Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Evaluation of Maximum Dose Rate Resulting from Failure of the Linac Charge Monitoring System

This evaluation was prepared in response to a request from the Accelerator Readiness Review Team for NSLS-II Routine Operations. The purpose of this evaluation is to document the maximum dose rate potential for failures in the linac charge monitoring system. It is noted that the probability of such a failure is extremely low and likely never realized. For the failure to occur, the linac injection has to be set to maximum output, monitoring devices as displayed in the Control Room would go unnoticed by the Operators, the Operator on duty would have to fail to recognize the event, other accumulating charge monitors that alarm at ASE limits would also need to fail or would have to go unrecognized by the Operator and finally there would have to be a simultaneous fault in the storage ring to generate dose on the experimental floor. Regardless of these multiple layers of protection, the maximum dose rate to staff on the NSLS-II experimental floor is presented below.

36 MATERIALS SCIENCE↗

Nevada National Security Site 2018 Data Report: Groundwater Monitoring Program, Area 5 Radioactive Waste Management Site

This report is a compilation of the groundwater and waste cell leachate sampling results from the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site, Nye County, Nevada. Groundwater samples from the aquifer immediately below the Area 5 RWMS have been collected and analyzed and static water levels have been measured in this aquifer since 1993. These groundwater data are evaluated for evidence of effects on the aquifer related to the Area 5 RWMS. Leachate from one lined mixed waste cell at the Area 5 RWMS (Cell 18) has been sampled since the cell opened in 2011. These leachate data are analyzed for hazardous contaminants to determine appropriate leachate handling and disposal. A second lined mixed waste cell at the Area 5 RWMS (Cell 25) began receiving waste in August 2018, but no leachate samples were collected or analyzed during 2018. This report includes data from 2014 through 2018 but focuses on the 2018 data. During 2018, groundwater samples were collected and static water levels were measured at three wells surrounding the Area 5 RWMS. Groundwater samples were collected at wells UE5PW-1, UE5PW-2, and UE5PW-3 on March 6 and August 14, 2018. Static water levels were measured at each of these wells on March 5, June 4, August 13, and October 25, 2018. Groundwater monitoring at the Area 5 RWMS complies with Title 40 Code of Federal Regulations (CFR) Part 264.97, General ground-water monitoring requirements , and 40 CFR 264.98, Detection monitoring program. Groundwater samples were analyzed for indicators of contamination (pH, specific conductance [SC], total organic carbon, total organic halides, and tritium) and, beginning in 2017, toxicity characteristic metals (arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver). General water chemistry parameters (calcium, iron, magnesium, manganese, potassium, sodium, sulfate, chloride, fluoride, bicarbonate, and silicate) were also measured. Results from samples collected in 2018 are within the limits for each parameter established by the Nevada Division of Environmental Protection in Resource Conservation and Recovery Act (RCRA) Permit NEV HW0101, Revision 6. Data from the shallow aquifer indicate there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS, and there were no significant changes in measured groundwater parameters compared to previous years. Leachate from lined mixed waste Cell 18 drains into a sump and is pumped into an above ground tank. Samples are collected from the tank when the leachate volume approaches the 3,000-gallon tank capacity. During 2018, leachate samples were collected on March 1, 2018 and August 1, 2018. All leachate analysis results are below the regulatory levels for toxicity characteristic contaminants (40 CFR 261.24) and below the investigation levels for polychlorinated biphenyls (PCBs), tritium, pH, and SC specified in RCRA Permit NEV HW0101, Revision 6. No quantifiable PCB levels were detected in any leachate sample. Based on the leachate analysis results, RCRA Permit NEV HW0101 allowed all leachate collected from Cell 18 to be pumped from the collection tank and used for dust control at Cell 18.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Integrated Biomimetic Framework with Intelligent Monitoring, Cognition and Decision Capabilities for Control of Advanced Energy Plants

