Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Non-Operational Property Evaluation for the Hanford Site River Corridor - 12409

The Hanford Site River Corridor consists of the former reactor areas of the 100 Areas and the former industrial (fuel processing) area in the 300 Area. Most of the waste sites are located close to the decommissioned reactors or former industrial facilities along the Columbia River. Most of the surface area of the River Corridor consists of land with little or no subsurface infrastructure or indication of past or present releases of hazardous constituents, and is referred to as non-operational property or non-operational area. Multiple lines of evidence have been developed to assess identified fate and transport mechanisms and to evaluate the potential magnitude and significance of waste site-related contaminants in the non-operational area. Predictive modeling was used for determining the likelihood of locating waste sites and evaluating the distribution of radionuclides in soil based on available soil concentration data and aerial radiological surveys. The results of this evaluation indicated: 1) With the exception of stack emissions, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas, 2) Stack emissions that may have been associated with Hanford Site operations generally emitted short-lived and/or gaseous radionuclides, and (3) the likelihood of detecting elevated radionuclide concentrations or other waste sites in non-operational area soils is very small. The overall conclusions from the NPE evaluation of the River Corridor are: - With the exception of stack emissions to the air, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas. While pathways such as windblown dust, overland transport and biointrusion have the potential for dispersing waste site contaminants, the resulting transport is unlikely to result in substantial contamination in non-operational areas. - Stack emissions that may have been associated with Hanford Site operations generally emitted short-lived and/or gaseous radionuclides; these radionuclides either would have decayed and would be undetectable in soil, or likely would not have deposited onto Hanford Site soils. A small fraction of the total historical emissions consisted of long-lived particulate radionuclides, which could have deposited onto the soil. Soil monitoring studies conducted as part of surveillance and monitoring programs do not indicate a build-up of radionuclide concentrations in soil, which might indicate potential deposition impacts from stack emissions. Aerial radiological surveys of the Hanford Site, while effective in detecting gamma-emitting nuclides, also do not indicate deposition patterns in soil from stack emissions. - The surveillance and monitoring programs also have verified that the limited occurrence of biointrusion observed in the River Corridor has not resulted in a spread of contamination into the non-operational areas. - Monitoring of radionuclides in ambient air conducted as part of the surveillance and monitoring programs generally show a low and declining trend of detected concentrations in air. Monitoring of radionuclides in soil and vegetation correspondingly show declining trends in concentrations, particularly for nuclides with short half lives (Cs-137, Co-60 and Sr-90). - Statistical analysis of the geographical distribution of waste sites based on man -made features and topography describes the likely locations of waste sites in the River Corridor. The results from this analysis reinforce the findings from the Orphan Site Evaluation program, which has systematically identified any remaining waste sites within the River Corridor. - Statistical analysis of the distribution of radionuclide concentrations observable from aerial surveys has confirmed that the likelihood of detecting elevated radionuclide concentrations in non-operational area soils is very small; the occurrences and locations where potentially elevated concentrations may be found are discussed below. In addition, statistical analysis showed that there is a relatively high probability (>50%) that concentrations of Cs-137 higher than background (3.9 Bq/kg or 1.05 pCi/g) are located outside of the operational portion of the 100-BC, 100-K, and 100-N Areas. This observation is based on modeled concentrations in soil derived from aerial radiography data. However, the extent is limited to a few meters from the respective facilities fence lines or known operational activities. Evaluation of the extent of contamination is being conducted as part of the RI process for each decision area. No unanticipated waste sites were identified either from the OSE program or statistical analysis of waste site proximity to known features. Based on the evaluation of these multiple lines of evidence, the likelihood of identifying waste sites or contaminant dispersal from Hanford site operations into non-operational areas can be considered very small. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of European Large Component Technology in the United States - 12561

