Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Self-Healing Cements with Improved Toughness at Casing and Formation Interfaces for Subsurface Applications

The goal of this project (developed for Topic 2) is to demonstrate that PNNL’s self-healing cement (US Patent 20180044570A1) is a superior well construction material compared to conventional cement and to accelerate its commercial adoption. The project also enables a pathway toward a rigorous and reproducible EGS development approach that can be extended to high-temperature unconventional oil and gas reservoirs as well as low temperature carbon storage reservoirs. To achieve this goal, the project’s objectives are to answer remaining technical questions and to address identified technical and market barriers. This project involves collaboration between PNNL, ARE, Cyrq Energy (under the auspices of ARE), and RC. This team demonstrates a strong technical partnership, linking theoretical and laboratory expertise with field-based geothermal resource management and well completions.

36 MATERIALS SCIENCE↗

Propulsion Materials: 2009 Annual Progress Report

The Propulsion Materials program focuses on enabling and innovative materials technologies that are critical in improving the efficiency of advanced engines. Projects within the Propulsion Materials Program address materials concerns that directly impact the critical technical barriers in each of these programs barriers such as fuel efficiency, thermal management, emissions reduction, and reduced manufacturing costs.

33 ADVANCED PROPULSION SYSTEMS↗

HarDWR - Water Management Area (WMA) Shapefiles

For a detailed description of the database of which this record is only one part, please see the HarDWR meta-record. Borders of all Water Management Areas (WMAs) across the 11 Western-most states of the continental United States are available filtered through a single source. The legal name for this set of boundaries varies state-by-state. The data is provided as two compressed shapefiles. One, stateWMAs, contains data for all 11 states. For 10 of those states, Arizona being the exception, the polygons represent the legal management boundaries used by those states to manage their surface and groundwater resources respectively. Arizona is unique among this collection of states in that surface and groundwater resources are managed using two separate sets of boundaries. During our followup analysis, due to technical reasons we decided to focus on one set of boundaries, those for surface water. Due to this, the Arizona surface WMAs are included within stateWMAs. The Arizona groundwater WMAs are provided as the second file azGroundWMAs as a companion to the first file for completeness and general reference, although the boundaries were no longer referenced in the analysis (Grogan et al., in review) past a certain point. The columns for both shapefiles are: basinNum: the state provided unique numerical ID basinName: the state provided English name of the area, where applicable state: the state name uniID: a unique identifier we created by concatenating the state name, and underscore, and the state numerical ID

Economics↗

Bridging Control and Deployment: A Cross-Layer Analysis of Scalable Building Cluster Control

Building cluster control has emerged as a promising approach for enabling flexible and coordinated operation of distributed building systems, yet its transition from pilot demonstrations to routine grid-interactive operation remains limited. This paper argues that this gap cannot be explained by control algorithms alone. Instead, it arises from interacting barriers in communication infrastructure, data and semantic interoperability, uncertainty management, stakeholder participation, market design, and policy support. Accordingly, the paper reviews both technical and non-technical barriers to building cluster control. Technical challenges include heterogeneous devices and protocols, communication latency and reliability, distributed decision-making, and uncertainty propagation across aggregated loads. Non-technical barriers include user participation, stakeholder coordination, incentive allocation, and data governance. Existing solution approaches are synthesized, including semantic interoperability frameworks, edge and hierarchical communication architectures, distributed and transactive control strategies, uncertainty-aware optimization, policy mechanisms, and market reforms. Based on this analysis, two research directions are identified: testing infrastructures that can evaluate control performance under realistic multi-building conditions, and abstraction methods that allow building clusters to interact with other energy sectors through standardized flexibility representations. Overall, the paper provides a structured review of how building cluster control can move from isolated demonstrations toward reproducible, market-compatible, and grid-relevant implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The need for a comprehensive expert system development methodology

In a traditional software development environment, the introduction of standardized approaches has led to higher quality, maintainable products on the technical side and greater visibility into the status of the effort on the management side. This study examined expert system development to determine whether it differed enough from traditional systems to warrant a reevaluation of current software development methodologies. Its purpose was to identify areas of similarity with traditional software development and areas requiring tailoring to the unique needs of expert systems. A second purpose was to determine whether existing expert system development methodologies meet the needs of expert system development, management, and maintenance personnel. The study consisted of a literature search and personal interviews. It was determined that existing methodologies and approaches to developing expert systems are not comprehensive nor are they easily applied, especially to cradle to grave system development. As a result, requirements were derived for an expert system development methodology and an initial annotated outline derived for such a methodology.

Baumert, John↗

A computer-based specification methodology

Standard practices for creating and using system specifications are inadequate for large, advanced-technology systems. A need exists to break away from paper documents in favor of documents that are stored in computers and which are read and otherwise used with the help of computers. An SADT-based system, running on the proposed Space Station data management network, could be a powerful tool for doing much of the required technical work of the Station, including creating and operating the network itself.

