Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “issues management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Perspectives on Previous DOE Transportation Acquisition Efforts - 19049

The Department of Energy (DOE) is planning for future large-scale transport of commercial Spent Nuclear Fuel (SNF) and High-Level Radioactive Waste (HLW) to eventual disposal and/or storage facilities. Various options for procuring transportation services are being evaluated. To inform this work, a review of past comments received on DOE transportation acquisition activities in the early 1990's through 2016 was conducted. Through the course of data collection, staff analyzed comments submitted from ten DOE initiatives from DoE's Office of Civilian Radioactive Waste Management (OCRWM) and DoE's Office of Nuclear Energy (DOE-NE). This paper summarizes and outlines key themes arising from these comments. Past issues identified by a wide variety of commenters (nuclear industry and cask vendors, nuclear utilities and purchasers, states, Tribes, local governments, rail carriers, nongovernmental organizations, trade organizations, engineering firms, and members of the public) were examined. These issues concerned DoE's activities to make maximum use of the private sector to transport and store SNF and HLW. The key themes analyzed include: Uniqueness of the Shipping Campaign, Views on Privatization, Industry Risk and Privatization, Unclear Roles and Responsibilities, and Responsibilities Recommended for DOE to Maintain. This paper concludes by discussing lessons that can be learned from analyzing these public comments and what that may mean moving forward in the U.S. radioactive waste management program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the Path to SunShot - Emerging Issues and Challenges in Integrating High Levels of Solar into the Electrical Generation and Transmission System

Increasing the use of grid-flexibility options (improved grid management, demand response, and energy storage) could enable 25% or higher penetration of PV at low costs (see Denholm et al. 2016). Considering the large-scale integration of solar into electric-power systems complicates the calculation of the value of solar. In fact a comprehensive examination reveals that the value of solar technologies—or any other power-system technology or operating strategy—can only be understood in the context of the generation system as a whole. This is well illustrated by analysis of curtailment at high PV penetrations within the bulk power and transmission systems. As the deployment of PV increases, it is possible that during some sunny midday periods due to limited flexibility of conventional generators, system operators would need to reduce (curtail) PV output in order to maintain the crucial balance between electric supply and demand. As a result, PV’s value and cost competitiveness would degrade. For example, for utility-scale PV with a baseline SunShot LCOE of 6¢/kWh, increasing the annual energy demand met by solar energy from 10% to 20% would increase the marginal LCOE of PV from 6¢/kWh to almost 11¢/kWh in a California grid system with limited flexibility. However, this loss of value could be stemmed by increasing system flexibility via enhanced control of variable-generation resources, added energy storage, and the ability to motivate more electricity consumers to shift consumption to lower-demand periods. The combination of these measures would minimize solar curtailment and keep PV cost-competitive at penetrations at least as high as 25%. Efficient deployment of the grid-flexibility options needed to maintain solar’s value will require various innovations, from the development of communication, control, and energy storage technologies to the implementation of new market rules and operating procedures.

14 SOLAR ENERGY↗

Commercialization of the land remote sensing system: An examination of mechanisms and issues

In September 1982 the Secretary of Commerce was authorized (by Title II of H.R. 5890 of the 97th Congress) to plan and provide for the management and operation of the civil land remote sensing satellite systems, to provide for user fees, and to plan for the transfer of the ownership and operation of future civil operational land remote sensing satellite systems to the private sector. As part of the planning for transfer, a number of approaches were to be compared including wholly private ownership and operation of the system by an entity competitively selected, mixed government/private ownership and operation, and a legislatively-chartered privately-owned corporation. The results of an analysis and comparison of a limited number of financial and organizational approaches for either transfer of the ownership and operation of the civil operational land remote sensing program to the private sector or government retention are presented.

Cauley, J. K.↗

Service area size assessment for evaluating the spatial scale of solid waste recovery chains: A territorial perspective

Highlights: • A model to evaluate the service area size of a waste recovery chain is proposed. • A recovery performance score is given per waste source. •The areas to be collected in priority are the sources with the highest score. • The score depends on the source's characteristics and the recovery technology. •Replacing anaerobic digestion by composting decreases the facility's spatial scale. - Abstract: Waste recovery is an integrated part of municipal solid waste management systems but its strategic planning is still challenging. In particular, the service area size of facilities is a sensitive issue since its calculation depends on various factors related to treatment technologies (output products) and territorial features (sources waste production and location). This work presents a systemic approach for the estimation of a chain's service area size, based on a balance between costs and recovery profits. The model assigns a recovery performance value to each source, which can be positive, neutral or negative. If it is positive, the source should be included in the facility's service area. Applied to the case of Montreal for food waste recovery by anaerobic digestion, the approach showed that at most 23 out of the 30 districts should be included in the service area, depending on the indicator, which represents around 127,000 t of waste recovered/year. Due to the systemic approach, these districts were not necessarily the closest to the facility. Moreover, for the Montreal case, changing the facility's location did not have a great influence on the optimal service area size, showing that the distance to the facility was not a decisive factor at this scale. However, replacing anaerobic digestion by a composting plant reduced the break-even transport distances and, thus, the number of sources worth collecting (around 68,500 t/year). In this way, the methodology, applied to different management strategies, gave a sense of the spatial dynamics involved in the recovery chain's design. The map of optimal supply obtained could be used to further analyse the feasibility of multi-site and/or multi-technology systems for the territory considered.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Salmon as a Bio-indicator of the Health of the Columbia River at Hanford - 15534

