Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “software management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Applying Standard Independent Verification and Validation (IVV) Techniques Within an Agile Framework: Is There a Compatibility Issue?

Agile methods have gained wide acceptance over the past several years, to the point that they are now a standard management and execution approach for small-scale software development projects. While conventional Agile methods are not generally applicable to large multi-year and mission-critical systems, Agile hybrids are now being developed (such as SAFe) to exploit the productivity improvements of Agile while retaining the necessary process rigor and coordination needs of these projects. From the perspective of Independent Verification and Validation (IVV), however, the adoption of these hybrid Agile frameworks is becoming somewhat problematic. Hence, we find it prudent to question the compatibility of conventional IVV techniques with (hybrid) Agile practices.This paper documents our investigation of (a) relevant literature, (b) the modification and adoption of Agile frameworks to accommodate the development of large scale, mission critical systems, and (c) the compatibility of standard IVV techniques within hybrid Agile development frameworks. Specific to the latter, we found that the IVV methods employed within a hybrid Agile process can be divided into three groups: (1) early lifecycle IVV techniques that are fully compatible with the hybrid lifecycles, (2) IVV techniques that focus on tracing requirements, test objectives, etc. are somewhat incompatible, but can be tailored with a modest effort, and (3) IVV techniques involving an assessment requiring artifact completeness that are simply not compatible with hybrid Agile processes, e.g., those that assume complete requirement specification early in the development lifecycle.

Agile↗

Kepler: A Search for Terrestrial Planets - SOC 9.3 DR25 Pipeline Parameter Configuration Reports

This document describes the manner in which the pipeline and algorithm parameters for the Kepler Science Operations Center (SOC) science data processing pipeline were managed. This document is intended for scientists and software developers who wish to better understand the software design for the final Kepler codebase (SOC 9.3) and the effect of the software parameters on the Data Release (DR) 25 archival products.

exoplanet↗

PMT v4.0 Capabilities

Explore the source record for details and available documents.

Project Management Tool↗

EED-2 Contract Final Report

This EED-2 contract provides for development and sustaining engineering of software and hardware systems that provide science data management for the ESDIS Project. A major activity under this contract will be for evolution and development engineering of the EOSDIS Core System (ECS), Earthdata platform, Common Metadata Repository (CMR), NASA-Compliant General Application Platform (NGAP) cloud environment, and other EOSDIS elements that provide the common capabilities and infrastructure of EOSDIS.

EOSDIS↗

Cross-Cutting Flight Infrastructure Improvements on M2020

Mars2020 (M2020) was formulated as a mission that leveraged as much Mars Science Laboratory (MSL) heritage as possible, while focusing major new development efforts on the original and unique elements needed to accomplish the different mission objectives. Well publicized examples of high profile new developments include precision landing, the sampling and caching system, the specific instrument suite, improved mobility via Autonomous Navigation, and later the addition of the Ingenuity helicopter. Less well known are the refinements to the core flight infrastructure, primarily in the cross-cutting functions of Telecom, Avionics, Data Management, Communications Behaviors, and Parameter Management. These enhancements are introduced predominately via flight software, and represent increases in capability that justified their inclusion in an otherwise heritage-focused project environment.Perseverance’s cross-cutting flight infrastructure improvements fall into and across the following five categories. First is a trimming of the software footprint of infrastructure modules, in order to make room for memory demands elsewhere in the system. Second is the minimization of data volume to be downlinked, through various methods such as the incorporation of new compression options. Third is the maximization of the available downlink bandwidth for data, by curtailing content-less data (fill) and introducing an improved UHF proximity link protocol. Fourth is a reduction in vulnerabilities, through increased file system redundancy, robustness, and software process monitoring. Fifth is an increase in operations efficiency by lowering file system mount times, improving parallelism between simultaneous events, minimizing the time to recover from file system errors, streamlining the purging of obsolete data, and reducing the number of commands to service parameters by a factor of 100.Individually, none of the cross-cutting infrastructure improvements are likely to garner headlines, but collectively they appreciably improve the safety and operability of Perseverance over its predecessor. This paper will describe the improvements, their promise, and where applicable, their actual impact in operations.

Bohannon, Emily↗

Discovery and Synchronization Service Architectural Notes

This is a short architectural note for a critical component of safely scaling drone operations. The primary motivation for this note is to collect language and terminology around the Discovery and Synchronization Service (DSS) as it is currently implemented for Uncrewed Aircraft System (UAS) Traffic Management. The major driver for this document was frequent miscommunication about DSS. Often there have been multiple informed and invested stakeholders in the same room making statements about “multiple DSSs” and each of them meaning something slightly different.