The European nuclear community currently has safer, more environmentally-friendly disposal options for large component disposal than the United States. The technology and innovation that makes these options viable will soon be available stateside. The removal and replacement of steam generators is a large and complicated task making volume reduction a vital service for the nuclear power industry. As plants age, the replacement of certain components is required in order to maintain plant efficiency and public safety. Currently in the United States, there are 3 options for the disposal of these items including: on-site storage, direct-disposal at a licensed (low-level radioactive waste) LLWR site, and volume reduction prior to disposal. If today's nuclear plants are to be used by future generations, waste stored on-site will eventually have to be disposed of to make room for newer, more advanced technology. Also, the space at LLWR disposal sites is finite, so all waste sent for disposal should be minimized whenever possible. Reducing the volume of decommissioned steam generators prior to final disposal shows the public that the nuclear industry is doing everything that it can to minimize its waste and conserve the environment. Additionally, many steam generators are massive and are not easily transported to a disposal site. When there is no practical transportation route, the size and weight of the component must be reduced. For various reasons including public safety, cost, and technical expertise, size reduction cannot be practically performed at the site of generation. However, since most facilities have some kind of access to a waterway, the components can be safely transported to another facility with barge access for size reduction. The size reduction process for steam generators has evolved over the past 5 years. Because of reductions to the amount of final waste, the dose to personnel, and the processing time, it is now an environmentally and economically friendly alternative to on-site storage and direct disposal. The major operations of this process include: - removal of the carbon steel steam generator dome; - removal of the channel head and majority of tube sheet to free the tubes from the tube sheet and gain access to all of the tubes for grit blasting; - grit blast decontamination of the steam generator tubes to allow disassembly; - removal of the U-Bend Section of the tubes to allow for tube pulling - tube pulling operations; - disassembly of the remainder of the steam generator shell and tube support assemblies; - size reduction of the steam generator resultant materials. All of the equipment for the American market is based on previous designs but has been adapted to meet the size requirements for processing of larger steam generators. This includes a large horizontal band saw, a tube pulling machine, tube blasting equipment, and a diamond wire saw frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Schottky Tune Meter for the Fermilab Mu2E Delivery Ring

The Mu2E experiment will measure the ratio of the rate of the neutrinoless, coherent conversion of muons into electrons as a measure of Charged Lepton Flavor Violation. As part of the Mu2E experiment, a proton storage ring, called the Delivery Ring, will utilize resonant extraction to slow-spill protons to the experiment. To regulate and optimize the Delivery Ring resonant extraction process, a fast tune measurement scheme will be required. This Mu2E tune meter will measure the average tune and the tune spectrum, in multiple time slices, through the entire resonant extraction cycle of nominally 43 msec. The Mu2E tune meter system utilizes vertical and horizontal 21.4 MHz Schottky detector resonant pickups, taken from the decommissioned Tevatron, high-gain amplifiers and digital down-conversion FPGA logic for its signal processing. This paper will present the design of this Schottky tune meter as well as tune measurements from the Mu2E delivery ring.

43 PARTICLE ACCELERATORS↗

Dismantling of HLLW Process Installations of the German Reprocessing Facility (WAK) - Progress and first Experiences in Hot Application of Remote Techniques - 17083

Decommissioning and dismantling of the former German Pilot Reprocessing Plant Karlsruhe (WAK) including the Vitrification Facility (VEK) is being executed in different Project steps related to the reprocessing, HLLW storage and vitrification complexes. While inside the reprocessing building the total inventory of process equipment has already been dismantled and disposed of, the HLLW storage and vitrification complex has been placed out of operation since vitrification was finalized in year 2010 and is now under deconstruction. This paper describes the progress and experiences made in dismantling of the process cells of the HLLW storage building. The major challenges of the dismantling are the high dose rates up to 70 Sv/h and the locking technology for the removal of the hot cell installations. As well as the adaption and extensive prototype testing of the remote handling equipment which was applied to dismantle the hot cell equipment prior to the start of the dismantling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prioritization of Model Support Activities for Performance and Safety Assessments - 17111

