Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Accelerated Aging of PV Cables - The Development of Methods Towards Combined-Accelerated Stress Testing

PV cables allow the collection and distribution of electricity from modules to the energy grid. Durable cabling allows continuous operation of PV installations. Cables with a life less than that of the modules must be replaced - reducing electricity generation and adding to the system operating expense. We have examined the durability of a variety of representative cable samples using artificial UV weathering (IEC TS 62788-7-2) and combined accelerated stress testing (C-AST). Jackets in this study include PV-rated (polyolefin), building wire (PVC/PA), and multi-conductor (rubber, as in PV trackers), with some examples of black and red cables. Characterizations at read points include appearance (camera and optical microscope), surface roughness (linear profilometry), instrumented indentation, surface morphology (SEM), chemical composition (EDS), thermal decomposition (TGA), phase transition (DSC), crystalline structure (WAXS), and polymer chemical structure (FTIR). Complimentary examinations confirm damage to the external and interior layer(s) of less durable samples, including changes in morphology (e.g., cracking), chemistry (e.g., oxidation), structure, and mechanical performance (e.g., through-thickness modulus and hardness). The results may be generally compared to other examples from the field (PV installations) or after accelerated testing (IEC 61215). The methods in this study are presently being applied in a follow-on C-AST study, incorporating both dynamic and kinematic fixtures.

balance of systems↗

The Results of Recent MICE Superconducting Spectrometer Solenoid Test

The MICE spectrometer solenoid magnets will be the first magnets to be installed within the MICE cooling channel. The MICE spectrometer solenoids may be the largest magnets that have been cooled using small two stage coolers. During the previous test of this magnet, the cooler first stage temperatures were too high. The causes of some of the extra first stage heat load has been identified and corrected. The rebuilt magnet had a single stage GM cooler in addition to the three pulse tube coolers. The added cooler reduces the temperature of the top of the HTS leads, the shield and of the first stage of the pulse tube coolers.

42 ENGINEERING↗

Machine Learning and Data Mining for Comprehensive Test Ban Treaty Monitoring

The Comprehensive Test Ban Treaty (CTBT) is gaining renewed attention in light of growing worldwide interest in mitigating risks of nuclear weapons proliferation and testing. Since the International Monitoring System (IMS) installed the first suite of sensors in the late 1990's, the IMS network has steadily progressed, providing valuable support for event diagnostics. This progress was highlighted at the recent International Scientific Studies (ISS) Conference in Vienna in June 2009, where scientists and domain experts met with policy makers to assess the current status of the CTBT Verification System. A strategic theme within the ISS Conference centered on exploring opportunities for further enhancing the detection and localization accuracy of low magnitude events by drawing upon modern tools and techniques for machine learning and large-scale data analysis. Several promising approaches for data exploitation were presented at the Conference. These are summarized in a companion report. In this paper, we introduce essential concepts in machine learning and assess techniques which could provide both incremental and comprehensive value for event discrimination by increasing the accuracy of the final data product, refining On-Site-Inspection (OSI) conclusions, and potentially reducing the cost of future network operations.

99 GENERAL AND MISCELLANEOUS↗

Design Overview of a High-Pressure Helium Flow Visualization Apparatus for Blanket Cooling Studies

Cooling of the fusion blanket first wall remains a significant challenge given the adverse conditions of heat and particle flux encountered near the plasma. Helium emerges as an attractive cooling candidate because of its chemical and neutronic inertness and separability from hydrogenic species (e.g. tritium). Because of the low thermal mass of helium, optimization of these coolant channels is warranted to provide high heat transfer performance at low pumping costs. Increasingly, computational fluid dynamics (CFD) simulations are employed to model and optimize these flow channels, and accompanying experimental data are needed to validate the predictions of these models. To provide the aforementioned experimental data, a high-pressure helium flow visualization upgrade has been designed for the Helium Flow Loop Experiment facility. This apparatus was built to American Society of Mechanical Engineers boiler and pressure vessel standards to withstand operating pressure of 4 MPa and mated to high-pressure glass windows. Seedless flow visualization is performed via high-speed background oriented schlieren (BOS), with image correlation used for time-resolved two-dimensional velocimetry at frequencies in excess of 60 kHz. Rectangular flow channel test articles are additively manufactured via laser powder bed fusion and installed into this visualization apparatus, with one-sided heating supplied by resistive heaters. In conclusion, the chosen test geometries were informed by prior CFD simulations, and the helium flow structures observed via BOS (detachment, recirculation, etc.) will be used for the validation of these accompanying models, in support of the design and optimization of blanket cooling channel configurations.

