Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project characterization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

International physical protection self-assessment tool for chemical facilities.

This report is the final report for Laboratory Directed Research and Development (LDRD) Project No.130746, International Physical Protection Self-Assessment Tool for Chemical Facilities. The goal of the project was to develop an exportable, low-cost, computer-based risk assessment tool for small to medium size chemical facilities. The tool would assist facilities in improving their physical protection posture, while protecting their proprietary information. In FY2009, the project team proposed a comprehensive evaluation of safety and security regulations in the target geographical area, Southeast Asia. This approach was later modified and the team worked instead on developing a methodology for identifying potential targets at chemical facilities. Milestones proposed for FY2010 included characterizing the international/regional regulatory framework, finalizing the target identification and consequence analysis methodology, and developing, reviewing, and piloting the software tool. The project team accomplished the initial goal of developing potential target categories for chemical facilities; however, the additional milestones proposed for FY2010 were not pursued and the LDRD funding therefore was redirected.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Bunch by Bunch Profiling with a Rotating X-ray Mask

It is desirable to monitor the cross sections of each positron bunch in the Low Energy Ring (LER) storage rings of the Positron Electron Project II (PEP-II) located at the Stanford Linear Accelerator Center. One method is to pass the x-rays given off by each bunch through a scintillator, thereby studying a visible image. A rotating x-ray mask with three slots scans the beam image in three different orientations, allowing us to mechanically collect data to characterize and profile each image. Progress was made in designing the x-ray mask, researching and procuring parts, as well as advancing project plans. However, due to time constraints and difficulties in procuring special parts, the full system was not completed. A simpler setup was built to test the hardware as well as the feasibility of characterizing a circular image with a rotating mask. A blinking green light emitting diode (LED) simulated a single positron bunch stored in the LER ring. The selected hardware handled this simulation setup well and produced data that led to a reasonable estimation of the LED image diameter.

43 PARTICLE ACCELERATORS↗

Characterize the Demand and Energy Characteristics of Direct Current Fast Chargers

The electric vehicle supply equipment (EVSE) deployed by The EV Project included both AC Level 2 (ACL2) and DCFC units. Over 100 of the Blink dual-port DCFCs were deployed by The EV Project. These DCFCs were all publicly accessible, located in workplaces, near traffic hubs, retail centers, parking lots, restaurants, and similar locations. The Blink DCFC dual-port design sequences the charge from one port to the other, delivering power to only one of two vehicles connected at a time. The actual power delivered through a port is determined by the PEV’s on-board battery management system (BMS).The Blink DCFC is capable of charging at power up to 60 kW. For the EV Project, the Nissan Leaf was the only participating PEV capable of accepting a DC charge. The Nissan Leaf BMS allows acceptance of up to 50 kW DC power. At this rate, the DCFC is capable of recharging a Leaf battery from a 30% state of charge (SOC) to an 80% SOC in about 25 minutes. The power required by the DCFC to recharge a plug-in electric vehicle (PEV) can be a significant additional electrical load for the charging site host and contributes to the overall power demand on the electric grid.

33 ADVANCED PROPULSION SYSTEMS↗

Discrimination Report: A Multisensor system for detection andcharacterization of UXO, ESTCP Project MM-0437,