Assessing human, ecological, and cultural health and well-being on- and off-site is an important aspect of managing legacy wastes and environmental remediation on U.S. Department of Energy sites. Such an assessment is especially important at places such as Hanford because the Columbia River runs through the site. The Columbia River is central to the culture and economy of the northwest, especially to the Tribes. While a full range of other bio-indicators are used to determine the health of the river with respect to contaminants, salmon are the iconic, keystone species in the Columbia River of concern to the full range of regulators, managers, Tribes, and the public. A bio-monitoring plan that will assure the public and others that the activities of DOE are not adversely impacting the salmon populations in the Columbia River is critical for long term stewardship, both of the Hanford Site and the River and its resources Numerous factors affect salmon populations, including different life stages, habitat variables, and anthropogenic effects, including hexavalent chromium. Based on a literature review of the factors affecting populations, a conceptual model was developed for effects on salmon population stability. Salmon have a life history that includes laying eggs in gravel (redds) at the river bottom and then spending several life stages in fresh water and maturing in saltwater before they return to their natal streams or rivers to breed. All of these phases are potentially vulnerable to a range of natural and anthropogenic factors. Eggs in redds in the river bottom are vulnerable to water erosion, dewatering, oxygen levels, predators, and contaminants, while juveniles (fry, parr, smolts) are vulnerable to water currents, oxygen levels, predators, contaminants, and negotiating dams. When adults return to the river up to 7 years later, they face these same factors, as well as intense fishing pressures. The major factor affecting salmon populations may well be the fight to swim upstream, around dams, to reach traditional spawning grounds. While the data provided in this study relate to salmon at Hanford, the overall conceptual framework provides a paradigm for evaluating other sensitive indicators at other Department of Energy sites. The framework provides a method to insure the Tribes and public that the health and well-being of an important economic, cultural, and aesthetic species is being adequately addressed, and suggests the types of data needed to address the issue. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Examining the Risk of Nuclear Trafficking

The need to stop illicit trafficking of nuclear and radioactive materials around the world is undeniable and urgent. This issue is particularly evident due to the highly dangerous consequences of the risks involved, the known interest of terrorist groups in acquiring such materials and the vulnerability of theft and diversion of such materials. Yet the phenomenon of nuclear trafficking remains a subject where the unknown dominates what is known on the subject. The trafficking panel at the Institute for Nuclear Materials Management (INMM) Workshop on Reducing the Risk of Radioactive and Nuclear Materials that took place in Albuquerque, New Mexico, March 10-11, 2009, dealt with some of the issues associated with nuclear trafficking. Different points of view on how to better address trafficking and thwart perpetrator efforts were discussed. This paper presents some of these views and addresses practical measures that should be considered to improve the situation.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Searching for science in the past and present discussion on commingling policy in the US - 15083

Since 1985, the policy in the United States for disposing of nuclear waste has included commingling defense and civilian spent nuclear fuel (SNF) and high-level radioactive waste (HLW) in a mined geologic repository. Commingling policy is under discussion again because of developments over the last several years in the nuclear waste management and disposal program. The authors reviewed the extent to which scientific and technical information was involved in considerations of commingling from the 1950's to the present. Evaluations undertaken by the US Department of Energy (US DOE) in 1985 and April 2014 are compared and the technical issues of health and safety, transportation, and national security are addressed in both evaluations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Preliminary Investigation into the Mitigation of Plug-in Hybrid Electric Vehicle Tailpipe Emissions Through Supervisory Control Methods Part 2: Experimental Evaluation of Emissions Reduction Methodologies