Helium flow↗

Integration of uncooled scraper elements and its diagnostics into Wendelstein 7-X

The modular stellarator Wendelstein 7-X in Greifswald (Germany) successfully started operation in 2015 with short pulse limiter plasmas. In 2017, the next operation phase (OP) OP1.2 will start once 10 uncooled test divertor units (TDU) with graphite armor will be installed. The TDUs allow for plasma pulses of 10 s with 8 MW heating. OP2, allowing for steady state operation, is planned for 2020 after the TDUs will be replaced by 10 water cooled CFC armored divertors. Due to the development of plasma currents like bootstrap currents in long pulse plasmas in OP2, the plasma could hit the edge of the divertor targets which has a reduced cooling capacity compared to the central part of the target tiles. To prevent overloading of these edges, a so-called scraper element can be positioned in front of the divertor, intersecting those strike lines that would otherwise hit the divertor edges. As a result, these edges are protected but as a drawback the pumping efficiency of neutrals is also reduced. As a test an uncooled scraper element with graphite tiles will be placed in two out of ten half modules in OP1.2. A decision to install ten water cooled scraper elements for OP2 is pending on the results of this test in OP1.2. To monitor the impact of the scraper element on the plasma, Langmuir probes are integrated in the plasma facing surface, and a neutral gas manometer measures the neutral density directly behind the plasma facing surface. Moreover, IR and VIS cameras observe the plasma facing surface and thermocouples monitor the temperatures of the graphite tiles and underlying support structure. This paper describes the integration of the scraper element and its diagnostics in Wendelstein 7-X.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Noise Measurements of a Low-Noise Top-Mounted Propulsion Installation for a Supersonic Airliner

A model-scale exhaust system was tested to validate low-noise concepts and noise prediction methods. The tests involved far-field acoustics, translating phased array, and particle image velocimetry; this report covers the far-field acoustic measurements. Data were acquired for a series of nozzles with different chevron designs, both uninstalled and installed on a representative aircraft planform. The impact of the various chevron treatments on the far-field noise was documented, along with the impact of the pylon and planform. For the baseline nozzle, installation produced a 2EPNdB reduction, as assumed in system studies. Chevrons were used to shift noise sources upstream to maximize the installation benefits and to reduce unshielded sources downstream. These resulted in reductions of 4-5EPNdB relative to the uninstalled baseline nozzle. Detailed analysis of spectral directivities behind the integrated EPNL metric gave insight into how well these concepts actually work. When correlated with particle image velocimetry measurements and phased array measurements, reported in companion papers, the explanation of acoustic benefits from top-mounted propulsion is clear as is the path toward optimization of the concept.

Supersonics↗

PIV/Phased Array/Far-Field Noise Measurements of a Low-Noise Top-Mounted Propulsion Installation for a Supersonic Airliner

A model-scale exhaust system was tested to validate low-noise concepts and noise prediction methods. The tests involved far-field acoustics, translating phased array, and particle image velocimetry; this report covers the far-field acoustic measurements. Data were acquired for a series of nozzles with different chevron designs, both uninstalled and installed on a representative aircraft planform. The impact of the various chevron treatments on the far-field noise was documented, along with the impact of the pylon and planform. For the baseline nozzle, installation produced a 2 EPNdB (Effective Perceived Noise in deciBels) reduction, as assumed in system studies. Chevrons were used to shift noise sources upstream to maximize the installation benefits and to reduce unshielded sources downstream. These resulted in reductions of 4-5 EPNdB...

Bridges, James↗

Blade surface pressure measurement on a pusher propeller in flight

Unsteady aerodynamics of a pusher propeller operating in the wake of a pylon is investigated through analysis of flight test data. Twenty-two surface-mounted miniature pressure transducers were installed at the 75 and 90 percent radius locations on a propeller blade on a test-bed aircraft. Twenty-six different flight conditions were flown to cover the range of speeds, rpm, altitudes, and flap positions encountered by an advanced turboprop general aviation aircraft. Preliminary analysis of the flight test data indicate a strong three-dimensionality to the perturbed flow at the 75 and 90 percent radii due to pylon wake encounter. Time-history of the pressure transducer waveforms recorded for 700 revolutions exhibit a one-per-cycle wave oscillation on the wake signature. No explanation is found for this behavior yet.