The Berkeley UXO Discriminator (BUD) is an optimally designed active electromagnetic system that not only detects but also characterizes UXO. The performance of the system is governed by a target size-depth curve. BUD was designed to detect UXO in the 20 mm to 155 mm size range for depths between 0 and 1.5 m, and to characterize them in a depth range from 0 to 1.1 m. The system incorporates three orthogonal transmitters and eight pairs of differenced receivers. Eight receiver coils are placed horizontally along the two diagonals of the upper and lower planes of the two horizontal transmitter loops. These receiver coil pairs are located on symmetry lines through the center of the system and each pair sees identical fields during the on-time of the pulse in all of the transmitter coils. They are wired in opposition to produce zero output during the on-time of the pulses in three orthogonal transmitters. Moreover, this configuration dramatically reduces noise in the measurements by canceling the background electromagnetic fields (these fields are uniform over the scale of the receiver array and are consequently nulled by the differencing operation), and by canceling the noise contributed by the tilt motion of the receivers in the Earth's magnetic field, and greatly enhances receiver sensitivity to the gradients of the target response. BUD is mounted on a small cart to assure system mobility. System positioning is provided by a Real Time Kinematic (RTK) GPS receiver. The system has two modes of operation: (1) the search mode, in which BUD moves along a profile and exclusively detects targets in its vicinity providing target depth and horizontal location, and (2) the discrimination mode, in which BUD is stationary above a target, and determines three discriminating polarizability responses together with the object location and orientation from a single position of the system. The detection performance of the system is governed by a size-depth curve shown in Figure 2. This curve was calculated for BUD assuming that the receiver plane is 0.2 m above the ground. Figure 2 shows that, for example, BUD can detect an object with 0.1 m diameter down to the depth of 0.9 m with a depth uncertainty of 10%. Any objects buried at a depth of more than 1.3 m will have a low probability of detection. The discrimination performance of the system is governed by a size-depth curve shown in Figure 3. Again, this curve was calculated for BUD assuming that the receiver plane is 0.2 m above the ground. Figure 3 shows that, for example, BUD can determine the polarizability of an object with 0.1 m diameter down to the depth of 0.63 m with polarizability uncertainty of 10%. Any objects buried at the depth more than 0.9 m will have a low discrimination probability. Object orientation estimates and equivalent dipole polarizability estimates used for large and shallow UXO/scrap discrimination are more problematic as they are affected by higher order (non-dipole) terms induced in objects due to source field gradients along the length of the objects. For example, a vertical 0.4 m object directly below the system needs to be about 0.90 m deep for perturbations due to gradients along the length of the object to be of the order of 20% of the uniform field object response. Similarly, vertical objects 0.5 m, and 0.6 m long need to be 1.15 m, and 1.42 m, respectively, below the system. For horizontal objects the effect of gradients across the object diameter are much smaller. For example, 155 mm and 105 mm projectiles need to be only 0.30 m, and 0.19 m, respectively, below the system. A polarizability index (in cm{sup 3}), which is an average value of the product of time (in seconds) and polarizability rate (in m{sup 3}/s) over the 34 sample times logarithmically spaced from 143 to 1300 {micro}s, and three polarizabilities, can be calculated for any object. We used this polarizability index to decide when the object is in a uniform source field. Objects with the polarizability index smaller than 600 cm{sup 3} and deeper than 1.8 m below BUD, or smaller than 200 cm{sup 3} and deeper than 1.35 m, or smaller than 80 cm{sup 3} and deeper than 0.90 m, or smaller than 9 cm{sup 3} and deeper than 0.20 m below BUD are sufficiently deep that the effects of vertical source field gradients should be less than 15%. All other objects are considered large and shallow objects. At the moment, interpretation software is available for a single object only. In case of multiple objects the software indicates the possible presence of metallic objects but is unable to provide characteristics of each individual object.

54 ENVIRONMENTAL SCIENCES↗

Characterizing the Payback and Profitability for Automated Heavy Duty Vehicle Platooning

Heavy duty vehicle platooning under highway operating conditions has been projected to provide significant fuel economy gains based on aerodynamic drag improvements of the platooning vehicles. Realizing these benefits and the economic viability under real-world operating conditions presents several challenges. The objective of this paper (the third as part of a series) is to analytically quantify the payback and profitability of heavy-duty vehicles platooning across the U.S. Interstate highway system. In this paper, a rigorous assessment of several factors that influence the platooning system payback for an end-user as well as the revenue potential for suppliers who may be utilizing an equipment lease model dependent on end-user savings, is presented. In this assessment key interactions explored include market adoption rates, platooning velocities, platoon-able daily mileage, platooning likelihood, variations in baseline powertrain fuel economy (diesel or electric), price of fuel (diesel or electricity), platooning fuel economy benefits, price of the added technology, and the impact of natural platooning due to traffic interactions. Further, the paper explores the economic impact of higher levels of vehicle automation for the trailing vehicles in the platoon, where extending the driver Hours of Service (HoS) may provide additional financial benefits. While the approach makes use of a limited fidelity vehicle analytical model for longitudinal dynamics and operations economics, the narrative provides application decision personnel with a mechanism and well-defined set of impact factors to consider as part of their architectural selection process.

