Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Control and Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

Waste to energy – key element for sustainable waste management

Highlights: • First paper on the importance of incineration from a urban metabolism point of view. • Proves that incineration is necessary for sustainable waste management. • Historical and technical overview of 100 years development of MSW incineration. - Abstract: Human activities inevitably result in wastes. The higher the material turnover, and the more complex and divers the materials produced, the more challenging it is for waste management to reach the goals of “protection of men and environment” and “resource conservation”. Waste incineration, introduced originally for volume reduction and hygienic reasons, went through a long and intense development. Together with prevention and recycling measures, waste to energy (WTE) facilities contribute significantly to reaching the goals of waste management. Sophisticated air pollution control (APC) devices ensure that emissions are environmentally safe. Incinerators are crucial and unique for the complete destruction of hazardous organic materials, to reduce risks due to pathogenic microorganisms and viruses, and for concentrating valuable as well as toxic metals in certain fractions. Bottom ash and APC residues have become new sources of secondary metals, hence incineration has become a materials recycling facility, too. WTE plants are supporting decisions about waste and environmental management: They can routinely and cost effectively supply information about chemical waste composition as well as about the ratio of biogenic to fossil carbon in MSW and off-gas.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Hardware-in-the-loop Microgrid Testbed

A hardware-in-the-loop (HIL) microgrid testbed for the evaluation and assessment of microgrid operation and control system has been presented in this paper. The HIL testbed is composed of a real-time digital simulator (RTDS) for modeling of the microgrid, multiple NI CompactRIOs for device level control, a prototype microgrid energy management system (MicroEMS), and a relay protection system. The applied communication-assisted hybrid control system has been also discussed. Results of function testing of HIL controller, communication, and the relay protection system are presented toshow the effectiveness of the proposed HIL microgrid testbed.

Xiao, Bailu↗

What is the Controllable Electrical Demand from Non-Residential Electric Vehicle Supply Equipment in the San Diego Region?

The EVSE deployed by The EV Project included both residential and non-residential units. Approximately 4,000 non-residential AC Level 2 (ACL2) EVSE were installed in workplace environments, fleet applications and publicly accessible locations near retail centers, parking lots, and similar locations. The power required to recharge a plug-in electric vehicle (PEV) can be a significant additional electrical load to electric grid but may also provide a controllable resource for mitigating grid overload issues. Electric utilities seek ways to reduce their generating costs by controlling the maximum (peak) load on their system, their generating resources, and frequency and voltage control on the system. This management may be achieved indirectly, through rates that incentivize their customers (including PEV owners) to manage the charging of their vehicles, or may take the form of direct utility control of non-residential EVSE. What insight can The EV Project data provide related to the magnitude of this impact and the potential controllable demand? The paper What is the Controllable Electrical Demand from Residential EVSE in the San Diego Region?1 addressed this question for residential EVSE. This paper quantifies the total controllable electrical load imposed on the electric grid by non-residential PEV charging in the San Diego region of The EV Project.

33 ADVANCED PROPULSION SYSTEMS↗

Cost reduction by integration of the assurance technologies.

It is shown how the cost of applying assurance disciplines to the development of complex systems can be reduced by integrating the mechanics of system engineering and system management into a 'Development Risk Control System'. The essential features of the integration process are examined. A 'Development Risk Management Model' is described, and the use of the model to integrate and thereby reduce the cost of other assurance disciplines is discussed and illustrated.