Plug-in hybrid electric vehicle (PHEV) technologies have the potential for considerable petroleum consumption reductions, possibly at the expense of increased tailpipe emissions due to multiple 'cold' start events and improper use of the engine for PHEV specific operation. PHEVs operate predominantly as electric vehicles (EVs) with intermittent assist from the engine during high power demands. As a consequence, the engine can be subjected to multiple cold start events. These cold start events may have a significant impact on the tailpipe emissions due to degraded catalyst performance and starting the engine under less than ideal conditions. On current hybrid electric vehicles (HEVs), the first cold start of the engine dictates whether or not the vehicle will pass federal emissions tests. PHEV operation compounds this problem due to infrequent, multiple engine cold starts. A continuation of previous analytical work, this research, experimentally verifies a vehicle supervisory control system for a pre-transmission parallel PHEV powertrain architecture. Energy management strategies are evaluated and implemented in a virtual environment for preliminary assessment of petroleum displacement benefits and rudimentary drivability issues. This baseline vehicle supervisory control strategy, developed as a result of this assessment, is implemented and tested on actual hardware in a controlled laboratory environment over a baseline test cycle. Engine cold start events are aggressively addressed in the development of this control system, which leads to enhanced pre-warming and energy-based engine warming algorithms that provide substantial reductions in tailpipe emissions over the baseline supervisory control strategy. The flexibility of the PHEV powertrain allows for decreased emissions during any engine starting event through powertrain 'torque shaping' algorithms. The results of the research show that PHEVs do have the potential for substantial reductions in fuel consumption. Tailpipe emissions from a PHEV test platform have been reduced to acceptable levels through the development and refinement of vehicle supervisory control methods only. Impacts on fuel consumption were minimal for the emissions reduction techniques implemented.

02 PETROLEUM↗

Corrective Action Management Unit Report of Post-Closure Care Activities. Calendar Year 2020

he Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015) to the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) and its Management and Operating (M&O) contractor. The current M&O contractor is National Technology & Engineering Solutions of Sandia, LLC (NTESS). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised and updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for calendar year (CY) 2020, as required by the Permit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2019

The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015) to the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) and its Management and Operating (M&O) contractor. The current M&O contractor is National Technology & Engineering Solutions of Sandia, LLC (NTESS). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised and updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for calendar year (CY) 2019, as required by the Permit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk Management Techniques and Practice Workshop Workshop Report

At the request of the Department of Energy (DOE) Office of Science (SC), Lawrence Livermore National Laboratory (LLNL) hosted a two-day Risk Management Techniques and Practice (RMTAP) workshop held September 18-19 at the Hotel Nikko in San Francisco. The purpose of the workshop, which was sponsored by the SC/Advanced Scientific Computing Research (ASCR) program and the National Nuclear Security Administration (NNSA)/Advanced Simulation and Computing (ASC) program, was to assess current and emerging techniques, practices, and lessons learned for effectively identifying, understanding, managing, and mitigating the risks associated with acquiring leading-edge computing systems at high-performance computing centers (HPCCs). Representatives from fifteen high-performance computing (HPC) organizations, four HPC vendor partners, and three government agencies attended the workshop. The overall workshop findings were: (1) Standard risk management techniques and tools are in the aggregate applicable to projects at HPCCs and are commonly employed by the HPC community; (2) HPC projects have characteristics that necessitate a tailoring of the standard risk management practices; (3) All HPCC acquisition projects can benefit by employing risk management, but the specific choice of risk management processes and tools is less important to the success of the project; (4) The special relationship between the HPCCs and HPC vendors must be reflected in the risk management strategy; (5) Best practices findings include developing a prioritized risk register with special attention to the top risks, establishing a practice of regular meetings and status updates with the platform partner, supporting regular and open reviews that engage the interests and expertise of a wide range of staff and stakeholders, and documenting and sharing the acquisition/build/deployment experience; and (6) Top risk categories include system scaling issues, request for proposal/contract and acceptance testing, and vendor technical or business problems. HPC, by its very nature, is an exercise in multi-level risk management. Every aspect of stewarding HPCCs into the petascale era, from identification of the program drivers to the details of procurement actions and simulation environment component deployments, represents unprecedented challenges and requires effective risk management. The fundamental purpose of this workshop was to go beyond risk management processes as such and learn how to weave effective risk management practices, techniques, and methods into all aspects of migrating HPCCs into the next generation of leadership computing systems. This workshop was a follow-on to the Petascale System Integration Workshop hosted by Lawrence Berkeley National Laboratory (LBNL)/NERSC last year. It was intended to leverage and extend the risk management experience of the participants by looking for common best practices and unique processes that have been especially successful. This workshop assessed the effectiveness of tools and techniques that are or could be helpful in HPCC risk management, with a special emphasis on how practice meets process. As the saying goes: 'In theory, there is no difference between theory and practice. In practice there is'. Finally, the workshop brought together a network of experts who shared information as technology moves into the petascale era and beyond.