33 ADVANCED PROPULSION SYSTEMS↗

Data Analysis for NEPA Supplement Analysis of Chemistry and Metallurgy Research Building Replacement Project at LANL - 16017

The Department of Energy/National Nuclear Security Administration (DOE/NNSA) is proposing to provide analytical chemistry (AC) and materials characterization (MC) capabilities at the Los Alamos National Laboratory (LANL) by using a combination of existing space in two existing buildings: The Radiological Laboratory/Utility/Office Building (RLUOB) and the Plutonium Facility, Building 4 (PF-4) in TA-55. This represents a change from decisions made by DOE as informed by previous National Environmental Policy Act (NEPA) analyses. In accordance with Council on Environmental Quality and DOE requirements, NNSA prepared a Supplement Analysis to evaluate the potential environmental impacts of the proposed action. The focus of this analysis is on determining whether the proposal to provide AC and MC laboratory capabilities in existing space in RLUOB and PF-4 rather than building a new nuclear facility is a substantial change that is relevant to environmental concerns or whether new circumstance or information relevant to environmental concerns and bearing on the proposed action or its impacts are significant. The determination of the analysis is that the existing Chemistry and Metallurgy Research Building Replacement Environmental Impact Statement (CMRR EIS) need not be supplemented, nor is a new EIS required, because 'the proposed changes do not represent a substantial change that is relevant to environmental concerns.'[1 p.49] No further NEPA analysis is necessary. This report describes the analysis used to create data needed for the Supplement Analysis. Los Alamos subject matter experts estimated equipment lists, facility modifications, waste quantities, labor needs and radiological doses. Los Alamos NEPA experts assisted in compiling existing data from the LANL Site-Wide EIS and CMRR EIS for public and other impacts. Bounding conditions were used to determine NEPA estimates. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrochemical Control for Corrosion in Molten Chlorides During CSP Plant Operation

The Liquid Pathway of the Concentrating Solar Power Generation 3 (CSP Gen3) program proposed low-cost molten chloride salt for energy storage. However, online corrosion control was identified as a remining major risk of the Liquid Pathway approach. This project addressed that risk. Electrochemical solutions for corrosion mitigation during CSP plant operation were investigated and their feasibility and scalability were evaluated. The leading cause of corrosion in molten chloride salt systems was identified as corrosive impurities that form within the salt upon exposure to trace amounts of air and moisture. Leveraging electrochemistry, reduction/oxidation reactions can be employed to remove these corrosive impurities. In Phase 1 of this project, a bench-scale batch electrochemical reactor was designed, fabricated, and used to assess the kinetics and thermodynamics of electrochemical salt purification. In Phase 2, a laboratory-scale flow reactor was designed, fabricated, and used to assess the efficacy of the electrochemical method under flowing conditions. Results show that under proposed operating conditions for the Liquid Pathway Gen3 Pilot Plant, the electrochemical method is significantly more effective at removing impurities than alternative chemical and thermal methods, and that the electrochemical method produces less harmful byproducts. A key advance made in the course of this project was the development of a 2-electrode method for electrochemical purification that is more scalable than previously developed 3 electrode methods. This novel method is based on Magnesium (Mg) electrowinning. A provisional patent based on this invention has been submitted (USPTO Application No. 63/480,355). Additional key advances made during this project include assessment of the effect of dissimilar alloys on corrosion, kinetic and thermodynamic evaluation of thermolysis reactions of impurities within the molten salt, characterization of byproducts of purification reactions, and generation of IP focused on isolating value-added products using molten salt-based electrochemistry that could be deployed to valorize the process (USPTO Application No. 63/478,806). Ultimately, this project represented a step toward feasibility of Liquid Pathway Gen3 CSP. The method developed under this project could significantly reduce capital expenses and operating costs and increase plant profitability by enabling use of less expensive alloys, decreasing maintenance, and increasing plant longevity. Key focus areas for follow-on work have been identified as 1) evaluation of the efficacy of the electrochemical method under turbulent conditions in a larger flow system, such as the FASTR loop, 2) development of methods for removal of purification byproducts, 3) modeling pilot and industrial scale performance of electrochemical salt purification during plant operation and 4) further assessment of the effect of impurities on salt vapor phase.

