Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Innovative mercury treatment technology options for the liquid waste system at the Savannah River Site: scoping studies

The Savannah River Site (SRS) Liquid Waste System (LWS) contains liquids, salts and sludges that are currently being processed into final wasteforms for disposition, specifically, waste glass for sludges, solids and liquids containing high levels of radioactivity, and saltstone grout for low activity decontaminated liquid solutions. The LWS also contains approximately 60,000 kg of mercury present in the following physical and chemical forms, specifically: a) ionic inorganic mercury, organomercury (e.g., methylmercury), and other minor components found in LWS fluids b) mercury solids such as oxides, hydroxides, amalgams sulfides and sorbed mercury, c) accumulations of dense liquid elemental mercury, and d) vapor phase elemental and organomercury mercury found in tank headspace gas and in evaporators. An effective and proactive management strategy of the mercury present in the LWS is needed to support processing of LWS wastes into glass and saltstone. Sustainable processing of the LAWS to completion requires mercury removal from the LWS at a rate of approximately 2,900 kg/yr. This removal can be accomplished through existing mercury treatment systems or newly implemented LWS “purge points”. The chemical speciation of mercury has emerged as the key factor that controls mercury behavior in the LWS. For example, past studies demonstrated that mercury speciation is adversely impacting the performance of existing removal systems so that significant levels of mercury are recycled from the Defense Waste Processing Facility (DWPF) back to the tank farm. Consequently, mercury concentrations have slowly increased in the LWS tank fluids over time. The presence of organo-mercury has also been identified as the cause of increased mercury leaching from saltstone. In response to these challenges, the Department of Energy (DOE) Office of Environmental Management (EM-TD) Technology Development Program has supported a series of scoping studies predicated on manipulating or controlling mercury speciation and mercury behaviors within the constraints of LWS waste chemistry and safety conditions. The intent of these studies was to rapidly triage potential technology options and develop a technically based go / no go recommendation for further work. This composite report presents the results of three scoping studies: 1) advanced photooxidation processes, 2) chemical reduction, and 3) mercury getters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compositional Variation Tests on DuraMelter 100 with LAW Sub-Envelope C1 Feed (LAWC22) Glass in Support of the LAW Pilot Melter (Final Report)

The Vitreous State Laboratory at The Catholic University of America (VSL) is developing and testing glass formulations for RPP-WTP waste envelopes to provide data to meet the RPP-WTP contract requirements and to support system design activities. That work is based upon small-scale batch melts (“crucible melts”) using waste envelope simulants. Selected formulations have also been tested in small-scale continuously-fed joule-heated melters (DM10 and DM100 systems) and, ultimately, in the LAW Pilot Melter. Such melter tests provide information on key process factors such as feed processing behavior, dynamic effects during processing, sulfate incorporation, processing rates, off-gas amounts and compositions, foaming control, etc., that cannot be reliably obtained from crucible melts. This sequential scale-up approach in the vitrification testing program ensures that maximum benefit is obtained from the more costly pilot-scale tests and that the most effective use is made of that resource. The principal objective of the work described in this report was to collect the necessary small-scale melter test data with a LAW Sub-Envelope C1 waste simulant in order to support the next series of tests with the same melter feed on the LAW Pilot Melter. This work was conducted under a corresponding Test Specification and Test Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

What Risk am I Assuming in Sending My Waste to ABC, Inc.? - 18524

Normal facility operations and the remediation of contaminated sites generate wastes and 'unusable' materials that must be managed. If these wastes and materials cannot be managed onsite, your next step will be to find a facility that can take these items. The type of waste or material will determine the facilities that will accept these items. There will be many factors to consider in selecting which facility to use including cost and the liability you are assuming. There are several entities that have established programs to review waste and material management facilities including the Defense Logistics Agency (DLA) Disposition Services group, the Department of Energy Consolidated Audit Program (DOECAP), CHWMEG, and the Joint Utility Vendor Audit Consortium (JUVAC). Depending on what organization you are associated with, you may have access to one or more of these entities and you will want to determine if they could aid your review of a facility or whether it is better for you to perform the review on your own. The purpose of this presentation is to briefly review the history, 'membership', and approach each of these entities takes in reviewing facilities and how they may aid in your risk management efforts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HEAT TRANSFER ANALYSIS FOR NUCLEAR WASTE SOLIDIFICATION CONTAINER

