Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Task analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Urban Air Mobility Fleet Manager Gap Analysis and System Design

NASA’s Urban Air Mobility (UAM) Sub-Project is engaged in re-search to facilitate the introduction of air taxis into the US National Airspace System. Given the history of conventional aircraft operations, it is clear that dispatcher support will be required for UAM. This paper presents a gap analysis, system requirements, and a workstation design concept for the UAM dispatcher or Fleet Manager (FM) position. The gap analysis focuses on the differences be-tween the tasks of the airline dispatcher and those projected for the FM. FM system capabilities and data requirements are then presented as foundations for soft-ware development. An initial user interface concept is provided. The FM software uses a single, large display. The system supports prediction, monitoring, and task execution. This paper is intended to support FM software design for future air taxi systems.

Richard Mogford↗

Analysis of full charge reconstruction algorithms for x-ray pixelated detectors

Existence of the natural diffusive spread of charge carriers on the course of their drift towards collecting electrodes in planar, segmented detectors results in a division of the original cloud of carriers between neighboring channels. This paper presents the analysis of algorithms, implementable with reasonable circuit resources, whose task is to prevent degradation of the detective quantum efficiency in highly granular, digital pixel detectors. The immediate motivation of the work is a photon science application requesting simultaneous timing spectroscopy and 2D position sensitivity. Leading edge discrimination, provided it can be freed from uncertainties associated with the charge sharing, is used for timing the events. Analyzed solutions can naturally be extended to the amplitude spectroscopy with pixel detectors.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Risk assessment as a framework for decisions.

The risk assessment approach has been applied to support numerous radioactive waste management activities over the last 30 years. A risk assessment methodology provides a solid and readily adaptable framework for evaluating the risks of CO2 sequestration in geologic formations to prioritize research, data collection, and monitoring schemes. This paper reviews the tasks of a risk assessment, and provides a few examples related to each task. This paper then describes an application of sensitivity analysis to identify important parameters to reduce the uncertainty in the performance of a geologic repository for radioactive waste repository, which because of importance of the geologic barrier, is similar to CO2 sequestration. The paper ends with a simple stochastic analysis of idealized CO2 sequestration site with a leaking abandoned well and a set of monitoring wells in an aquifer above the CO2 sequestration unit in order to evaluate the efficacy of monitoring wells to detect adverse leakage.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Full Charge Reconstruction Algorithms for X-Ray Pixelated Detectors

Existence of the natural diffusive spread of charge carriers on the course of their drift towards collecting electrodes in planar, segmented detectors results in a division of the original cloud of carriers between neighboring channels. This paper presents the analysis of algorithms, implementable with reasonable circuit resources, whose task is to prevent degradation of the detective quantum efficiency in highly granular, digital pixel detectors. The immediate motivation of the work is a photon science application requesting simultaneous timing spectroscopy and 2D position sensitivity. Leading edge discrimination, provided it can be freed from uncertainties associated with the charge sharing, is used for timing the events. Analyzed solutions can naturally be extended to the amplitude spectroscopy with pixel detectors.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

NOUS: A Knowledge Graph Management System

Knowledge graphs represent information as entities and relationships between them. For tasks such as natural language question answering or automated analysis of text, a knowledge graph provides valuable context to establish the specific type of entities being discussed. It allow us to derive better context about newly arriving information and leads to intelligent reasoning capabilities. We address two primary needs: A) Automated construction of knowledge graphs is a technically challenging, expensive process; and B) The ability to synthesize new information by monitoring newly emerging knowledge is a transformational capability that does not exist in state of the art systems.