14 SOLAR ENERGY↗

Wyoming CarbonSAFE Phase III: Site Characterization and Permitting Commercial-Scale Carbon Storage Complex Feasibility Study at Dry Fork Station, Wyoming

This report presents the findings of the technical and non-technical site characterization and permitting activities (“Phase III”) conducted under the Wyoming CarbonSAFE: Accelerating CCUS Commercialization and Deployment at Dry Fork Power Station (DFS) and the Wyoming Integrated Test Center project (“Wyoming CarbonSAFE”). Wyoming CarbonSAFE is part of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) Carbon Storage Assurance Facility Enterprise (“CarbonSAFE”) Initiative. The results of Phase III demonstrate that the Wyoming CarbonSAFE project - referred to as the Northern Powder River Basin Carbon Sequestration Hub (NPRB-CSH) - meets the technical, regulatory, and commercial feasibility requirements necessary to advance toward commercial development and construction. The activities completed under this project Phase make the NPRB-CSH one of the region’s most commercially ready carbon storage sites. Completion of this Phase included the finalization of all site surface and subsurface characterization activities, completion and testing of two Class VI standard wells, 10 draft Class VI permits-to construct to address the future needs of a storage complex, finalized NEPA assessments, transportation and capture FEED studies, and a full commercialization strategy with economic modeling, operation and site closure strategies. The NPRB-CSH meets all requirements to progress to a CarbonSAFE Phase IV program or advance to full commercial operations under the development of a business partner.

01 COAL, LIGNITE, AND PEAT↗

Win-Win Regulatory Strategies in Idaho - 19241

During the course of any waste management or environmental remediation project, the earliest goals must include the creation and maintenance of mutual trust, respect, and cooperation with regulatory agencies and stakeholders. The heavy equipment and treatment systems remain idled until bounding characterization and risk analysis is complete, technical and functional requirements are identified, required controls and limits are established, and the proper permits and approvals are issued. Once a project receives approval to start up or break ground, the regulatory process has only just begun. Process modifications and improvements, as well as unexpected events, will continue to necessitate further reviews, discussions, and approvals. Building healthy professional relationships with the regulatory community and consistently meeting or exceeding their expectations, while operating within controls, is a cornerstone to jointly finding cost-effective solutions to complex issues, and streamlining the path to success. Navigating the optimal routes to compliance through the myriad regulatory waypoints is essential to avoiding schedule delays, staying within budget, and keeping clients continuously satisfied and delighted. Two complex case studies from the Idaho Cleanup Project Core will examine regulatory communication and integration strategies that have proven effective to date in obtaining timely approvals and maintaining compliance: (1) conducting Decontamination and Decommissioning as non-time critical removal actions (NTCRA) under CERCLA, and (2) preparing the integrated documentation necessary to obtain DOE, EPA, DEQ, and NRC approvals to close calcine storage units at the Idaho Nuclear Technology and Engineering Center (INTEC). (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

