational fluid dynamics (CFD) analysis are (1) to verify that the design concept of using wedge shaped pier extensions to divert flow around piers as a scour counter measure has the intended effect on the flow, (2) to refine the design of the length and orientation of the pier extensions within the channel and (3) to optimize the guide walls that will protect a set of outer piers and the abutments on each side of the channel. The original proposed design is shown in Figure 1.3. The results of this effort are the recommended designs that are judged to be the best designs based on results from the set of test cases run combined with engineering judgment. The refined designs from the CFD analysis are expected to be tested in a limited set of physical model experiments to verify that they work well.

42 ENGINEERING↗

Geometrical Sparing Factors for the Rectum and Bladder in the Prediction of Grade 2 and Higher Complications After High-Dose-Rate Brachytherapy for Cervical Cancer

Purpose: This study aimed to assess the predictive values of geometrical sparing factors for the rectum and bladder in high-dose-rate intracavitary brachytherapy (HDRICB) for Grade 2 and higher late sequelae in patients with cervical cancer. Methods: A total of 392 patients were enrolled in this study. They were treated with external beam radiotherapy to the pelvis, after which HDRICB was performed using Ir-192 remote after-loading at 1-week intervals for three or four sessions. The geometrical sparing factor (GSF) was defined as the average of the ratios between the reference doses and the Point A dose. Results: A total of 46 patients (11.7%) had Grade 2 or higher late rectal complications (36 Grade 2, 9 Grade 3, and 1 Grade 4). In all, 32 patients (8.2%) had Grade 2 or higher late bladder complications (14 Grade 2, 16 Grade 3, and 2 Grade 4). Multivariate analysis demonstrated a high risk of rectal sequelae in patients who developed bladder complications (p = 0.0004, hazard ratio 3.54) and had a rectal GSF greater than 0.7 (p = 0.01, hazard ratio 1.99). The high risk factors for bladder complications were development of rectal complications (p = 0.0004, hazard ratio 3.74), concurrent chemotherapy (p = 0.0001, relative risk 3.94), and a bladder GSF greater than 0.9 (p = 0.01, hazard ratio, 2.53). Conclusion: This study demonstrates the predictive value of GSFs in HDRICB for cervical cancer. Patients with rectal GSFs greater than 0.7 or bladder GSFs greater than 0.9 are at risk for Grade 2 and higher late sequelae.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

WE-G-BRC-02: Risk Assessment for HDR Brachytherapy

Failure Mode and Effects Analysis (FMEA) originated as an industrial engineering technique used for risk management and safety improvement of complex processes. In the context of radiotherapy, the AAPM Task Group 100 advocates FMEA as the framework of choice for establishing clinical quality management protocols. However, there is concern that widespread adoption of FMEA in radiation oncology will be hampered by the perception that implementation of the tool will have a steep learning curve, be extremely time consuming and labor intensive, and require additional resources. To overcome these preconceptions and facilitate the introduction of the tool into clinical practice, the medical physics community must be educated in the use of this tool and the ease in which it can be implemented. Organizations with experience in FMEA should share their knowledge with others in order to increase the implementation, effectiveness and productivity of the tool. This session will include a brief, general introduction to FMEA followed by a focus on practical aspects of implementing FMEA for specific clinical procedures including HDR brachytherapy, physics plan review and radiosurgery. A description of common equipment and devices used in these procedures and how to characterize new devices for safe use in patient treatments will be presented. This will be followed by a discussion of how to customize FMEA techniques and templates to one’s own clinic. Finally, cases of common failure modes for specific procedures (described previously) will be shown and recommended intervention methodologies and outcomes reviewed. Learning Objectives: Understand the general concept of failure mode and effect analysis Learn how to characterize new equipment for safety Be able to identify potential failure modes for specific procedures and learn mitigation techniques Be able to customize FMEA examples and templates for use in any clinic.

60 APPLIED LIFE SCIENCES↗

System Safety and the Unintended Consequence

The analysis and identification of risks often result in design changes or modification of operational steps. This paper identifies the potential of unintended consequences as an over-looked result of these changes. Examples of societal changes such as prohibition, regulatory changes including mandating lifeboats on passenger ships, and engineering proposals or design changes to automobiles and spaceflight hardware are used to demonstrate that the System Safety Engineer must be cognizant of the potential for unintended consequences as a result of an analysis. Conclusions of the report indicate the need for additional foresight and consideration of the potential effects of analysis-driven design, processing changes, and/or operational modifications.