Source record↗

EGS Collab Earth Modeling: Integrated 3D Model of the Testbed

The EGS Collab project is conducting a series of stimulation and interwell flow tests in an intermediate scale (~10-20 m) testbed located on the 4850 level in the Sanford Underground Research Facility (SURF) in Lead, South Dakota. The testbed consists of eight ~200 ft (~60 m) HQ-diameter (9.6 cm) boreholes that are drilled into the Poorman Formation from the western rib of the West Access Drift. Of the eight boreholes, one borehole is used as an injection/stimulation well, another sub-parallel borehole located about 10 m away from the injection well is used as a production well, and rest of the other boreholes are used as monitoring wells. For 3D visualization of the testbed as well as to provide spatially accurate and consistent parameter data for geomechanical and geophysical process modeling tasks, we are using Leapfrog Software (Seequent Limited). For analysis of fractures and creation of conditioned stochastic discrete fracture network (CS-DFN) model of the testbed, we are using FracMan (Golder Associates Inc.). As of mid-May 2019, the EGS Collab Leapfrog database contains the general layout of the drifts/shafts at the 4850 and 4100 levels; generalized geologic framework model of a domain that spans both the 4850 and 4100 levels; the CS-DFN of the testbed; and layouts of the EGS Collab testbed boreholes, kISMET testbed boreholes, and other existing boreholes at the 4850 level. This information has been obtained from the SURF Vulcan database, detailed laser scan and point surveys of borehole collar locations, directional surveys of borehole trajectories, and mapping of features in the drifts, boreholes, and cores. Similarly, other types of data that have been incorporated into the Leapfrog database include static features of the testbed such as natural discontinuities (e.g., fractures, weeps), location of monitoring instruments, and stimulation notches. Baseline geophysical characterization results (e.g., seismic, ERT, temperature, etc.) are also imported into the Leapfrog database. The location and size of packers, various point-source signals detected during stimulation and flow tests (e.g., temperature anomalies, micro-earthquake events, etc.) are also compiled in the database. All feature locations are reported using the local Homestake Mine coordinate system. In this paper, we present some of the geostructural characteristics as well as the status of the testbed as represented by Leapfrog/FracMan database/visualizations.

15 GEOTHERMAL ENERGY↗

Structural Weight Estimation for Launch Vehicles

This paper describes some of the work in progress to develop automated structural weight estimation procedures within the Vehicle Analysis Branch (VAB) of the NASA Langley Research Center. One task of the VAB is to perform system studies at the conceptual and early preliminary design stages on launch vehicles and in-space transportation systems. Some examples of these studies for Earth to Orbit (ETO) systems are the Future Space Transportation System [1], Orbit On Demand Vehicle [2], Venture Star [3], and the Personnel Rescue Vehicle[4]. Structural weight calculation for launch vehicle studies can exist on several levels of fidelity. Typically historically based weight equations are used in a vehicle sizing program. Many of the studies in the vehicle analysis branch have been enhanced in terms of structural weight fraction prediction by utilizing some level of off-line structural analysis to incorporate material property, load intensity, and configuration effects which may not be captured by the historical weight equations. Modification of Mass Estimating Relationships (MER's) to assess design and technology impacts on vehicle performance are necessary to prioritize design and technology development decisions. Modern CAD/CAE software, ever increasing computational power and platform independent computer programming languages such as JAVA provide new means to create greater depth of analysis tools which can be included into the conceptual design phase of launch vehicle development. Commercial framework computing environments provide easy to program techniques which coordinate and implement the flow of data in a distributed heterogeneous computing environment. It is the intent of this paper to present a process in development at NASA LaRC for enhanced structural weight estimation using this state of the art computational power.

Cerro, Jeff↗

Modeling Personnel Turnover in the Parametric Organization

A primary issue in organizing a new parametric cost analysis function is to determine the skill mix and number of personnel required. The skill mix can be obtained by a functional decomposition of the tasks required within the organization and a matrixed correlation with educational or experience backgrounds. The number of personnel is a function of the skills required to cover all tasks, personnel skill background and cross training, the intensity of the workload for each task, migration through various tasks by personnel along a career path, personnel hiring limitations imposed by management and the applicant marketplace, personnel training limitations imposed by management and personnel capability, and the rate at which personnel leave the organization for whatever reason. Faced with the task of relating all of these organizational facets in order to grow a parametric cost analysis (PCA) organization from scratch, it was decided that a dynamic model was required in order to account for the obvious dynamics of the forming organization. The challenge was to create such a simple model which would be credible during all phases of organizational development. The model development process was broken down into the activities of determining the tasks required for PCA, determining the skills required for each PCA task, determining the skills available in the applicant marketplace, determining the structure of the dynamic model, implementing the dynamic model, and testing the dynamic model.

Dean, Edwin B.↗

Historic Habitat Opportunities and Food-Web Linkages of Juvenile Salmon in the Columbia River Estuary and Their Implications for Managing River Flows and Restoring Estuarine Habitat, Physical Sciences Component, Progress Report.