COOLR: A New System for Dynamic Thermal-Aware Computing

Extreme-scale systems need to walk a fine line between the amount of cooling they receive and the thermal-induced performance and reliability degradation they can sustain. System managers are extremely motivated to battle cooling-energy cost: the largest line item in their total operating cost. On the other hand, pushing the nodes to peak performance in tightened cooling regimes places the burden on the dynamic thermal management (DTM) to protect the hardware. DTM schemes throttle performance to relieve heat accumulation within nodes when cooling cannot mitigate the problem. These interventions prevent fatal failures but introduce inevitable performance degradations and variations. Such variations can have drastic consequences on the performance of extreme-scale systems. Furthermore, distribution of heat across different system nodes depends not only on the amount of workload. Even if a strictly equal share of computational load is assigned to all nodes, there are physical attributes and topological features of each system that inherently cause uneven accumulation of heat. These can cause one subcomponent to trigger DTM prematurely and penalize the overall system. Our goal in this project is to create a holistic thermal-aware view of the system, capturing both inherent physical attributes and dynamic system state. We developed COOLR, a dynamic system with the ability to evaluate the interplay between management of computation, data, power dissipation, and thermal state. Thereby, COOLR will achieve higher overall performance at the same energy and cooling cost. First, we performed a systematic power and thermal modeling and of high performance computing architectures. Analytical and empirical techniques were blended to generate a light-weight thermal model of target systems. Second, we developed a thermal-aware OS and runtime system. Policies for managing resources and schedules for processes has been designed to co-optimize the thermal state and performance of the system. The main outcome of our proposed thermal-aware dynamic computing system are scheduling and allocation of processes and memory accesses leading to an appropriately “skewed” distribution of activity across the system. The ultimate result of this new arrangement resulted in reduced occurrences of hotspots and reduced episodes of DTM intervention, leading to improvements in performance. The overall thermal characterization and modeling methodology (thermal instrumentation techniques, model building, and systematic model reduction) resulting from this project can be applied to systems beyond our immediate scope and will be applicable to future scaling. The thermal-aware dynamic computing paradigm will impact the efficiency of extreme-scale systems. The gained “thermal slack” can be given back to further tighten the cooling budget, benefiting the management cost of next generation extreme-scale systems.

97 MATHEMATICS AND COMPUTING↗

Characteristics of KE Basin Sludge Samples Archived in the RPL - 2007

Samples of sludge were collected from the K East fuel storage basin (KE Basin) floor, contiguous pits (Weasel Pit, North Load Out Pit, Dummy Elevator Pit, and Tech View Pit), and fuel storage canisters between 1995 and 2003 for chemical and radionuclide concentration analysis, physical property determination, and chemical process testing work. Because of the value of the sludge in this testing and because of the cost of obtaining additional fresh samples, an ongoing program of sludge preservation has taken place with the goals to track the sludge identities and preserve, as well as possible, the sludge composition by keeping the sludge in sealed jars and maintaining water coverage on the sludge consistent with the controlling Fluor Hanford (FH) Sampling and Analysis plans and FH contracts with the Pacific Northwest National Laboratory (PNNL). This work was originally initiated to provide material for planned hydrothermal treatment testing in accordance with the test plan for the Sludge Treatment Project (STP) corrosion process chemistry follow on testing (Delegard et al. 2007). Although most of the planned hydrothermal testing was canceled in July 2007 (as described in the forward of Delegard et al. 2007), sample consolidation and characterization was continued to identify a set of well-characterized sludge samples that are suited to support evolving STP initiatives. The work described in the letter was performed by the PNNL under the direction of the Sludge Treatment Project, managed by Fluor Hanford.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Broadband Characterization and Circuit Model Development of Transmission-Scale Transformers

This report describes broadband measurements of transmission-scale transformers typical in the electric power grid. This work was performed as part of the EMP Resilient Grid LDRD project at Sandia National Laboratories to generate circuit models that can be used for high-altitude electromagnetic pulse (HEMP) coupling simulations and response predictions. The objective of the work was to obtain characterization data of substation yard equipment across a frequency range relevant to HEMP. Vector network analyzer measurements up to 100 MHz were performed on two power transformers at ABB-Hitachi and a single ITEC potential transformer. Custom cable breakouts were designed to interface with the transformer terminals and provide ground connections to the chassis at the base of the transformer bushings. The three-phase terminals of the power transformers were measured as a common mode impedance using a parallel resistive splitter, and the single-phase terminals of the potential transformer were measured directly. A vector fitting algorithm was used to empirically fit circuit models to the resulting two-port networks and input impedances of the measured objects. Simplified circuit representations of the input impedances were also generated to assess the degree of precision needed for high-altitude electromagnetic pulse response predictions, which were performed in Sandia's XYCE circuit simulator platform. HEMP coupling simulations using the transformer models showed significant reduction in the voltage peak and broadening in the pulse width seen at the power transformer compared to the traveling wave voltage. This indicated the importance of the load condition when defining the coupled insult in an electric power substation. Simplified circuit models showed a similar voltage at the transformer with a smoothed waveform. The presence of potential transformers in the simulation did not significantly change the simulated voltage at the power transformer. Single-port input impedance models were also developed to define load conditions when transfer characteristics were not necessary.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grimsel Test Site - A Successful International Underground Research Laboratory for Many Decades - 20429