The Nuclear Nonproliferation Programs Design Authority is in the design stage of the Waste Solidification Building (WSB) for the treatment and solidification of the radioactive liquid waste streams generated by the Pit Disassembly and Conversion Facility (PDCF) and Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF). The waste streams will be mixed with a cementitious dry mix in a 55-gallon waste container. Savannah River National Laboratory (SRNL) has been performing the testing and evaluations to support technical decisions for the WSB. Engineering Modeling & Simulation Group was requested to evaluate the thermal performance of the 55-gallon drum containing hydration heat source associated with the current baseline cement waste form. A transient axi-symmetric heat transfer model for the drum partially filled with waste form cement has been developed and heat transfer calculations performed for the baseline design configurations. For this case, 65 percent of the drum volume was assumed to be filled with the waste form, which has transient hydration heat source, as one of the baseline conditions. A series of modeling calculations has been performed using a computational heat transfer approach. The baseline modeling results show that the time to reach the maximum temperature of the 65 percent filled drum is about 32 hours when a 43 C initial cement temperature is assumed to be cooled by natural convection with 27 C external air. In addition, the results computed by the present model were compared with analytical solutions. The modeling results will be benchmarked against the prototypic test results. The verified model will be used for the evaluation of the thermal performance for the WSB drum. Detailed results and the cases considered in the calculations will be discussed here.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The MARSAME Methodology: Fundamentals, Benefits and Applications - 12135

MARSAME is an acronym for the 'Multi-Agency Radiation Survey and Assessment of Materials and Equipment'. Published in January 2009, MARSAME was a joint effort between the U.S. Department of Energy (DOE), the U.S. Department of Defense, the U.S. Department of Energy, and the U.S. Nuclear Regulatory Commission (NRC) to aid sites in the clearance of materials and equipment (M and E). The MARSAME manual supplements the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM), published in 1997. As cited in the MARSAME, applicable M and E includes metals, concrete, tools, equipment, piping, conduit, and furniture. Also included are dispersible bulk materials such as trash, rubble, roofing materials, and sludge. Solids stored in containers, as well as liquids and gases, represent additional M and E. The MARSAME methodology covers multiple technical areas, including the initial assessment (IA), Measurement Quality Objectives (MQOs), survey approaches and considerations, survey plans, survey implementation, and Data Quality Assessment (DQA). These topics are generally captured under four phases of the data life cycle, which are Planning, Implementation, Assessment, and Decision-Making. Flexibility and a graded approach are inherent components of the MARSAME methodology pertaining to M and E property clearance programs. Because large quantities of M and E potentially affected by radioactivity are present in the United States, owners of the M and E need to identify acceptable disposition options. Thirteen disposition options, broadly defined under both release and interdiction scenarios, are described in MARSAME. Nine disposition options are listed for release; these options are categorized into two for reuse, two for recycle, four for disposal, and one that is essentially 'status quo' (i.e., maintain current radiological controls). Four interdiction options are also cited. To date, applications of the MARSAME approach for M and E property clearance under reuse scenarios have been limited. However, this should change as familiarity increases. Known examples are provided from DOE-contractor and NRC-licensee facilities. If the methodology is appropriately planned and implemented, the benefits of the MARSAME approach include worker and public protection, reduction in the amount of disposed radioactive waste, reuse of materials (resulting in environmental and material sustainability advantages), and cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Region Three Aerial Measurement System Flight Planning Tool - 12006

