Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Directors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

STS-44 Post Launch Press Conference

Dick Young, NASA Public Affairs, introduces Bob Sieck, Launch Director, Kennedy Space Center, who gives an overview of the STS-44 Atlantis countdown and launch. He discusses the hardware problem experienced shortly before liftoff (a replenishing valve for the liquid oxygen on the mobile launch platform had been leaking). He then answers questions from the press.

Source record↗

STS-52 Post Launch Press Conference

Dick Young, NASA Public Affairs, introduces Brewster Shaw, Deputy Program Manager Space Shuttle, and Bob Sieck, Launch Director, Kennedy Space Center, who give brief statements about the countdown and launch of the STS-52 Columbia Orbiter. The problems encountered during countdown are discussed, including details on the hydrogen leak in the ground umbilical carrier tank, the 100% exceedance of load on the external tank, and the reasons why the flight rule for an upper limit of cross winds was waived. The men then answered questions from the press.

Source record↗

STS-106 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Scott Higgenbotham, Kennedy Space Center Payload Manager, and Ed Priselac, Shuttle Weather Officer, who give an overview of the successful countdown for the STS-106 Atlantis mission thus far. Prelaunch activities and the payload status are described. The weather forecast for the upcoming launch is given. The men then answer questions from the press.

Source record↗

STS-106 Post Launch Press Conference

Bruce Buckingham, NASA Public Affairs, introduces Bill Gerstenmaier, Shuttle Program Integration Manager, and Mike Leimbach, Kennedy Space Center Launch Director, who give an overview of the successful countdown and launch of STS-106 Atlantis. They then answer questions from the press.

Source record↗

STS-106 Countdown Status Briefing

George Diller, NASA Public Affairs, introduces Steve Altemus, NASA Test Director, Scott Higgenbotham, Kennedy Space Center Payload Manager, and Ed Priselac, Shuttle Weather Officer, who give an overview of the successful countdown for the STS-106 Atlantis mission thus far. Prelaunch activities are described, such as the engine preparations, the communications systems power up, final flight close outs, and payload status. The weather forecast for the upcoming launch is given. The men then answer questions from the press.

Source record↗

Spacelab Life Sciences Research Panel

This document describes some of the life sciences research that was conducted on Spacelab missions. Dr. Larry Young, Director of the National Space Biomedical Research Institute, provides an overview of the Life Sciences Spacelabs.

Sulzman, Frank↗

STS-53 Countdown Status Briefing

George Diller, NASA Public Affairs, introduces Mike Leinbach, Shuttle Test Director, and Ed Prisella, Shuttle Weather Officer, USAF. They give a summary of the countdown for the launch of STS-53 Discovery and information on the weather for the launch time. They then answer questions from the press.

Source record↗

Worlds Smaller than Saturn

Computerized animations show the following: (1) an artist's conception of a Saturn-like extrasolar planet; (2) star and planet motion; and (3) young stellar disk and planet formation. Footage shows the outside of the Mauna Kea Observatories in Hawaii and Geoff Marcy and Paul Butler inside while they are processing information. Then a press conference,'Worlds Smaller than Saturn', is seen. Anne Kinney, Origins Science Director, NASA Headquarters, introduces Geoff Marcy, Paul Butler, Alan Boss, and Heidi Hammel. They discuss the discovery of the two new Saturn-sized extrasolar planets that are orbiting the stars HD46375 and 79 Seti, giving details on the search technique and size distribution. They then answer questions from the press.

Source record↗

STS-102 Expedition 2 Increment and Science Briefing

Merri Sanchez, Expedition 2 Increment Manager, John Uri, Increment Scientist, and Lybrease Woodard, Lead Payload Operations Director, give an overview of the upcoming activities and objectives of the Expedition 2's (E2's) mission in this prelaunch press conference. Ms. Sanchez describes the crew rotation of Expedition 1 to E2, the timeline E2 will follow during their stay on the International Space Station (ISS), and the various flights going to the ISS and what each will bring to ISS. Mr. Uri gives details on the on-board experiments that will take place on the ISS in the fields of microgravity research, commercial, earth, life, and space sciences (such as radiation characterization, H-reflex, colloids formation and interaction, protein crystal growth, plant growth, fermentation in microgravity, etc.). He also gives details on the scientific facilities to be used (laboratory racks and equipment such as the human torso facsimile or 'phantom torso'). Ms. Woodard gives an overview of Marshall Flight Center's role in the mission. Computerized simulations show the installation of the Space Station Remote Manipulator System (SSRMS) onto the ISS and the installation of the airlock using SSRMS. Live footage shows the interior of the ISS, including crew living quarters, the Progress Module, and the Destiny Laboratory. The three then answer questions from the press.

