Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Program organization

The Skylab medical experiments altitude test plan is outlined. Described are the scope and objectives of the program, the management system under which it would be conducted, requirements for configuration of the test facility, test control documentation, data processing, and detailed test objectives.

Source record↗

Aerospike thrust chamber program

An existing, but damaged, 25,000-pound thrust, flightweight, oxygen/hydrogen aerospike rocket thrust chamber was disassembled and partially repaired. A description is presented of the aerospike chamber configuration and of the damage it had suffered. Techniques for aerospike thrust chamber repair were developed, and are described, covering repair procedures for lightweight tubular nozzles, titanium thrust structures, and copper channel combustors. Effort was terminated prior to completion of the repairs and conduct of a planned hot fire test program when it was found that the copper alloy walls of many of the thrust chamber's 24 combustors had been degraded in strength and ductility during the initial fabrication of the thrust chamber. The degradation is discussed and traced to a reaction between oxygen and/or oxides diffused into the copper alloy during fabrication processes and the hydrogen utilized as a brazing furnace atmosphere during the initial assembly operation on many of the combustors. The effects of the H2/O2 reaction within the copper alloy are described.

Campbell, J., Jr.↗

Optical/thermal analysis methodology for a space-qualifiable RTP furnace

A methodology to predict the coupled optical/thermal performance of a reflective cavity heating system was developed and a laboratory test to verify the method was carried out. The procedure was utilized to design a rapid thermal processing (RTP) furnace for the Robot-Operated Material Processing in Space (ROMPS) Program which is a planned STS HH-G canister experiment involving robotics and material processing in microgravity. The laboratory test employed a tungsten-halogen reflector/lamp to heat thin, p-type silicon wafers. Measurements instrumentation consisted of 5-mil Pt/Pt-Rh thermocouples and an optical pyrometer. The predicted results, utilizing an optical ray-tracing program and a lumped-capacitance thermal analyzer, showed good agreement with the measured data for temperatures exceeding 1300 C.

Bugby, D.↗

Commercial jet transport crashworthiness

The results of a study to identify areas of research and approaches that may result in improved occupant survivability and crashworthiness of transport aircraft are given. The study defines areas of structural crashworthiness for transport aircraft which might form the basis for a research program. A 10-year research and development program to improve the structural impact resistance of general aviation and commercial jet transport aircraft is planned. As part of this program parallel studies were conducted to review the accident experience of commercial transport aircraft, assess the accident performance of structural components and the status of impact resistance technology, and recommend areas of research and development for that 10-year plan. The results of that study are also given.

Widmayer, E.↗

Advanced fiber placement of composite fuselage structures

The Hercules/NASA Advanced Composite Technology (ACT) program will demonstrate the low cost potential of the automated fiber placement process. The Hercules fiber placement machine was developed for cost effective production of composite aircraft structures. The process uses a low cost prepreg tow material form and achieves equivalent laminate properties to structures fabricated with prepreg tape layup. Fiber placement demonstrations planned for the Hercules/NASA program include fabrication of stiffened test panels which represent crown, keel, and window belt segments of a typical transport aircraft fuselage.

Anderson, Robert L.↗

Orbital Space Plane Program Status

The Orbital Space Plane Program is an integral part of NASA's Integrated Space Transportation Program (ISTP). The ISTP consists of three major programs: Space Shuttle, Orbital Space Plane, and Next Generation Launch Technology. The Orbital Space Plane (OSP) Program will develop a new Crew Transfer Vehicle (CTV) with multipurpose utility for the Agency. The CTV will complement and back up the Space Shuttle by taking crews to and from the International Space Station (ISS), as well as enable a transition path to future reusable launch vehicle systems. In the CTV development cycle, around 2010 it will be used as a Crew Return Vehicle (CRV). The OSP will be launched on an Evolved Expendable Launch Vehicle (EELV). NASA is in the process of establishing Level 1 Requirements and initiating concept studies. Ongoing flight demonstrators will continue, while new flight demonstrator projects will begin. The OSP Program contains two elements: (1) Technology and Demonstrations, and (2) Design, Development, and Production. The OSP Design, Development, and Production element will enter the Formulation Phase in FY03. Per NASA Procedures and Guidelines 7120.5B, the Formulation Phase will be utilized to establish the Program schedule and budget plans. Current budget planning is based on Phase A concept studies being conducted in FY03 and FY04, preliminary design activities conducted in FY04 and FY05, and a Preliminary Design Review in FY05. An OSP full-scale development decision will be made in FY05. At that point, a conclusion to proceed will result in the OSP Program transitioning from the Formulation Phase to the Development Phase.