Long-term changes and fluctuations in river flow, water properties, tides, and sediment transport in the Columbia River and its estuary have had a profound effect on Columbia River salmonids and their habitat. Understanding the river-flow, temperature, tidal, and sediment-supply regimes of the Lower Columbia River (LCR) and how they interact with habitat is, therefore, critical to development of system management and restoration strategies. It is also useful to separate management and climate impacts on hydrologic properties and habitat. This contract, part of a larger project led by the National Oceanic and Atmospheric Administration (NOAA), consists of three work elements, one with five tasks. The first work element relates to reconstruction of historic conditions in a broad sense. The second and third elements consist, respectively, of participation in project-wide integration efforts, and reporting. This report focuses on the five tasks within the historic reconstruction work element. It in part satisfies the reporting requirement, and it forms the basis for our participation in the project integration effort. The first task consists of several topics related to historic changes in river stage and tide. Within this task, the chart datum levels of 14 historic bathymetric surveys completed before definition of Columbia River Datum (CRD) were related to CRD, to enable analysis of these surveys by other project scientists. We have also modeled tidal datums and properties (lower low water or LLW, higher high water or HHW, mean water level or MWL, and greater diurnal tidal range or GDTR) as a function of river flow and tidal range at Astoria. These calculations have been carried for 10 year intervals (1940-date) for 21 stations, though most stations have data for only a few time intervals. Longer-term analyses involve the records at Astoria (1925-date) and Vancouver (1902-date). Water levels for any given river flow have decreased substantially (0.3-1.8 m, depending on river flow and tidal range), and tidal ranges have increased considerably (by a factor of 1.5 to 4 for most river-flow levels) since the 1900-1940 period at most stations, with the largest percentage changes occurring at upriver stations. These changes have been caused by a combination of changes in channel roughness, shape and alignment, changes in coastal tides, and (possibly) bed degradation. Tides are growing throughout the Northeast Pacific, and Astoria (Tongue Pt) has one of the most rapid rates of increase in tidal range in the entire Eastern Pacific, about 0.3m per century. More than half of this change appears to result from changes within the system, the rest from larger scale changes in coastal tides. Regression models of HHW have been used to estimate daily shallow water habitat (SWHA) available in a {approx}25 mile long reach of the system from Eagle Cliff to Kalama for 1925-2004 under four different scenarios (the four possible combinations of diked/undiked and observed flow/ virgin flow). More than 70% of the habitat in this reach has been lost (modern conditions vs. virgin flow with not dikes). In contrast, however, to the reach between Skamokawa and Beaver, selective dike removal (instead of a combination of dike removal and flow restoration) would suffice to increase spring SWHA. The second task consists of reconstruction of the hydrologic cycle before 1878, based on historic documents and inversion of tidal data collected before the onset of the historic flow record in 1878. We have a complete list of freshet times and peak flows for 1858-1877, and scattered freshet information for 1841-1857. Based on tidal data, we have reconstructed the annual flow cycles for 1870 and 1871; other time periods between 1854 and 1867 are under analysis. The three remaining tasks relate to post-1878 hydrologic conditions (flows, sediment supply and water temperature), and separation of the human and climate influences thereon. Estimated ob-served (sometimes routed), adjusted (corrected for reservoir manipulation) and virgin (corrected also for irrigation diversion) flows for 1878-2004 have been compiled for the Columbia River at The Dalles and Beaver, and for the Willamette River at Portland. Sediment transports for the ob-served, adjusted and virgin flows have been calculated for 1878-2004 for the Columbia River at Vancouver and Beaver, for the Willamette River at Portland, and for other west-side tributaries seaward of Vancouver. For Vancouver and Portland, it has been possible to estimate sand trans-port (including gravel), fine sediment transport and total load. Only total load can be estimated at Beaver, and only fine sediment transport can be determined for the west-side tributaries, except for the post-1980 period influenced by the 1980 eruption of Mt St. Helens. Changes in flows and sediment transport due to flow regulation, irrigation diversion, and climate have been estimated.

13 HYDRO ENERGY↗

Predicting Team Functioning in Long Term Space Missions Using Acoustic and Linguistic Measures

Maintaining optimal team functioning is critical for long-duration space exploration missions, yet traditional monitoring methods, such as self-reports and wearable sensors, often impose operational burdens or suffer from bias. This paper investigates a non-intrusive speech-based artificial intelligence (AI) framework to predict degradations in team functioning using data from the Human Exploration Research Analog (HERA) of the U.S. National Aeronautics and Space Administration (NASA). Using acoustic features, linguistic descriptors, and semantic embeddings, we evaluate static non-linear and temporal machine learning models to predict both objective (task accuracy) and subjective (self-reported efficacy and cohesion) team functioning outcomes. Results indicate that temporal models outperform static approaches, with prediction of objective task accuracy in Team Interaction Battery (TIB) improving from near chance to 71%. Self-reported outcomes, including team efficacy and cohesion, are predicted more reliably than task performance, achieving balanced accuracies of up to 85.56% and 78.12%, respectively, and are found to be most strongly associated with acoustic features. In a second interdependent task, the MMSEV–EVA, accuracies of up to 78% are achieved using temporal models with acoustic features. Furthermore, incorporating just 1–2 days of team-specific historical data systematically improved performance, and acoustic markers from informal pre-task interactions provided modest predictive gains. Finally, while automated preprocessing yielded viable accuracy, humancorrected data provided moderate performance gains, though transcription error rates did not significantly correlate with model performance. These findings highlight the potential of speech as a passive, high-fidelity monitoring tool for autonomous habitats.

