Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “current status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Thermodynamics of grain-boundary phases

The past decade has seen a significant increase in research efforts aimed at understanding the thermodynamics of low-dimensional phases existing in many materials systems, ranging from two-dimensional materials to core regions of extended defects in crystalline solids. We review the current status of theoretical, computational, and experimental research on the “defect phases,” focusing on grain boundaries (GBs) in elemental and multicomponent polycrystalline materials. After reviewing the generalized concept of a phase of any dimensionality, we discuss recent progress in atomistic computer simulations of GB phase transformations and phase coexistences, including the observation of one-dimensional defects separating GB phases (defects in defects). Computational predictions compare well with experimental observations of multiple GB phases and segregation-induced phase transformations. An intriguing open question of GB thermodynamics is whether the GB free energy can be driven to a zero value by increasing solute segregation. We review recent efforts to understand this ultimate thermodynamic stabilization of GB phases and the possible polycrystalline microstructures that may arise. An outlook for future research in the field is discussed.

Materials science↗

Perspectives on multi-material additive manufacturing

The last two decades have seen enormous gains in industrial adoption of additive manufacturing (AM) technologies. Its layer-wise approach to fabrication offers designers the opportunity to create structures with unique performance advantages over their traditionally manufactured counterparts, and have created new manufacturing business models and supply chains. While today’s AM technologies have enabled the creation of new geometries, future AM systems that offer simultaneous processing of multiple materials in a single build open opportunities for new product functionality that cannot be achieved by traditional manufacturing methods. Advances in multi-material additive manufacturing, which integrate dissimilar material into a complex, three-dimensional object, is emerging but the advances have been sporadic. Moving beyond homogenous materials, adding multi-materials, gradient, functional and responsive materials, and materials with heterogeneous and graded properties means that a single additive process based on either energy delivery or material deposition alone may not be suitable. Finally, this perspective gives a brief overview of the current status, challenges, and future recommendations for multi-material additive manufacturing. The authors aim to expand the notion of multi-material additive manufacturing beyond combining materials with dissimilar properties, to combinations of materials at different length scales, material classes as well as multiple functionalities.

36 MATERIALS SCIENCE↗

A development of wide dynamic-range halo monitor for 8 GeV proton beams at FNAL

The FNAL accelerator complex has been upgrading in increasing beam intensity and beam quality. A new beam halo diagnostic device is required in the beam transport line between booster and Recycler. For this purpose, it was decided to introduce the wide dynamic range monitor technique that was developed in 2012 and has been in operation at the J-PARC beam transport line. The device is a two-dimensional beam profile monitor, and it has a dynamic range of approximately six digits of magnitude by using of Optical Transition Radiation and fluorescence screens. Eliminating harmful beam halos is the most important technique for high-intensity proton accelerators. Therefore, beam halo diagnosis is indispensable and becomes more and more important. New FNAL device has been manufactured in a collaboration between J-PARC and FNAL as a part of U.S.-Japan Science and Technology Cooperation Program in High Energy Physics. The equipment will be manufactured at J-PARC and will be shipped to FNAL in 2025.We designed the device to satisfy FNAL specifications: the beam energy, intensity, and size. Currently, most of the equipments are under construction. The large-aperture optical system has been completed and its optical characteristics are being evaluated at J-PARC. We have been also investigating measurement methods corresponding to FNAL bunch trains. This paper reports on the current status of these developments.

43 PARTICLE ACCELERATORS↗

Design Concepts for Muon-Based Accelerators

Muon-based accelerators have the potential to enable facilities at both the Intensity and the Energy Frontiers. Muon storage rings can serve as high precision neutrino sources, and a muon collider is an ideal technology for a TeV or multi-TeV collider. Progress in muon accelerator designs has advanced steadily in recent years. In regard to 6D muon cooling, detailed and realistic designs now exist that provide more than 5 order-of-magnitude emittance reduction. Furthermore, detector performance studies indicate that with suitable pixelation and timing resolution, backgrounds in the collider detectors can be significantly reduced thus enabling high quality physics results. Thanks to these and other advances in design & simulation of muon systems, technology development, and systems demonstrations, muon storage-ring-based neutrino sources and a muon collider appear more feasible than ever before. A muon collider is now arguably among the most compelling approaches to a multi-TeV lepton collider. This paper summarizes the current status of design concepts for muon-based accelerators for neutrino factories and a muon collider.

