Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ReEDS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

ORALLOY (93.2 235U) METAL CYLINDER WITH BERYLLIUM TOP REFLECTOR

A variety of critical experiments were constructed of enriched uranium metal during the 1960s and 1970s at the Oak Ridge Critical Experiments Facility (ORCEF) in support of criticality safety operations at the Y-12 Plant. The purposes of these experiments included the evaluation of storage, casting, and handling limits for the Y-12 Plant and providing data for verification of calculation methods and cross-sections for nuclear criticality safety applications. These included solid cylinders of various diameters, annuli of various inner and outer diameters, two and three interacting cylinders of various diameters, and graphite and polyethylene reflected cylinders and annuli. Of the hundreds of delayed critical experiments, one experiment was comprised of a stack of approximately 7-inch-diameter metal discs. The bottom of the stack consisted of uranium with an approximate height of 4-1/8 inches. The top of the stack consisted of beryllium with an approximate height of 5-9/16 inches. This experiment was performed on August 20, 1963 by J. T. Mihalczo and R. G. Taylor (Ref. 1) with accompanying logbook. Both detailed and simplified model specifications are provided in this evaluation. This fast-spectra experiment was determined to represent an acceptable benchmark. The calculated eigenvalues for both the detailed and simple models are within approximately 0.5% of the benchmark values, but significantly greater than 3s from the benchmark value because the uncertainty in the benchmark is very small: ±0.0002 (1s). There is significant variability between results using different neutron cross section libraries, the greatest being a ?keff of ~0.65% . Unreflected and unmoderated experiments with the same highly enriched uranium metal parts were performed at the Oak Ridge Critical Experiments Facility in the 1960s and are evaluated in HEU MET FAST 051. Thin graphite reflected (2 inches or less) experiments also using the same highly enriched uranium metal parts are evaluated in HEU MET FAST 071. Polyethylene-reflected configurations are evaluated in HEU-MET-FAST-076. Highly enriched metal annuli with beryllium cores are evaluated in HEU-MET-FAST-059.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CONCRETE REFLECTED ARRAYS OF U(93.2) METAL

During the period from 1963 – 1973, experiments involving highly enriched uranium units were performed at the Oak Ridge National Laboratory Critical Experiments Facility to determine various critical configurations of three-dimensional arrays. The experiments formed a four-part series, and were reported by several different experimenters; the results of interest for this evaluation are those reported for the fourth experimentation, Critical Three-Dimensional Arrays of Neutron Interacting Units: Part IV, published and performed by D.W.Magnuson (Ref 1). Information is also available in the logbook . This set of experiments utilized subcritical metal units on a split table apparatus to determine critical configurations for 2×2×2 arrangements of highly enriched uranium reflected by concrete. Magnuson manipulated the configuration of several uranium cylinders and blocks within a concrete reflector. The different permutations utilized uranium cylinders of two different heights in various positions in the three dimensional array; certain cases also placed thin uranium blocks on top of the cylinders. The thickness of the surrounding concrete, as well as the inner dimensions of the concrete reflector was also varied in certain cases. The variations resulted in fourteen different experimental permutations or configurations. All fourteen configurations were judged to be unacceptable for use as criticality safety benchmarks. All experiments were initially evaluated; however only three configurations were evaluated in detail. Configurations 2, 4, 6 and 12 were not evaluated in detail because they are subcritical and configurations 5, 7, 8, 9, and 10 were also were not evaluated in detail because they were supercritical by more than beta effective (~0.007), or prompt critical. The experiments evaluated in detail for this benchmark were configurations 1, 3, and 11. The experimental report also contains the information for HEU-MET-FAST-056. Closely related work has been recorded in HEU-MET-FAST-053, which is a benchmark evaluation of a different series of three dimensional array experiments with four different moderator materials. HEU-MET-FAST-023 and HEU-MET-FAST-026 are also related because they utilize the same metal cylinders as these experiments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Polyethylene-Reflected Arrays of HEU(93.2) Metal Units Separated by Vermiculite

This benchmark details the results of an experiment performed in the early 1970s as part of a series testing critical configurations in three dimensional arrays. For this experiment, cylinders of 93.2% enriched uranium metal were arranged in a 2x2x2 array inside of a polyethylene reflector. Layers of vermiculite of varying heights were surrounding each cylinder to achieve criticality variations. A total of four experimental configurations were tested by D.W. Magnuson, and detailed in his experimental report “Critical Three-Dimensional Arrays of Neutron Interacting Units: Part IV. Arrays of U(93.2) Metal Reflected by Concrete and Arrays Separated by Vermiculite and Reflected by Polyethylene.” The benchmark HEU-MET-FAST054 is closely related; the results of both experiments are discussed in the same report (Ref. 1) Closely related work has been recorded in HEU-MET-FAST-053, which is a benchmark evaluation of a different series of three dimensional array experiments with four different moderator materials. HEU-MET-FAST-023 and HEU-MET-FAST-026 are also related because they utilize the same metal cylinders as these experiments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