and tank farm closure consider the performance of a wide variety of wastes, facilities and natural systems over very long time frames. Within the United States Department of Energy - Office of Environmental Management (DOE-EM), several PAs are currently being developed and similar applications are underway at numerous locations around the world. The Savannah River National Laboratory (SRNL) is providing technical support for PAs at several DOE-EM sites and developed recommendations for approaches to prioritize model support activities to help focus efforts on activities that would be expected to significantly influence decision-making. A general approach has been developed to identify data needs for the modeling, foster integration and communication between the PA team and the groups providing model support, and document the basis for prioritization of specific model support efforts. The approach addresses development of the rationale for efforts to address key needs and also describe the rationale for not pursuing efforts that are not expected to influence the conclusions of the PA. The approach will be of use for groups conducting PAs for waste disposal and can also be applied for other modeling efforts for site restoration activities (e.g., decommissioning, environmental remediation, etc.). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of Low Level Waste Disposal Policy, Strategies and Techniques - 17201

The mission of low level radioactive waste disposal facilities is to accept and dispose of waste in compliance with all applicable laws, regulations, license requirements, and social expectations. These facilities need to provide a cost effective disposal service to the waste generators, so that the cost savings could be passed down to business, industry, and ultimately, to the general public. To fulfil this mission, waste disposal facilities need to establish and maintain review and optimization mechanisms to respond to changing circumstances that may impact the long-term safe, cost effective operation of their facilities. Maintaining existing disposal resources available as long as possible, managing increased demand for disposal space as a consequence of growing number of nuclear facilities to be decommissioned, and developing capacity for future needs and uncertainties are some of the key challenges that drive optimization of disposal facilities. While the concept of optimization of low level waste disposal facilities is not new, the framework for holistic optimization of waste disposal facilities, enabling them to provide cost effective, sustainable services to the nuclear industry, as well as maintaining optimized safety and radiation protection systems is a notable gap in the current radioactive waste management body of knowledge. A comprehensive optimization framework is required to support the implementation of safe, effective, and sustainable integrated waste management strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consolidated Nuclear Security, LLC, Excess Facility Disposition Program - 17289

Consolidated Nuclear Security, LLC (CNS), the management and operating contractor for the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee, and the Pantex Plant (Pantex) in Amarillo, Texas, has developed an integrated strategy to address badly deteriorating excess facilities presenting risks to people, the environment, and the National Nuclear Security Administration (NNSA) mission. The comprehensive, integrated Excess Facilities Disposition Program (EFDP) incorporates NNSA scope for excess facility risk reduction, preparation of facilities to be transferred to the U.S. Department of Energy (DOE) Office of Environmental Management (EM) for demolition, and demolition of non-process contaminated facilities. The Program has been developed using the NNSA Office of Safety, Infrastructure, and Operations (NA-50) Program Management Plan as a guide. The Program has undertaken actions to address the most immediate risks associated with CNS excess facilities. At Y-12, new foam roofs have been installed on Buildings 9201-5 (Alpha 5), 9204-4 (Beta 4), and 9206 to minimize further facility degradation. Tanks and dikes outside of Alpha 5 and Beta 4 are also being disconnected, drained, and filled with concrete. In addition, Beta 4 will be getting a new electrical system as its Manhattan Project-era system will be replaced by a temporary 'construction power' setup that will provide as-needed electricity to the building that is safer, more reliable, and will ease demolition activities in the future. The EFDP is also focusing on the basement of Alpha 5 and is planning to remove the water from the aging facility's flooded basement, which in some areas contains up to 54 inches of water. The EFDP is also planning several efforts to remove excess materials from Alpha 5 and Beta 4, de-inventory the Alpha 5 Mercury House System and numerous transformers, and de-inventory Beta 4 hydraulic pumps and systems. Efforts are also underway to deactivate and decommission non-process-contaminated facilities at Y-12 and at Pantex. The EFDP has prioritized the performance of work to reduce risk while at the same time supporting the preparation of process-contaminated Y-12 facilities for transfer to EM. The Program aligns with the EM goal to have the NNSA scope completed in Alpha 5 and Beta 4 by the end of FY 2020, and Building 9206 completed by the end of FY 2024. These dates and project sequencing will support the Y-12-related DOE EM cleanup initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mitigation of Radioactive Waste By Sampling and Analyzing The Affected Area and Efficient Use of Different Detectors - 17400