Ball, L. W.↗

Soyuz/ACRV accommodation study

Included is a set of viewgraphs that present the results of a study conducted at the LaRC Space Station Freedom Office at the request of the Space Station Freedom Level 1 Program Office and the JSC ACRV Project Office to determine the implications of accommodating two Soyuz TM spacecraft as Assured Crew Return Vehicles (ACRV) on the Space Station Freedom (SSF) at the Permanently Crewed Capability (PCC) stage. The study examined operational as well as system issues associated with the accommodation of the Soyuz for several potential configuration options. Operational issues considered include physical hardware clearances, worst case Soyuz departure paths, and impacts to baseline operations such as Pressurized Logistics Module (PLM) exchange, Space Station Remote Manipulator System (SSRMS) attachment, Extravehicular Activity (EVA), and automatic rendezvous and docking (AR&D). Systems impact analysis included determining differences between Soyuz interface requirements and SSF capabilities for the Electrical Power System (EPS), Thermal Control System (TCS), Communications and Tracking (C&T), Audio-Video Subsystem (A/V), Data Management System (DMS), and Environmental Control and Life Support System (ECLSS). Significant findings of this study have indicated that the current AV capability of the Soyuz will need to be increased to provide adequate departure clearances for a worst case escape from an uncontrolled SSF and that an interface element will be required to mate the Soyuz vehicles to station, provide for AR&D structural loads, and to house Soyuz-to-SSF system interfaces.

Cruz, Jonathan↗

Obfuscation for high-performance computing systems

An example technique includes initializing, by an obfuscation computing system, communications with nodes in a distributed computing platform. The nodes include compute nodes that provide resources in the distributed computing platform and a controller node that performs resource management of the resources. The obfuscation computing system serves as an intermediary between the controller node and the compute nodes. The technique further includes outputting an interactive user interface (UI) providing a selection between a first privilege level and a second privilege level, and performing one of: based on the selection being for the first privilege level, a first obfuscation mechanism for the distributed computing platform to obfuscate digital traffic between a user computing system and the nodes, or based on the selection being for the second privilege level, a second obfuscation mechanism for the distributed computing platform to obfuscate digital traffic between the user computing system and the nodes.

Aloisio, Scott↗

Panel Session 80: Interagency Community of Practice in Risk and Performance Assessment

This panel focused on the status of the Inter-agency Performance and Risk Assessment Community of Practice (P and RA COP). Representatives from the P and RA COP and subject matter experts discussed lessons learned and provided feedback on building the P and RA COP to support risk-informed environmental decision making. Panelists with presentations: Understanding Mechanisms to Manage Uncertainty and Risk in Waste Containment Systems (Craig Benson, University of Virginia - CRESP (USA) Scaling for Performance Assessments (Paul Black, Katie Catlett, Doug Anderson, Paul Duffy, Tom Stockton, Sam Van Sickle, John Carson); Interagency Community of Practice in Rick and Performance Assessment (Horst Monken Fernandes); Institutional Controls as a Risk Management Tool (David Esh); Superfund: Explanation of Screening and PRG's for Risk and Dose Assessment (Stuart Walker)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

10 CFR 830 Major Modification Determination for the Advanced Test Reactor Remote Monitoring and Management Capability

The Advanced Test Reactor (ATR; TRA-670), which is located in the ATR Complex at Idaho National Laboratory, was constructed in the 1960s for the purpose of irradiating reactor fuels and materials. Other irradiation services, such as radioisotope production, are also performed at ATR. While ATR is safely fulfilling current mission requirements, assessments are continuing. These assessments intend to identify areas to provide defense–in-depth and improve safety for ATR. One of the assessments performed by an independent group of nuclear industry experts recommended that a remote accident management capability be provided. The report stated that: “contemporary practice in commercial power reactors is to provide a remote shutdown station or stations to allow shutdown of the reactor and management of long-term cooling of the reactor (i.e., management of reactivity, inventory, and cooling) should the main control room be disabled (e.g., due to a fire in the control room or affecting the control room).” This project will install remote reactor monitoring and management capabilities for ATR. Remote capabilities will allow for post scram reactor management and monitoring in the event the main Reactor Control Room (RCR) must be evacuated.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Impact of Behind-the-Meter Heterogeneous Distributed Energy Resources on Distribution Grids

The increasing integration of distributed energy resources (DERs) on the electric grid brings new challenges and opportunities for utility grid operations. With the rapid deployment of DERs, there is emerging interest in integrating these controllable devices with utility operations at all levels for monitoring and management. To understand the challenges with increasing behind-the-meter (BTM) DERs and to identify the needs in deploying advanced controls, a comprehensive grid impact study is indispensable. This paper presents the analysis which help visualize the DER impact on the grid, identify the challenges and provides an insight into the new distribution management and control needs to enable reliable and resilient grid operations.