Farokhi, S.↗

Vortex Wake Geometry of a Model Tilt Rotor in Forward Flight

A full-span 0.25-scale V-22 tiltrotor was tested in the NASA Ames 40-by 80-Foot Wind Tunnel in November 2000. The main objective of the test was to acquire a comprehensive database to validate tiltrotor analyses. Figure 1 shows the model installed in the Ames 40- by 80-Foot Wind Tunnel. Rotor and vehicle performance measurements were taken in addition to wing pressures, acoustics, and flow visualization. A dual acoustic traverse system was installed to measure blade-vortex interaction (BVI) noise levels and directivity. Test conditions included hover and forward flight in helicopter mode. Angle-of-attack and thrust sweeps for three tunnel speeds were acquired before model problems caused the premature conclusion of the test. The test will resume in the Ames 80- by 120-Foot Wind Tunnel in late 2001. This paper will focus on the wake geometry measurements that were acquired during the test. The wake geometry measurements were a small subset of a larger matrix of planned measurements designed to study the development and structure of the dual vortex system generated during BVI conditions. The present paper will provide wake geometry data for four test conditions. In addition, the data will be compared with previously acquired wake measurements from an isolated tiltrotor

Wadcock, Alan J.↗

Hydrodynamic Investigation of the the Take-Off Characteristics of a 1/10-Scale Dynamic Model of the Convair XF2Y-1 Airplane

An investigation was made of the take-off characteristics of a 1/10-scale dynamic model of the Convair XF2Y-1 airplane. This airplane is a water-based, jet-propelled, delta-wing fighter incorporating a hydro-ski landing gear. Tests were made with the original configuration, with the beaching wheels removed, and with the wheels installed and fairings added in front of the wheels. Each configuration was tested at weight and balance conditions simulating 17,000 pounds gross weight with the moment due t o 7,600 pounds of thrust, 17,300 pounds gross weight with a 9,500-pound thrust condition, and 23,000 pounds gross weight with a 9,300-pound thrust condition. Constant-speed runs were made at various elevon settings and vertical ski-strut positions; and trim, rise, and resistance were measured. Accelerated runs were made with controlled elevons and scale shock struts which could be extended as desired, and the longitudinal stability and spray characteristics were observed and photographed.

McBridge, Ellis E.↗

High-Temperature Split-Flow Recompression Brayton Cycle Initial Test Results

Supercritical CO 2 (S-CO 2 ) power plants offer the potential for better economics because of their small size, use of standard materials, and improved electrical power conversion efficiency at modest temperature (400–750°C). Sandia National Laboratories (SNL or Sandia) and the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) are operating a supercritical CO 2 Brayton cycle power system—the Generation IV (Gen IV) split-flow S-CO 2 compressor test loop—currently located in Arvada Colorado, at Barber Nichols, Inc., under contract to Sandia. A photograph of the upgraded loop is shown in Figure E-1. This system is one of the first S-CO 2 power-producing Brayton cycles operating in the world. This report provides a summary of the newly installed hardware and briefly describes some of the test results that were performed in the upgraded split-flow Brayton loop during June and July of 2011. The Gen IV S-CO 2 split-flow Brayton loop was reconfigured to operate as a simple heated recuperated Brayton loop for the testing in this report period. The test loop had just concluded a phase of construction that substantially increased the capability of the loop by adding heaters, a high-temperature (HT) recuperator, more waste heat removal capability, high-power load banks, larger diameter piping with more bends to reduce thermal stress, and more capable scavenging pumps to reduce windage and friction within the turbomachinery and provide greater cooling capabilities. With these additions, the loop greatly increased its capacity for electrical power generation (30–80 kWe per generator, depending on the loop configuration) and its ability to reach high temperatures (up to 810 K [1000°F]). In recent weeks of testing, the test facility began to realize this potential by achieving new records in turbine inlet temperature (615 K [650°F]), shaft speed (52,000 rpm), pressure ratio (1.65), flow rate (2.7 kg/s), and electrical power generated (20 kWe). These operating conditions still remain short of design conditions for each turbine—an inlet temperature of 810 K (1000°F), a pressure ratio of 1.8, a shaft speed of 75,000 rpm, a flow rate of 3.5 kg/s, and a maximum generator power of 125 kWe—but they are beginning to be approached. Not all planned upgrades were implemented due to the limited funding profile of FY2010. Only 520 kW of heater power were installed—not the total 780 kW. Furthermore, because one of the heater controllers was not functioning, only 390 kW of heater power were available. Similarly, the 3-in. piping was installed only in the high-pressure leg of the loop, not in the low-pressure leg, as was originally planned. We also had to rely on the new load bank capability for rapid shutdown situations, and were not able to install a dedicated shutdown resistor. Nevertheless, in spite of these limitations, we operated the loop at record operating conditions and were largely limited only by the facility and support equipment—not the turbomachinery.