The Region 3 Aerial Measurement System Flight Planning Tool is used by the National Nuclear Security Agency (NNSA), United States Department of Energy, Radiological Assistance Program, Region 3, to respond to emergency radiological situations. The tool automates the flight planning package process while decreasing Aerial Measuring System response times and decreases the potential for human error. Deployment of the Region Three Aerial Measurement System Flight Planning Tool has resulted in an immediate improvement to the flight planning process in that time required for mission planning has been reduced from 1.5 hours to 15 minutes. Anecdotally, the RAP team reports that the rate of usable data acquired during surveys has improved from 40-60 percent to over 90 percent since they began using the tool. Though the primary product of the flight planning tool is a pdf format document for use by the aircraft flight crew, the RAP team has begun carrying their laptop computer on the aircraft during missions. By connecting a Global Positioning System (GPS) device to the laptop and using ESRI ArcMap's GPS tool bar to overlay the aircraft position directly on the flight plan in real time, the RAP team can evaluate and correct the aircraft position as the mission is executed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Continuous Improvement and the Safety Case for the Waste Isolation Pilot Plant Geologic Repository - 13467

The Waste Isolation Pilot Plant (WIPP) is a geologic repository 2150 feet (650 m) below the surface of the Chihuahuan desert near Carlsbad, New Mexico. WIPP permanently disposes of transuranic waste from national defense programs. Every five years, the U.S. Department of Energy (DOE) submits an application to the U.S. Environmental Protection Agency (EPA) to request regulatory-compliance re-certification of the facility for another five years. Every ten years, DOE submits an application to the New Mexico Environment Department (NMED) for the renewal of its hazardous waste disposal permit. The content of the applications made by DOE to the EPA for re-certification, and to the NMED for permit-renewal, reflect any optimization changes made to the facility, with regulatory concurrence if warranted by the nature of the change. DOE points to such changes as evidence for its having taken seriously its 'continuous improvement' operations and management philosophy. Another opportunity for continuous improvement is to look at any delta that may exist between the re-certification and re-permitting cases for system safety and the consensus advice on the nature and content of a safety case as being developed and published by the Nuclear Energy Agency's Integration Group for the Safety Case (IGSC) expert group. DOE at WIPP, with the aid of its Science Advisor and teammate, Sandia National Laboratories, is in the process of discerning what can be done, in a reasonably paced and cost-conscious manner, to continually improve the case for repository safety that is being made to the two primary regulators on a recurring basis. This paper will discuss some aspects of that delta and potential paths forward to addressing them. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mobile loading transuranic waste at small quantity sites in the Department of Energy complex-10523

Los Alamos National Laboratory, Carlsbad Office (LANL-CO), operates mobile loading operations for all of the large and small quantity transuranic (TRU) waste sites in the Department of Energy (DOE) complex. The mobile loading team performs loading and unloading evolutions for both contact handled (CH) and remote handled (RH) waste. For small quantity sites, many of which have yet to remove their TRU waste, the mobile loading team will load shipments that will ship to Idaho National Laboratory, a centralization site, or ship directly to the Waste Isolation Pilot Plant (WIPP). For example, Argonne National Laboratory and General Electric Vallecitos Nuclear Center have certified programs for RH waste so they will ship their RH waste directly to WIPP. Many of the other sites will ship their waste to Idaho for characterization and certification. The Mobile Loading Units (MLU) contain all of the necessary equipment needed to load CH and RH waste into the appropriate shipping vessels. Sites are required to provide additional equipment, such as cranes, fork trucks, and office space. The sites are also required to provide personnel to assist in the shipping operations. Each site requires a site visit from the mobile loading team to ensure that all of the necessary site equipment, site requirements and space for shipping can be provided. The mobile loading team works diligently with site representatives to ensure that all safety and regulatory requirements are met. Once the waste is ready and shipping needs are met, the mobile loading team can be scheduled to ship the waste. The CH MLU is designed to support TRUPACT-II and HalfPACT loading activities wherever needed within the DOE complex. The team that performs the mobile loading operation has obtained national certification under DOE for TRUPACT-II and HalfPACT loading and shipment certification. The RH MLU is designed to support removable lid canister (RLC) and RH-72B cask loading activities wherever needed within the DOE complex. The team that performs the mobile loading operation has obtained national certification under DOE for RLC and RH-72B Cask loading and shipment certification. To date, the mobile loading team has successfully made 2,131 CH and RH TRU waste shipments. The mobile loading team continues to provide each site with safe and compliant loading ofTRU waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 68: Small Business Procurement and Contracting Opportunities Within the DOE Complex and USACE FUSRAP Program

