Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “HVAC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Advanced Building Construction (ABC) Research Opportunities Report: Industrializing Construction to Decarbonize Buildings

The DOE Building Technologies Office generally seeks to develop, demonstrate, and accelerate the adoption of cost-effective technologies, techniques, and tools in support of an equitable transition to a decarbonized building stock and energy system by 2050. This ABC Innovations Roadmap specifically focuses on and prioritizes innovations that support the industrialization of whole building retrofits and rapid growth of efficient new construction. The content relates to the integration of technologies and industrialization of processes associated with building construction and renovation. The ABC Innovations Roadmap cross-applies innovations in both the new and existing building sectors with a focus on widescale applicability. Installation flexibility is key to commoditizing solutions that are applicable for a wide variety of buildings (e.g., different building types, vintages, architectural details, and system configurations) and to help simplify decarbonization processes for the workforce.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Best Practices Series, Volume 9: Builders Challenge Guide to 40% Whole-House Energy Savings in the Hot-Dry and Mixed-Dry Climates

This best practices guide is the ninth in a series of guides for builders produced by the U.S. Department of Energy’s Building America Program. This guide book is a resource to help builders design and construct homes that are among the most energy-efficient available, while addressing issues such as building durability, indoor air quality, and occupant health, safety, and comfort. With the measures described in this guide, builders in the hot-dry and mixed-dry climates can achieve homes that have whole house energy savings of 40% over the Building America benchmark (a home built to mid-1990s building practices roughly equivalent to the 1993 Model Energy Code) with no added overall costs for consumers. These best practices are based on the results of research and demonstration projects conducted by Building America’s research teams. The guide includes information for managers, designers, marketers, site supervisors, and subcontractors, as well as case studies of builders who are successfully building homes that cut energy use by 40% in the hot-dry and mixed-dry climates.

54 ENVIRONMENTAL SCIENCES↗

Rebuilding It Better: Greensburg, Kansas. Kiowa County Courthouse (Brochure)

This document is one in a series of five that showcases the green, sustainable buildings in Greensburg, Kansas. The Kiowa County Courthouse was one of only two buildings left standing after the tornado, which allowed the building to be renovated and refurbished rather than torn down.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demonstration of Datacenter Automation Software and Hardware (DASH) at the California Franchise Tax Board

Control software and wireless sensors designed for closed-loop, monitoring and control of IT equipment's inlet air temperatures in datacenters were evaluated and tested while other datacenter cooling best practices were implemented. The controls software and hardware along with each best practice were installed sequentially and evaluated using a measurement and verification procedure between each measure. The results show that the overall project eliminates 475,239 kWh per year, which is 21.3percent of the baseline energy consumption of the data center. The total project, including the best practices will save $42,772 per year and cost $134,057 yielding a simple payback of 3.1 years. However, the control system alone eliminates 59.6percent of the baseline energy used to move air in the datacenter and 13.6percent of the baseline cooling energy, which is 15.2percent of the baseline energy consumption (see Project Approach, Task 1, below, for additional information) while keeping temperatures substantially within the limits recommended by ASHRAE. Savings attributed to the control system are $30,564 per year with a cost $56,824 for a simple payback of 1.9 years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Duct Leakage Modeling in EnergyPlus and Analysis of Energy Savings from Implementing SAV with InCITeTM