Wright, Steven Alan↗

Technology Solutions Case Study: Stand-Off Furring in Deep Energy Retrofits

IBACOS, in collaboration with GreenHomes America, was contracted by the New York State Energy Research and Development Authority to research exterior wall insulation solutions. This research investigated cost-effective deep energy retrofit (DER) solutions for improving the building shell exterior while achieving a cost-reduction goal, including reduced labor costs to reach a 50/50 split between material and labor. The strategies included exterior wall insulation plus energy upgrades as needed in the attic, mechanical and ventilation systems, and basement band joist, walls, and floors. The work can be integrated with other home improvements such as siding or window replacement. This strategy minimizes physical connections to existing wall studs, encapsulates existing siding materials (including lead paint) with spray foam, and creates a vented rain screen assembly to promote drying. GreenHomes America applied construction details created by IBACOS to a test home. 2x4 framing members were attached to the wall at band joists and top plates using "L" clips, with spray foam insulating the wall after framing was installed. Windows were installed simultaneously with the framing, including extension jambs. The use of clips in specific areas provided the best strength potential, and "picture framing" the spray foam held the 2x4s in place. Short-term testing was performed at this house, with monitoring equipment installed for long-term testing.

Building America↗

New High-Temperature Turbine Seal Rig Installed

Current NASA program goals for aircraft engines and vehicle performance include reducing direct operating costs for commercial aircraft by 3 percent in large engines and 5 percent in regional engines, reducing engine fuel burn up to 10 percent, and reducing engine oxides of nitrogen emissions by more than 50 percent. Significant advancements in current gas turbine engines and engine components, such as seals, are required to meet these goals. Specifically, advanced seals have been identified as critical in meeting engine goals for specific fuel consumption, thrust-to-weight ratio, emissions, durability, and operating costs. In a direct effort to address and make progress toward these goals, researchers at the NASA Glenn Research Center have developed a unique high-temperature, high-speed engine seal test rig to evaluate seals under the temperature, speed, and pressure conditions anticipated for next-generation turbine engines. Newly installed, this seal test rig has capabilities beyond those of any existing seal rigs. It can test air seals (i.e., labyrinth, brush, and new seal concepts) at temperatures of up to 1500 F and pressures up to 100 psid (even higher pressures are possible at lower temperatures), and at all surface speeds anticipated in future NASA (Ultra-Efficient Engine Technology, UEET) and Integrated High-Performance Turbine Engine Technology (IHPTET) engine programs. In addition, seals can be tested offset from the rotor centerline, in the rotor runout condition, and with simulated mission profiles. Support for this new rig was provided by Glenn, the U.S. Air Force, and the U.S. Army.

Delgado, Irebert R.↗

Cooling Performance Testing of Attaway's Negative Pressure CDU

Attaway is a recently installed High-Performance Computing (HPC) machine at Sandia National Labs that is 70% water-cooled and 30% air-cooled. This machine, supplied by Penguin Computing, uses a novel new cooling system from Chilldyne that operates in a vacuum, preventing water leaks. If water-cooling is to fail, fans inside of each node will ramp up to do 100% of the cooling on Attaway. Various tests were completed on Attaway to determine the robustness of its cooling system as well as its ability to respond to sudden changes in states. These changes include an immediate change from an idle compute load to full load (Linpack) as well as running Linpack without any water cooling from Attaway's CDUs. It was discovered that Attaway could respond to sudden compute load changes very well, never throttling any nodes. When Linpack was run without water cooling, the system was able to operate for a short time before throttling happened.

42 ENGINEERING↗

Stand-Off Furring in Deep Energy Retrofits: Syracuse, New York (Fact Sheet)

IBACOS, in collaboration with GreenHomes America, was contracted by the New York State Energy Research and Development Authority to research exterior wall insulation solutions. This research investigated cost-effective deep energy retrofit (DER) solutions for improving the building shell exterior while achieving a cost-reduction goal, including reduced labor costs to reach a 50/50 split between material and labor. The strategies included exterior wall insulation plus energy upgrades as needed in the attic, mechanical and ventilation systems, and basement band joist, walls, and floors. The work can be integrated with other home improvements such as siding or window replacement. This strategy minimizes physical connections to existing wall studs, encapsulates existing siding materials (including lead paint) with spray foam, and creates a vented rain screen assembly to promote drying. GreenHomes America applied construction details created by IBACOS to a test home. 2x4 framing members were attached to the wall at band joists and top plates using 'L' clips, with spray foam insulating the wall after framing was installed. Windows were installed simultaneously with the framing, including extension jambs. The use of clips in specific areas provided the best strength potential, and 'picture framing' the spray foam held the 2x4s in place. Short-term testing was performed at this house, with monitoring equipment installed for long-term testing. Testing measurements will be provided in a later report, as well as utility impact (before and after), costs (labor and materials), construction time, standard specifications, and analysis for the exterior wall insulation strategy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Spray Foam Exterior Insulation with Stand-Off Furring

