Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “construction technology”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

High Elevation Radiation Array (HERA) detectors for airborne thunderstorm investigations

A high-energy atmospheric physics phenomenon, referred to as a terrestrial gamma ray flash (TGF), is associated with lightning and produces large bursts of energetic photon radiation. TGFs will be investigated using a suite of gamma-ray instruments designed and constructed to fly on ten United States Air Force (USAF) WC-130J Hurricane Hunter aircraft as part of an aircrew ionization study led by the Air Force Institute of Technology (AFIT) and the United States Air Force School of Aerospace Medicine (USAFSAM), in cooperation with the 53rd Weather Reconnaissance Squadron (WRS). Each instrument consists of one NaI and one plastic detector, a GPS timing device, and an instrument computer that performs data acquisition. High Elevation Radiation Array (HERA) detectors will be employed to maximize the chances of observing TGFs near their source and to gain a better understanding of their origin, mechanism, ubiquity, and to assess potential hazards posed to military and commercial aircrew and passengers. The HERA program, deployed on 10 separate Air Force aircraft over a multi-year campaign, will result in thousands of observational flight hours and be the largest concerted effort to date to observe TGFs in situ through aircraft observations. In this paper, we give an overview of the scientific goals of this campaign and how the HERA instruments have been designed to meet those goals. Here, we include a detailed description of the HERA instrument, along with mass model and signal processing simulations.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Status and Challenges of the Interaction Region Magnets for HL-LHC

About one hundred magnets of six different types shall be installed in the High Luminosity LHC (HL-LHC) in the years 2026-2028 at CERN. The magnets design, construction and test are based on CERN collaborations with institutes and industrial partners in USA, Spain, Italy, Japan and China. Three types of correctors are based on Nb-Ti technology and feature conductor peak fields in the 2 to 4 T range: for all of them the prototype phase has been successfully completed. The production is well advanced for the superferric correctors, and is starting for the canted cosine theta correctors and for the nested correctors. The separation and recombination Nb-Ti dipoles D1 and D2, with a 4.5-6 T bore field range, are both in the prototype phase after the completion of the short model program. The most challenging magnet, the Nb 3 Sn quadrupole with conductor peak field above 11 T, is in the prototype phase at CERN and halfway through the production phase in the USA. In this paper we will give, for each type of magnet, an overview of the main achievements obtained so far and we will outline the technical points still needing validation from the prototype program.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

National Reactor Innovation Center NRC Early Site Permit Roadmap

The National Reactor Innovation Center (NRIC) at Idaho National Laboratory (INL) in Idaho Falls, Idaho, was authorized under the Nuclear Energy Innovation Capabilities Act (Public Law 115–248) to provide private sector technology developers with resources and infrastructure for testing, demonstration, and performance assessment to accelerate deployment of new advanced reactor technology concepts. NRIC’s mission is to enable clean, affordable, reliable energy by supporting U.S. government investments in nuclear energy research, development, demonstration, and commercialization of new nuclear energy systems. It intends to provide existing facilities and other undeveloped and previously developed sites at INL to advanced reactor vendors for prototype technology testing and deployment. Some of these demonstration projects may be subject to DOE authorization, while other projects may require approval by the U.S. Nuclear Regulatory Commission (NRC) prior to construction and operation. NRIC and INL are considering whether to pursue one or more ESPs to help facilitate new reactor deployment at the INL Site. An ESP would allow early investment in licensing infrastructure in advance of a reactor design being ready to deploy. Through the ESPs, NRIC would help reduce the cost and time required to deploy demonstration reactors at the INL Site. This also will allow INL to bring its nuclear and siting experience to the ESP development process allowing for better and more efficient improvements and utilization of the Site. A preapproved ESP at INL will also remove the uncertainty of NRC siting approvals from the demonstration project proponents, who may not be well positioned to complete the analyses in a timely manner. The purpose of this NRIC ESP roadmap is to provide rigor and understanding needed for INL and DOE decision-makers to make data-informed decisions on pursuing NRC ESPs in support of future advanced reactor demonstrations at INL. The roadmap provides a structured method for addressing potential challenges and identifying options for resolution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