This project addressed two significant deficiencies in air-handling systems for large commercial building: duct leakage and duct static pressure reset. Both constitute significant energy reduction opportunities for these buildings. The overall project goal is to bridge the gaps in current duct performance modeling capabilities, and to expand our understanding of air-handling system performance in California large commercial buildings. The purpose of this project is to provide technical support for the implementation of a duct leakage modeling capability in EnergyPlus, to demonstrate the capabilities of the new model, and to carry out analyses of field measurements intended to demonstrate the energy saving potential of the SAV with InCITeTM duct static pressure reset (SPR) technology. A new duct leakage model has been successfully implemented in EnergyPlus, which will enable simulation users to assess the impacts of leakage on whole-building energy use and operation in a coupled manner. This feature also provides a foundation to support code change proposals and compliance analyses related to Title 24 where duct leakage is an issue. Our example simulations continue to show that leaky ducts substantially increase fan power: 10percent upstream and 10percent downstream leakage increases supply fan power 30percent on average compared to a tight duct system (2.5percent upstream and 2.5percent downstream leakage). Much of this increase is related to the upstream leakage rather than to the downstream leakage. This does not mean, however, that downstream leakage is unimportant. Our simulations also demonstrate that ceiling heat transfer is a significant effect that needs to be included when assessing the impacts of duct leakage in large commercial buildings. This is not particularly surprising, given that ?ceiling regain? issues have already been included in residential analyses as long as a decade ago (e.g., ASHRAE Standard 152); mainstream simulation programs that are used for large commercial building energy analyses have not had this capability until now. Our analyses of data that we collected during our 2005 tests of the SAV with InCITeTM duct static pressure reset technology show that this technology can substantially reduce fan power (in this case, by about 25 to 30percent). Tempering this assessment, however, is that cooling and heating coil loads were observed to increase or decrease significantly depending on the time window used. Their impact on cooling and heating plant power needs to be addressed in future studies; without translating the coil loads to plant equipment energy use, it is not possible to judge the net impact of this SPR technology on whole-building energy use. If all of the loads had decreased, such a step would not be as necessary.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Processed data from the Building Management System for the System Engineering Building.

The dataset spans November 2018 to May 2020 and includes time-series measurements corresponding to supply and return temperatures of air and water, air, hot water and cold water flow rates, energy and power consumption, set-points etc. as a single CSV file. In addition to the measurements, a metadata .json file, and a .ttl file to visualize the data as per BRICK schema are also included.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data Sets for Evaluation of Building Fault Detection and Diagnostics Algorithms

This documentation and dataset can be used to test the performance of automated fault detection and diagnostics algorithms for buildings. The dataset was created by LBNL, PNNL, NREL, ORNL and ASHRAE RP-1312 (Drexel University). It includes data for air-handling units and rooftop units simulated with PNNL's large office building model.

AHU↗

Curated Test Fault Data Set

The curated fault experiment data set consists of tagged and fully described time series representing measured faults from the AFDD test building (ORNLs Flexible Research Platform [FRP]), including baseline performance and faulty performance. A total of 10 different faults are tested for 49 different faulted and unfaulted scenarios with various fault intensity levels. Additional Contacts: Principal investigator: Matt Leach Matt.Leach@nrel.gov Experiments coordinator: Piljae Im imp1@ornl.gov Document preparation: Janghyun Kim Janghyun.Kim@nrel.gov

AFDD↗

Field Testing Unvented Roofs with Asphalt Shingles in Cold and Hot-humid Climates

BSC TO5 Task 7.1 Field Testing Unvented Roofs with Asphalt Shingles in Cold Climates - Bolingbrook, IL 60440 BSC TO5 Task 7.1 Field Testing Unvented Roofs with Asphalt Shingles in Hot-Humid Climates - Friendswood, TX 77546 To understand the long-term moisture performance of unvented roof assemblies with fibrous insulation, the U.S. Department of Energy's Building America team Building Science Corporation built and monitored test roofs in two climates: a cold-climate test house in Bolingbrook, Illinois (Chicago area; zone 5A), and a hot-humid test house in Friendswood, Texas (Houston area, zone 2A). The Chicago-area test bed had seven parallel experimental rafter bays. The assemblies included a control vented compact (cathedral) roof, a dense-pack cellulose unvented roof, and an unvented roof with a "diffusion vent" (a strip of vapor-permeable gypsum sheathing at the ridge to allow drying). The interior finish was gypsum wallboard (GWB) with latex paint. The other four bays were top vent roof assemblies, which have a polypropylene breather mesh between the roof sheathing and the asphalt shingles to allow ventilation drying of the assembly from underneath the vapor-impermeable shingles. Two of the four "top vent" roofs were fiberglass batt and two were dense-pack cellulose roofs with either interior GWB or open to the interior. Wintertime moisture-related failure was accelerated by providing interior humidification (22.2 degree C [72 degree F]/50% relative humidity [RH]), which is known to be an extreme interior loading). Data were captured over 8 months, including a winter and the following spring and early summer.