IBACOS, in collaboration with GreenHomes America, was contracted by the New York State Energy Research and Development Authority to research exterior wall insulation solutions. This research investigated cost-effective deep energy retrofit (DER) solutions for improving the building shell exterior while achieving a cost-reduction goal, including reduced labor costs to reach a 50/50 split between material and labor. The strategies included exterior wall insulation plus energy upgrades as needed in the attic, mechanical and ventilation systems, and basement band joist, walls, and floors. The work can be integrated with other home improvements such as siding or window replacement. This strategy minimizes physical connections to existing wall studs, encapsulates existing siding materials (including lead paint) with spray foam, and creates a vented rain screen assembly to promote drying. GreenHomes America applied construction details created by IBACOS to a test home. 2x4 framing members were attached to the wall at band joists and top plates using 'L' clips, with spray foam insulating the wall after framing was installed. Windows were installed simultaneously with the framing, including extension jambs. The use of clips in specific areas provided the best strength potential, and 'picture framing' the spray foam held the 2x4s in place. Short-term testing was performed at this house, with monitoring equipment installed for long-term testing. Testing measurements will be provided in a later report, as well as utility impact (before and after), costs (labor and materials), construction time, standard specifications, and analysis for the exterior wall insulation strategy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Spray Foam Exterior Insulation with Stand-Off Furring

IBACOS, in collaboration with GreenHomes America, was contracted by the New York State Energy Research and Development Authority to research exterior wall insulation solutions. This research investigated cost-effective deep energy retrofit (DER) solutions for improving the building shell exterior while achieving a cost-reduction goal, including reduced labor costs to reach a 50/50 split between material and labor. The strategies included exterior wall insulation plus energy upgrades as needed in the attic, mechanical and ventilation systems, and basement band joist, walls, and floors. The work can be integrated with other home improvements such as siding or window replacement. This strategy minimizes physical connections to existing wall studs, encapsulates existing siding materials (including lead paint) with spray foam, and creates a vented rain screen assembly to promote drying. GreenHomes America applied construction details created by IBACOS to a test home. 2x4 framing members were attached to the wall at band joists and top plates using "L" clips, with spray foam insulating the wall after framing was installed. Windows were installed simultaneously with the framing, including extension jambs. The use of clips in specific areas provided the best strength potential, and "picture framing" the spray foam held the 2x4s in place. Short-term testing was performed at this house, with monitoring equipment installed for long-term testing. Testing measurements will be provided in a later report, as well as utility impact (before and after), costs (labor and materials), construction time, standard specifications, and analysis for the exterior wall insulation strategy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a 12-Thrust Chamber Kerosene /Oxygen Primary Rocket Sub-System for an Early (1964) Air-Augmented Rocket Ground-Test System

Airbreathing/Rocket combined-cycle, and specifically rocket-based combined- cycle (RBCC), propulsion systems, typically employ an internal engine flow-path installed primary rocket subsystem. To achieve acceptably short mixing lengths in effecting the "air augmentation" process, a large rocket-exhaust/air interfacial mixing surface is needed. This leads, in some engine design concepts, to a "cluster" of small rocket units, suitably arrayed in the flowpath. To support an early (1964) subscale ground-test of a specific RBCC concept, such a 12-rocket cluster was developed by NASA's Marshall Space Flight Center (MSFC). The small primary rockets used in the cluster assembly were modified versions of an existing small kerosene/oxygen water-cooled rocket engine unit routinely tested at MSFC. Following individual thrust-chamber tests and overall subsystem qualification testing, the cluster assembly was installed at the U. S. Air Force's Arnold Engineering Development Center (AEDC) for RBCC systems testing. (The results of the special air-augmented rocket testing are not covered here.) While this project was eventually successfully completed, a number of hardware integration problems were met, leading to catastrophic thrust chamber failures. The principal "lessons learned" in conducting this early primary rocket subsystem experimental effort are documented here as a basic knowledge-base contribution for the benefit of today's RBCC research and development community.

Pryor, D.↗