The paper summarizes the way by which the mitigation of the radioactive waste during events like decommissioning of nuclear power plants, or during a nuclear disaster can be done so that the rehabilitation process for flora and fauna can begin in a natural manner. The paper describes the problems faced during ER operations in the developing countries and need of international committees in these areas. The paper suggests marking of the radioactive areas which can be used for controlled personnel access and which can be useful for monitoring purposes, while also focusing on the need of proper knowledge while handling detectors in ER operations for successful site characterization. It also highlights the importance of bio-indicators in these operations and also gives a description of various detectors used widely and their related significance for ER operations. The paper gives an overview of the planning and site characterization stages that follow in the environmental remediation. Planning stage should consider: 1. The impact on the ecosystem and human beings and the risk of spreading of the radionuclides. 2. The financial aid in hand for detectors, machinery and skilled labor. As the planning stages develop, the very first thing is the survey of the site. Site investigation should be carried out in all aspects including meteorology, geology, and hydrology, seismicity, geomorphology and the other aspects depending on site for a certain period of time. A site characterization should take: 1. The amount of damage occurred to the environment in the nearby region. 2. The distribution, character and the extent to which radioactivity has been dispersed. 3. The amount of risk that will be involved for personnel working in the field. 4. The precision of data collected that is to be used as input for further processes. In the developing countries, the central governmental bodies play a pivotal role in providing funds internally or from international bodies. The paper shows the effect how political issues effect the work progress of ER operations, that hamper the process and make people frustrated, who really work on the field. Paper provides the suggestion for the proper use of detectors in these countries where surveyors lack knowledge on what kind of detectors to be used while taking precision as a parameter. The table beside gives just a small picture of the large variety of detectors available today and tries to summarizes the main detectors with applications. There should also be a proper marking of the areas into different levels of radiation that will be helpful for work access control and monitoring personnel health. The paper also suggests of using bio-indicators in ER operation more often. The paper proposes to use site-specific bio-indicators which are very helpful in knowing the proper effect of the event in the environment. There is no single paved path for every situation that can lead to a successful ER. The planning should be done in such a way that the future work is not disturbed due to technical problems. In developing countries, political issues can hamper the progress of work and time remains a critical issue in such areas. The lack of proper knowledge for the use of detectors can affect the outcome of site characterization. Areas of the survey should be marked with different levels of activity for efficient monitoring of personnel's. The use of bio-indicators should be used more often and should be chosen as per the site. As they are a helpful tool in evaluating the work progress. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EPRI Report: Review of Geostatistical Approaches to Characterization of Subsurface Contamination - 17442

The key metric in the final release of a nuclear facility from radiological controls following plant decommissioning is the potential long-term radiation exposure to future users of the site. This is estimated from modeling of the exposure that could conceivably result from residual contamination remaining on the site in buildings, soil and groundwater after the completion of decontamination, dismantlement and remediation activities. A key input to such modelling is characterization data obtained from surveys and sampling. To date, the regulatory guidance for conducting the final status survey required to show compliance with regulator approved site release limits (i.e., radionuclide concentrations or contamination levels) has been limited to surface contamination. EPRI has completed a project that provides guidance for use of geo-statistics in the development of a site final status survey that will address the impact of dose to a future user of the site from subsurface contamination. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Processing and disposition of remote-handled transuranic liquid waste generated at Oak Ridge National Laboratory - 15113

Oak Ridge National Laboratory (ORNL) produces transuranic (TRU) isotopes for the US Department of Energy's (US DoE's) heavy-element research program and other programs for medical and industrial applications. As a result, the research facilities generate remote-handled TRU liquid low-level waste (LLLW). This LLLW is presently collected and mixed with larger volumes of legacy and environmental management waste streams for future treatment. Once the legacy waste is disposed of as part of the US DOE Environmental Management program, the large-scale waste treatment processes will be decommissioned, and new capabilities will be needed to characterize, treat, package, and dispose of the newly generated LLLW at ORNL. Various approaches are being considered for addressing treatment and disposal of the future LLLW streams. A variety of processing methods and final waste forms is under consideration. The impacts of the chemical and radionuclide compositions of the waste stream are being evaluated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and testing of a combined neutron and gamma assay system for measuring fissile material in fuel and waste items - 15340