This panel session was held in the Panel Zone in the Exhibit Hall and focused on small business procurement and contracting opportunities within the DOE Complex as well as the US Army Corps of Engineers (USACE) National Formerly Utilized Sites Remedial Action Program (FUSRAP) projects. Each panelist provided a general overview of their respective organization, small business goals and the success in meeting those goals. They further discussed recently awarded procurement, upcoming opportunities and provided additional contact information for individual small business program managers within their organization. This panel was open to all WM participants, including Exhibitors. This panel session focused on small business procurement and contracting opportunities within the DOE Complex and the USACE FUSRAP Program. The DOE and USACE contract directly with small businesses and encourage prime contractors to obtain goods and services from small and disadvantaged businesses (Tier 2) and often tie these goals to contract award fee. Goods and services being considered for these procurements include decontamination and decommissioning, remediation, transportation and disposal of radioactive waste, health physics, emergency response planning and training, lab services, R and D products, waste treatment, maintenance, A/E and professional consulting. This panel complemented Session 21 and Session 48, US DOE Spring Quarterly Forum, and Session 88 on Doing Business with the DOE. Presentations proposed include: 1 - Small Business Procurement and Contracting Opportunities Within the DOE Complex (Aaron Deckard, US DOE (USA)); 2 - Small Business Procurement and Contracting Opportunities Within the DOE Complex (William Badger, AECOM (USA)); 3 - Engineering the Extraordinary (Lisa Tribuce-Leoung Tat, Bechtel National, Inc. (USA)); 4 - Fluor Small Business Procurement and Contracting Opportunities (Debra Sampson, Fluor Government Group (USA)); 5 - HII Technical Solutions Division Small Business Opportunities (Kela Lofton, HII Nuclear Inc. (USA)); 6 - U. S. Army Corps of Engineers Radiological Remediation Work (Nicki Fatherly, USACE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Well Plugging and Abandonment, Reconfiguration, and New Well Drilling Activities for Fiscal Year 2008

The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy (DOE) facility for disposal of transuranic mixed waste under a permit issued by the New Mexico Environment Department. WIPP is 26 miles southeast of Carlsbad, New Mexico, in eastern Eddy County. Disposal panels are mined in the Permian Salado Formation at a depth of 2,150 feet below ground surface (bgs). Field activities for this Basic Data Report were initiated in February 2008, and concluded in July 2008. The FY 2008 program included the plugging and abandonment (P&A) of two monitoring wells, which permanently removed them from the monitoring network; the reconfiguration of three existing monitoring wells; and drilling and completion of two new groundwater monitoring wells. In addition, two existing monitoring wells were bailed to restore natural formation water to the casing. This Basic Data Report presents the summary of procedures followed for each well completion as documented by the Site Technical Representative (STR) and the field geologist contracted by Washington TRU Solutions LLC (WTS).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sandia Review of High Bridge Associates Report: Comparison of Plutonium Disposition Alternatives: WIPP Diluted Plutonium Storage and MOX Fuel Irradiation

