Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REPOSITORY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Management of Metals from Decommissioning of Nuclear Facilities - 18411

The EDF group companies within the Cyclife platform have for decades performed treatment and recycling of metals. With different approaches but all considered international Good Practice, as valuable materials are recovered for safe recycling and volumes in the repositories for radioactive waste are saved. For an efficient decommissioning project, a well-defined waste management process is one of the critical paths, not least when it comes to routes for clearance and recycling of materials. It is easy to underestimate the complexity and bottlenecks caused by shortage of logistic space. In order to mitigate these risks, activities such as strengthening categorization, quantification and adopting different routes based on the material properties should be implemented. By categorization of the of waste and materials considered/classified as contaminated or potentially contaminated it is obvious that the management of the metals is a key parameter in nuclear decommissioning. Analyses performed by the EDF companies shows that a majority of the materials, classified as contaminated, from a BWR/PWR plant are metals. Experience gives that a high percentage of these metals from decommissioning can be subject to recycling either directly upon completion of the clearance process or after certain treatment. Non-technical key parameters like the regulatory requirements on applying the waste hierarchy, the impact on repository programs as well as, not at least, the regulatory and public acceptance of recycling of materials from the nuclear industry are, together with costs essential factors when forming the routing of metals and other waste materials from a decommissioning project. Today the EDF group companies are positioned to provide a wide range of services for management of the contaminated metals from decommissioning projects, spanning from industrial management of metals which directly will be subject general clearance after verification measurements up to decontamination and melting of selected reactor internals for recycling to public domain or within the nuclear industry. In this paper the typical waste material composition for BWR and PWR plants, the different ways to treat/manage the radioactive and potentially radioactive metals including a comparison of the different approach commonly used in a technical, logistical and economical perspectives. A few success stories will be resented as well as lessons learned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced Evaluation Criteria to Meet the WIPP Waste Acceptance Criteria - 18655

The Waste Isolation Pilot Plant (WIPP) is a deep geologic repository for the disposal of Transuranic (TRU) waste and the only such disposal facility of its kind. TRU waste is radioactive mixed waste generated by the U. S. Department of Energy in support of National Defense. In 2014, the WIPP facility was shut down when two separate accidents occurred in the repository. The two accidents were a fire on a large underground haul truck that prompted evacuation and filled the mine with smoke and soot, and a radiation release that contaminated the exhaust ventilation and disposal areas of the mine. DOE performed two accident investigations in 2014 that resulted in many corrective actions. Some of the corrective actions resulted in significant changes in the WIPP Waste Acceptance Criteria (WAC) and are required to be applied to all TRU waste upon the resumption of shipments to WIPP. WIPP re-opened and began taking shipments again in 2017 and a large backlog of over 25,000 TRU waste containers that were certified prior to the new WAC have been undergoing re-evaluation since the re-opening. This paper will focus on the new WAC criteria that TRU waste must meet above-and-beyond previous WAC criteria and the implementation of new processes for approval. The primary area for these changes is in the area of waste characterization using Acceptable Knowledge (AK) and new detailed analyses required for chemical compatibility. The accident investigation revealed that the radiation release was due to a thermal runaway and bursting of the waste container due to inadvertent mixtures of nitrates and combustibles resulting in ignitable waste forms. In other words, the TRU waste container had incompatible contents that went undiscovered and created a hazard characteristic that was prohibited at WIPP. Through detailed chemical compatibility evaluations and new oversight, the DOE should be able to prevent a similar accident (see Figure 1). The new chemical compatibility evaluations and evaluations of oxidizing chemicals combined with combustibles are complex and detailed. Chemical compatibility is not a new requirement, but a much more detailed evaluation is a new requirement. And, obtaining historical information about the generation of the final waste form for legacy packaged waste can be very challenging. Specifically, determining possible amounts of chemicals in the waste can be extremely challenging. This paper does not explore in depth, the details of oxidizing chemicals. Other papers presented will discuss oxidizing chemicals. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methods to Capture the Tritium Released by Recovery/Recycle of Zirconium from Used Fuel Cladding: A Review