Munck, Robert G.↗

Hubble Space Telescope: SRM/QA observations and lessons learned

The Hubble Space Telescope (HST) Optical Systems Board of Investigation was established on July 2, 1990 to review, analyze, and evaluate the facts and circumstances regarding the manufacture, development, and testing of the HST Optical Telescope Assembly (OTA). Specifically, the board was tasked to ascertain what caused the spherical aberration and how it escaped notice until on-orbit operation. The error that caused the on-orbit spherical aberration in the primary mirror was traced to the assembly process of the Reflective Null Corrector, one of the three Null Correctors developed as special test equipment (STE) to measure and test the primary mirror. Therefore, the safety, reliability, maintainability, and quality assurance (SRM&QA) investigation covers the events and the overall product assurance environment during the manufacturing phase of the primary mirror and Null Correctors (from 1978 through 1981). The SRM&QA issues that were identified during the HST investigation are summarized. The crucial product assurance requirements (including nonconformance processing) for the HST are examined. The history of Quality Assurance (QA) practices at Perkin-Elmer (P-E) for the period under investigation are reviewed. The importance of the information management function is discussed relative to data retention/control issues. Metrology and other critical technical issues also are discussed. The SRM&QA lessons learned from the investigation are presented along with specific recommendations. Appendix A provides the MSFC SRM&QA report. Appendix B provides supplemental reference materials. Appendix C presents the findings of the independent optical consultants, Optical Research Associates (ORA). Appendix D provides further details of the fault-tree analysis portion of the investigation process.

Rodney, George A.↗

Software technology insertion: A study of success factors

Managing software development in large organizations has become increasingly difficult due to increasing technical complexity, stricter government standards, a shortage of experienced software engineers, competitive pressure for improved productivity and quality, the need to co-develop hardware and software together, and the rapid changes in both hardware and software technology. The 'software factory' approach to software development minimizes risks while maximizing productivity and quality through standardization, automation, and training. However, in practice, this approach is relatively inflexible when adopting new software technologies. The methods that a large multi-project software engineering organization can use to increase the likelihood of successful software technology insertion (STI), especially in a standardized engineering environment, are described.

Lydon, Tom↗

The NASA SBIR product catalog

The purpose of this catalog is to assist small business firms in making the community aware of products emerging from their efforts in the Small Business Innovation Research (SBIR) program. It contains descriptions of some products that have advanced into Phase 3 and others that are identified as prospective products. Both lists of products in this catalog are based on information supplied by NASA SBIR contractors in responding to an invitation to be represented in this document. Generally, all products suggested by the small firms were included in order to meet the goals of information exchange for SBIR results. Of the 444 SBIR contractors NASA queried, 137 provided information on 219 products. The catalog presents the product information in the technology areas listed in the table of contents. Within each area, the products are listed in alphabetical order by product name and are given identifying numbers. Also included is an alphabetical listing of the companies that have products described. This listing cross-references the product list and provides information on the business activity of each firm. In addition, there are three indexes: one a list of firms by states, one that lists the products according to NASA Centers that managed the SBIR projects, and one that lists the products by the relevant Technical Topics utilized in NASA's annual program solicitation under which each SBIR project was selected.

Gilman, J. A.↗

Cognitive Systems Modeling and Analysis of Command and Control Systems

Military operations, counter-terrorism operations and emergency response often oblige operators and commanders to operate within distributed organizations and systems for safe and effective mission accomplishment. Tactical commanders and operators frequently encounter violent threats and critical demands on cognitive capacity and reaction time. In the future they will make decisions in situations where operational and system characteristics are highly dynamic and non-linear, i.e. minor events, decisions or actions may have serious and irreversible consequences for the entire mission. Commanders and other decision makers must manage true real time properties at all levels; individual operators, stand-alone technical systems, higher-order integrated human-machine systems and joint operations forces alike. Coping with these conditions in performance assessment, system development and operational testing is a challenge for both practitioners and researchers. This paper reports on research from which the results led to a breakthrough: An integrated approach to information-centered systems analysis to support future command and control systems research development. This approach integrates several areas of research into a coherent framework, Action Control Theory (ACT). It comprises measurement techniques and methodological advances that facilitate a more accurate and deeper understanding of the operational environment, its agents, actors and effectors, generating new and updated models. This in turn generates theoretical advances. Some good examples of successful approaches are found in the research areas of cognitive systems engineering, systems theory, and psychophysiology, and in the fields of dynamic, distributed decision making and naturalistic decision making.