A combined neutron and gamma ray assay system for the measurement of fissile material in both fuel and waste items has been designed, modelled, developed and tested. The purpose of the system is to measure and characterize a wide range of fissile materials including uranium, plutonium, americium and mixed oxide fuel arising from a variety of processes and facilities across the United Kingdom. Dounreay Site Restoration Limited at Dounreay currently stores these items form the United Kingdom Nuclear Decommissioning Authority's un-irradiated fuel inventory. This inventory comprises historic materials from ex-United Kingdom Atomic Energy Authority nuclear fuel projects and experiments together with fast reactor fuel materials and some commercial fuel items as delivered to Dounreay for recovery. The combined assay system has been designed and constructed to support the operation of a fuel processing facility, which will be operated at Dounreay to treat these historic legacy fuel materials, making them suitable for long term storage. Appropriate characterization of the fissile material is required for safety, criticality control and nuclear materials safeguards purposes prior to final disposition. The system consists of both gamma ray and neutron measurement components. The results of a neutron measurement are combined with the gamma ray isotopic ratio measurement results to generate the assay result for the fissile material being characterized. The gamma ray component of the system employs a safeguards quality high purity Germanium detector with electro-mechanical cooling and the measurements of fissile material containers are made in a shielded chamber with a tin and copper graded lining. Containers of fissile material are rotated during the gamma ray measurement and a variable automatic steel collimator aperture mechanism is employed to adjust the measured count rate to control detector dead time. Gamma ray spectra are analysed using the plutonium and uranium isotopic ratio code PC/FRAM. The gamma ray system can also be configured to perform a direct assay of small quantities of uranium bearing material. For this assay measurement a series of cadmium filters can be positioned in front of the detector to reduce the contribution from 59 keV gamma rays from Am-241. In addition to gamma ray isotopic measurements, both active and passive neutron assay is performed by the system. The neutron-measuring component consists of a thick walled cylindrical polyethylene chamber, which provides neutron moderation for 30 one-inch diameter He-3 detector tubes located in re-entrant channels in the polyethylene moderator. Two removable polyethylene-inserts incorporating lower plug assemblies are provided, one with and one without a cadmium lining. Also two top plug units are provided, again one with cadmium and one without a cadmium liner. The Neutron Subsystem can be operated both as a passive and as an active neutron coincidence counter. In both fast and thermal active neutron mode, the neutron component employs two americium-beryllium (Am-Be) alpha-n neutron sources, one positioned in the top and the other in the bottom plug unit. The neutron sources are removed when the counter is operated in passive mode. Passive neutron detection efficiency and active neutron performance has been modelled using the MCNP Monte Carlo computer simulation code as part of the design process. In the absence of fissile samples, operation of the gamma ray component of the system has been tested initially using calibrated Eu-152 and Ba-133 gamma ray sources and the use of archived spectra from fissile material measurements. Initial testing of the neutron system has employed a calibrated Cf-252 spontaneous fission neutron source. Neutron testing has been confirmed using further MCNP simulations. The results of test measurements with the system are presented and compared with the results of MCNP measurement simulations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Needs for integrated risk assessment to support optimal environmental management decisions - 15455