Bogacz, Slawomir↗

Fermilab Superconducting Nb₃Sn High Field Magnet R&D Program

Magnets based on the modern Nb₃Sn conductor are the main candidates for future high-energy hadron colliders. Fermilab as part of the U.S. MDP executes an extensive R&D program on these high-field magnets. This program includes basic conductor and material R&D, quench per-formance studies, and building a meter-long high-field demonstrator. This paper summarizes the current status of the program including its recent results.

43 PARTICLE ACCELERATORS↗

Slow Extraction Beam Commissioning for the Mu2e Experiment at Fermilab

Following the successful completion of the Muon g-2 experiment run at Fermilab, the Muon Campus facility has been reconfigured from delivering 3 GeV muon beams to the g-2 storage ring to providing slow-extracted 8 GeV proton beam spills for the Mu2e experiment. The first full-scale commissioning run with slow extraction was conducted during the 2025 run, followed by the second run in early 2026. We present the results and current status of this commissioning campaign.

Nagaslaev, V. [Fermilab]↗

Electron Ion Collider Strong Hadron Cooling Injector and ERL

Intra-beam Scattering (IBS) and other diffusion mechanisms in the EIC Hadron Storage Ring (HSR) degrade the beam emittances during a store, with growth times of about 2 hours at the nominal proton energies of 275GeV, 100 GeV, and 41 GeV. Strong Hadron Cooling (SHC) can maintain good hadron beam quality and high luminosity during long collision stores. A novel cooling method ’ Coherent electron Cooling (CeC) ’ is chosen as the baseline SHC method, due to its high cooling rates. An Energy Recovery Linac (ERL) is used to deliver an intense high-quality electron beam for cooling. In this paper, we discuss the beam requirements for SHC-CeC and describe the current status of the injector and ERL designs. Two designs of injector and ERL will be presented: one for dedicated SHC and another one for SHC with precooler.

Wang, E.↗

Connecting Colorado's Renewable Resources to the Markets in a Cabon-Constrained Electricity Sector

The benchmark goal that drives the report is to achieve a 20 percent reduction in carbon dioxide (CO{sub 2}) emissions in Colorado's electricity sector below 2005 levels by 2020. We refer to this as the '20 x 20 goal.' In discussing how to meet this goal, the report concentrates particularly on the role of utility-scale renewable energy and high-voltage transmission. An underlying recognition is that any proposed actions must not interfere with electric system reliability and should minimize financial impacts on customers and utilities. The report also describes the goals of Colorado's New Energy Economy5 - identified here, in summary, as the integration of energy, environment, and economic policies that leads to an increased quality of life in Colorado. We recognize that a wide array of options are under constant consideration by professionals in the electric industry, and the regulatory community. Many options are under discussion on this topic, and the costs and benefits of the options are inherently difficult to quantify. Accordingly, this report should not be viewed as a blueprint with specific recommendations for the timing, siting, and sizing of generating plants and high-voltage transmission lines. We convened the project with the goal of supplying information inputs for consideration by the state's electric utilities, legislators, regulators, and others as we work creatively to shape our electricity sector in a carbon-constrained world. The report addresses various issues that were raised in the Connecting Colorado's Renewable Resources to the Markets report, also known as the SB07-91 Report. That report was produced by the Senate Bill 2007-91 Renewable Resource Generation Development Areas Task Force and presented to the Colorado General Assembly in 2007. The SB07-91 Report provided the Governor, the General Assembly, and the people of Colorado with an assessment of the capability of Colorado's utility-scale renewable resources to contribute electric power in the state from 10 Colorado generation development areas (GDAs) that have the capacity for more than 96,000 megawatts (MW) of wind generation and 26,000 MW of solar generation. The SB07-91 Report recognized that only a small fraction of these large capacity opportunities are destined to be developed. As a rough comparison, 13,964 MW of installed nameplate capacity was available in Colorado in 2008. The legislature did not direct the SB07-91 task force to examine several issues that are addressed in the REDI report. These issues include topics such as transmission, regulation, wildlife, land use, permitting, electricity demand, and the roles that different combinations of supply-side resources, demand-side resources, and transmission can play to meet a CO{sub 2} emissions reduction goal. This report, which expands upon research from a wide array of sources, serves as a sequel to the SB07-91 Report. Reports and research on renewable energy and transmission abound. This report builds on the work of many, including professionals who have dedicated their careers to these topics. A bibliography of information resources is provided, along with many citations to the work of others. The REDI Project was designed to present baseline information regarding the current status of Colorado's generation and transmission infrastructure. The report discusses proposals to expand the infrastructure, and identifies opportunities to make further improvements in the state's regulatory and policy environment. The report offers a variety of options for consideration as Colorado seeks pathways to meet the 20 x 20 goal. The primary goal of the report is to foster broader discussion regarding how the 20 x 20 goal interacts with electric resource portfolio choices, particularly the expansion of utility-scale renewable energy and the high-voltage transmission infrastructure. The report also is intended to serve as a resource when identifying opportunities stemming from the American Recovery and Reinvestment Act of 2009.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DEVELOPMENT OF AN APPROACH TO MODELING LOADING AND ELUTION OF SPHERICAL RESORCINOL FORMALDEHYDE ION-EXCHANGE RESIN