Array↗

Field Testing of an Unvented Roof with Fibrous Insulation, Tiles, and Vapor Diffusion Venting

BSC TO5 Task 2.5 Field Testing of an Un-vented Roof with Fibrous Insulation and Tiles - Winter Park, FL 32789 Field test data available for wood moisture contents, temperature, and relative humidity. Un-vented roofs (aka cathedral-ized attics) are an established presence in Florida residential building markets. These roofs are built with a layer of spray polyurethane foam (SPF) on the underside of the roof deck. Such a roof configuration positions the heating, ventilating, and air-conditioning equipment and ductwork within the conditioned space and improves airtight-ness in practice (by shifting the air barrier from the ceiling to the roofline). However, SPF is more expensive than fibrous insulation. Some builders have also become wary of using SPF because of liability concerns about indoor air quality and off-gassing. Unfortunately, un-vented roofs that use only air-permeable fibrous insulation (cellulose or fiberglass) have been demonstrated to be at risk of moisture issues in climate zone 2A because condensation and moisture accumulation occur at the ridge. This report describes research about a test implementation of an un-vented tile roof assembly in a hot-humid climate (Orlando, Florida; climate zone 2A); the roof was insulated with air-permeable insulation (netted and blown fiberglass). Given the localized moisture accumulation and failures seen in previous work, the U.S. Department of Energy's Building America research team Building Science Corporation theorized that installation of diffusion vents might allow for the wintertime release of moisture to safe levels. Diffusion vents are open slots at the roof's highest points (the ridge and hips) that are covered with a water-resistant but vapor-open (500+ perm) air barrier membrane. The test home is a two-story slab-on-grade structure (3,600 ft2 ); the roof was insulated with a prototype insulation system (called boxed netting), which allows full depth insulation (i.e., it is not limited by the depth of the truss top chord). As a control comparison, one part of the roof was constructed as a typical un-vented roof (with a self-adhered membrane at the ridge). Ideally, failure would occur in the control roof and the experimental (diffusion vent) roofs would show sufficient drying to avoid failure. No intentional space conditioning was provided in the un-vented attic so worst-case humidity buildup conditions could be observed.

air leakage↗

Evaluation of the U.S. Department of Energy Challenge Home Program Certification of Production Builders - Chicago, IL and Devens, MA

TO4 Task 3.1 - K Hovnanian Chicago, IL DOE Challenge Home Program Certified Home Constructed and Verified Specifications DOE Challenge Home Building envelope Ceiling R-49 blown fiberglass, Grade I Walls 2x4 framing @ 16 o.c. with R-13 fiberglass batts, Grade I and 1"" R-5 extruded polystyrene (XPS) insulating sheathing Frame Floors R-38 blown fiberglass, Grade I Basement Walls R-19 fiberglass batts draped full height, Grade I Basement Slab uninsulated Windows Above Grade: ENERGY STAR certified, U=0.29, SHGC=0.28 Basement: Non ENERGY STAR certified, U=0.29, SHGC=0.24 Infiltration 2 ACH 50 Mechanical systems Heat 95% AFUE sealed combustion natural gas furnace in conditioned space Goodman GMH950703BXAF Cooling 13 SEER split system Goodman GSX130301BC DHW AO Smith Vertex 100 0.96 EF natural gas tank water heater in 2nd floor utility closet Hot Water Distribution Redesigned trunk and branch Compliant with EPA WaterSense Efficient Distribution Requirements Ducts Located 100% in conditioned space via floor joists leak free to outside (5% or less) Ventilation Central Fan Integrated Supply (CFIS) ventilation with 6"" insulated outside air duct Fan Controller: Air Cycler FRV, with 6"" motorized damper 50 CFM outside air flow, 33% duty cycle (10 minutes on, 20 minutes off); ASHRAE 62.2-2010 compliance via an exhaust fan - Panasonic FV-08VQ5 WhisperCeiling Rerturn Pathways Active Return at Master Bedroom Transfer Grilles in Secondary Bedrooms Appliances, Lighting, MELs Lights 80% ENERGY STAR certified CFL Appliances ENERGY STAR certified refrigerator, dishwasher, and clothes washer; Natural gas range/oven and clothes dryer" STRUCTURE - Test House Lot 145 - 2013 DOE Challenge Test House Task 3.1 Bolingbrook, IL 60490 House is constructed and is DOE Challenge Verified by Don Nelson, a local rater. The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. To that end, Building Science Corporation (BSC) consulted on the construction of five test houses by three cold climate production builders in three separate U.S. cities. (1) K. Hovnanian Homes, Chicago, Illinois (2) David Weekley Homes, Denver, Colorado (3) Transformations, Inc., Devens, Massachusetts. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations about the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: (1) Adding services to the scope of work for various trades, such as HERS Rater and heating, ventilation, and air conditioning contractor. (2) Increased material costs related to the checklists, especially the U.S. Environmental Protection Agency Indoor airPLUS and WaterSense Efficient Hot Water Distribution requirement. Ceiling - 18" cellulose Walls - 12" open cell spray foam in double stud walls Foundation - R-10 under slab, 3 1/2" closed-cell spray foam at walls Windows - Harvey U=0.20, SHGC=0.22 Infiltration - 1.0 sq in per 100 sq ft Heating - Mini split heat pump, 10.6 HSPF, 23 SEER Cooling - Mini split heat pump, 10.6 HSPF, 23 SEER DHW - 0.97 EF instantaneous propane water heater Ventilation - bathroom exhaust fans as basic option, HRV upgrade option Adams Circle Devens MA 01434 Cavite Street Devens, MA 01434