Cleaning up legacy waste from 50 years of nuclear weapons production and energy research still remains a challenge for the U.S. Department of Energy (DOE). The DOE environmental management program is currently forecasted to run through at least late 2060's with an estimated liability of $204 billion. Risks to human health of workers and the public, the ecological system, and nuclear safety of cleanup activities continue to drive the cost of DOE's cleanup programs. Currently, these risks are generally assessed and managed independently of each other. Except for DOE self-regulated on-site disposal activities of low-level radioactive waste, risks to human health and the environment are generally under the purview of U.S. Environmental Protection Agency and State regulatory agencies, while nuclear safety risks are regulated by DOE with oversight from the U.S. Nuclear Regulatory Commission and the Defense Nuclear Facilities Safety Board where appropriate. When managing health and environmental risks, the individual regulatory authorities often use an area-by-area (or unit-by-unit), contaminant-by-contaminant (chemical-by-chemical or radionuclide-by-radionuclide) approach, focusing on a single medium (soil, water, or air), a single source (e.g., a burial ground or a processing facility), and a single receptor (e.g, a groundwater well or a creek). This level of segregation in risk evaluations by risk category, geographical location, and operational unit, as well as the corresponding separation of regulatory authorities poses a significant challenge to reaching an optimal decision in prioritizing and managing cleanup activities. This management challenge adds another layer of complexity to large-scale cleanup effort at complex sites such as the Hanford site in eastern Washington. Therefore, to support a scientifically sound, operationally robust decision making process, there is a need for an integrated, holistic approach to risk assessment that addresses the combined effects of all major contributing factors. Previous studies have pointed out the need for integrated risk assessments that address multi-contaminant, multimedia, multi-pathway exposures, for the purposes of evaluating risks to human health and the environment. We believe that a comprehensive risk assessment should also take into nuclear safety risks that are associated with handling of nuclear material either retrieved from burial sites or to be decommissioned from nuclear facilities. Recent efforts, such as the Consortium for Risk Evaluation with Stakeholder Participation (CRESP)-led Hanford site-wide independent risk review that will categorize all types of risks at the Hanford site and the DOE complex-wide risk review mandated by the Fiscal Year 2014 Consolidated Appropriations Act ('Omnibus bill'), are beginning to more comprehensively address this need. This paper provides a categorization of various types of risks present at typical DOE sites, reviews the current risk assessment and management practices, and discusses the needs for integrating nuclear safety into performance and risk assessments for optimal cleanup decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities to Reuse and Recycle Redundant Radioisotopes - 16023

Sixty plus years of nuclear research and operation in the UK has produced significant quantities of nuclear material. To those involved in decommissioning a site or facility, this material represents a liability that needs to be managed and eventually disposed of. However to those in the wider nuclear industry and supply chain, the radioisotopes represent a potential resource of valuable, and in some cases irreplaceable material for future work. There is therefore an opportunity to create a win-win by identifying material that could be recycled or reused, removing it from being a liability and creating value from what is considered a waste. The UK is currently focused on the clean up of nuclear sites and the safe disposal of legacy nuclear material. Whilst the bulk of legacy material on these sites is mixed wastes in various solid and liquid forms, some of it consists of material produced for research purposes in the form of radioisotopes or exotic fuels. This has resulted in a plethora of unirradiated and irradiated materials in store across the UK including: Depleted and natural Uranium, Enriched Uranium, Mixed U/Pu oxides, Uranium carbide and mixed U/Pu carbides, Thorium as metal and oxides, Research radioisotopes. The material exists in almost every conceivable state from pure metal and oxides to solutions. Some material is well characterised and free from extraneous debris, other material is poorly characterised and contaminated with chemicals, experimental residues and sweepings. In addition, to reduce the risk and potential hazard across the UK there has also been a period of consolidation of obsolete radioactive sources from a wide variety of industrial or medical facilities to secure storage within a licensed site. The waste hierarchy is an established principle for the management of wastes, radioactive or otherwise. Its principles are set out and it gives top priority to prevention in the first place. Where waste is produced, it gives priority to preparation for re-use, then recycling before consideration for disposal as a last resort. The term wastes may only be applicable to the owner of the material where they may view the material as unwanted, unusable, or a by-product. It does not necessarily follow that the material is a waste to all potential owners. Therefore it is important to consider the potential value of material before it is considered for disposal since there is a significant and growing market for radioisotopes across the world. This paper will outline some of the opportunities in the UK for the recycle of surplus radioisotopes and orphan material. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Ambivalent Role of Participants in Nuclear Waste Decisions - 16360