Source record↗

STS-102 Prelaunch Press Conference

Joel Wells, NASA Public Affairs, introduces Ron Dittemore, NASA Shuttle Program Manager, Tommy Holloway, NASA International Space Station Program Manager, Dave King, NASA Director of Shuttle Processing, and Captain Clif Stargardt, US Air Force Meteorologist, in this STS-102 prelaunch press conference. The men give an overview of the prelaunch processing for the Discovery Orbiter (such as the PRSD loading) and give a weather forecast for launch. They then answer questions from the press.

Source record↗

STS-102 Countdown Status

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Glenn Chin, Leonardo Payload Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-102 prelaunch press conference. Mr. Spaulding gives an overview of the status of the Discovery Orbiter, including the prelaunch procedures (payload inspection and closure, avionics check, and the loading of the onboard cyrogenic tanks), the countdown and built in time holds, launch window, Discovery launch, and the landing. Mr. Chin discusses the payload status, including specifications on the Multi-Purpose Logistics Module, and the hardware contamination inspection. Mr. Priselac describes the weather forecast for the upcoming launch. The men then answer questions from the press.

Source record↗

STS-102 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Pete Nickolenko, NASA Test Director, Glenn Chin, Leonardo Mission Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-102 prelaunch press conference. Mr. Nickolenko gives an overview of the countdown and built-in hold times, the launch window, and prelaunch activities (such as activation and checkout of the onboard computer systems, closing the payload bay doors, servicing of the onboard cryogenic cell tanks, main engine tests, and power-up of the ground communications systems). Mr. Chin confirms that the payload is in the final flight configuration and is ready for launch. Mr. Priselac gives the weather forecast for the launch date. The men then answer questions from the press.

Source record↗

Flight Computer Processing Avionics for Space Station Microgravity Experiments: A Risk Assessment of Commercial Off-the-Shelf Utilization

NASA/Marshall Space Flight Center (MSFC) is continually looking for ways to reduce the costs and schedule and minimize the technical risks during the development of microgravity programs. One of the more prominent ways to minimize the cost and schedule is to use off-the-shelf hardware (OTS). However, the use of OTS often increases the risk. This paper addresses relevant factors considered during the selection and utilization of commercial off-the-shelf (COTS) flight computer processing equipment for the control of space station microgravity experiments. The paper will also discuss how to minimize the technical risks when using COTS processing hardware. Two microgravity experiments for which the COTS processing equipment is being evaluated for are the Equiaxed Dendritic Solidification Experiment (EDSE) and the Self-diffusion in Liquid Elements (SDLE) experiment. Since MSFC is the lead center for Microgravity research, EDSE and SDLE processor selection will be closely watched by other experiments that are being designed to meet payload carrier requirements. This includes the payload carriers planned for the International Space Station (ISS). The purpose of EDSE is to continue to investigate microstructural evolution of, and thermal interactions between multiple dendrites growing under diffusion controlled conditions. The purpose of SDLE is to determine accurate self-diffusivity data as a function of temperature for liquid elements selected as representative of class-like structures. In 1999 MSFC initiated a Center Director's Discretionary Fund (CDDF) effort to investigate and determine the optimal commercial data bus architecture that could lead to faster, better, and lower cost data acquisition systems for the control of microgravity experiments. As part of this effort various commercial data acquisition systems were acquired and evaluated. This included equipment with various form factors, (3U, 6U, others) and equipment that utilized various bus structures, (VME, PC104, STD bus). This evaluation of hardware was performed in conjunction with a trade study that considered over twenty (20) different factors relevant to the selection of an optimum design approach. These factors included; safety, sizing and timing, radiation hardness and single event upset, power consumption, heat dissipation, size and volume, expected service life, maintainability, heritage, operating systems, requirements for software reuse, availability of compatible interface boards, relative cost, schedule, reliability, EMI/EMC factors, "hot swap" capability, standards for conduction cooling, I/O capabilities, unique carrier requirements and operating system considerations. The approach to evaluate Safety as part of this study included a review of the Preliminary Hazard Analysis (PHA) for each of the experiment designs and a determination of how each hazard could be addressed and eliminated when different processors were selected. This included evaluating various design approaches and trade-offs between fault tolerant designs and fail-safe designs in accordance with NSTS 1700.7B. This will include the results of radiation testing where available. Various operating systems, such as VxWorks, Linux, QNX, and Embedded NT are evaluated and the advantages and disadvantages of their utilization are also addressed. Design implementation strategies for the various operating systems are considered and discussed. This paper presents the results and recommendations from this trade study. Preliminary conclusions from this study are that safety concerns from lack or radiation testing on COTS equipment can be addressed by additional testing and design considerations, the PC104 bus provided adequate I/O for the SDLE and EDSE microgravity experiments, and PC104 bus components offered significant advantages over VME and cPCI for weight and space reductions.