After uranium, the second largest mass contained in most used nuclear fuel (UNF) is the zirconium-based Zircaloy{sup R} cladding in the fuel cladding which accounts for about 25% of the mass. In current practice, the cladding requires disposal in a geologic repository. Zirconium may be recovered from the Zircaloy cladding of UNF for recycle. Alternatively, it may be decontaminated to recategorize it as low-level waste. Either approach reduces the quantities of high-level waste destined for a geologic repository, thereby reducing the overall cost of recycling UNF. Process development studies are under way in the United States and Republic of Korea based on dry chlorination using a mixture of chlorine (Cl{sub 2}) and an inert carrier such as argon (Ar) to convert the zirconium in the alloy, which is greater than 98 wt% of the alloy mass, to zirconium tetrachloride (ZrCl{sub 4}). The ZrCl{sub 4} is volatile and is easily separated from the non-volatile components. The residues include non-volatile chlorides such as CrCl{sub 3}, oxychlorides and oxides. The product ZrCl{sub 4} is recovered as a solid salt by condensation when cooled to less than about 300 deg. C. Feasibility tests with actual UNF cladding have demonstrated that the recovered zirconium chloride salt is sufficiently separated from fuel and fission product radionuclides that it emanates no significant dose and can be handled without shielding. Several methods for capturing tritium released from cladding during the chlorination process have been identified. A detailed description of the methodologies, advantages, drawbacks, and conceptual flowsheets will be presented. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fuel Cycle Study to Developing a Viable Long Term Nuclear Power Scenario for the UK

Within the UK a closed fuel cycle has been in operation for decades but with the introduction of a new build programme to create 16 GWe capacity using LWR technology and with the closure of the UK's reprocessing industry, an open fuel cycle will be implemented beyond 2020. However, it is expected that 16 GWe nuclear capacity will not be enough for the UK to curb greenhouse gas emissions through increased demand for low carbon electricity, and tackle energy security. As such further nuclear expansion scenarios are being considered between 40 and 75 GWe by 2050. This study evaluates a viable 40 GWe UK nuclear scenario, evaluating the extent to which key drivers can impact a future UK nuclear energy strategy, including; the ability to sustain a relatively high nuclear capacity, fresh uranium availability, accumulation of spent fuel at decommissioning nuclear reactor sites and capacity requirements of future GDF host sites. The thermal reactor open fuel cycle is the de-facto standard around the world for many reasons including the reliance on extremely mature technology, significant operational experience and most importantly a relatively low cost. However, the premise that a thermal reactor open fuel cycle is the correct one to adopt long term is dependent on the notion that large quantities of UO{sub 2} spent fuel can eventually be disposed of in a geological disposal facility and the future availability of fresh uranium. The total amount of available uranium is unknown and if extraction from seawater proves to be economic and practical then any future concerns regarding supply disappear. Spent fuel disposability on the other hand has never been performed on a commercial scale and there is some uncertainty when and whether this can be achieved. This paper will follow from previous work already presented in 2013 [REF] which examined UK fuel cycles involving the transition to a closed fast reactor fleet by the end of this century. The revised scenarios now assume fast reactors are required later in the scenario, in-line with other countries. In addition, the new study has used physics methods originally developed by SKB to assess the physical size of the repository required to dispose of all intermediate and high level waste whilst ensuring temperature limits imposed by the engineered barriers and surrounding geology are adhered to. The disposition of less Am-241 in the repository will no doubt lead to a reduction in GDF footprint. However, this may not be important to GDF design and economics. The purpose of this paper is to also critically review the importance of and put into perspective a smaller GDF footprint and lower fissile inventory. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Scenario Development: Proposal of a Methodology for Different Host Rocks and Disposal Concepts - 19007

Scenario development is an essential part of the assessment of the long-term safety of a repository for radioactive waste. The new act on site selection in Germany in 2017 requires that salt, clay and crystalline rock are studied as possible sites for repositories. So far, a comprehensive methodology for scenario development has been developed only for a site in salt rock in Germany within the Preliminary Safety Analysis (VSG). The question arose whether this methodology is transferable to other host rocks and disposal concepts and which modifications may be necessary. The transferability was shown in the project ANSICHT for clay rock sites while introducing some modifications of the methodology. This project studied the transferability of crystalline rock sites, however, there is no suitable safety and disposal concept or even a generic site yet. To study the transferability, initial barriers and FEP for different concepts were selected and the first steps of the methodology for crystalline rock were applied and discussed. It was concluded that the definition of barriers as containment providing rock zone (CPRZ) is difficult but important for the application of the methodology. Concepts for crystalline rock can foresee a CPRZ within the host rock or above. If the concept is using engineered barriers only and no CPRZ, the number of initial barriers is low. This will subsequently lead to a more complex scenario development since long FEP chains have to be considered. Based on the discussion so far, the transferability of the methodology seems to be feasible in general. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