The current strategy for removal of cesium from the Hanford waste stream is ion-exchange using spherical Resorcinol-Formaldehyde (sRF) resin. The original resin of choice was granular SuperLig 644 resin and during testing of this resin several operational issues were identified. For example, the granular material had a high angle of internal friction resulting in fragmentation of resin particles along its edges during cycling and adverse hydraulic performance. Efforts to replace SuperLig 644 were undertaken and one candidate was the granular Resorcinol-Formaldehyde (RF) resin where experience with this cation exchanger dates back to the late 1940's. To minimize hydraulic concerns a spherical version of RF was developed and several different chemically produced batches were created. The 5E-370/641 batch of sRF was selected and for the last decade numerous studies have been performed (e.g., batch contact tests, column loading and elution tests). The Waste Treatment Plant (WTP) flowsheet shows that the aqueous phase waste stream will have a wide range of ionic concentrations (e.g., during the loading step 0-3 M free OH, 5+ M Na, 0-1 M K, 0-3 M NO{sub 3}). Several steps are required in the ion-exchange process to achieve the required Cs separation factors: loading, displacement, washing, elution, and regeneration. The sRF resin will be operated over a wide range in pH (i.e., pH of 12-14 during the loading step and pH of 0.01-1 during the elution step). During some of these steps very high levels of counter-ions and co-ions will be present within the aqueous phase. Alternative process feeds are under consideration as well (e.g., sodium levels as high as 8 M and column operation up to 45 C during loading, reduced and recycled HNO{sub 3} during elution). In order to model the performance of sRF resin through an entire ion-exchange cycle, a more robust isotherm model is required. To achieve this more robust isotherm model requires knowledge of the numbers and kinds of fixed ionogenic groups that make up sRF. Recent literature reviews and scoping titration tests strongly indicate that sRF is a polyfunctional cation exchange resin with at least three dominant types of ring groups playing a role in its isotherm behavior over the wide pH range of operations. Also three types of fixed ionogenic acid groups are present: sulfonic (SO{sub 3}H{sup -}) groups; carboxylic (COOH{sup -}) groups, and resorcylic (OH{sup -}) groups. It is this premise that we are working under in the development of a robust isotherm model for sRF over its entire planned pH operating range. The application of prototypic isotherms for modeling ion-exchange column behavior is demonstrated in Section 3 of this report. This preliminary work served to focus the development effort on the use of a mass-action based isotherm. In Section 4 of this report, the foundational material required to develop a robust isotherm model for sRF is provided. The paths taken, and choices made, are given for the reader to better understand our current status with respect to this goal and to highlight our most recent understanding of sRF exchange equilibria. Our ultimate goal is to update the CERMOD code (Aleman and Hamm, 2007) with a robust isotherm model for sRF that spans the entire pH and concentration ranges of planned operations. The isotherm model will then be used in the VERSE-LC code to model an entire ion-exchange cycle.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Large Scale Duty Cycle (LSDC) Project: Tractive Energy Analysis Methodology and Results from Long-Haul Truck Drive Cycle Evaluations