Temporal modeling↗

Wavelet Methods Developed to Detect and Control Compressor Stall

A "wavelet" is, by definition, an amplitude-varying, short waveform with a finite bandwidth (e.g., that shown in the first two graphs). Naturally, wavelets are more effective than the sinusoids of Fourier analysis for matching and reconstructing signal features. In wavelet transformation and inversion, all transient or periodic data features (as in compressor-inlet pressures) can be detected and reconstructed by stretching or contracting a single wavelet to generate the matching building blocks. Consequently, wavelet analysis provides many flexible and effective ways to reduce noise and extract signals which surpass classical techniques - making it very attractive for data analysis, modeling, and active control of stall and surge in high-speed turbojet compressors. Therefore, fast and practical wavelet methods are being developed in-house at the NASA Lewis Research Center to assist in these tasks. This includes establishing user-friendly links between some fundamental wavelet analysis ideas and the classical theories (or practices) of system identification, data analysis, and processing.

Le, Dzu K.↗

MCC flight operations automation of STS orbiter systems monitoring

The integration of new capabilities into the Mission Control Center at the Johnson Space Center in Houston, Texas in order to improve the data monitoring and analysis of the STS is discussed. User interface application software and systems, such as the flight data file Shuttle mission simulator and failure analysis program, to be utilized for flight operations automation are examined. Consideration is given to task automation, the trend monitoring system, the data retrieval system, and the launch processing system. The development and functions of the Shuttle data analysis system, which is to operate in real time, are described.

Bates, William V., Jr.↗

Overview of the AVT-191 Project to Assess Sensitivity Analysis and Uncertainty Quantification Methods for Military Vehicle Design

A NATO symposium held in 2008 identified many promising sensitivity analysis and un-certainty quantification technologies, but the maturity and suitability of these methods for realistic applications was not known. The STO Task Group AVT-191 was established to evaluate the maturity and suitability of various sensitivity analysis and uncertainty quantification methods for application to realistic problems of interest to NATO. The program ran from 2011 to 2015, and the work was organized into four discipline-centric teams: external aerodynamics, internal aerodynamics, aeroelasticity, and hydrodynamics. This paper presents an overview of the AVT-191 program content.

Benek, John A.↗

Aluminum Clad Spent Nuclear Fuel Task 6: Surrogate Sample Preparation and Validation Experiment Test Plan

This document presents the experimental test plan for Task 6: Surrogate Preparation and Validation. Task 6 will produce and validate surrogate oxyhydroxide materials used in other experimental tasks within the larger Aluminum Clad Spent Nuclear Fuel Long Term Dry Storage Project. Task 6 includes both the preparation and characterization of surrogate oxyhydroxide materials as well as the analysis of oxide/oxyhydroxide layers on Savannah River Site Spent Nuclear Fuel Materials. This test plan provides experimental design details and the task’s overall quality assurance approach.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Review and Analysis of Development of "Safety by Design" Requirements

This report, the deliverable for Task 4 of the NA-243 Safeguards by Design Work Plan for Fiscal Year 2009, develops the lessons to be learned for the institutionalization of Safeguards By Design (SBD) from the Department of Energy (DOE) experience developing and implementing DOE-STD-1189, Integration of Safety into the Design Process. This experience was selected for study because of the similarity of the challenges of integrating safety and safeguards into the design process. Development of DOE-STD-1189 began in January 2006 and the standard was issued for implementation in March 2008. The process was much more time consuming than originally anticipated and might not have come to fruition had senior DOE management been less committed to its success. Potentially valuable lessons can be learned from both the content and presentation of the integration approach in DOE-STD-1189 and from the DOE experience in developing and implementing DOE-STD-1189. These lessons are important because the instutionalization of SBD does not yet appear to have the level of senior management commitment afforded development and implementation of DOE-STD-1189.

Vance, Scott A.↗

OTVE turbopump condition monitoring, task E.5

Recent work has been carried out on development of isotope wear analysis and optical and eddy current technologies to provide bearing wear measurements and real time monitoring of shaft speed, shaft axial displacement and shaft orbit of the Orbit Transfer Vehicle hydrostatic bearing tester. Results show shaft axial displacement can be optically measured (at the same time as shaft orbital motion and speed) to within 0.3 mils by two fiberoptic deflectometers. Evaluation of eddy current probes showed that, in addition to measuring shaft orbital motion, they can be used to measure shaft speed without having to machine grooves on the shaft surface as is the usual practice for turbomachinery. The interim results of this condition monitoring effort are presented.

Coleman, Paul T.↗