99 GENERAL AND MISCELLANEOUS↗

Force/torque display for space teleoperation control experiments and evaluation

Experiments were performed at the Johnson Space Center (JSC), Manipulator Development Facility using the full scale Shuttle Remote Manipulator System (SRMS) to evaluate the effect of visual presentation through perspective display of the orthogonal forces and torques sensed at the manipulator end effector. The experiments investigated the effect of the display information on the management of forces and torques generated during payload berthing and deployment, as well as simulated satellite module change-out operations. The evaluation also addressed (1) issues of display format, including: force/torque scaling, point of resolution, and display mixing with video generated imagery, and (20) task related variables of payload size, alternative sources of guidance information, and control mode. The results are presented of a first-pass informal anlaysis of the analog, strip chart-recorded data from these evaluation tests. The results provide a relative measure of improvement in force management through the use of such a display, as well as information regarding the impact of display variables and task demands on operator performance.

Corker, K.↗

Management and Analysis of Radiation Portal Monitor Data

Oak Ridge National Laboratory (ORNL) receives, archives, and analyzes data from radiation portal monitors (RPMs). Over time the amount of data submitted for analysis has grown significantly, and in fiscal year 2013, ORNL received 545 gigabytes of data representing more than 230,000 RPM operating days. This data comes from more than 900 RPMs. ORNL extracts this data into a relational database, which is accessed through a custom software solution called the Desktop Analysis and Reporting Tool (DART). DART is used by data analysts to complete a monthly lane-by-lane review of RPM status. Recently ORNL has begun to extend its data analysis based on program-wide data processing in addition to the lane-by-lane review. Program-wide data processing includes the use of classification algorithms designed to identify RPMs with specific known issues and clustering algorithms intended to identify as-yet-unknown issues or new methods and measures for use in future classification algorithms. This paper provides an overview of the architecture used in the management of this data, performance aspects of the system, and additional requirements and methods used in moving toward an increased program-wide analysis paradigm.

Rowe, Nathan C↗

FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SA baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Value Based Decision Approach to Help Inform Waste Management Guidance for VLLW Following an RDD Detonation - 19510

The detonation of a radiological dispersal device in an urban environment or similar large-scale radiological event has the potential to spread radioactive contamination over a large area. The resulting effort to clean up and dispose of this waste will involve input and coordination from a wide variety of stakeholder groups, especially if the waste crosses municipal and state boundaries. Guidance designed to help effectively and safely deal with the wastes generated from incident cleanup will need to navigate the intersection of stakeholders at the local, regional, and national levels. At the same time, the sheer size of such a cleanup effort and the volumes of wastes generated will require innovative and potentially novel solutions compared to current Low-Level Radioactive Waste disposal practices. A structured decision-making approach incorporating value-focused thinking is one method that could be employed to help build stakeholder confidence in a given cleanup guidance strategy and documentation. This approach would help ensure that all stakeholder perspectives were accounted for in a given decision situation and to promote transparency in the decision-making process. This paper will discuss research into the role and development of a public stakeholder tool used to gather input from relevant stakeholders in order to help inform cleanup and disposal guidance of Very Low-Level Radioactive Waste following a radiological disaster. This tool is being designed to draw on aspects of value-focused decision making. Case studies from two prominent recent events will be discussed to illustrate some of the key issues that could benefit from such an approach to stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of LANL FY19 Technical Interface Coordination with SHINE

In FY19, Los Alamos National Laboratory (LANL) provided technical support for SHINE emergent needs and technical interface coordination including coordination of SHINE CFD and thermal hydraulics conference calls, Mo-99 meetings and reviews, national laboratory conference calls, and program management activities such as reporting and tracking requirements for current FY19 activities. LANL has also provided general technology consultation support for emerging issues. LANL has participated in the bi-weekly conference calls with SHINE and other national laboratories regarding LANL’s current activities. Activities discussed include FY18 carryover items including the ANSYS Fluent-Nek5000 comparison study (for assessment of Nek5000 for coupled calculations), Supo 3-D CFD model geometry validation, and releasing CFD-MCNP coupled codes for the generic solution vessel simulations. Also, additional mid-year funded activities discussed during these conference calls include the ANL bubble experiment #2 collaboration. SHINE had a general technology consultation request in FY19. SHINE inquired about LANL’s capability to measure enrichment percentage of uranium samples, however, additional information is needed to continue. The meeting minutes for these activities are shown in Appendix A. LANL has also been providing monthly updates on the laboratory SharePoint site (managed by Pacific Northwest National Laboratory) regarding current FY19 activities. Monthly updates include current activity milestone and deliverable status, completion date updates and variances if applicable, and actual cost at the task dependent activity level. LANL attended several Mo-99 meetings and reviews in FY19. LANL attended the FY19 Mo-99 Laboratory Mid-Year Program and Financial Review at Argonne National Laboratory (ANL) on March 20-21, 2019, as well as the FY19 Mo-99 Program Meeting and Mid-Year Financial Review in Chicago, IL on April 29-30, 2019. LANL also attended the FY20 Laboratory Work Package Planning Meeting at ANL on June 4-6, 2019.

43 PARTICLE ACCELERATORS↗