For more than 35 years, Nagra and its partners from around the world have been conducting underground research projects at the Grimsel Test Site (GTS, www.grimsel.com) to contribute to the development and confirmation of safe geological disposal concepts and for the characterization of suitable host rock formations. Over the years, the results of this internationally recognized research program have been, and continue to be, incorporated directly into exploration programs, modelling, safety, and engineering feasibility studies on options for deep geological repositories. Each project of the GTS program involves field-testing, laboratory studies, design and modelling tasks, and integrates all scientific and technical aspects. Each project phase is planned with a duration of three to five years to facilitate practical and administrative aspects and allow flexibility for updating the overall project plans with the latest findings. Scientific and engineering interaction among the different projects is ensured via an international steering committee meeting. Hosting an IAEA level C radiation- controlled zone, which allows use of radionuclides, including actinides such as thorium, uranium, neptunium, plutonium and americium, in in-situ experiments is one of the reasons why GTS also developed as a center of excellence for work with radioactive tracers under realistic in-situ boundary conditions. Last year, a new five-year program (2019 to 2023) started which includes projects with a planning horizon of decades. The new five-year program includes a new phase of in-situ experiments using radionuclides such as migration experiments in the Colloid Formation and Migration project (CFM), the Long-Term Diffusion experiment (LTD) and the newly established C-14 and I-129 Migration in cement project (CIM). The 'High Temperature effects on Bentonite' (HotBENT) project is starting in the current phase and is studying the effects of elevated temperatures (>175 deg. C) on bentonite materials. As a generic underground research laboratory (URL) it is expected that the GTS will provide in the coming years a platform for international collaboration, knowledge development and knowledge transfer for the next generation of scientists and engineers in the area of radioactive waste disposal and geosciences. A key role regarding knowledge transfer and training is provided by the well-established Grimsel Training Center (GTC), which (beside many URL related issues) also covers many general aspects of radioactive waste management. In this paper we provide an overview of the current program at the GTS, focusing on the experiments that study the migration of radionuclides through engineered barrier materials and the geosphere. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2012 Geothermal Technologies Peer Review Summary: Mapping Diffuse Seismicity

The purpose of this project as it relates to GTP goals is to create a methodology that can be successfully implemented at an EGS site to aid in the successful creation of an EGS reservoir. The MFP technique would allow developers to obtain better seismic information for input when characterizing the hazard and risk associated with induced seismic events and when creating and monitoring the EGS reservoir. The purpose of this project as it relates to the geothermal industry / market is to create a method by which certain recommendations within the 2012 Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems can be more easily implemented. The particular recommendation referred to is that seismic instrumentation should be able to detect events at least as small as M1.0 and preferably down to M0.0. This technique has been shown to decrease the magnitude completeness threshold of existing seismic networks, and as such should positively impact implementation of the above recommendation.