French Geological Disposal Project: From Siting to Permitting - 19018

The future 'Cigeo' geological repository will be located in eastern France, at the border between the Meuse and Haute-Marne. Research has been carried out in this area since the 1990's, leading to the identification of a zone within the Paris basin whose geological characteristics make it suitable for the deep geological disposal of high- and intermediate-level long-lived radioactive waste, as well as a smaller zone of approximately 250 km{sup 2} (proposed in 2005) within which the characteristics of the host layer are very similar to those observed in the Underground Research Laboratory (URL). In 2010, based on additional surveys, a zone of approximately 30 km{sup 2} called ZIRA, in which the industrial underground facility would be constructed was defined. The repository structures within the ZIRA will be located at a depth of 525 metres. Half the surface area of the ZIRA is located in a wooded area, the other half being situated in grassland or farmland. All the subsequent design studies (preliminary and detailed) of Cigeo as well as the preparation of the licensing files (to be submitted in 2020) were conducted on the basis on this precise siting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning, Decontamination, and Disposal of LLW-LL, and ILW-LL at a Former Rare Earths Processing Facility in Malaysia - 19087

Geosyntec Consultants, Inc. (Geosyntec) was the design-build Contractor for a project involving the remediation and disposal of low level (LLW-LL and ILW-LL) NORM and TENORM wastes at a former rare earth processing facility in Malaysia. These sites were associated with a plant that extracted rare earth elements from local tin ores. Because of the naturally occurring radioactivity contained in the raw materials, these productions resulted in by-products and residues containing LLW-LL and ILW-LL thorium hydroxide and uranium hydroxide. The total mass of uranium (∼120 tons) and thorium (∼1,200 tons) managed in a single repository required the project design incorporate requirements related to inventory, security and safeguards around nuclear precursor materials. The requirement to consider a performance over a period of more than 10,000 years led to significant challenges in design and modeling of the disposal facility as this disposal facility was purposely designed and permitted as a final disposal for the LLW-LL and ILW-LL. The first phase of the project was the decommissioning, decontamination, and demolition of the 14- acre former rare earth processing plant and excavation of contaminated soils, construction of an engineered cell at the repository for waste disposal, and transportation and disposal of the waste materials into the cell. Final status surveys were carried out to allow the site to be successfully released by the Malaysian regulatory authorities as a clean site for re-development as common industrial use. Over 11,000 loads of material, including approximately 75,000 cubic meters of excavated soils and plant debris, were transported in specially designed steel transport boxes on public roads for disposal in the engineered cell. The second phase of the project included the design and construction of a second engineered cell, enhanced with protective barrier systems and a final cover system constructed of natural materials. Ancillary facilities such as substations, offices, processing buildings, and wastewater treatment plants were constructed to support retrieval and processing of the materials from more than 87,000 individual drums using a semi-automated process. The drums, waste packages, and other materials in the storage facility were systematically extracted, sorted, inventoried, solidified using Portland cement, transported, and disposed in the cell. All temporary facilities were decontaminated, demolished, and disposed in the cell. Radiological inventory and radiation safety programs were implemented to quantify the waste activity and to control exposure to workers and the public during the project. The total mass of radioactive contaminated waste disposed in the two projects is nearly 200,000 tons. The projects were carried out under a high level of scrutiny from Malaysian and international regulatory bodies. Between 2014 and 2017, performance monitoring and modeling activities were carried out to demonstrate that the disposal facility was performing in accordance with design requirements established by regulatory agencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimation of Deposition Behavior of Supersaturated Silicic Acid around Geological Disposal Facility - 19137