Norlander, Arne↗

Program Options to Explore Ocean Worlds

Including Earth, roughly a dozen water ocean worlds exist in the solar system: the relict worlds Ceres and Mars, vast oceans inside most of the large Jovian and Saturnian icy moons, and Kuiper Belt Objects like Triton, Charon, and Pluto whose geologies are dominated by water and ammonia. Key pieces of the ocean-world science puzzle – which when completed may reveal whether life is widespread in the cosmos, why it exists where it does, and how it originates – are distributed among them. The eventual exploration of all these worlds will yield humanity’s total tangible knowledge about life in the universe, essentially forever. Thus, their exploration has existential significance for humanity’s self-regard, and indeed perhaps of our place in the natural scheme. The matter of planning how to pursue such a difficult and unprecedented exploration opportunity is therefore historic. The technical challenges are formidable, far harder than at Mars: missions to the Jovian and Saturnian ocean worlds are severely power-limited; trip times can be as much as a half decade and decade, respectively. And the science targets are global-scale oceans beneath kilometers of cryogenic ice. Reaching and exploring them would be a multi-generational undertaking, so again it is essential to plan and prepare. Today, we lack the instrumentation, subsystems, and remote operational-intelligence technologies needed to build and use exploration avatars as good as what we can envision needing. Each ocean world holds a piece of the puzzle, but the three priority targets are Europa at Jupiter, and Enceladus and Titan at Saturn. As with the systematic exploration of Mars, exploring these diverse worlds poses a complex technical and programmatic challenge – a strategic challenge – that needs to be designed and managed if each generation is to see its work bear fruit, and if the space science community is to make most effective use of the public money devoted to the quest. Strategic programs benefit from coherence. In only 15 years, the Mars Exploration Program (MEP) has transformed humanity’s view of Mars as a once and future habitable place, a world quite possibly holding relict evidence of life. Finding such evidence, we would study it to know if that life shared an origin common with Earth life. However, life in the ocean worlds could not have shared our origin, so exploring them opens another level in our quest to understand life in the universe: not only to places with vast salt-water seas known to contain organics and hydrothermal seafloors active today, but to places where anything alive cannot be related to us. MEP’s success – from its presence in the public consciousness to its rewriting of planetary habitability – make it an obvious template and source of lessons learned for a viable ocean worlds exploration program (OWEP). Six attributes of the MEP are analyzed for application to a potential OWEP. From this, five hypothetical programmatic scenarios are compared to the default case, and conclusions drawn. A coherent OWEP should have several parts: first, dedicated continuous investment in enabling technologies; and second, two directed-purpose, medium-class (~$1B) missions per decade that conduct pivotal investigations on a documented roadmap. Science could start in 2035, informing development of decadal flagship missions after Europa Clipper, to the places revealed to hold the most promise. The fastest pace of scientific discoveries would require access to high-performance propulsion infrastructure, e.g., the Space Launch System, Falcon Heavy, and high-power in-space solar electric propulsion, all capable of halving trip time. Not including these boosts, such a program would cost about a half-billion dollars more per year than NASA’s existing mission portfolio; the program architecture funded today cannot deliver a strategic OWEP while also sustaining balance among other solar system exploration priorities and opportunities.

Naderi, F.↗

ACAS Xr Part Task Sim, Preliminary Experiment Design

In early 2022, the Human Autonomy Teaming Lab (NASA Ames Research Center) will conduct a manned, human-in-the-loop (HITL) simulation. This part task HITL will begin the lab’s Hazard Perception and Avoidance (HPA) technical work under NASA’s Advanced Air Mobility (AAM), Automated Flight and Contingency Management (AFCM) Sub-Project. The goals will be to assess levels of automation for manned, electric vertical takeoff and landing (eVTOL) aircraft. This simulation will test manual and automated Resolution Advisory (RA) responses and return-to-course (RTC) maneuvers for the first version of the Airborne Collision Avoidance System’s (ACAS) rotary-wing (Xr) variant. This will be conducted on a fixed-based simulator designed to fly eVTOL aircraft while maneuvering for intruding traffic. Variables for this study include levels of autonomy (i.e., manual and automated) as well as the types of alerts at the onset of conflicts (i.e., Corrective and RA). The data collected will include response times, losses of well clear, and maneuver sizes and durations as well as subjective ratings like acceptability, perceived workload, and meaningful human control. Additional details and future anticipations are also discussed.

air taxis↗

Lean Model-Based Systems Engineering on the NASA High-Density Vertiplex Subproject

The High Density Vertiplex (HDV) subproject of NASA’s Advanced Air Mobility (AAM) project adopted Model-Based Systems Engineering (MBSE)in July of 2020, prior to subproject formulation. A small and lean team of HDV Systems Engineers(SE) are utilizing MagicDraw to execute NASA SE processes via MBSE. The SEs learned how to use MagicDraw from scratch and HDV is the first project for which the SEs have utilized MagicDraw. This paper will demonstrate project technical execution via MBSE, utilizing the digital elements built into the SysML (Systems Modeling Language). SysML provides a model-centric means of carrying out the NASA SE common technical processes by providing tools for complete system modeling, including requirements and interface management and design capture. The authors also leverage and extend SysML to perform other SE tasks, such as Verification and Validation (V&V)tracking. MBSE has two main purposes for HDV: 1) documenting the subproject’s logical architecture for distribution outside of the subproject, 2) capturing the subproject’s physical architecture in a single-source-of-truth for use by the subproject’s members. This paper details the challenges, lessons learned, and solutions that were encountered in implementing MBSE in the first iteration on a multi-iteration, full-lifecycle design, build, fly project.

