Solid rockets- seeking a new plateau. part ii- the state-of-art in solid rockets designed primarily for space missions
State of art in solid rockets designed primarily for space missions
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
State of art in solid rockets designed primarily for space missions
Future Exploration missions will require an Oxygen Generation Assembly (OGA) to electrolyze water to supply oxygen for crew metabolic consumption. The system design will be based on the International Space Station (ISS) OGA but with added improvements based on lessons learned during ISS operations. These improvements will reduce system weight, crew maintenance time and resupply mass from Earth while increasing reliability. Currently, the design team is investigating the feasibility of the upgrades by performing ground tests and analyses. Upgrades being considered include: redesign of the electrolysis cell stack, deletion of the hydrogen dome, replacement of the hydrogen sensors, deletion of the wastewater interface, redesign of the recirculation loop deionizing bed and redesign of the cell stack Power Supply Module. The upgrades will be first demonstrated on the ISS OGA.
Monte is a software set designed for use in mission design and spacecraft navigation operations. The system can process measurement data, design optimal trajectories and maneuvers, and do orbit determination, all in one application. For the first time, a single software set can be used for mission design and navigation operations. This eliminates problems due to different models and fidelities used in legacy mission design and navigation software. The unique features of Monte 040 include a blowdown thruster model for GRAIL (Gravity Recovery and Interior Laboratory) with associated pressure models, as well as an updated, optimalsearch capability (COSMIC) that facilitated mission design for ARTEMIS. Existing legacy software lacked the capabilities necessary for these two missions. There is also a mean orbital element propagator and an osculating to mean element converter that allows long-term orbital stability analysis for the first time in compiled code. The optimized trajectory search tool COSMIC allows users to place constraints and controls on their searches without any restrictions. Constraints may be user-defined and depend on trajectory information either forward or backwards in time. In addition, a long-term orbit stability analysis tool (morbiter) existed previously as a set of scripts on top of Monte. Monte is becoming the primary tool for navigation operations, a core competency at JPL. The mission design capabilities in Monte are becoming mature enough for use in project proposals as well as post-phase A mission design. Monte has three distinct advantages over existing software. First, it is being developed in a modern paradigm: object- oriented C++ and Python. Second, the software has been developed as a toolkit, which allows users to customize their own applications and allows the development team to implement requirements quickly, efficiently, and with minimal bugs. Finally, the software is managed in accordance with the CMMI (Capability Maturity Model Integration), where it has been ap praised at maturity level 3.
Engineering design specifications and development of the large area detector and photomultiplier tube assemblies for the Burst and Transient Source Experiment (BATSE) of the Gamma Ray Observatory (GRO) mission are examined.
This paper describes the mission and system design for a viable, promising first mission application of solar sail technology.
A successful design was developed, one with many advantages over the original mission. The time spent in orbit was more evenly spread over the region being investigated. The radiation close was significantly lower and the mission did not rely on gravity assist at the moon and thus did not have to make measurements that far out in the tail. A spacecraft design was developed that keeps interference from the engines to a minimum. The design however was quite specific for four spacecraft. It could not be easily scaled to five spacecraft for example. One problem was discovered that is a concern for all similar missions. Inter- spacecraft communication can determine the spacing of the vehicles easily and to the accuracy required. However, the orientation of the polyhedron with the spacecraft at its vertices is not well known for small separations. Ground station range measurements give the line of sight location well but not the angle around that vector. This is a problem any such mission needs to solve. Neither the navigation teams at Goddard nor at Lewis were willing to attempt to solve this problem. At the completion of the study a report was made to the AGU meeting in San Francisco and a paper published in the volume "Science Closure and Enabling Technologies for Constellation Class Missions". This paper is attached.
Neptune is a prime destination for future exploration missions. This study designed the mission concept including the Flagship-class orbiter and atmospheric probe to the Neptune-Triton system. The results of this study will be used as the Decadal Survey considers on NASA’s planetary science priorities from 2022-2032.This poster will focus on the design of the entry and descent sequence for the atmospheric probe.
This design study was conducted to support the HABEX project. There are a number of companion papers at this conference which go into detail on what all the HABEX goals are. The objective of this paper is to establish a baseline primary mirror design which satisfies the following structural related requirements. The designs in this study have a high TRL (Technology Readiness Level), realistic manufacturing limits and performance in line with the HABEX mission. A secondary goal of the study was to evaluate a number competing criteria for the selection. Questions such as differences in the on axis versus off axis static and dynamic response to disturbances. This study concentrates on the structural behavior, companion papers cover thermal and long term stability aspects of the problem.
Data return advantages of earth-Mars-earth flyby trajectories over more conventional Mars trajectories
Jupiter orbiter spacecraft propulsion system design, noting advantages of fluorine/hydrazine propellant combination
This paper provides an overview of the Shuttle Radar Topography Mission (SRTM), with emphasis on flight system implementation and mission operations from systems engineering perspective. Successfully flown in February, 2000, the SRTM's primary payload consists of several subsystems to form the first spaceborne dual-frequency (C-band and X-band) fixed baseline interferometric synthetic aperture radar (InSAR) system, with the mission objective to acquire data sets over 80% of Earth's landmass for height reconstruction. The paper provides system architecture, unique design features, engineering budgets, design verification, in-flight checkout and data acquisition of the SRTM payload, in particular for the C-band system. Mission operation and post-mission data processing activities are also presented. The complexity of the SRTM as a system, the ambitious mission objective, the demanding requirements and the high interdependency between multi-disciplined subsystems posed many challenges. The engineering experience and the insight thus gained have important implications for future spaceborne interferometric SAR mission design and implementation.