Today's global nuclear sector has entered a critical juncture. Waste management solutions have the potential to influence the prospects of whether new plants will be built and when aging plants will be decommissioned. Even in countries without nuclear power plants, the siting of nuclear waste can present communication challenges and opportunities for public involvement. As new nuclear programs withstand scrutiny, local communities share their want for solutions to nuclear waste before new plant construction commences. Developing nations have begun to explore the potential of adding nuclear power production to their energy mix. They carefully watch established nuclear players to accelerate their plans with lessons learned elsewhere. Some newcomers to nuclear energy will make decisions on new construction based on other operators' abilities to reconcile public concerns regarding radioactive waste. Distinct forms of government, cultural norms and means of public discourse present innovative approaches and changing expectations worldwide. This paper explores how practitioners are evaluating ways to activate stakeholders on nuclear waste siting in nations embarking on new nuclear programs. It investigates the incentives that people have to participate and legitimize the formation of laws, regulations and standards for nuclear materials management. Finally, it highlights examples of public participation techniques from established operating environments and posits that overly prescriptive requirements for stakeholder engagement can reduce the authenticity of public involvement and weaken confidence among participants in the decision making process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimized Qualification of Legacy Waste for the Repository Konrad - 16629

The repository Konrad in Germany is planned for the acceptance of low level waste and intermediate level waste. The Wiederaufarbeitungsanlage Karlsruhe (WAK GmbH) has the assignment to decommission and dispose of the nuclear facilities on the site of the Karlsruhe Institute of Technology (KIT). The entire inventory of these installations as well as the existing waste materials stored in the interim storage of the HDB are planned to be sent to the repository Konrad and are therefore treated according to the respective acceptance criteria. These acceptance criteria were defined on the basis of safety considerations and first published as a draft in 1995. After full legal recognition in 2007 the acceptance criteria were revised in 2010 and 2014. All legacy waste treated prior to 1995 has to be re-qualified according to the current state of acceptance. The repository will not open for acceptance of waste materials until 2022. Up to now only a small amount of acceptable waste packages exist. Therefore WAK GmbH established a scheme to improve and accelerate the processes and to have 2 annual delivery capacities (5000 m{sup 3} in total) ready by the end of the decade. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing and Deployment of Remote Systems to Remove Highly Radioactive Soil at Hanford's 324 Building - 18043

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CHPRC) is in the process of procuring, testing and deploying remotely operated tools to safely remove highly contaminated soil from beneath the 324 Building on the Hanford Site in southeastern Washington State. The 324 Building operated for more than 40 years, completing a variety of high-dose engineering development and demonstration activities inside six hot cells that shielded the workers from the highly radioactive materials. Activities to decommission, decontaminate and demolish the facility began in 2008. In 2010, soil contamination was found in the soil under one of the hot cells, and building deactivation was paused to evaluate the soil contamination. Sampling efforts, using borehole technology, revealed significant under-building contamination with dose rates measuring has high as 130 Sv/hr (13,000 R/hr). The highly-contaminated soil has to be removed before traditional open air deactivation activities can continue. CHPRC completed proof of concept testing and built a full-scale test facility to demonstrate the effectiveness of three primary tools that will accomplish the floor and soil removal. The tools include a commercially available concrete saw, and a commercially available excavator arm that have been modified to operate remotely in the high-radiation environment within the hot-cell. In order to reduce the wear on the hot-cell overhead cranes, a remote operated rail and cart system has been designed to transport soil and debris out of the hot-cell to an airlock area where the waste will be separated, according to its level of radioactivity. A camera and light system has been designed to provide visual and audio coverage of the hot-cell area that will allow the operations to proceed from remote control stations. This paper will describe the primary remote operated equipment designed for the project and the challenges and processes for developing, testing and deploying the equipment necessary to excavate the soil from below the 324 Building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Content Addition and Testing for 2017 NRC Amendment for the Versa-Pac Type A Fissile Packaging - 18120