This report addresses the approach that will be used in the Large Scale Duty Cycle (LSDC) project to evaluate the fuel savings potential of various truck efficiency technologies. The methods and equations used for performing the tractive energy evaluations are presented and the calculation approach is described. Several representative results for individual duty cycle segments are presented to demonstrate the approach and the significance of this analysis for the project. The report is divided into four sections, including an initial brief overview of the LSDC project and its current status. In the second section of the report, the concepts that form the basis of the analysis are presented through a discussion of basic principles pertaining to tractive energy and the role of tractive energy in relation to other losses on the vehicle. In the third section, the approach used for the analysis is formalized and the equations used in the analysis are presented. In the fourth section, results from the analysis for a set of individual duty cycle measurements are presented and different types of drive cycles are discussed relative to the fuel savings potential that specific technologies could bring if these drive cycles were representative of the use of a given vehicle or trucking application. Additionally, the calculation of vehicle mass from measured torque and speed data is presented and the accuracy of the approach is demonstrated.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Use of wind power forecasting in operational decisions.

The rapid expansion of wind power gives rise to a number of challenges for power system operators and electricity market participants. The key operational challenge is to efficiently handle the uncertainty and variability of wind power when balancing supply and demand in ths system. In this report, we analyze how wind power forecasting can serve as an efficient tool toward this end. We discuss the current status of wind power forecasting in U.S. electricity markets and develop several methodologies and modeling tools for the use of wind power forecasting in operational decisions, from the perspectives of the system operator as well as the wind power producer. In particular, we focus on the use of probabilistic forecasts in operational decisions. Driven by increasing prices for fossil fuels and concerns about greenhouse gas (GHG) emissions, wind power, as a renewable and clean source of energy, is rapidly being introduced into the existing electricity supply portfolio in many parts of the world. The U.S. Department of Energy (DOE) has analyzed a scenario in which wind power meets 20% of the U.S. electricity demand by 2030, which means that the U.S. wind power capacity would have to reach more than 300 gigawatts (GW). The European Union is pursuing a target of 20/20/20, which aims to reduce greenhouse gas (GHG) emissions by 20%, increase the amount of renewable energy to 20% of the energy supply, and improve energy efficiency by 20% by 2020 as compared to 1990. Meanwhile, China is the leading country in terms of installed wind capacity, and had 45 GW of installed wind power capacity out of about 200 GW on a global level at the end of 2010. The rapid increase in the penetration of wind power into power systems introduces more variability and uncertainty in the electricity generation portfolio, and these factors are the key challenges when it comes to integrating wind power into the electric power grid. Wind power forecasting (WPF) is an important tool to help efficiently address this challenge, and significant efforts have been invested in developing more accurate wind power forecasts. In this report, we document our work on the use of wind power forecasting in operational decisions.

17 WIND ENERGY↗

Study of charmonium resonances in the γγ -> K 0 S K ± π ∓ i- and γγ -> K + K - π + π - π 0 processes

This thesis reports the analysis of the e + e - → e + e - K S 0 K ± π ± and e + e - → e + e - K + K - π + π - π 0 processes using the final dataset of the BABAR experiment located at the SLAC National Accelerator Laboratory. From previous measurements, the K S 0 K ± π ± final state is known to show a clear signal from the β c (2S) particle. This c$\bar{c}$ state escaped detection for almost twenty years and its properties are still not well established on the experimental ground, while accurate predictions exist on the theoretical side. The e + e - → e + e - K + K - π + π - π 0 process is first studied in this thesis. An accurate determination of the β c (2S) properties is obtained in the K S 0 K ± π ± decay mode. We also report the first observation of η c (2S) and other charmonium states to the K + K - π + π - π 0 final state. The results of this thesis have been published in Physical Review D, and will be useful to test theoretical models describing the charmonium system. The thesis is organized in four chapters. The first one gives a brief introduction of the theoretical models used to describe the charmonium system. The second one discuss the current status of conventional and exotic charmonium spectroscopy, reporting recent experimental results and their interpretation. The third Chapter is devoted to describe the BABAR experiment. The analysis technique and results are described in Chapter 4. Finally, conclusions from this analysis are drawn.