Estes, Howard↗

Determination of an Optimal Commercial Data Bus Architecture for a Flight Data System

NASA/Marshall Space Flight Center (MSFC) is continually looking for methods to reduce cost and schedule while keeping the quality of work high. MSFC is NASA's lead center for space transportation and microgravity research. When supporting NASA's programs several decisions concerning the avionics system must be made. Usually many trade studies must be conducted to determine the best ways to meet the customer's requirements. When deciding the flight data system, one of the first trade studies normally conducted is the determination of the data bus architecture. The schedule, cost, reliability, and environments are some of the factors that are reviewed in the determination of the data bus architecture. Based on the studies, the data bus architecture could result in a proprietary data bus or a commercial data bus. The cost factor usually removes the proprietary data bus from consideration. The commercial data bus's range from Versa Module Eurocard (VME) to Compact PCI to STD 32 to PC 104. If cost, schedule and size are prime factors, VME is usually not considered. If the prime factors are cost, schedule, and size then Compact PCI, STD 32 and PC104 are the choices for the data bus architecture. MSFC's center director has funded a study from his discretionary fund to determine an optimal low cost commercial data bus architecture. The goal of the study is to functionally and environmentally test Compact PCI, STD 32 and PC 104 data bus architectures. This paper will summarize the results of the data bus architecture study.

Crawford, Kevin↗

Evaluating Education and Science in the KSC Visitor Complex Exhibits

The continuing development of exhibits at the Kennedy Space Center's Visitor Complex is an excellent opportunity for NASA personnel to promote science and provide insight into NASA programs and projects for the approximately 3 million visitors that come to KSC annually. Stated goals for the Visitor Complex, in fact, emphasize science awareness and recommend broadening the appeal of the displays and exhibits for all age groups. To this end, this summer project seeks to evaluate the science content of planned exhibits/displays in relation to these developing opportunities and identify specific areas for enhancement of existing or planned exhibits and displays. To help expand the educational and science content within the developing exhibits at the Visitor Complex, this project was structured to implement the goals of the Visitor Center Director. To accomplish this, the exhibits and displays planned for completion within the year underwent review and evaluation for science content and educational direction. Planning emphasis for the individual displays was directed at combining the elements of effective education with fundamental scientific integrity, within an appealing format.

Erickson, Lance K.↗

STS-105 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Steve Altemus, NASA Test Director, Glenn Chin, STS-105 Mission Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-105 prelaunch press conference. An overview is given of the launch countdown, payload status (Leonardo Multipurpose Logistics Module), and weather forecast. The men then answer questions from the press.

Source record↗

STS-105 Pre-Launch Press Conference

George Diller, NASA Public Affairs, introduces Bill Gerstenmaier, Deputy Manager of the ISS Program, Dave King, NASA Director of Shuttle Processing, and Judy Konecky, Staff Meteorologist, in this STS-105 press conference. An overview is given of the success of the Expedition 2 crew, the expectations of the Expedition 3 crew, the launch countdown status, and the weather forecast for the Shuttle launch. They then answer questions from the press.

Source record↗

STS-104 Pre-Launch Press Conference

George Diller, NASA Public Affairs, introduces Jim Halsell, Shuttle Program Launch Integration Manager, Dave King, NASA Director of Shuttle Processing, Michael Hawes, Deputy Associate Administrator for ISS, and John Weems, Launch Weather Officer, in this STS-104 press conference. An overview is given of the launch and mission activities, International Space Station activities during the mission, and the weather forecast for the launch. The men then answer questions from the press.

Source record↗