For safety evaluation about the geological disposal system, the leakage of radionuclides with groundwater flow is estimated by considering the groundwater flow through the manmade and natural barriers. In such an estimate, we should also consider the influence of cement materials used for the construction of the disposal facility system. Cement material including high alkalinity alters groundwater condition up to 13 in pH and dissolves numerous silicate materials, which release silicic acid to groundwater. Since this groundwater mixes with natural groundwater downstream, supersaturated silicic acid will be produced with the decrease of pH to 8 around the repository system. Thus, in this study, the behavior of supersaturated silicic acid in a flow system was examined by using the column packed with amorphous silica particles under the condition of constant hydraulic head. The packed length is 20 mm or 40 mm, and the supersaturated silicic acid solution was continuously injected into the column. Here, the supersaturated silicic acid was adjusted by mixing with distilled water of pH 8 just before the solution was injected into the column. In the results, the supersaturated silicic acid quickly deposited in the packed column, and colloidal silicic acid was not detected at the outlet of the column. The deposition amount of supersaturated silicic acid in the column decreased with time, and became larger in the longer column. Besides, the flow rate decreased with the deposition of supersaturated silicic acid. Thus, this study monitored the decrease rate of permeability with the supply amount of silicic acid. In the results, the change rate did not depend on packed length. This suggested that even with a short packed length, by considering the amount of precipitation of supersaturated silicic acid, it is possible to estimate the change in permeability similarly to the case of a long packed length. Such a decrease effect in permeability may contribute to retarding the migration of radionuclides around the repository. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dismantling of the Spent Resins Hot Compaction Unit at Tihange NPP, Belgium - 19139

Design, construction and commissioning of the Spent Ion Exchange Resins Hot Compaction Unit at Tihange Nuclear Power Plant took place from 2005 till 2011. In this conditioning process, batches of radioactive resin beads were first dried to less than 4% moisture by a conical vacuum dryer. Resins were then poured in compactable 200-liter drums and super-compacted. Resulting pellets were emplaced in standard 400-liter drums, the packages qualified for final disposal in Belgium, and eventually grouted. The Belgian Waste Management Agency (ONDRAF/NIRAS) was consulted before initiating the project and issued a statement of no objection. The technology turned out to be used for the first time in the particular case of bead shaped resins (unlike powdered resins) and with a grouting requirement. Finally, commissioning tests ended in a safe and reproducible waste form, compliant with prevailing Waste Acceptance Criteria. Volume Reduction Factors of about 2 were recorded after drying and compaction. New tests were carried out to support the Qualification File of the process, which was submitted to ONDRAF/NIRAS. After performing many trials using inactive resins, the Operator dried two batches of radioactive resins and super-compacted four drums: this was a planned qualification step, aiming at the validation of process parameters. In the meantime, ONDRAF/NIRAS made parallel progress in the design of the future Near Surface Repository, where conditioned resins will be disposed of, and found some incompatibility between encapsulated dried resin beads and water intrusion hazards inside the repository. Based on the risk that dried resin beads will swell if they absorb water, causing mechanical stresses likely to compromise the integrity of the disposal site, ONDRAF/NIRAS informed Tihange NPP that the Hot Compaction Unit would not be qualified as spent resins conditioning process. Further to this irrevocable decision, the Operator undertook three actions: - The first one was the qualification and purchase of waste containers to provide additional temporary storage capacity on site for its operational spent resins; - The second one is the selection of a new spent resins conditioning process and the performance of the related qualification tests to demonstrate it meets the updated Waste Acceptance Criteria; - The last one is the dismantling of the Hot Compaction Unit to clear the space and enable the installation of new equipment. This latter task was carried out in 2018, involving decontamination and free release measurements of all the materials, a very limited fraction of it having to be further processed as radioactive waste. Nevertheless, Tihange NPP wishes to keep the super-compactor and its hydraulic unit for a possible resale or reuse for the treatment of mixed waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Operational and Safety Lessons Learned from the 2014 Fire and Radiological Events - 19389

The Waste Isolation Pilot Plant (WIPP) experienced two accident events in 2014 within 9 days of each other (salt haul truck fire and a radiological release). The repository was designed in the 1980's for high level waste and started operations in late 1990's for defense related transuranic (TRU) waste. Several long-standing technical issues from competing requirements between an underground facility (mine), nuclear safety, and environmental requirements lead to design, operations, and safety weaknesses that were not resolved prior to the two accident events. Other design issues and actions during early recovery efforts were identified as lessons learned for the Safety Significant Confinement Ventilation System (SSCVS) and Utility Shaft (US) capital asset projects and for future planning efforts. The infrastructure at WIPP was significantly degraded at the time of the events with key safety related items that had been out of service or not maintained for years. The emergency response to the two accident events was less than adequate and caused concerns with stakeholders. There are many operational and safety lessons learned from these two events and their corrective actions that will be valuable for all future planning of deep geological repositories (DGR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Approach for Setting Priorities for Experimental Studies in Support of Safety Assessments - 19393