The objective of the project entitled “Development of Integrated Biomimetic Framework with Intelligent Monitoring, Cognition, and Decision Capabilities for Control of Advanced Energy Plants” is to develop algorithms and methodologies for designing a biomimetic control system for optimal control of advanced energy plants. Traditionally, control systems have been designed based on assumed a priori knowledge of the process system. A number of variables are manipulated to accomplish disturbance rejection and/or servo control performance. While it is possible to adapt the process model based on available data, the control structure and the controllers rarely change. Thus, the knowledge learnt during process operation is lost or remains underutilized. In addition, the business models of today, especially for power plants, are rapidly changing. The power plant operators are being pushed to the edge due to the penetration of renewable energy derived power to the grid, the demand for high efficiency, ever-tightening environmental regulations, and requirements for increased plant availability. Thus, power plant operations need to be agile and should adapt quickly to the dynamic requirements. A number of characteristics distinguish biological systems from the traditional process control systems. Self-organization, distributed intelligence, adaptability, intelligent monitoring, cognition, and decision capabilities are some of the powerful characteristics of the biological world that can be effectively utilized in process control. At the top, the central nervous system (CNS) integrates the information from and coordinates the activities of all parts of the bodies (for bilaterian animals). Inspired by these distinct characteristics, this project seeks to develop methodologies and algorithms to accomplish: (i) self-organization of the control structure for maximizing the plant’s operating profit by mimicking the function of the cortical areas in the human brain, (ii) distributed and adaptive controllers that mimic the rule of pursuit present in ants, (iii) intelligent monitoring of the controllers powered with cognition and decision capabilities that mimic the artificial immune systems, and (iv) seamless coordination and integration in the control system that mimics the CNS.

20 FOSSIL-FUELED POWER PLANTS↗

Filtration testing for enhanced performance of Radionuclide Monitoring Stations for Nuclear Treaty Verification

A study of aerosol filtration was conducted to improve U.S. Radionuclide Monitoring Station (RMS) performance for Nuclear Treaty Verification. The primary objectives of this study were to improve system operability and maintainability, reduce power consumption and operational cost, and reduce baseline radionuclide sensitivity. To meet these goals, Sandia National Laboratories (SNL) studied the performance of alternate filter materials and aerosol collection technologies that could be engineered into U.S. Radionuclide Monitoring Stations. Laboratory-scale filtration experiments were conducted with Filter Material 1, FM1 (current filter), Filter Material 2, FM2, and Filter Material 3, FM3. All three materials employ electrostatically charged filter fibers to enhance nanoparticle collection. FM2 and FM3 both had higher air permeability with respect to FM1 which is advantageous for high volume collection and power savings. Particle pre-charging, a well-established industrial technique used in electrostatic precipitators, was tested to see if electrostatically charging particles prior to filtration could enhance filter performance. We found that particle-pre-charging did enhance aerosol collection efficiencies for materials which would not have otherwise satisfied RMS performance requirements. Laboratory-scale testing indicated it may be possible to reduce the baseline radionuclide sensitivity to approximately 60% of its current value by increasing the volume of air sampled in 24 hours to 2.5 times the current air volume. Improvements to geolocation may also be possible with shorter air samples (e.g., 12 hours). A new methodology was developed at SNL to assess filter performance using established RMS certification procedures. We coined these tests “mid-scale” since they bridged the gap between laboratory-scale and full-scale RMS testing. Four filter specimens were drawn from the exact same atmospheric aerosol. Gamma spectroscopy was used to assess radiological backgrounds due to radon progeny and other naturally occurring radionuclides. Direct comparisons between the four filters allowed SNL to quantify the relative change in baseline sensitivity by altering air flow rate, filter material, and particle-pre charging. Mid-scale results agreed with laboratory-scale results: alterations to RMS configuration (filter, flow, and particle charge) may result in baseline sensitivities approximately 55-60% of their current values. Finally, an assessment of scalability was performed to determine if technical approaches used in laboratory-scale and mid-scale testing could be engineered into full-scale Radionuclide Monitoring Stations. Results suggested that particle-pre-charging is a viable technical approach if reductions in baseline sensitivity or power consumption are desired.