The Versa-Pac is a certified Type A, fissile packaging (USA NRC Certificate no. USA/9342/AF-96), often used as a waste package for one time use. Continuous content additions have improved the versatility of the package resulting in expanded uses for the nuclear industry. Principal design of the Versa-Pac packaging maintains the use of an inner liner positioned inside a 55-gallon (VP-55) or 110-gallon drum (VP-110), as used for decades in the transport and disposal of Type A fissile materials. The Versa-Pac is used directly or in conjunction with pails, pipe containers, poly bottles, and a variety of smaller containers, inserts and vessels. The Versa-Pac content developments assist the industry with site shutdown, decommissioning, and cleanup operations, allowing for removal, transport, and storage options for the residual waste materials. A 2017 NRC license amendment application adds new capabilities to the Versa-Pac that include a low 1.25 wt% {sup 235}U enriched uranium loading, small quantities of UF{sub 6} in the form of 1S and 2S cylinders, and a payload mass increase from 250 to 350 pounds for the Versa-Pac 55-gallon version (VP-55). The lower uranium enrichment loading of 1.25 wt% {sup 235}U allows for a higher uranium mass limit. The inclusion of 1S and 2S UF{sub 6} cylinders fills an industry need to remove and dispose of long-stored material during site cleanup activities. The content payload mass limit is increased for low contaminated or radioactive heavy metal contents, such as cut plant components and ingots. Regulatory certification of new contents is demonstrated by test, analysis, and a combination of these techniques to show that the design function of the Versa-Pac as a Type A fissile package remains unchanged. Specific UF{sub 6} criticality and thermal analysis upgrades are added to the design documentation to accommodate 1S and 2S UF{sub 6} cylinders. The parameters for criticality analyses are simplified, ensuring no credit for cylinder containment is required for HAC thus reducing the reliance on a single specific shoring device. An upgrade of the Versa-Pac thermal analysis demonstrates compliance with ANSI N14.1 UF{sub 6} cylinder thermal limits. A new drop test sequence for the VP-55 was performed, documenting the addition of the 350-pound payload and demonstrating the VP-55 maintains structural integrity during the NCT and HAC drop, crush and puncture events as defined by 10 CFR 71. The testing and analyses show no loss of the material occurs and the package maintains the material in a subcritical state. This paper traces the engineering and licensing efforts involved in expanding the Versa-Pac's versatility for the 2017 NRC amendment application; summarizing the new testing and results for the payload increase, the content addition criticality and thermal evaluations, and content description for the Versa-Pac Safety Analysis Report. The NRC license amendment is scheduled for Winter 2017. Testing and supporting analyses reported in the Versa-Pac Safety Analysis Report demonstrates the content developments met the performance requirements of 10 CFR 71 for a Type A fissile package. A revision of the NRC Certificate of Compliance is expected in Spring 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hot Isostatically Pressed Ceramic Waste forms for High Dose Spent Adsorbents - 18129

Decommissioning and clean-up of nuclear facilities requires the development of new technologies to condition radioactive wastes, producing passively safe waste packages of minimal volume, to reduce storage and disposal costs. We have applied hot isostatic pressing to demonstrate conceptual waste forms for high dose spent adsorbents (i.e. ion exchange materials) present on the Sellafield site, UK, and Fukushima Daiichi site, Japan. These radioactive wastes pose several challenges which demand early conditioning to produce a passively safe wasteform, including: a wet and granular nature, and hence dispersible as a result of loss of containment; a very high dose rates as a result of their selectivity for short lived radionuclides (e.g. Sr-90, Cs-137, Co-60); radiogenic self-heating, as a result of the concentration of such lived radio nuclides; hydrogen production as a result of radiolysis of entrained water [1]. Here, we demonstrate the conversion of natural inorganic ion exchange materials into multiphase ceramic waste forms, achieving a waste loading of 100 wt.% and density in excess of 97% theoretical. High resolution thermogravimetric analysis coupled with mass spectroscopy was utilised to characterise the evolution of water and volatiles during the in-can bake out step, prior to the HIP cycle. This allowed optimisation of the bake out parameters (temperature, time and vacuum) to enable complete removal of water and volatiles, affording ceramic bodies with minimal residual porosity by hot isostatic pressing at 1250 deg. C for 4 h in stainless steel canisters. Characterisation of the ceramic waste forms by SEM /EDX and X-ray diffraction revealed the nuclides of concern to be incorporated within well-known natural mineral and synthetic phases, with Cs partitioning into the K-feldspar. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