Array↗

Air Leakage and Air Transfer Between Garage and Living Space

This research project focused on evaluation of air transfer between the garage and living space in a single-family detached home constructed by a production homebuilder in compliance with the 2009 International Residential Code and the 2009 International Energy Conservation Code. The project gathered important information about the performance of whole-building ventilation systems and garage ventilation systems as they relate to minimizing flow of contaminated air from garage to living space. Important gaps and barriers addressed by this research were: (1) Developing recommendations for effective methods for precluding the flow of contaminated air from garages to living space. (2) Creating a resource for guiding home builders and retrofitters to achieve garage isolation by use of mechanical ventilation equipment. (3) Providing field measurement support for revision of the EPA Indoor airPLUS program requirements, which are part of the DOE Challenge Home program. Field test data provided in the form of technical report showing blower door test results for air leakage measurements and tracer gas testing results. Waldorf, MD 20602

Array↗

Spray Foam Exterior Insulation with Stand-Off Furring - New York

IBACOS and Green Homes America 1 (GHA) collaborated with the New York State Energy Research and Development Authority (NYSERDA) Advanced Buildings Program to research a variation of a commercial curtain wall assembly for residential construction as part of a comprehensive whole-house deep energy retrofit (DER) package. The advantages of this strategy include minimizing the physical connections to each individual existing wall stud, using closedcell spray foam to encapsulate existing siding materials including lead paint, and creating a vented rain screen assembly to promote drying. As Moore (2011) states, "Closed-cell foam acts as air-sealing, insulation, and secondary drainage plane..." Field installations on a limited number of houses indicate that the incremental cost when installed as part of a typical siding and window replacement job adds approximately $10/ft2 of wall area. 2 x 4 framing members were attached to the wall at band joists and top plates using "L" clips, and spray foam was used to insulate the wall after the framing was installed. Windows were installed as the framing was put up, including extension jambs. Key lessons learned include the following: (1) The installed cost of the spray foam system was comparable to the installed cost of the rigid foam and furring strips. (2) Spray foam should be applied in such a way that it locks the framing members in place before the remaining foam is installed in the field of the wall. The spray foam has a tendency to move the new wall framing as it expands. Best practice is to "picture frame" the wall framing with spray foam and then apply the spray foam in the field of each bay. (3) Variations in the existing siding conditions must be accounted for when attaching the ledger boards and wall framing. A best practice is to uniformly shim the ledger boards off the walls so the new framing is a uniform distance from the ledger boards and the inside surface of the interior framing. This is important primarily for window and door installation and the associated extension jambs and trim. (4) From a sequencing perspective, it is advantageous to replace the windows at the same time as the exterior walls are being built. This requires a crew that can perform a number of different tasks (e.g., framing, flashing, window install, trim carpentry) and does not lend itself to subcontracting this approach piecemeal (e.g., framing subcontractor, window installer, drainage plane installer, trim carpenter). (5) Application of the brackets and associated fastener screws was more time consuming than anticipated. (6) It is important for the spray foam contractor to perform all preparatory work, which in this case included placing plastic over the windows and exposed foundation to minimize or eliminate the possibility of damage due to overspray.

