Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NEVADA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Using Water-Level Models to Conceptualize Groundwater-Flow Systems: Examples from the Nevada National Security Site - 17044

Analysis of water-level trends in well hydro-graphs can be used to better understand and conceptualize a groundwater-flow system. A water-level trend reflects the summation of all natural and anthropogenic stresses acting on the aquifer at the well location. Common stresses include recharge, evapotranspiration, barometric pressure, earth tides, and pumping. A water-level model (WLM) can be used as a tool to distinguish which stresses are affecting the trend and quantify the impact of each stress on the trend. A WLM is an analytical model that fits measured water levels to a synthetic curve representing the sum of one or more time-series components that explain the water-level trend. Time-series components include recharge pulses simulated with Gamma transforms of precipitation; long-term climatic trends and barometric-pressure responses simulated with moving averages of barometric pressure and water levels in background wells; tidal responses computed from theoretical tidal signals; and pumping drawdown simulated with Theis models. WLM examples are presented to show how to: (1) determine and decompose stresses affecting long-term water levels in wells; and (2) estimate short-term draw-downs in observation wells where drawdown is masked by environmental water-level fluctuations. (authors)

58 GEOSCIENCES↗

Nevada National Security Site - Area 5 Waste Received Under Permit SW532

Calendar Year 23 Asbestos Report for Permit SW532 Being resubmitted to address a comment received by NDEP, the weight and volume of two packages on one of the shipments was rounded differently than the quarterly report and we are revising the annual report to match.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