NASA ARC's Coded Structures Laboratory (CSL) is developing autonomous construction, maintenance, and reconfiguration technologies to meet long-duration and deep space infrastructure needs, in accordance with long-term NASA goals of "in-space reliance" and "mass-less exploration." We seek to achieve these capabilities by utilizing a "programmable meta-material" approach that integrates emerging advances in materials (mechanical meta-materials), manufacturing (cooperative mobile robotics), and autonomy (multi-agent planning algorithms). Through the ARMADAS project, we have shown assembly of high-performance engineered cellular materials using multiple cooperating mobile robotic assemblers. In this paper, we describe how such a programmable meta-material architecture may shift the paradigm of how we design, build, manufacture, and operate future space infrastructure and assets. The core of a programmable meta-material architecture consists of 3 main technology sub-areas: the structure, the assembly agents, and the assembly algorithms. We co-design these systems to ensure an adaptable system that can create and reconfigure structures from a base set of building block components. From this core technology, we can branch out and expand the capability of the system through additional secondary component types and robotic agents to perform activities such as inspections, maintenance, repair, payload installation, or perform power and communications interconnect. As these technologies mature, future designers will be able to utilize the system to rapidly integrate and operate assets in space or on planetary surfaces from a set of well-tested part library, or create their own modules to integrate into the system. A core trait to the development of this system is the automation approach. Because of the modular and functional discrete (pixel-like) nature of the structural system, a diverse set of powerful algorithms for analysis, planning, and simulation can be adapted and leveraged to optimize construction, maintenance, and dynamic reorganization (as hardware with programmable form and function). With an ability to free the design space from launch vehicle constraints and fundamentally shift how a mission is designed and conducted, we discuss the influence of a programmable meta-material architecture on mission design, build, and operations. For the "design phase", we discuss project lifecycle effects, costs, time, and performance. For the "build phase", we discuss reusability, ISRU, manufacturing, material logistics, and scalability. And for "operations", we discuss autonomy, maintenance and upgrades, reliability, and reconfiguration. Autonomy and modularity are the primary enabling traits of this system. Engineering systems that utilize a modular and reconfiguration building block approach such as digital communication and computation systems, currently lead all other areas of technology in size and complexity scalability. NASA is extending the benefits and flexibility of digital systems to hardware systems, to optimize materials lifecycle management and expand our space exploration mission capabilities.
Using generalized logarithmic spirals to approximate low-thrust trajectories, a new strategy for the design of low-thrust gravity-assist transfers has been developed. Each transfer leg is defined by a semi-analytic model, and its solution is equivalent to a hybrid Lambert’s problem. The method is suitable for approximating both flyby and rendezvous transfer legs. A branch and prune algorithm is used to generate a collection of initial guesses for further optimization. The analytic nature of the low-thrust model simplifies the pruning step, since dynamical and operational constraints (like maximum thrust or total v) can be imposed easily. The solutions obtained with the global search algorithm can be post-processed, filtered, and ranked according to various criteria. This is where the versatility of the method resides, because changing the selection criteria does not require a new search. Selected candidates are then optimized further, in order to generate actual low-thrust orbits. Two mission design examples are presented: an asteroid deflection mission using a kinetic impactor, and a rendezvous mission to Jupiter. These examples are used to analyze the convergence of the optimization stage, in particular how far from the optimal solution the initial guesses are.
Experimental design for the Mariner mission to Comet Encke is considered, examining the following experiments: volatile and nonvolatile chemical analysis, an imaging system for the comet nucleus, the ultraviolet spectrometer, and magnetic field and plasma experiments. Mission design is discussed, emphasizing the mission profile, trajectory and targeting and the spacecraft design.
Conceptual design of low-boom supersonic aircraft is heavily dictated by aircraft volume and lift distributions. These unique design characteristics make it a challenge to enforce mission requirements (such as static margins and trim requirements) during design optimization. This low-boom design challenge is resolved by using reversed equivalent area targets for low-fidelity low-boom inverse design and a block coordinate optimization (BCO) method for multidisciplinary design optimization (MDO). The corresponding low-boom MDO problem includes aircraft mission constraints on ranges, cruise speeds, trim for low-boom cruise, static margins for takeoff/cruise/landing, takeoff/landing field lengths, approach velocity, and tail rotation angles for trim at takeoff/landing, as well as fuselage volume constraints for passengers and main gear storage. The BCO method is developed to optimally resolve the conflicts between the low-boom inverse design objective and other design constraints. This method is successfully applied to design a low-boom supersonic configuration that carries 40 passengers, flies a low-boom mission with cruise Mach of 1.6 and range of 2,500 nm, and cruises overwater at Mach 1.8 with range of 3,600 nm. The generated configuration satisfies all specified mission constraints and has the potential to match a reversed equivalent area target with ground noise level below 70 PLdB.
The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.
The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.
A team was created to participate in the Mars Scout Opportunity. Trade studies determined that an aircraft provided the best opportunity to complete the science objectives of the team. A high fidelity six degree of freedom flight simulation was required to provide credible evidence that the aircraft design fulfilled mission objectives and to support the aircraft design process by providing performance evaluations. The team created the simulation using the Langley Standard Real-Time Simulation in C++ (LaSRS++) application framework. A rapid prototyping approach was necessary because the team had only three months to both develop the aircraft simulation model and evaluate aircraft performance as the design and mission parameters matured. The design of LaSRS++ enabled rapid-prototyping in several ways. First, the framework allowed component models to be designed, implemented, unit-tested, and integrated quickly. Next, the framework provides a highly reusable infrastructure that allowed developers to maximize code reuse while concentrating on aircraft and mission specific features. Finally, the framework reduces risk by providing reusable components that allow developers to build a quality product with a compressed testing cycle that relies heavily on unit testing of new components.