54 ENVIRONMENTAL SCIENCES↗

SRS Composite Analysis Monitoring Plan (FY2019 Model Validation)

Using a projected end-state date of 2065 (SRNS 2015b), the Savannah River Site (SRS) Composite Analysis (CA) modeling for each facility and waste site began on the inventory year assigned to it so that source depletion and radionuclide transport out of the system could be appropriately captured. Some SRS waste sites that have already achieved their end states (i.e. end-state inventories and end-state configuration) are currently contributing to the potential off-site public dose through source release, groundwater transport, discharge to on-site surface streams, and stream transport to the CA point of assessments (POAs). The inventory year assigned to these waste sites is 2002 or before. This means that SRS CA results from 2002 and beyond are a reasonable representation for these waste sites that have already achieved their end states and are currently contributing to the potential off-site public dose. The SRS Annual Environmental Report (AER) monitoring can differentiate and separate liquid pathway data allowing the data representing only waste sites at their end state to be produced. Because the SRS CA has projected reasonable end-state impacts from 2002 and beyond, and the AER monitoring can differentiate and separate operating and end-state contributions to annual liquid pathway release, an opportunity exists to use the AER monitoring data to validate the SRS CA model. The CA model validation program uses a graded and systematic approach for taking corrective action, starting with an SRS established administrative dose limit of 15 mrem/yr, below which no action is required. Based on the location of the 2010 SRS CA POAs, the only potential exposure pathway for the public is through surface water. The completion of the FY2019 CA model validation indicates that the SRS CA projected dose, while generally conservative, provides a reasonable representation of the maximum annual doses. These doses are well below the administrative limit; therefore, no additional action is required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an In-Situ Method for Cable Condition Monitoring in Nuclear Power Plants (SBIR Phase IIB Final Report)

This is the final report of a Small Business Innovation Research (SBIR) project that Analysis and Measurement Services Corporation (AMS) has conducted for the U.S. Department of Energy (DOE) over a seven-and-a-half year period (February 2013 through April 2020 with the awards of Phase I, Phase II and Phase IIB projects). The goal of the project was to design, develop, validate, and demonstrate a technique for in-situ testing of cable insulation polymers that will identify, locate, and provide the degree of aging for cables commonly used in nuclear power plants. During the Phase I project, AMS established that the frequency domain reflectometry (FDR) technique can successfully identify and measure cable insulation degradation that can be trended with aging. In Phase II, AMS performed extensive cable aging studies to correlate FDR measurements with other laboratory condition monitoring techniques and developed aging condition categories to quantify the severity of insulation degradation. In Phase IIB, the project expanded the research to include a wider variety of cable polymers that are used in the commercial nuclear power industry. This work also involved developing acceptance criteria to objectively assess age-related cable degradation while sharing the results of this research with industry, academia, and national laboratories to advance the state of the art in cable aging management technologies. The products developed under this research project provide the nuclear industry with an effective condition monitoring tool to support safe and long-term plant operation. Throughout the project, collaborations and support were received from a variety of industry organizations and individuals including DOE National Laboratories as well as nuclear plant utilities and several other industry experts and cable manufacturers. Contributions from these organizations included the donation of new cables, naturally aged cables, and research collaboration. The validation and commercialization of the products of this project were achieved through opportunities to test and demonstrate the technologies’ capabilities on-site at nuclear power generation and research facilities as well as in the laboratory alongside industry peers and cable testing service companies. The research resulted in a technology that can be used to identify, locate, and quantify age-related degradation in several types of cable polymers. This included developing software and hardware as well as the methodology for using the FDR technique to assess age-related degradation of installed cables. The technology developed under this project can provide nuclear plant management, engineers, and technicians with an in-situ electrical test method to determine if in-service cables need to be replaced, monitored on a periodic basis, or show no evidence of significant age-related degradation that may require action. Near the end of this Phase IIB project, the FDR product was sold to a nuclear power utility in South Korea. This sale of a dedicated aging assessment tool is the beginning of a comprehensive contract with the expectation of twelve (12) units sold to that country. Additionally, the FDR technology has been sold to several industry organizations including a nuclear research institute and the Diablo Canyon nuclear power plant. This technology is also being leased by other nuclear industry service companies for incorporation into aging management programs. The cable testing technology that was developed under this project was also integrated into a comprehensive cable aging assessment service that is being offered to the nuclear industry at the request of U.S. nuclear utilities and is currently part of onsite testing services provided by AMS.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