Many experiments have been conducted, in both academia and industry, to support the understanding of the disposal of radioactive waste. For the disposal of low-level radioactive waste (LLW) into radioactive waste repositories, it is important to develop an approach to tackle which datasets are able to directly underpin safety assessments, and what future research experiments could address the gaps in this understanding. In this paper, we present an approach to identify which future experiments should be considered to underpin safety assessments for disposals of LLW in a near-surface repository. The approach involves 6-steps: define the disposal problem (e.g. the disposal of LLW in engineered vaults); determine what key processes may affect the disposal of the waste; establish the assumptions underpinning the key processes; determine how sensitive the key process parameters are to variation; determine whether key data are available and assess the quality of that data with respect to the disposal problem; and determine attributes for experiments needed to supply missing key data. We show, in this paper, how this approach can be used to develop a better understanding of C-14 gas generation, under varying degrees of groundwater saturation, for the disposal of LLW into engineered vaults, in the near-surface. Furthermore, we have developed an approach that identifies the types of experiments and their attributes to aid researchers to help select appropriate types of experiments to underpin safety assessments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The OECD-NEA RK and M Initiative (2011-2018) - a 7-year step in a 10,000-year journey: What next? - 19432

The OECD Nuclear Energy Agency (NEA) has coordinated an international initiative to develop understanding and guidelines related to the long-term preservation of records, knowledge and memory (RK and M) for radioactive waste repositories. After seven years of work, it has come to a close in 2018. Currently, the 'Final Report of the RK and M Initiative' is in the final process of publication [the status/sentence will be updated in early 2019]. It includes a historical review, sets out the RK and M fundamentals, presents a menu of approaches and mechanisms of RK and M preservation, and finally provides suggestions on how to develop a systemic strategy aimed at embedding radioactive waste repositories in society over extended periods of time. This paper highlights the 'multi-dimensionality' of RK and M preservation: Multiple time frames need to be considered, multiple transmission modes explored, and multiple actors brought together. The latter seems to be the primary aspect to be considered in the discussion about future (international) cooperation in the RK and M preservation field. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Techniques for Vegetation Removal from UAV-Based Photogrammetric DSM near WIPP Land Withdrawal Act Boundary, NM

The Waste Isolation Pilot Plant is located within New Mexico's karst landscape and is the United States' only deep geologic radioactive waste repository which isolates transuranic waste from defense activities underground in a bedded salt formation. Characteristic karst topography in this region is made up of material (such as limestone) that can be dissolved by water over a long period of time, and includes features such as springs, surface streams, sinking streams, caves, and sinkholes. Karst features can potentially impact the integrity of the waste repository in the future and compromise WIPP's performance, particularly when coupled with incompatible land-use activities within the Land Withdrawal Act (LWA) boundary as well as increased water withdrawals outside the LWA. In order to better capture the ground surface topography to support hydrology modeling efforts, the U.S. DOE has enlisted FIU to develop a high-resolution digital elevation model (DEM). In a previous field study, a high-resolution digital surface model (DSM) of an adjacent representative site, Basin 6, was developed by photogrammetry using aerial images captured with unmanned aerial vehicles. The DSM generated was based on point clouds representing the entire landscapes, including points of terrain, vegetation and infrastructure. These above-ground features need to be removed to create a DSM/DEM with good representation of the bare ground. In recent years, many techniques including both pre- and post-processing of DSMs, were developed for vegetation removal with varied success. This research focuses on applying and comparing various vegetation removal methods using point clouds generated of the Basin 6 pilot study area. The 3D RGB-based point cloud classification using Python scripts was a modification of the procedure by Themistocleous (2019). The method using Liblas classifies the point cloud three-dimensionally, whereas the method by Themistocleous (2019) is two-dimensional. The preliminary result of the method using Liblas, however, still had a large amount of vegetation remaining compared to the Pix4D Machine Learning method. The vegetation layer remains highly visible in the DEMs processed using the vegetation indices as opposed to the Pix4D Machine Learning method, which produces a DEM where mostly bare ground is seen. Further modifications to the input parameters are required to improve the vegetation vs. bare ground classification using this approach. The next step will be to improve the method using Liblas and to also test other vegetation removal methods found in the literature review to compare them against the two described here.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CSA, the French LILW Disposal Facility: Taking Stock of the 30 years' Operating Experience - 20009