27 ARPA - Advanced Research Projects Agency-Energy↗

A real-time, portable, microcomputer-based jet engine simulator

Modern piloted flight simulators require detailed models of many aircraft components, such as the airframe, propulsion system, flight deck controls and instrumentation, as well as motion drive and visual display systems. The amount of computing power necessary to implement these systems can exceed that offered by dedicated mainframe computers. One approach to this problem is through the use of distributed computing, where parts of the simulation are assigned to computing subsystems, such as microcomputers. One such subsystem, such as microcomputers. One such subsystem, a real-time, portable, microcomputer-based jet engine simulator, is described in this paper. The simulator will be used at the NASA Ames Vertical Motion Simulator facility to perform calculations previously done on the facility's mainframe computer. The mainframe will continue to do all other system calculations and will interface to the engine simulator through analog I/0. The engine simulator hardware includes a 16-bit microcomputer and floating-point coprocessor. There is an 8 channel analog input board and an 8 channel analog output board. A model of a small turboshaft engine/control is coded in floating-point FORTRAN. The FORTRAN code and a data monitoring program run under the control of an assembly language real-time executive. The monitoring program allows the user to isplay and/or modify simulator variables on-line through a data terminal. A dual disk drive system is used for mass storage of programs and data. The CP/M-86 operating system provides file management and overall system control. The frame time for the simulator is 30 milliseconds, which includes all analog I/0 operations.

Blech, R. A.↗

System Health and Status Reporting is Used to Improve Infrastructure Systems at the Hanford Site - 20449

Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Telerobot local-remote control architecture for space flight program applications

The JPL Supervisory Telerobotics (STELER) Laboratory has developed and demonstrated a unique local-remote robot control architecture which enables management of intermittent communication bus latencies and delays such as those expected for ground-remote operation of Space Station robotic systems via the Tracking and Data Relay Satellite System (TDRSS) communication platform. The current work at JPL in this area has focused on enhancing the technologies and transferring the control architecture to hardware and software environments which are more compatible with projected ground and space operational environments. At the local site, the operator updates the remote worksite model using stereo video and a model overlay/fitting algorithm which outputs the location and orientation of the object in free space. That information is relayed to the robot User Macro Interface (UMI) to enable programming of the robot control macros. This capability runs on a single Silicon Graphics Inc. machine. The operator can employ either manual teleoperation, shared control, or supervised autonomous control to manipulate the intended object. The remote site controller, called the Modular Telerobot Task Execution System (MOTES), runs in a multi-processor VME environment and performs the task sequencing, task execution, trajectory generation, closed loop force/torque control, task parameter monitoring, and reflex action. This paper describes the new STELER architecture implementation, and also documents the results of the recent autonomous docking task execution using the local site and MOTES.

Zimmerman, Wayne↗

Conceptual design of a biological specimen holding facility

An all-important first step in the development of the Spacelab Life Science Laboratory is the design of the Biological Specimen Holding Facility (BSHF) which will provide accommodation for living specimens for life science research in orbit. As a useful tool in the understanding of physiological and biomedical changes produced in the weightless environment, the BSHF will enable biomedical researchers to conduct in-orbit investigations utilizing techniques that may be impossible to perform on human subjects. The results of a comprehensive study for defining the BSHF, description of its experiment support capabilities, and the planning required for its development are presented. Conceptual designs of the facility, its subsystems and interfaces with the Orbiter and Spacelab are included. Environmental control, life support and data management systems are provided. Interface and support equipment required for specimen transfer, surgical research, and food, water and waste storage is defined. New and optimized concepts are presented for waste collection, feces and urine separation and sampling, environmental control, feeding and watering, lighting, data management and other support subsystems.