2018 Long-Term Hydrologic Monitoring Program Report for Rio Blanco, Colorado, Site

This report presents the monitoring data collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Rio Blanco, Colorado, Site (Figure 1). The Rio Blanco site was the location of an underground nuclear test during which three nuclear devices were detonated nearly simultaneously in a single borehole in 1973. The test resulted in residual radionuclide contamination at the detonation depths of 5840, 6230, and 6690 feet (ft) (DOE 2015). Monitoring includes the collection of samples from groundwater wells and surface water locations near the site to assess for any potential impacts that may be attributed to the Rio Blanco nuclear test. This report summarizes the laboratory analytical results obtained from the sampling event conducted in 2018. This annual report and previous reports are available on the LM public website at https://www.lm.doe.gov/rio_blanco/Sites.aspx. Data collected during this and previous monitoring events are available on the Geospatial Environmental Mapping System (GEMS) website at https://gems.lm.doe.gov/#site=RBL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial development of an in-situ, passive material surveillance test article for monitoring high temperature reactor structural components

This report describes the development of a family of passively-actuated surveillance test articles, suitable for use in an in-situ reactor test program monitoring the degradation in structural material properties caused by the reactor environment. The test articles apply creep-fatigue-type cyclic load to a test section driven by changes in the reactor coolant temperature converted to mechanical force by differential thermal expansion. The report describes three types of test articles, all of which apply the load to a 316H test section using Alloy 617 as the driver material. The three types of specimens each serve a unique purpose: (1) initial proof-of-concept, (2) validation of the models used to size the specimens to achieve a given strain range, and (3) demonstration that the articles can be miniaturized for use in an actual operating reactor. In addition to the specimen design, fabrication, and testing, this report describes the outline of two types of in-situ monitoring programs, using the test article. Monitoring programs such as these could be a critical component in gaining regulator acceptance for Molten Salt Reactor (MSR) designs using structural materials for which there is little long-term experimental environmental testing or operating experience available for calibrating the component structural design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Selection of Well Locations for Saturated Zone Monitoring at the E-Area Low Level Waste Facility

Savannah River Site (SRS) has adopted a revised approach to performance monitoring of the E- Area Low Level Waste Facility (ELLWF) that adds a saturated zone component to the existing vadose zone monitoring program (Kubilius, 2019). The revised monitoring approach specifies that eight additional water table wells be installed near Slit Trench 1 (ST1) and Engineered Trench 2 (ET2). Six wells will be installed at locations characterized in 2017 and 2018. These include four wells near ET2 (ELF001D, ELF002D, ELF003D, and ELF004D) at locations identified by Kubilius (2019) and two wells north of ST1 (ELF005D and ELF006D) at locations finalized in this report. Additionally, two wells (ELF007D and ELF008D) are to be installed at locations south of ST1 based on characterization work completed in 2020 and documented in this report. This area is near well cluster BGX-2 between the Mixed Waste Management Facility (MWMF) and the ELLWF. The area is upgradient of ELLWF and, contamination in the water table aquifer is sourced from MWMF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Results for Avian Monitoring at the Technical Area 36 Minie Site, Technical Area 39 Point 6, and Technical Area 16 Burn Ground at Los Alamos National Laboratory

Los Alamos National Laboratory (LANL) biologists in the Environmental Protection and Compliance Division initiated a multi-year program in 2013 to monitor avifauna (birds) at two open detonation sites and one open burn site on LANL property. In this annual report we compare monitoring results from these efforts among years to monitor trends. The objectives of this study are to 1) determine whether LANL operations impact bird species richness, diversity, or abundance and 2) examine occupancy and nest success of secondary-cavity nesting birds using nestboxes. LANL biologists completed the eighth year of this effort in 2020

54 ENVIRONMENTAL SCIENCES↗

GMS Station SOH Monitoring Configuration Guide (V.1.2)

The GMS Station State-of-Health (SOH) monitoring capability provides the system controller the ability to view current SOH values and calculated statistics for stations and channels, view trend plots of SOH values, be notified when station SOH status changes, and acknowledge or quiet notifications while the station issues are being investigated. The SOH monitoring capability includes components to acquire CD 1.1 protocol station data, extract SOH information from the raw data packets, process the raw SOH information for display, store the SOH information, and display the SOH information in an interactive display. All these components use system and processing configuration to provide the system controller mission-relevant information about station health. This document is a guide to setting the processing configuration for GMS SOH monitoring.