French Andra's currently operational LILW repository, Aube disposal facility, is almost 30 years old. From the beginning, the repository has benefited from the lessons learned from the first disposal facility, the CSM. It has nevertheless continued to evolve, to improve and to adapt, seeking to gain in efficiency, safety and cost optimization. This is a look at what has changed at the CSA since 1992 - and the effect these changes had on its operating practices, construction principles and the entire management organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential for Transport of Cesium as Bio-colloids in a High Ionic Strength System

The Waste Isolation Pilot Plant (WIPP) is a deep geologic repository for long-term disposal of transuranic, radioactive waste that is a byproduct from the nation's nuclear defense program. Most likely release scenario → human intrusion (potentially through drilling) (US DOE 1995; 1996). Brine may proceed through the Rustler formation (the most transmissive layer) (Perkins et al., 1999). There is a need to investigate halophilic microbes including their mobility in the Rustler formation and the potential for enhancing transport of cesium as a bio-colloid. Objectives: To quantify the change in mobility of Cs by interaction with microbes (Chromohalobacter) that may be present near Waste Isolation Pilot Plant. What is Chromohalobacter?: a halophilic microbe, isolated from near the WIPP site, able to thrive in the high salt concentrations relevant to the repository. Does the microbe growth phase effect uptake of Cs? Experiments conducted with actively growing and stationary phase Chromohalobacter. Uptake may differ if Cs{sup +} is mistaken for K{sup +} in an actively growing (Log) phase versus stationary phase microbes (not actively reproducing). Materials: 1'' Teflon column packed with 1 gram of dolomite [355-500 μm, CaMg(CO{sub 3}){sub 2}] connected to a syringe pump and fraction collector via Teflon tubing. Chromohalobacter (100 million cells/mL) and dolomite collected near the WIPP. Synthetic brine - 15% NaCl (w/v ∼2.78 M) + 3 mM NaHCO{sub 3}. Methodology: Negative Control 5,000 ppb Cs initially injected into mini-columns with brine. Injection solution was then switched to only brine. Cs Experiments with Stationary Phase Chromo: Set 1: Viable stationary Chromo injected into minicolumns after reaction with 200 ppb Cs. Injection solution was then switched to only brine (without Cs or microbes). Set 2: Stressed stationary Chromo initially injected into mini-columns after reaction with 200 ppb Cs. Then, switched to brine only. Cs Experiments with Log phase Chromo: Set 1: Chromo injected into mini-columns after reaction with 5,000 ppb Cs. Injection then switched to only brine (without Cs or microbes). Set 2: Chromo grown with 5,000 ppb Cs and spiked with additional Cs before injection into columns. Preliminary Conclusions: Cs was not taken up or mobilized by Chromohalobacter in the actively growing or stationary phases or under stressed conditions. Competition may have occurred between Cs and K{sup +} at lower ionic strength, significantly greater concentrations of K{sup +} were present. Results suggest that Chromohalobacter can selectively uptake K{sup +} in the presence of Cs{sup +}. Future Research: K{sup +} and Cs{sup +} uptake will be monitored at high ionic strength in K{sup +} depleted media to consider uptake of Cs in the absence of K.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Rapid Sequential Separation Method for Determination of Actinides and TENORM in Fracking Wastes - 20223