Demetrios Katsaduros↗

Hazard Perception & Avoidance (HPA): Part Task 1 - Results Outbrief

n April 2022, the Human Autonomy Teaming Lab (NASA Ames Research Center) conducted a manned, human-in-the-loop (HITL) simulation. This part task HITL began the lab’s Hazard Perception and Avoidance (HPA) technical work under NASA’s Advanced Air Mobility (AAM), Automated Flight and Contingency Management (AFCM) Sub-Project. The goals were to assess levels of automation for manned, electric vertical takeoff and landing (eVTOL) aircraft. This simulation tested manual and automated Resolution Advisory (RA) responses and return-to-course (RTC) maneuvers for the first version of the Airborne Collision Avoidance System’s (ACAS) rotary-wing (Xr) variant. This was conducted on a fixed-based simulator designed to fly eVTOL aircraft while maneuvering for intruding traffic. Variables for this study included levels of autonomy (i.e., manual and automated) as well as the types of alerts at the onset of conflicts (i.e., Corrective and RA). The data collected included response times, losses of well clear, and maneuver sizes and durations as well as subjective ratings like acceptability, and perceived workload. Additional details and future anticipations are also discussed.

air taxis↗

Assured Vehicle Automation 1 Sim - Results Outbrief

In early 2022, the Human Autonomy Teaming Lab (NASA Ames Research Center) conducted a manned, human-in-the-loop (HITL) simulation. This part-task HITL began the lab’s Hazard Perception and Avoidance (HPA) technical work under NASA’s Advanced Air Mobility (AAM), Automated Flight and Contingency Management (AFCM) Sub-Project. The results of that sim guided the objectives of the current study, which were to examine pilots’ use of the Airborne Collision Avoidance System (ACAS) rotorcraft variant (Xr) v2 in multiple phases of flight with two separate Xr Modes, fully leverage Xr v2 features (e.g., use radar altimeter data to inform low altitude Resolution Advisory [RA] behavior, utilize the ability to designate “terminal-area intruders,” and display airspeed-based Detect and Avoid [DAA] guidance), emulate a “Traffic Advisory” (TA), and present Xr in a higher-fidelity environment. Therefore, this study was conducted in the Vertical Motion Simulator, and the variables included Phase of Flight (En-route, Hover, and Approach) as well as ACAS Xr Mode (TA/RA and DAA). The data collected included response times, losses of well clear, and maneuver sizes and durations as well as subjective ratings like acceptability and usability. Additional details and future anticipations are also discussed.

air taxis↗

A Decision Support System for Extravehicular Operations Under Significant Communication Latency

Within the next few decades, humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant two-way communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) performing an EVA and an Earth-based mission control. Next-generation operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the on-planet extravehicular crewmember(s), and intermediate mission support from intravehicular crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. For this purpose, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automating the tracking and projection of consumables usage over an EVA timeline, providing real-time probabilistic safety assessments of an EVA timeline given consumables constraints, and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the intravehicular crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g. training bias.

Mars↗

Hazard Perception & Avoidance (HPA), Assured Vehicle Automation 1 Simulation (AVA-1h) Results Outbrief

In late 2022, the Human Autonomy Teaming Lab (NASA Ames Research Center) conducted a manned, human-in-the-loop (HITL) simulation. This HITL was the lab’s second Hazard Perception and Avoidance (HPA) technical work under NASA’s Advanced Air Mobility (AAM), Automated Flight and Contingency Management (AFCM) Sub-Project. The goals were to assess detect and avoid technology for manned, electric vertical takeoff and landing (eVTOL) aircraft. This simulation tested Resolution Advisory (RA) responses and return-to-course (RTC) maneuvers for the second version of the Airborne Collision Avoidance System’s (ACAS) rotary-wing (Xr) variant. This was conducted at the center's Vertical Motion Simulator (VMS), on a motion-based platform, and was configured to fly eVTOL aircraft while maneuvering for intruding traffic. Variables for this study included ACAS Xr modes (i.e., TA/RA and DAA) and phases of flight (i.e., Cruise, Hover, and Approach). The data collected included response times, losses of well clear, and pilots' noncompliances to alerts and guidance as well as subjective ratings like acceptability and perceived workload. Additional details and future anticipations are also discussed.

ACAS Xr↗