15 GEOTHERMAL ENERGY↗

Decommissioning of Active Ventilation Systems in a Nuclear R and D Facility to Prepare for Building Demolition (Whiteshell Laboratories Decommissioning Project, Canada) - 13073

Whiteshell Laboratories (WL) is a nuclear research establishment owned by the Canadian government and operated by Atomic Energy of Canada Limited (AECL) since the early 1960's. WL is currently under a decommissioning license and the mandate is to remediate the nuclear legacy liabilities in a safe and cost effective manner. The WL Project is the first major nuclear decommissioning project in Canada. A major initiative underway is to decommission and demolish the main R and D Laboratory complex. The Building 300 R and D complex was constructed to accommodate laboratories and offices which were mainly used for research and development associated with organic-cooled reactors, nuclear fuel waste management, reactor safety, advanced fuel cycles and other applications of nuclear energy. Building 300 is a three storey structure of approximately 16,000 m{sup 2}. In order to proceed with building demolition, the contaminated systems inside the building have to be characterized, removed, and the waste managed. There is a significant focus on volume reduction of radioactive waste for the WL project. The active ventilation system is one of the significant contaminated systems in Building 300 that requires decommissioning and removal. The active ventilation system was designed to manage hazardous fumes and radioactivity from ventilation devices (e.g., fume hoods, snorkels and glove boxes) and to prevent the escape of airborne hazardous material outside of the laboratory boundary in the event of an upset condition. The system includes over 200 ventilation devices and 32 active exhaust fan units and high efficiency particulate air (HEPA) filters. The strategy to remove the ventilation system was to work from the laboratory end back to the fan/filter system. Each ventilation duct was radiologically characterized. Fogging was used to minimize loose contamination. Sections of the duct were removed by various cutting methods and bagged for temporary storage prior to disposition. Maintenance of building heating, ventilation and air conditioning (HVAC) balancing was critical to ensure proper airflow and worker safety. Approximately 103 m{sup 3} of equipment and materials were recovered or generated by the project. Low level waste accounted for approximately 37.4 m{sup 3}. Where possible, ducting was free released for metal recycling. Contaminated ducts were compacted into B-1000 containers and stored in a Shielded Modular Above-Ground Storage Facility (SMAGS) on the WL site awaiting final disposition. The project is divided into three significant phases, with Phases 1 and 2 completed. Lessons learned during the execution of Phases 1 and 2 have been incorporated into the current ventilation removal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Open-air Demolition: Validation of EPA Approved Alternative Method for Emission Estimation - 19397

Emissions from open-air demolition of US Department of Energy (DOE) facilities are regulated by the US Environmental Protection Agency (EPA) under 40 CFR 61 subpart H. This regulation requires that facilities estimate emissions using an EPA approved method from activities such as open-air demolition prior to commencing the activity. Should those emissions exceed certain thresholds, the facility may be required to obtain an Approval to Construct or Modify the facility and/or installed monitoring methods meeting methods acceptable to EPA. There are no EPA approved methods that are specific to open-air demolition methods. For this project the DOE and CH2M Hill BWXT elected to prepare an alternative method specific to open-air demolition. EPA conditionally approved the method but required validation of the method during the demolition of the Vitrification Facility at the West Valley Demonstration Project (WVDP) before use for open-air demolition at other WVDP structures. The validation method included detailed source characterization, close-in ambient samplers, and a comparison of measured results to predicted emissions using AERMOD (American Meteorological Society (AMS) and U.S. Environmental Protection Agency (EPA) Regulatory Model). The methods evaluated include hydraulic hammers, mechanical shears, load out of waste and handling of the debris piles. The validation method involved the collection and analysis of ambient air samples from air samplers located at strategic locations within the projected plume path of the demolition activities. The analytical results from the air samplers were then compared to ambient air concentrations predicted at the sampler locations with the EPA model AERMOD. The input to the AERMOD software is a source term developed weekly using the alternative method and material at risk disturbed during each week. To account for the building wake effects of the surrounding structures, virtual point sources were developed in the AERMOD model and placed at the locations of the demolition, debris piles, debris handling and load out areas. It was found that the factors used for hydraulic hammering were extremely conservative and that emissions from the debris pile were not only the primary emission source, but that the moisture content of the debris pile and the wind speed were critical factors that must be considered in future open-air demolition projects. Based on the results of the validation process, adjustments were made to the alternative method. The final validated alternative method provides an approach for estimating airborne emissions from open-air demolition methods and techniques. The method will be used in lieu of 40 CFR 61 Appendix D to estimate emissions from future open-air demolition projects at the WVDP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