Jackson, J. K.↗

Standardizing power monitoring and control at exascale

Power API-the result of collaboration among national laboratories, universities, and major vendors-provides a range of standardized power management functions, from application-level control and measurement to facility-level accounting, including real-time and historical statistics gathering. Here, support is already available for Intel and AMD CPUs and standalone measurement devices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Langley Research Center NASA/PERT TIME III

Program provides practical system for total project management in areas of planning, scheduling, resource control, and reporting. It allows use of existing management and administrative tools and processes and is applicable to many types of projects.

Source record↗

Control of large flexible space structures

Progress in robust design of generalized parity relations, design of failure sensitive observers using the geometric system theory of Wonham, computational techniques for evaluation of the performance of control systems with fault tolerance and redundancy management features, and the design and evaluation od control systems for structures having nonlinear joints are described.

Vandervelde, W. E.↗

SU-E-T-77: A Statistical Approach to Manage Quality for Pre-Treatment Verification in IMRT/VMAT

Objective: The study presents the application of a simple concept of statistical process control (SPC) for pre-treatment quality assurance procedure analysis for planar dose measurements performed using 2D-array and a-Si electronic portal imaging device (a-Si EPID). Method: A total of 195 patients of four different anatomical sites: brain (n1=45), head & neck (n2=45), thorax (n3=50) and pelvis (n4=55) were selected for the study. Pre-treatment quality assurance for the clinically acceptable IMRT/VMAT plans was measured with 2D array and a-Si EPID of the accelerator. After the γ-analysis, control charts and the quality index Cpm was evaluated for each cohort. Results: Mean and σ of γ ( 3%/3 mm) were EPID γ %≤1= 99.9% ± 1.15% and array γ %<1 = 99.6% ± 1.06%. Among all plans γ max was consistently lower than for 2D array as compared to a-Si EPID. Fig.1 presents the X-bar control charts for every cohort. Cpm values for a-Si EPID were found to be higher than array, detailed results are presented in table 1. Conclusion: Present study demonstrates the significance of control charts used for quality management purposes in newer radiotherapy clinics. Also, provides a pictorial overview of the clinic performance for the advanced radiotherapy techniques.Higher Cpm values for EPID indicate its higher efficiency than array based measurements.

60 APPLIED LIFE SCIENCES↗

Posttraumatic Stress Disorder After High-Dose-Rate Brachytherapy for Cervical Cancer With 2 Fractions in 1 Application Under Spinal/Epidural Anesthesia: Incidence and Risk Factors

Purpose: To investigate the psychological consequences of high-dose-rate brachytherapy with 2 fractions in 1 application under spinal/epidural anesthesia in the treatment of locally advanced cervical cancer. Methods and Materials: In 50 patients with locally advanced cervical cancer, validated questionnaires were used for prospective assessment of acute and posttraumatic stress disorder (ASD/PTSD) (Impact of Event Scale–Revision), anxiety/depression (Hospital Anxiety and Depression Scale), quality of life (European Organization for Research and Treatment of Cancer Quality of Life Questionnaire Core 30/Cervical Cancer 24), physical functioning (World Health Organization performance status), and pain (visual analogue scale), before and during treatment and 1 week and 3 months after treatment. Qualitative interviews were recorded in open format for content analysis. Results: Symptoms of ASD occurred in 30% of patients 1 week after treatment; and of PTSD in 41% 3 months after treatment in association with this specific brachytherapy procedure. Pretreatment predictive variables explain 82% of the variance of PTSD symptoms. Helpful experiences were the support of the treatment team, psychological support, and a positive attitude. Stressful factors were pain, organizational problems during treatment, and immobility between brachytherapy fractions. Conclusions: The specific brachytherapy procedure, as performed in the investigated mono-institutional setting with 2 fractions in 1 application under spinal/epidural anesthesia, bears a considerable risk of traumatization. The source of stress seems to be not the brachytherapy application itself but the maintenance of the applicator under epidural anesthesia in the time between fractions. Patients at risk may be identified before treatment, to offer targeted psycho-social support. The patients' open reports regarding helpful experiences are an encouraging feedback for the treatment team; the reported stressful factors serve as a basis for improvement of patient management, especially regarding pain control.

62 RADIOLOGY AND NUCLEAR MEDICINE↗