43 PARTICLE ACCELERATORS↗

Analog Readout and Analysis Software for the Ultra-High Rate Germanium (UHRGe) Project

High-resolution high-purity germanium (HPGe) spectrometers are needed for Safeguards applications such as spent fuel assay and uranium hexafluoride cylinder verification. In addition, these spectrometers would be applicable to other high-rate applications such as non-destructive assay of nuclear materials using nuclear resonance fluorescence. Count-rate limitations of today's HPGe technologies, however, lead to concessions in their use and reduction in their efficacy. Large-volume, very high-rate HPGe spectrometers are needed to enable a new generation of nondestructive assay systems. The Ultra-High Rate Germanium (UHRGe) project is developing HPGe spectrometer systems capable of operating at unprecedented rates, 10 to 100 times those available today. This report documents current status of developments in the analog electronics and analysis software.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SiD Letter of Intent

This document presents the current status of the Silicon Detector (SiD) effort to develop an optimized design for an experiment at the International Linear Collider. It presents detailed discussions of each of SiD's various subsystems, an overview of the full GEANT4 description of SiD, the status of newly developed tracking and calorimeter reconstruction algorithms, studies of subsystem performance based on these tools, results of physics benchmarking analyses, an estimate of the cost of the detector, and an assessment of the detector R and D needed to provide the technical basis for an optimised SiD.

43 PARTICLE ACCELERATORS↗

Lac du Flambeau Band of Lake Superior Chippewa Indians Strategic Energy Plan

This plan discusses the current energy use on the Lac du Flambeau Reservation, the current status of the Tribe's energy program, as well as the issues and concerns with energy on the reservation. This plan also identifies and outlines energy opportunities, goals, and objectives for the Tribe to accomplish. The overall goal of this plan is to address the energy situation of the reservation in a holistic manner for the maximum benefit to the Tribe. This plan is an evolving document that will be re-evaluated as the Tribe's energy situation changes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Summary Report on CO 2 Geologic Sequestration & Water Resources Workshop

The United States Environmental Protection Agency (EPA) and Lawrence Berkeley National Laboratory (LBNL) jointly hosted a workshop on “CO 2 Geologic Sequestration and Water Resources” in Berkeley, June 1–2, 2011. The focus of the workshop was to evaluate R&D needs related to geological storage of CO 2 and potential impacts on water resources. The objectives were to assess the current status of R&D, to identify key knowledge gaps, and to define specific research areas with relevance to EPA’s mission. About 70 experts from EPA, the DOE National Laboratories, industry, and academia came to Berkeley for two days of intensive discussions. Participants were split into four breakout session groups organized around the following themes: Water Quality and Impact Assessment/Risk Prediction; Modeling and Mapping of Area of Potential Impact; Monitoring and Mitigation; Wells as Leakage Pathways. In each breakout group, participants identified and addressed several key science issues. All groups developed lists of specific research needs; some groups prioritized them, others developed short-term vs. long-term recommendations for research directions. Several crosscutting issues came up. Most participants agreed that the risk of CO 2 leakage from sequestration sites that are properly selected and monitored is expected to be low. However, it also became clear that more work needs to be done to be able to predict and detect potential environmental impacts of CO 2 storage in cases where the storage formation may not provide for perfect containment and leakage of CO 2 –brine might occur.

54 ENVIRONMENTAL SCIENCES↗

Code Verification and Confidence-Building

This document described the current status of verification and confidence building activities for the four simulation codes used for groundwater flow and transport simulations in the NRAP project. This is meant to be a ‘living document’ which will evolve as the verification suites expand and the models are tested against new field and laboratory experiments. Documenting these activities will enable the simulation teams at different laboratories to share verification problems, to benchmark against other codes. It will also help stakeholders understand the testing process and to gain confidence in model results.

54 ENVIRONMENTAL SCIENCES↗