97 MATHEMATICS AND COMPUTING↗

GMS Station SOH Monitoring Users Guide (V.1.2)

The Geophysical Monitoring System (GMS) State-of-Health User Interface (SOH UI) is a web-based application that allows a user to view and acknowledge the SOH status of stations in the GMS system. The SOH UI will primarily be used by the System Controller, who monitors and controls the system and external data connections. The System Controller uses the station SOH UIs to monitor, detect, and troubleshoot problems with station data availability and quality.

58 GEOSCIENCES↗

Three Years of Multilevel Monitoring Data at the Riverton, Wyoming, Processing Site That Show Contaminant Increases After River Flooding Events and a Large Recharge Event

The tailings pile at the Riverton, Wyoming, Processing Site has been removed, but contaminant concentrations in the shallow aquifer increase after large recharge events. The Riverton site experienced flooding near the Little Wind River in early May 2016, February 2017, and June 2017. The May 2016 flooding was from a large rain event. The February 2017 flooding was due to an ice jam, and the June 2017 flooding was due to mountain snowmelt runoff. In addition, the site experienced high water tables in April and May 2017, as this was the second wettest spring in Riverton since records began in 1918. Past reports indicated the accumulation of solid-phase uranium and molybdenum in evaporites above the respective contaminant groundwater plumes. Given these data, multilevel monitoring wells were installed in 2015 to monitor seasonal changes in groundwater quality. Data from three years of groundwater monitoring are summarized in this report and compared with the flooding and large recharge events. The results indicate that evaporite-related constituents (especially sodium, sulfate, and chloride) present across the site in a silt layer can be released to the shallow sand and gravel aquifer during flooding and large recharge events. The solid-phase and water-phase data confirm that these evaporites are mainly sodium sulfate and sodium chloride salts with some calcite and gypsum.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Mitigation and Monitoring Report for the Arroyo Las Positas Management Project

This report describes maintenance, monitoring, and mitigation conducted in 2020 as part of the Arroyo Las Positas Management Project (the project) at Lawrence Livermore National Laboratory’s (LLNL’s) Livermore Site. The purpose of this project is to enhance habitat value for the California red-legged frog (Rana draytonii) within the LLNL reach of Arroyo Las Positas and protect LLNL facilities from flooding. The project description, in addition to the monitoring and mitigation requirements for this project are described in the October 2015 Revised Mitigation and Monitoring Plan for the Arroyo Las Positas Management Project (MMP) and the Formal Consultation on the Proposed Arroyo Maintenance Project on Arroyo Las Positas at Lawrence Livermore National Laboratory (biological opinion; Service File Numbers 1-1-97-F-173 and 1-1-98-I-1562).

54 ENVIRONMENTAL SCIENCES↗

Integrated System and Application Continuous Performance Monitoring and Analysis Capability

Scientific applications run on high-performance computing (HPC) systems are critical for many national security missions within Sandia and the NNSA complex. However, these applications often face performance degradation and even failures that are challenging to diagnose. To provide unprecedented insight into these issues, the HPC Development, HPC Systems, Computational Science, and Plasma Theory & Simulation departments at Sandia crafted and completed their FY21 ASC Level 2 milestone entitled "Integrated System and Application Continuous Performance Monitoring and Analysis Capability." The milestone created a novel integrated HPC system and application monitoring and analysis capability by extending Sandia's Kokkos application portability framework, Lightweight Distributed Metric Service (LDMS) monitoring tool, and scalable storage, analysis, and visualization pipeline. The extensions to Kokkos and LDMS enable collection and storage of application data during run time, as it is generated, with negligible overhead. This data is combined with HPC system data within the extended analysis pipeline to present relevant visualizations of derived system and application metrics that can be viewed at run time or post run. This new capability was evaluated using several week-long, 290-node runs of Sandia's ElectroMagnetic Plasma In Realistic Environments ( EMPIRE ) modeling and design tool and resulted in 1TB of application data and 50TB of system data. EMPIRE developers remarked this capability was incredibly helpful for quickly assessing application health and performance alongside system state. In short, this milestone work built the foundation for expansive HPC system and application data collection, storage, analysis, visualization, and feedback framework that will increase total scientific output of Sandia's HPC users.