Array↗

Performance and Costs of Ductless Heat Pumps in Marine-Climate High-Performance Homes Habitat for Humanity The Woods

The Washington State University (WSU) Energy Program's Building America (BA) team conducted a case study of a high-performance affordable housing community: The Woods (Figure 1). This BA effort is part of a larger-scale study of 30 homes funded from 2013-2016 by Tacoma Public Utilities (TPU) and the Bonneville Power Administration. The Woods is a Habitat for Humanity (HFH) community of homes certified by ENERGY STAR Homes Northwest (ESHNW); the community is in the marine climate of Tacoma/Pierce County, Washington. This research report builds on an earlier preliminary draft 2014 BA report and includes significant billing analysis and cost-effectiveness research from a collaborative and ongoing DHP research effort for TPU and the Bonneville Power Administration. This final BA report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing. The research goal of the U.S. Department of Energy's BA research team Building America Partnership for Improved Residential Construction was to compare a ductless heat pump (DHP) hybrid system (DHP in common area/electric resistance [ER] in bedrooms) to an all-electric zonal ER system in high-performance single-family affordable housing. This effort included assessing the costs and benefits of a DHP/ER hybrid system located in the main living area to offset the primary heating demand of zonal ER heaters in the bedroom zones and comparing these findings to data from of new affordable single-family housing in Washington State. This report includes: (1) Measured indoor and outdoor temperatures and relative humidity (RH) in the homes. (2) Field testing results of heating, ventilating, and air-conditioning equipment; ventilation system airflows; building envelope tightness; lighting, appliance, and other input data required for preliminary Building Energy Optimization (BEopt) modeling; and ENERGY STAR field verification (3) BEopt modeling results compared to measured energy use. (4) A comparison of the space heat energy consumption of a DHP/ER hybrid heating system and a traditional zonal ER heating system installed in the same home. This comparison is made by implementing a series of weekly "flip-flop tests" (referred to here as "switchback" tests per TPU) to compare space heating, temperature, and RH in zonal ER heating mode with a DHP/ER mode as discussed in the Building America Test Plan (Lubliner 2010a). (5) Cost data from HFH and other sources related to building efficiency measures focusing on the DHP/ER hybrid heating system. (6) An evaluation of the thermal performance and cost benefit of DHP/ER hybrid heating systems in these high-performance homes employing life cycle cost analysis for energy code policy and monthly cash flow analysis of HFH homeowners. (7) Post-monitoring occupant survey results. The report also provides the following stakeholder findings and recommendations: (1) DHP single-head systems at The Woods are cost-effective to new homebuyers of these high-performance all-electric homes. (2) Stakeholder education is needed on design, inspection, and commissioning; documentation is needed for heat recovery ventilation (HRV) and from ENERGY STAR builders, verifiers, and inspectors to help ensure that the houses meet the goal of "build tight, ventilate right." (3) A code gap in inspection and enforcement was identified that should be addressed by: (3a) Improving the fire marshal's approach to sprinkler attic piping freeze protection; (3b) Improving the maintenance of ceiling insulation continuity; and (3c) Educating the local building inspector on attic insulation inspection concerns that allow for maximizing design improveme...

affordable housing↗

Sacramento Deep Energy Retrofit (DER) Home Study

This project was part of the Sacramento Municipal Utility District (SMUD) Deep Energy Retrofit (DER) Project which included several other homes in addition to the the subject of this study. Some of the reports and presentations included in this dataset cover the whole DER project. The retrofit home was one of several homes in the DER project. The goal of this monitoring plan is to develop a protocol for monitoring the SMUD DER project and answer the following major questions: 1. Is heat pump water heater performing as expected? 2. Is the whole house energy as expected? 3. Based on monitored results, how can performance be improved in future retrofit projects?

Array↗