National Reactor Innovation Center NRC Early Site Permit Roadmap

The National Reactor Innovation Center (NRIC) at Idaho National Laboratory (INL) in Idaho Falls, Idaho, was authorized under the Nuclear Energy Innovation Capabilities Act (Public Law 115–248) to provide private sector technology developers with resources and infrastructure for testing, demonstration, and performance assessment to accelerate deployment of new advanced reactor technology concepts. NRIC’s mission is to enable clean, affordable, reliable energy by supporting U.S. government investments in nuclear energy research, development, demonstration, and commercialization of new nuclear energy systems. It intends to provide existing facilities and other undeveloped and previously developed sites at INL to advanced reactor vendors for prototype technology testing and deployment. Some of these demonstration projects may be subject to DOE authorization, while other projects may require approval by the U.S. Nuclear Regulatory Commission (NRC) prior to construction and operation. NRIC and INL are considering whether to pursue one or more ESPs to help facilitate new reactor deployment at the INL Site. An ESP would allow early investment in licensing infrastructure in advance of a reactor design being ready to deploy. Through the ESPs, NRIC would help reduce the cost and time required to deploy demonstration reactors at the INL Site. This also will allow INL to bring its nuclear and siting experience to the ESP development process allowing for better and more efficient improvements and utilization of the Site. A preapproved ESP at INL will also remove the uncertainty of NRC siting approvals from the demonstration project proponents, who may not be well positioned to complete the analyses in a timely manner. The purpose of this NRIC ESP roadmap is to provide rigor and understanding needed for INL and DOE decision-makers to make data-informed decisions on pursuing NRC ESPs in support of future advanced reactor demonstrations at INL. The roadmap provides a structured method for addressing potential challenges and identifying options for resolution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Qualification Test Requirements Report for High-Temperature Irradiation-Resistant Thermocouples

The qualification of f high-temperature irradiation-resistant thermocouples (HTIR-TCs) is set forth utilizing the Advanced Gas Reactor (AGR) 5/6/7 test in the Advanced Test Reactor located at the Idaho National Laboratory (INL). The requirements to achieve the qualification are appropriate design, construction, and calibration followed by proper installation and performance parameters.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

An expert system approach to astronomical data analysis

Expert systems technology has much to offer to the problem of astronomical data analysis, where large data volumes and sophisticated analysis goals have caused a variety of interesting problems to arise. The construction of a prototype expert system whose target domain is CCD image calibration, is reported. The prototype is designed to be extensible to different and more complex problems in a straighforward way, and to be largely independent of the details of the specific data analysis system which executes the plan it generates.

Johnston, Mark D.↗

Second NASA Workshop on Wiring for Space Applications

This document contains the proceedings of the Second NASA Workshop on Wiring for Space Applications held at NASA LeRC in Cleveland, OH, 6-7 Oct. 1993. The workshop was sponsored by NASA Headquarters Code QW Office of Safety and Mission Quality, Technical Standards Division and hosted by NASA LeRC, Power Technology Division, Electrical Components and Systems Branch. The workshop addressed key technology issues in the field of electrical power wiring for space applications. Speakers from government, industry, and academia presented and discussed topics on arc tracking phenomena, wiring system design, insulation constructions, and system protection. Presentation materials provided by the various speakers are included in this document.

Source record↗

SMES: Redefining the path to commerical demonstration

SMES (Superconducting Magnetic Energy Storage) is an emerging technology offering tremendous potential benefits to the utility industry. San Diego Gas & Electric (SDG&E) and Bechtel are leading a team of companies and national laboratories working towards design and construction of the world's first demonstration facility for large, commercial SMES for enhancing transmission stability in the Southwestern United States.

Bingham, W. G.↗

Summary of Research

The Center for High Technology's journey to the competition named For Inspiration of Science and Technology, or FIRST began on Monday December 16, 1996 when there was a meeting with officials and engineers to discuss the FIRST competition. The task was to research, design, and construct a robot to take inner tubes from- designated places or the human player and place the inner tubes on a goal during a two minute period. The goal had nine branches and a place on the top for the inner tubes and was later described as looking like a giant coat hanger. The human player, who could either hand the robot inner tubes or could throw the inner tubes on the goal, had to stand in a certain area during the competition and could only move in a certain parameter. The playing field which was described by the rules, was a carpeted, hexagon shaped area and allowed each team to have one side between them. Around the perimeter were the stations for the robot, the robot's controller, and the other human player.