With recent advances in unconventional drilling technology in the US and around the world, the risks of environmental contamination and exposure due to technologically enhanced naturally occurring radioactive materials (TENORM) from fracking wastes have also surfaced. Although the Permian Basin (southeastern New Mexico, western Texas) has long been a modest producer of oil, the advent of fracking technology a decade ago turned it into hot property for producers. A 2018 assessment of undiscovered, technically recoverable continuous oil and gas resources by the U.S. Geological Survey estimates an average 46.3 billion barrels of oil and 281 trillion cubic feet of gas. This is likely to increase the use of unconventional drilling and TENORM generation. TENORM concentrations in oil and gas exploration and production waste can be several hundred to several thousand times higher than background TENORM concentrations. Both the thorium and uranium decay chains contribute to airborne radionuclides arising from the radon gas escaping the ground and subsequently decaying as airborne particulates. Additionally, radon decay products {sup 210}Pb and {sup 210}Po can build up in scale on the internal surfaces of oil and gas handling pipes and in sludge in refineries, becoming potential inhalation and ingestion hazards for workers. Furthermore, southeastern NM is also home to world's only licensed and operating transuranic nuclear waste repository, the DoE's Waste Isolation Pilot Plant (WIPP). Plutonium isotopes ({sup 239+240}Pu) and {sup 241}Am, are expected to account for more than 99% of the total radioactivity scheduled for disposal in the WIPP repository. Thus, an improved understanding of the environmental fate and transport of TENORM, liberated by unconventional drilling, is essential to assess how best to protect individuals and the environment. In this context, accurate measurement of TENORM and actinides in environmental and biological samples is essential. In this presentation, a new sequential method for the separation and pre-concentration of actinides (Pu, Am, Np) and TENORM (Po, U and Th) derived from oil and gas exploration is proposed. The TEVA method involves a rapid co-precipitation step to remove matrix interferences from the samples, followed by plutonium oxidation state adjustment to Pu (IV) and an incubation period of ∼ 1 hour at 50-60 deg. C to allow the resultant Po (II) to oxidize into Po(IV). The polonium, neptunium, thorium and plutonium are then separated on a TEVA column, while americium and uranium are separated on a TRU column. After separation, the alpha counting source was prepared by micro-precipitation with copper sulfide (CuS) for polonium and neodymium fluoride (NdF{sub 3}) for actinides. The efficiency and reliability of the procedures were tested by analyzing filter, drinking water and frack sand samples. The method is simple, robust and can be performed quickly with excellent removal of interferences, high chemical recovery and very good alpha peak resolution. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Co-Disposal Waste Package Loading Options for DOE SNF and HLW - 20331

The U.S. Department of Energy (DOE) is responsible for managing spent nuclear fuel (SNF) that is currently in, or will in the future come into, its possession. DOE must continue to safely store that SNF, transport it to an interim storage site or a repository, and dispose of it. These fuels come from a wide range of reactor types with various cladding materials and enrichments. Many of these reactors, now decommissioned, had unique design features, such as core configuration, fuel element and assembly geometry, moderator and coolant materials, operational characteristics, and neutron spatial and spectral properties, resulting in a large diversity of reactor and fuel designs. Because of the wide variety and conditions of SNF, a robust DOE Standard Canister was proposed that would confine radionuclides and preclude moderator. The DOE Standard Canister had four variations: 3.05-meter (10-foot) or 4.57-meter (15-foot) length, and 45.7-cm (18-inch) or 61.0-cm (24-inch) diameter. For ultimate disposal in the Yucca Mountain Repository, these canisters were to be grouped with 61.0-cm (24-inch) diameter high level waste (HLW) canisters in a 2.13-meter (84-inch) diameter co-disposal waste package. The smaller 45.7-cm (18-inch) diameter DOE Standard Canister could be placed in the middle of five HLW canisters. The larger 61.0-cm (24-inch) diameter DOE Standard Canister would take the place of one of the five HLW canisters on the outer ring in the co-disposal waste package. No DOE Standard Canisters have been loaded. A preliminary evaluation has estimated the number of elements of a fuel type that can fit into the different sizes of the DOE Standard Canister, but no definitive loading configuration has been selected. Changing the loading configuration could impact the number of loadable DOE Standard Canisters and the number of co-disposal waste packages needed for eventual disposition. This paper conveys the ranges of DOE Standard Canisters and HLW canisters that may be produced under certain conditions. It also examines the differences in the estimated number of co-disposal waste packages produced for eventual disposal when using different loading strategies in the DOE Standard Canister for Advanced Test Reactor (ATR), Peach Bottom, and High Flux Isotope Reactor (HFIR) SNF. Changing the loading configurations of ATR, Peach Bottom, and HFIR SNF slightly impacted the number of co-disposal waste packages that may be needed for ultimate disposal. The change in loading configuration was more impactful when a different canister was used, as opposed to varying the number of elements that could fit inside the same size canister. In one case, a reduction of co-disposal waste packages could be achieved by allowing mixing of short HLW canisters with long DOE Standard Canisters. The main conclusion from this analysis is that the ratio between HLW canisters and DOE Standard Canisters will drive the total number of co-disposal waste packages. If too many HLW canisters (i.e., more than five times the number of 18-inch DOE standard canisters) or DOE Standard Canisters are produced, some co-disposal waste packages may not have all positions filled. A co-disposal waste package may be filled with all HLW with no DOE Standard Canister, or a co-disposal waste package could be filled with a single DOE Standard Canister. A ratio that does not closely align to optimum could allow for the design of waste packages that hold just HLW canisters or just DOE SNF canisters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Development for Dry Storage of Aluminum-Clad Spent Nuclear Fuel - 20490