The subject report from High Bridge Associates (HBA) was issued on March 2, 2016, in reaction to a U.S. Department of Energy (DOE) program decision to pursue down-blending of surplus Pu and geologic disposal at the Waste Isolation Pilot Plant (WIPP). Sandia National Laboratories was requested by the DOE to review the technical arguments presented in the HBA report. Specifically, this review is organized around three technical topics: criticality safety, radiological release limits, and thermal impacts. Questions raised by the report pertaining to legal and regulatory requirements, safeguards and security, international agreements, and costing of alternatives, are beyond the scope of this review.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Audit Report on "Waste Processing and Recovery Act Acceleration Efforts for Contact-Handled Transuranic Waste at the Hanford Site"

The Department of Energy's Office of Environmental Management's (EM), Richland Operations Office (Richland), is responsible for disposing of the Hanford Site's (Hanford) transuranic (TRU) waste, including nearly 12,000 cubic meters of radioactive contact-handled TRU wastes. Prior to disposing of this waste at the Department's Waste Isolation Pilot Plant (WIPP), Richland must certify that it meets WIPP's waste acceptance criteria. To be certified, the waste must be characterized, screened for prohibited items, treated (if necessary) and placed into a satisfactory disposal container. In a February 2008 amendment to an existing Record of Decision (Decision), the Department announced its plan to ship up to 8,764 cubic meters of contact-handled TRU waste from Hanford and other waste generator sites to the Advanced Mixed Waste Treatment Project (AMWTP) at Idaho's National Laboratory (INL) for processing and certification prior to disposal at WIPP. The Department decided to maximize the use of the AMWTP's automated waste processing capabilities to compact and, thereby, reduce the volume of contact-handled TRU waste. Compaction reduces the number of shipments and permits WIPP to more efficiently use its limited TRU waste disposal capacity. The Decision noted that the use of AMWTP would avoid the time and expense of establishing a processing capability at other sites. In May 2009, EM allocated $229 million of American Recovery and Reinvestment Act of 2009 (Recovery Act) funds to support Hanford's Solid Waste Program, including Hanford's contact-handled TRU waste. Besides providing jobs, these funds were intended to accelerate cleanup in the short term. We initiated this audit to determine whether the Department was effectively using Recovery Act funds to accelerate processing of Hanford's contact-handled TRU waste. Relying on the availability of Recovery Act funds, the Department changed course and approved an alternative plan that could increase costs by about $25 million by processing Hanford TRU-waste on-site rather than at AMWTP. Further, under the newly adopted alternative approach, the Department would fail to achieve the previously anticipated reductions in volume associated with the use of existing AMWTP waste compaction capabilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ALTERNATIVES OF MACCS2 IN LANL DISPERSION ANALYSIS FOR ONSITE AND OFFSITE DOSES

In modeling atmospheric dispersion to determine accidental release of radiological material, one of the common statistical analysis tools used at Los Alamos National Laboratory (LANL) is MELCOR Accident Consequence Code System, Version 2 (MACCS2). MACCS2, however, has some limitations and shortfalls for both onsite and offsite applications. Alternative computer codes, which could provide more realistic calculations, are being investigated for use at LANL. In the Yucca Mountain Project (YMP), the suitability of MACCS2 for the calculation of onsite worker doses was a concern; therefore, ARCON96 was chosen to replace MACCS2. YMP's use of ARCON96 provided results which clearly demonstrated the program's merit for onsite worker safety analyses in a wide range of complex configurations and scenarios. For offsite public exposures, the conservatism of MACCS2 on the treatment of turbulence phenomena at LANL is examined in this paper. The results show a factor of at least two conservatism in calculated public doses. The new EPA air quality model, AERMOD, which implements advanced meteorological turbulence calculations, is a good candidate for LANL applications to provide more confidence in the accuracy of offsite public dose projections.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management Strategies for Production of Mo-99