May, Philip J.↗

The Evolution of the DARWIN System

DARWIN is a web-based system for presenting the results of wind-tunnel testing and computational model analyses to aerospace designers. DARWIN captures the data, maintains the information, and manages derived knowledge (e.g. visualizations, etc.) of large quantities of aerospace data. In addition, it provides tools and an environment for distributed collaborative engineering. We are currently constructing the third version of the DARWIN software system. DARWN's development history has, in some sense, tracked the development of web applications. The 1995 DARWIN reflected the latest web technologies--CGI scripts, Java applets and a three-layer architecture--available at that time. The 1997 version of DARWIN expanded on this base, making extensive use of a plethora of web technologies, including Java/JavaScript and Dynamic HTML. While more powerful, this multiplicity has proven to be a maintenance and development headache. The year 2000 version of DARWIN will provide a more stable and uniform foundation environment, composed primarily of Java mechanisms. In this paper, we discuss this evolution, comparing the strengths and weaknesses of the various architectural approaches and describing the lessons learned about building complex web applications.

Walton, Joan D.↗

Adsorption Processes in Spacecraft Environmental Control and Life Support Systems

The environmental control and life support system on a spacecraft must maintain a safe and comfortable environment in which the crew can live and work. The system's functions include supplying the crew with oxygen and water as well as removing carbon dioxide, water vapor, and trace contaminants from cabin air. Although open-loop systems have been used in the past, logistics and safety factors of current and future missions in space make near-complete recycling of the cabin's air and water imperative. The recycling process may include separation and reduction of carbon dioxide, removal of trace gas-phase contaminants, recovery and purification of humidity condensate, purification and polishing of wastewater streams, and other processes. Several of these operations can be performed totally or in part by adsorption processes. These processes are frequently good candidates to perform separations and purifications in space due to their gravity independence, high reliability, relatively high energy efficiency, design flexibility, technological maturity, and regenerability. For these reasons, adsorption has historically played a key role in life support on U.S. and Russian piloted spacecraft. This article focuses on three current spacecraft life support applications that often use adsorption technology: gas-phase trace contaminant control, carbon dioxide removal from cabin air, and potable water recovery from waste streams. In each application, adsorption technology has been selected for use on the International Space Station. The requirements, science, and hardware for each of these applications are discussed. Eventually, human space exploration may lead to construction of planetary habitats. These habitats may provide additional opportunities for use of adsorption processes, such as control of greenhouse gas composition, and may have different requirements and resources available to them, such as gases present in the planetary atmosphere. Adsorption separation and purification processes can be expected to continue to fulfill environmental control and life support needs on future missions.

Bauman, Liese Dall↗

A Second Generation Multi-Angle Imaging SpectroRadiometer (MISR-2)

The Multi-angle Imaging SpectroRadiometer (MISR) has been in Earth orbit since December 1999 on NASA's Terra spacecraft. This instrument provides new ways of looking at the Earth's atmosphere, clouds, and surface for the purpose of understanding the Earth's ecology, environment, and climate. To facilitate the potential future continuation of MISR's multi-angle observations, a study was undertaken in 1999 and 2000 under the Instrument Incubator Program (IIP) of NASA Code Y's Earth Science Technology Office (ESTO) to investigate and demonstrate the feasibility of a successor to MISR that will have greatly reduced size and mass. The kernel of the program was the design, construction, and testing of a highly miniaturized camera, one of the nine that would probably be used on a future space borne MISR-like instrument. This demonstrated that the size and mass reduction of the optical system and camera electronics are possible and that filters can be assembled to meet the miniaturized packaging requirements. An innovative, reflective optics design was used, enabling the wavelength range to be extended into the shortwave infrared. This was the smallest all-reflective camera ever produced by the contractor. A study was undertaken to determine the feasibility of implementing nine (multi-angle) cameras within a single structure. This resulted in several possible configurations. It would also be possible to incorporate one of the cameras into an airborne instrument.