A candidate disposition pathway for the > 13 MTHM of aluminum-clad spent nuclear fuel (ASNF), owned and managed by the U.S. Department of Energy, is the drying and placement of the SNF into sealed-canister dry storage, with the ASNF-in- canisters 'road-ready' for transportation to and final direct disposal in a repository waste package. Technical information gaps in fuel drying, and fuel dry storage behavior, have previously challenged the declaration of technology readiness for drying and placement of this fuel into the DOE Standard Canister design for > 50 years of safe dry storage. The principal technical information gaps included: i) characterization and thermal dehydration behavior of aluminum (oxy)hydroxide films attendant on the cladding due to film formation during reactor operation and during post-discharge up to long-term wet storage histories; and ii) G-value data to enable estimation of the radiolytic gas generation from the cladding with its (oxy)hydroxide films. Thus, the oxide films on the ASNF challenged the safety of a sealed storage canister with thermal and radiolytic decomposition of the waters on the films that can lead to corrosion, pressurization, and flammability issues. These gaps in the technical information base have largely been closed. This paper discusses the investigations at the Idaho National Laboratory (INL) and the Savannah River National laboratory (SRNL), and outlines the pending technology development work for input to an engineering design to enable a road-ready dry storage system for ASNF. The ASNF inventory considered for road-ready dry storage is stored at the Savannah River Site (SRS) and at the Idaho Nuclear Technology and Engineering Center (INTEC) at the INL. The ASNF inventory in the SRS L Basin is from foreign and domestic research reactors (FRR and DRR), and is diverse in terms of design, irradiation, and post-reactor-discharge storage conditions; these factors yield a range of characteristics of cladding oxide films on ASNF. Mixed aluminum (oxy)hydroxide (boehmite and bayerite/gibbsite) films, non-uniform in thicknesses up to a maximum local thickness bounded by 25 μm, were observed on ASNF materials removed from wet storage in the L Basin and in non-sealed dry storage at the SRS following reactor service and a long-term (up to 40+ years) interim storage history. The ASNF inventory at INTEC, in both wet and vented dry storage, is predominantly from the Advanced Test Reactor (ATR), but it also includes DRR and FRR fuel. To address a profound behavior of these films, radiolysis testing of aluminum specimens with mixed type boehmite/bayerite oxide films was performed to develop basic data on G-values for production of radiolytic hydrogen under dry storage conditions with nominal relative humidity, temperature, and cover gas. Modeling and simulation of canister internal environments with postulated inventories of oxide films provides estimation of the evolution of the conditions of the canister loaded with ASNF. Simultaneous Thermal Analysis (TGA/DSC) of hydrated oxide powders, and laboratory-scale aluminum specimens with a bayerite film (∼10 μm) using TGA methods, inform drying time/temperature conditions to be used for the ASNF. A demonstration project is recommended for Verification and Validation of the drying and storage of the ASNF. Remaining major tasks leading up to the hot demonstration include scale-up radiolysis testing and scale-up drying testing. Engineering design with the information from the technology program will establish the safety basis and enable long-term (> 50 years) dry storage compatibility with ASNF in the DOE Standard Canister pending its transportation to and disposal in a repository. This full capability would show the ASNF-in-canister storage system to be road-ready. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