uas traffic management↗

Agile Task Tracking Tool

The work was created to provide a tool for the purpose of improving the management of tasks associated with Agile projects. Agile projects are typically completed in an iterative manner with many short duration tasks being performed as part of iterations. These iterations are generally referred to as sprints. The objective of this work is to create a single tool that enables sprint teams to manage all of their tasks in multiple sprints and automatically produce all standard sprint performance charts with minimum effort. The format of the printed work is designed to mimic a standard Kanban board. The work is developed as a single Excel file with worksheets capable of managing up to five concurrent sprints and up to one hundred tasks. It also includes a summary worksheet providing performance information from all active sprints. There are many commercial project management systems typically designed with features desired by larger organizations with many resources managing multiple programs and projects. The audience for this work is the small organizations and Agile project teams desiring an inexpensive, simple, user-friendly, task management tool. This work uses standard readily available software, Excel, requiring minimum data entry and automatically creating summary charts and performance data. It is formatted to print out and resemble standard flip charts and provide the visuals associated with this type of work.

Duke, Roger T.↗

GOOML - Finding Optimization Opportunities for Geothermal Operations: Preprint

Geothermal Operational Optimization with Machine Learning (GOOML) is a transferable and extensible component-based geothermal asset modeling framework that considers complex steamfield relationships and identifies optimization prospects using a data-driven approach. We have used this framework to develop digital twins that provide steamfield operators with an operational environment to analyze and understand historical and forecasted power production, explore new steamfield configuration possibilities, and seek optimal asset management for real world applications. The GOOML modeling software is built on a generic component-based systems framework that allows for both historical and forecast analysis. A GOOML model can perform historical data-assimilation using first-principal thermodynamics to create a meaningful data model. Historical production data can then be coupled with a forecast framework to train machine-learning models of steamfield components to predict future outputs. This modeling environment enables digital exploration of steamfield design configurations and operational scenarios. GOOML digital twins have been developed for steamfields in New Zealand and the United States representing differing power generation and field conditions. These digital twins have been validated by comparing hindcast predictions against historical production data. Reinforcement learning experiments were conducted to demonstrate the ability to programmatically explore the operations space using machine learning agents. Our initial results are compelling; two to five percent increases in annual energy production were demonstrated by the GOOML models with no additional infrastructure build required. GOOML offers a new approach to geothermal operations by applying state-of-the-art machine learning algorithms, comprehensive data analytics, and interaction with digital twins. Through application of these tools, operators will realize greater availability and higher net generation which will increase the cost effectiveness of geothermal energy projects.

access↗

Multi-Device Knob Utility for LCLS

At the SLAC National Accelerator Laboratory (SLAC) the Controls Department (CD) has developed a new Multi-Device Knob Utility (MKB) based on the Experimental Physics and Industrial Control System (EPICS) toolkit for controlling one or more Process Variables (PVs) in unison, or simultaneously, from a physical knob located in the control room, or from various software tools such as the EPICS Extensible Display Manager (EDM) or a Swing slider in Java. A group of devices are hooked up to a knob, and then the value written to the devices is a simple function of the value of the knob. This is used, most commonly, to create a bump in the electron beam for the Linac Coherent Light Source (LCLS). Control system variables typically controlled are magnetic fields, phases, and timing offsets. This paper describes the technologies used to implement this utility.

43 PARTICLE ACCELERATORS↗

ScanSilc/XTK® Plugin v.2.5.X

SAND2021-14232 O The ScanSilc/XTK Plugin interfaces between Scanna ScanSilc digital radiography hardware and the X-Ray ToolKit® (XTK) software. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Eldridge, Bryce↗

Material Accountancy Performance Indicator Toolkit

The MAPIT - Material Accountancy Performance Indicator Toolkit includes statistical tests and calculations based on open literature that calculate safeguards metrics. The tool can be used with user supplied datasets or with the several included datasets which are generated from models that are maintained at Sandia National Laboratories. The models are not included with the software. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525. SAND2021-0467 O

Shoman, Nathan↗

The Role of Data Filtering in Open Source Software Ranking and Selection

Faced with more than 100M open source projects, a more manageable small subset is needed for most empirical investigations. More than half of the research papers in leading venues investigated filtering projects by some measure of popularity with explicit or implicit arguments that unpopular projects are not of interest, may not even represent "real" software projects, or that less popular projects are not worthy of study. However, such filtering may have enormous effects on the results of the studies if and precisely because the sought-out response or prediction is in any way related to the filtering criteria.This paper exemplifies the impact of this common practice on research outcomes, specifically how filtering of software projects on GitHub based on inherent characteristics affects the assessment of their popularity. Using a dataset of over 100,000 repositories, we used multiple regression to model the number of stars -a commonly used proxy for popularity- based on factors such as the number of commits, the duration of the project, the number of authors and the number of core developers. Our control model included the entire dataset, while a second filtered model considered only projects with ten or more authors. The results indicated that while certain characteristics of the repository consistently predict popularity, the filtering process significantly alters the relationships between these characteristics and the response. We found that the number of commits exhibited a positive correlation with popularity in the control sample but showed a negative correlation in the filtered sample. These findings highlight the potential biases introduced by data filtering and emphasize the need for careful sample selection in empirical research of mining software repositories. We recommend that empirical work should either analyze complete datasets such as World of Code, or employ stratified random sampling from a complete dataset to ensure that filtering is not biasing the results.