spectroradiometers↗

Polyimide Resins Resist Extreme Temperatures

Spacecraft and aerospace engines share a common threat: high temperature. The temperatures experienced during atmospheric reentry can reach over 2,000 F, and the temperatures in rocket engines can reach well over 5,000 F. To combat the high temperatures in aerospace applications, Dr. Ruth Pater of Langley Research Center developed RP-46, a polyimide resin capable of withstanding the most brutal temperatures. The composite material can push the service temperature to the limits of organic materials. Designed as an environmentally friendly alternative to other high-temperature resins, the RP-46 polyimide resin system was awarded a 1992 "R&D 100" award, named a "2001 NASA Technology of the Year," and later, due to its success as a spinoff technology, "2004 NASA Commercial Invention of the Year." The technology s commercial success also led to its winning the Langley s "Paul F. Holloway Technology Transfer Award" as well as "Richard T. Whitcom Aerospace Technology Transfer Award" both for 2004. RP-46 is relatively inexpensive and it can be readily processed for use as an adhesive, composite, resin molding, coating, foam, or film. Its composite materials can be used in temperatures ranging from minus 150 F to 2,300 F. No other organic materials are known to be capable of such wide range and extreme high-temperature applications. In addition to answering the call for environmentally conscious high-temperature materials, RP-46 provides a slew of additional advantages: It is extremely lightweight (less than half the weight of aluminum), chemical and moisture resistant, strong, and flexible. Pater also developed a similar technology, RP-50, using many of the same methods she used with RP-46, and very similar in composition to RP-46 in terms of its thermal capacity and chemical construction, but it has different applications, as this material is a coating as opposed to a buildable composite. A NASA license for use of this material outside of the Space Agency as well as additional government-funded testing proved that RP-46 is even more exceptional than originally thought.

Source record↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Geopolymer Concrete – A greener alternative on Earth and a feasible material for the Moon

This research is focused on designing in-situ-based concrete material for extraterrestrial construction. Five regolith lunar simulants varying in their compositions were tested and their mechanical performance tested. The results have shown that the lunar regolith simulants are feasible for such concrete technology but exhibit variability due to their mineralogy, amorphous (glass) content, and particle size and shape distributions.

Peter J Collins↗

Discovering Digital Engineering Needs Through Human-Centered Approaches

Digital engineering has the power to transform organizations in profound ways, but digitizing legacy workflows and infusing new technologies into existing practices may not yield the intended results or address the underlying problems or bottlenecks. This paper describes the human-centered approaches used to understand stakeholder challenges and identify digital engineering needs during the design-build-test portion of the systems development lifecycle. Through a series of interactive stakeholder workshops and need-finding activities, key stakeholder needs were identified to help guide the integration of digital engineering technologies. The overarching need was for downstream system development steps to be considered further upstream in the project lifecycle in a manner that allows for proactive and interactive co-constructive idea exploration, problem resolution, and requirements considerations in a collective engagement with engineers and technicians from multiple disciplines to increase efficiency and reduce risks while offering opportunities to improve the final engineered system. Supporting this need was a wide-ranging desire from stakeholders for digital and non-digital support structures for efficient rapid iteration during system development. This work yielded several improvements for system development processes and for digital engineering infusion.

Human-centered Design↗

Discovering Digital Engineering Needs Through Human-Centered Approaches

Digital engineering has the power to transform organizations in profound ways, but digitizing legacy workflows and infusing new technologies into existing practices may not yield the intended results or address the underlying problems or bottlenecks. This paper describes the human-centered approaches used to understand stakeholder challenges and identify digital engineering needs during the design-build-test portion of the systems development lifecycle. Through a series of interactive stakeholder workshops and need-finding activities, key stakeholder needs were identified to help guide the integration of digital engineering technologies. The overarching need was for downstream system development steps to be considered further upstream in the project lifecycle in a manner that allows for proactive and interactive co-constructive idea exploration, problem resolution, and requirements considerations in a collective engagement with engineers and technicians from multiple disciplines to increase efficiency and reduce risks while offering opportunities to improve the final engineered system. Supporting this need was a wide-ranging desire from stakeholders for digital and non-digital support structures for efficient rapid iteration during system development. This work yielded several improvements for system development processes and for digital engineering infusion.

Design Science↗