Watson, Clifford↗

Reliability Analysis in the Presence of Aleatory Uncertainty

This paper proposes a method for modeling a system’s response using data. In contrast to approaches that identify a limit state function, we focus on the case in which not all uncertain parameters affecting the response are observable and the measured response is corrupted by noise. To this end, the system response is not characterized by a limit state function but instead by a Random Predictor Model (RPM) having a nonparametric structure. Consequently, the resulting failure probability is not a scalar but a random variable. This variable accounts for the aleatory contributions of the model-form uncertainty and the measurement noise into the response. Furthermore, we propose a framework that enables trading off the predicted range of failure probabilities resulting from such an analysis with a measure of risk. In this context, risk is the percentage of all predicted outcomes the analyst is willing to ignore. The reliability analysis of an aeroelastic structure subject to flutter is used to illustrate the ideas proposed.

Crespo, L. G.↗

Risk Management and Risk Aversion, from Benefit to Impediment

Risk management is a critical tool for improving the probability of project success by identifying, assessing, prioritizing, and attempting to control threats to project realization. For industries that require high operational reliability due to the potential consequences of off-normal events, such as the nuclear, aerospace, and chemical sectors, a major focus of risk management is the preservation of process safety. Due to the nature of the processes or systems under consideration, the associated process safety analyses (such as risk and safety assessments) and safety features can require significant resources. These costs are typically tolerated either due to the need to satisfy regulatory requirements or based on the assumption that they generally decrease the occurrence of unwanted events and therefore improve the probability of project success. However, as the level of acceptable or tolerable risk from unwanted events decreases, the required resources necessary for ensuring and demonstrating satisfaction of these criteria can grow and in turn can become one of the dominant impediments to project success. This paper outlines a high-level theoretical framework for the consideration of dominant project risks, which includes potential project failure from both the occurrence of high consequence off-normal events and the inability to achieve project completion due to the resource needs and innovation losses associated with extreme risk aversion. Utilizing such an integrated approach permits an attempt to optimize the probability of successful project realization while also providing valuable insight into the proper level of acceptable risk. The work is presented as a first step, in hopes of spurring additional discussion and analysis regarding appropriate levels of risk tolerance and the balance of project benefits.

Grabaskas, David↗

Microbial Characterization During the Early Habitation of the International Space Station

An evaluation of the microbiota from air, water, and surface samples provided a baseline of microbial characterization onboard the International Space Station (ISS) to gain insight into bacterial and fungal contamination during the initial stages of construction and habitation. Using 16S genetic sequencing and rep-PCR, 63 bacterial strains were isolated for identification and fingerprinted for microbial tracking. Of the bacterial strains that were isolated and fingerprinted, 19 displayed similarity to each other. The use of these molecular tools allowed for the identification of bacteria not previously identified using automated biochemical analysis and provided a clear indication of the source of several ISS contaminants. Strains of Bradyrhizobium and Sphingomonas unable to be identified using sequencing were identified by comparison of rep-PCR DNA fingerprints. Distinct DNA fingerprints for several strains of Methylobacterium provided a clear indication of the source of an ISS water supply contaminant. Fungal and bacterial data acquired during monitoring do not suggest there is a current microbial hazard to the spacecraft, nor does any trend indicate a potential health risk. Previous spacecraft environmental analysis indicated that microbial contamination will increase with time and will require continued surveillance. Copyright 2004 Springer-Verlag.

Fungi/genetics↗

Understanding Competing Risks

Highlights: • Clinicians and researchers need to be cognizant of competing risks (ie, the occurrence of an event that precludes future development of the outcome of interest). • Censoring is appropriate when a patient being censored at a particular time (eg, owing to loss to follow-up) is deemed to have approximately the same future risk of developing the outcome of interest as patients still being followed, and when the reason for censoring is not related to events of interest. • Censoring is not appropriate in many scenarios; for example, a dead patient can never develop a future cancer recurrence or late effect. • Kaplan-Meier (KM) analysis is commonly used for a time-to-event analysis when the primary outcome (eg, overall survival) has no meaningful competing risk and censoring is appropriate. Cox proportional hazards modeling can be used for multivariable analysis to examine the association between covariates and the primary outcome. • In the presence of competing events, incorrect use of the KM analysis will likely lead to an overestimation of the risk of the outcome of interest and biased estimates from both univariable and multivariable analyses. Therefore, KM usually should not be used to determine local recurrence risk because humanity is always at risk for dying, which is a competing risk. • A competing risk analysis is therefore most appropriate when there are competing events to the primary outcome of interest. The most commonly used multivariable model in these situations is the Fine-Gray model. • Many fundamental questions in radiation oncology—local and regional recurrence, treatment-related toxicity—are best addressed using competing risk methodologies.

62 RADIOLOGY AND NUCLEAR MEDICINE↗