Production of Mo-99 for medical isotope use is being investigated using dissolved low enriched uranium (LEU) fissioned using an accelerator driven process. With the production and separation of Mo-99, a low level waste stream will be generated. Since the production facility is a commercial endeavor, waste disposition paths normally available for federally generated radioactive waste may not be available. Disposal sites for commercially generated low level waste are available, and consideration to the waste acceptance criteria (WAC) of the disposal site should be integral in flowsheet development for the Mo-99 production. Pending implementation of the “Uranium Lease and Take-Back Program for Irradiation for Production of Molybdenum-99 for Medical Use” as directed by the American Medical Isotopes Production Act of 2012, there are limited options for disposing of the waste generated by the production of Mo-99 using an accelerator. The commission of a trade study to assist in the determination of the most favorable balance of production throughput and waste management should be undertaken. The use of a waste broker during initial operations of a facility has several benefits that can offset the cost associated with using a subcontractor. As the facility matures, the development of in-house capabilities can be expanded to incrementally reduce the dependence on a subcontractor.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Talent Programs; Engaging Young Professionals to Increase Engagement in the Radwaste Environment - 19075

In 2015, Millennials became the most populous workforce demographic in the United States. As the largest generation ever, they will have a major influence in the workplace for decades to come. The challenge now faced by employers is the ability to attract, engage, and retain this new generation in a highly competitive labor market. While the Baby Boomer generation continues to retire, maximizing the transfer of knowledge and preparing future leaders in the Radwaste Environment is of utmost importance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 3: Prospects for Shared Solutions for Solving the WM Challenges for Small and Emerging Nuclear Countries

This panel focused on sharing WM solutions for small and emerging nuclear countries. As countries with substantial inventories of spent nuclear fuel pursue their national repository programs with varying degrees of progress, countries with only a few reactors and those at the beginning stages of their nuclear programs face a far different and substantial challenge toward developing a national solution. This session brought together a panel of experts from government and industry to explore shared solutions and next steps building off the recent progress made by international organizations and the recent efforts and lessons learned. Panelists with presentations: The Rationale for a Multinational Repository (Sean Tyson); Perspectives on the Future of the Multi-National Repository Concept (Alan Brownstein); Why Would any Country Accept Foreign Spent Nuclear Fuel? (Charles McCombie); Dual Track Strategy for Small Countries (Leon Kegel)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote-Handled TRU Storage Challenges at Sandia National Laboratories/ New Mexico - 16071

The events at the Waste Isolation Pilot Plant (WIPP) in February 2014 had a significant impact on the packaging, storage, and disposal options at Sandia National Laboratories/New Mexico (Sandia) as with other transuranic generator sites. In 2012, Sandia had identified accountable material for disposal, fresh and irradiated mixed oxide (MOX) and uranium oxide (UO{sub 2}), which had been used in experiments conducted in the 1970's and 1980's. During the 2012/2013 timeframe, discussions with WIPP determined the samples and experimental vessels qualified as remote-handled (RH) transuranic (TRU) waste for disposal at WIPP. Sandia began discussions with WIPP to determine the process to repackage and characterize the material for disposal at WIPP in addition to obtain funding to complete the project. By January 2014, Sandia had contracted with Nuclear Waste Partnerships, LLC (NWP) to provide Central Characterization Program (CCP) certified visual examination (VE) and dose-to-curie (DTC) support to package and certify the accountable material/waste. Work began on February 3, 2014 with the arrival of two VE operators. On February 5, 2014, a salt truck caught fire in the underground and on February 14, 2014, the radiological release occurred at WIPP initiating a suspension of shipments. The length of the suspension was not known at the time. Sandia was only a couple of days into this long-term project, had signed a contract with NWP for support, and was still responsible for meeting earlier negotiated milestones. There were 37 parent containers which included experimental vessels from 3 to 10 feet long and unused material pieces. The original plan was to package each of the 37 parent containers separately, but several issues, including the suspension of shipments, made it imperative that a new path forward be developed. Because space is limited in the Auxiliary Hot Cell Facility (AHCF), the storage configuration for criticality safety and material-at-risk was of the highest importance. Therefore, packaging in the fewest number of containers without exceeding WIPP limits, keeping the accountable items together, and not violating any safety basis requirements was Sandia's goal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