Malviya Thakur, Addi↗

Towards Software Bill of Materials in the Nuclear Industry

Large, modern industrial facilities often incorporate thousands of digital assets in their operational technology. Regulated facilities, such as nuclear power plants (NPPs), maintain robust cybersecurity and configuration management programs that often use bills of materials (BOMs) for these assets, including make, model, and version of hardware, firmware, and software. However, these BOMs typically capture only first- or second-tier information provided by the original equipment manufacturer (OEM). Unfortunately, as indicated by the increasing number and sophistication of software supply chain attacks, this level of detail is insufficient for identifying all the potential vulnerabilities and risks in software applications. Software BOMs (SBOMs) provide detailed enumeration of components and dependencies within the product or devices, including firmware. SBOMs can be combined with vulnerability data sources and vendor vulnerability attestations to improve vulnerability management and enable rapid identification of affected components when new software vulnerabilities are discovered. Ideally, SBOMs are created by the OEM prior to installation. However, since this practice is not yet commonplace and since NPPs are typically slow to adopt new technology, most NPPs do not incorporate SBOMs into their asset or configuration management programs. Fortunately, SBOMs can be generated by NPPs on existing digital assets to provide further insight into risk management decisions. This report provides an overview of the current SBOM ecosystem and recommends guidance on how to get started in a “crawl, walk, run” manner to develop and implement a sustainable SBOM program for digital assets in an NPP.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrated Demand Management (IDM): Concept of Operations

NASA's Integrated Demand Management research activity developed a concept for a novel use of the FAA's Collaborative Trajectory Options Program (CTOP) decision support software to support airspace capacity-limited arrival operations involving Time Based Flow Management (TBFM). This document provides a detailed, graphical description of the concept.

IDM↗

A Component Approach to Collaborative Scientific Software Development: Tools and Techniques Utilized by the Quantum Chemistry Science Application Partnership

Cutting-edge scientific computing software is complex, increasingly involving the coupling of multiple packages to combine advanced algorithms or simulations at multiple physical scales. Component-based software engineering (CBSE) has been advanced as a technique for managing this complexity, and complex component applications have been created in the quantum chemistry domain, as well as several other simulation areas, using the component model advocated by the Common Component Architecture (CCA) Forum. While programming models do indeed enable sound software engineering practices, the selection of programming model is just one building block in a comprehensive approach to large-scale collaborative development which must also address interface and data standardization, and language and package interoperability. We provide an overview of the development approach utilized within the Quantum Chemistry Science Application Partnership, identifying design challenges, describing the techniques which we have adopted to address these challenges and highlighting the advantages which the CCA approach offers for collaborative development.

Kenny, Joseph P.↗

NIF Projects Controls and Information Systems Software Quality Assurance Plan

Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

42 ENGINEERING↗

Management of the Space Station Freedom onboard local area network

An operational approach is proposed to managing the Data Management System Local Area Network (LAN) on Space Station Freedom. An overview of the onboard LAN elements is presented first, followed by a proposal of the operational guidelines by which management of the onboard network may be effected. To implement the guidelines, a recommendation is then presented on a set of network management parameters which should be made available in the onboard Network Operating System Computer Software Configuration Item and Fiber Distributed Data Interface firmware. Finally, some implications for the implementation of the various network management elements are discussed.

Miller, Frank W.↗

Air Traffic Management Technology Demonstration-1 (ATD-1) Avionics Phase 2 Flight Test Training for Interval Management

Prior to the successful flight test validation of a new avionics prototype, participants from Boeing, Honeywell, and United Airlines underwent group training at NASA Langley Research Center. New prototype software for an algorithm which enables greater efficiency in high-density airspace, called Interval Management, was to be incorporated into Electronic Flight Bags and placed in the cockpit for pilot usage. The goals of the training were to teach the flight test pilots how to operate the new software, establish techniques to simultaneously position three aircraft prior to each test scenario, and ensure a common communication protocol among team members when coordinating the position of aircraft for the next scenario. The multi-tiered interactive training regimen consisted of a process that continually built upon previous foundational material. The primary learning elements were 1) a portable computer-based trainer that was provided to the pilots prior to classroom training sessions, 2) classroom learning, 3) full mock-up simulator training, and 4) refresher training just prior to the flight test. Each part of the regimen was designed to repeat and build upon the previous element. The purpose of this Technical Memorandum is to inform the aviation industry how flight training for Interval Management was conducted at Langley Research Center in order to reduce overall development costs of future Interval Management training programs. Secondly, the paper provides insight regarding the decision-making process when attempting to conduct a flight test.

Roper, Roy D.↗