97 MATHEMATICS AND COMPUTING↗

Southeast Regional Carbon Sequestration Partnership (SECARB) Revised Monitoring Plan

This report summarizes the revisions made after attainment of project metrics of monitoring 1.5 million metric tons stored which occurred at 1 ½ years and after the end of the period of accelerated injection rate (February 2011) to reach project metrics. Denbury continues downdip injection because of its impact on production, but has modified the rate of injection to meet its EOR objectives. Therefore this project will not have a post-injection “closure” period. Injected CO 2 is being recycled and the flow field is substantively controlled by production. However, a period of observation of this long duration storage has value to the program in terms of showing no impact on near-surface environments and monitoring any changes in the reservoir over the long term. In addition, observations made during the first two years of injection have raised a number of significant questions that can be addressed during the next stages of research. Lastly, budget readjustment is needed, as some tasks have gone over budget and some have been completed under budget, leaving some opportunities to address remaining issues. This report provides an overview of the revisions and supplements proposed to the modeling and monitoring plan to complete the project.

01 COAL, LIGNITE, AND PEAT↗

Integrated System and Application Continuous Performance Monitoring and Analysis Capability (Final)

Scientific applications run on high-performance computing (HPC) systems are critical for many national security missions within Sandia and the NNSA complex. However, these applications often face performance degradation and even failures that are challenging to diagnose. To provide unprecedented insight into these issues, the HPC Development, HPC Systems, Computational Science, and Plasma Theory & Simulation departments at Sandia crafted and completed their FY21 ASC Level 2 milestone entitled "Integrated System and Application Continuous Performance Monitoring and Analysis Capability." The milestone created a novel integrated HPC system and application monitoring and analysis capability by extending Sandia’s Kokkos application portability framework, Lightweight Distributed Metric Service (LDMS) monitoring tool, and scalable storage, analysis, and visualization pipeline. The extensions to Kokkos and LDMS enable collection and storage of application data during run time, as it is generated, with negligible overhead. This data is combined with HPC system data within the extended analysis pipeline to present relevant visualizations of derived system and application metrics that can be viewed at run time or post run. This new capability was evaluated using several week-long, 290-node runs of Sandia’s ElectroMagnetic Plasma In Realistic Environments (EMPIRE) modeling and design tool and resulted in 1TB of application data and 50TB of system data. EMPIRE developers remarked this capability was incredibly helpful for quickly assessing application health and performance alongside system state. In short, this milestone work built the foundation for expansive HPC system and application data collection, storage, analysis, visualization, and feedback framework that will increase total scientific output of Sandia’s HPC users.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Project 57 Air Monitoring Report: January 1 through September 30, 2020, with a Review of the Period of Record Radionuclide Analyses

The DOE Environmental Management Nevada Program (EM NV) identified the Project 57 contaminated area as Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion Site, which consisted of one Corrective Action Site (CAS): NAFR-23- 02, Pu Contaminated Soil (U.S. DOE, 2014). The CAS included several Project 57 operational facilities in addition to the plutonium-contaminated soil. With approval of the State of Nevada Division of Environmental Protection, the DOE closed the Project 57 surface soil contamination site in October 2020. Closure was accomplished by installing a clean soil cap constructed over ground zero and the surrounding areas of the CA that may be entrained with wind-transported soil particles. After completion of the ground zero cap in October 2020, DRI discontinued monitoring of meteorological and associated environmental conditions at the Project 57 site as directed by DOE EM NV. Navarro dismantled air monitoring stations P57-3 and P57-4 and removed the equipment on October 20, 2020. This report presents the meteorological and dust observations and radiological analyses accomplished during the approximately 10 months when the air monitoring data collection equipment was operational during CY2020.

54 ENVIRONMENTAL SCIENCES↗