Dumbacher, Daniel L.↗

Close Range Photogrammetry in Space - Measuring the On-Orbit Clearance between Hardware on the International Space Station

When photogrammetrists read an article entitled "Photogrammetry in Space" they immediately think of terrestrial mapping using satellite imagery. However in the last 19 years the roll of close range photogrammetry in support of the manned space flight program has grown exponentially. Management and engineers have repeatedly entrusted the safety of the vehicles and their crews to the results of photogrammetric analysis. In February 2010, the Node 3 module was attached to the port side Common Berthing Mechanism (CBM) of the International Space Station (ISS). Since this was not the location at which the module was originally designed to be located on the ISS, coolant lines containing liquid ammonia, were installed externally from the US Lab to Node 3 during a spacewalk. During mission preparation I had developed a plan and a set of procedures to have the astronauts acquire stereo imagery of these coolant lines at the conclusion of the spacewalk to enable us to map their as-installed location relative to the rest of the space station. Unfortunately, the actual installation of the coolant lines took longer than expected and in an effort to wrap up the spacewalk on time, the mission director made a real-time call to drop the photography. My efforts to reschedule the photography on a later spacewalk never materialized, so rather than having an as-installed model for the location of coolant lines, the master ISS CAD database continued to display an as-designed model of the coolant lines. Fast forward to the summer of 2015, the ISS program planned to berth a Japanese cargo module to the nadir Common Berthing Mechanism (CBM), immediately adjacent to the Node 3 module. A CAD based clearance analysis revealed a negative four inch clearance between the ammonia lines and a thruster nozzle on the port side of the cargo vehicle. Recognizing that the model of the ammonia line used in the clearance analysis was "as-designed" rather than "as-installed", I was asked to determine the real clearance between the ammonia lines and expected position of the thruster bell using existing on-orbit imagery. Imagery of the area of interest, taken several years earlier from the Space Shuttle during a fly-around of the ISS, was found and used to set a stereo pair. Space Vision System Targets and Handrail bolts measured in the ISS analytical coordinate system (ISSACS) prior to launch, were used to obtain an absolute orientation so all photogrammetric measurement's would be in the ISSACS coordinate system. Coordinates for the design location of the edges of the thruster bell, when the cargo vehicle was fully berthed to the ISS, were displayed in 3-D relative to the as-installed ammonia lines. This immediately revealed a positive clearance, which was later quantified to be a minimum of 10" +/0.5". The analysis was completed over a single weekend by a single analyst. Using updated imagery, acquired from the station's robotic arm, a complete as-installed model of the coolant lines was generated from stereo photography and replaced the design model in the master ISS CAD database.

Liddle, Donn↗

GPM Mission, its Scientific Agenda, and its Ground Validation Program

The GPM mission is currently planned for start in the late 2010 time frame. From the perspective of NASA s Earth Science Enterprise (ESE) and within the framework of ESE's global water and energy cycle (GWEC) research program, its main scientific goal is to help answer pressing scientific problems concerning how global and regional water cycle processes and precipitation fluctuations and trends influence the variability intrinsic to climate, weather, and hydrology. These problems cut across a hierarchy of space-time scales and include improving understanding of climate-water cycle interactions, developing better techniques for incorporating satellite precipitation measurements into weather and climate predictions, and demonstrating that more accurate, more complete, and better sampled observations of precipitation and other water budget variables used as inputs can improve the ability of prognostic hydrometeorological models in the prediction of hazardous flood-producing storms, seasonal flood/draught conditions, and fresh water resource stores. The GPM mission will expand the scope of precipitation measurement through the use of a constellation of some 9 satellites, one of which will be an advanced TRMM-like core satellite carrying a dual-frequency Ku-Ka band precipitation radar (DPR) and an advanced, multifrequency passive microwave radiometer with vertical-horizontal polarization discrimination (GMI). The other constellation members will include a combination of new dedicated satellites and co-existing operational/research satellites carrying similar (but not identical) passive microwave radiometers. The goal of the constellation is to achieve 3-hour sampling at any spot on the globe -- continuously. The constellation s orbit architecture will consist of a mix of sun-synchronous and non-sun-synchronous satellites with the core satellite providing measurements of calibration-quality rainrates, plus cloud-precipitation microphysical processes, to be used in conjunction with more basic rain retrievals from the other constellation satellites to ensure bias-free constellation coverage.

Smith Eric A.↗

Runway configuration improvement programming model.

The basic objectives of the study were to subject a set of runway configurations to cost analysis and to develop a dynamic programming model which would enable an airport to economically match the ground capacity to its air traffic demand. Quantitative differences in the capacity of runway configurations result from the various aircraft/aircraft and aircraft/air-system interactions. A problem formulation and solution procedure is presented which is intended to be a meaningful technique for the long-range planning of runway expansion programs.

Yu, J. C.↗

NNSA GenScen 2.1 Methodology

Nuclear weapons stockpile planning is a complex process. The Non-Proliferation Treaty,' New START Treaty,2 DOE/NNSA, STRATCOM, Navy, Air Force, and Executive-Branch all have objectives that drive requirements for the types and quantities of nuclear weapons, which in turn drive how nuclear weapons are designed, manufactured, tested, maintained, deployed, transported, stored, retired, and ultimately dismantled. An estimated 200 distinct individuals contribute to the development, completion, and approval of this plan. And once that plan is completed, herein called the N NSA Program of Record (POR), ensuring that the plan is feasible — that the stockpile work can get done — ensures that the Nuclear Security Enterprise (NSE) can deliver the intended nuclear force posture.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Shuttle Orbiter solid-state television camera

The Shuttle closed-circuit TV system incorporates a mix of monochrome TV cameras (in the payload bay for operations support purposes) and color cameras (in the crew cabin for crew activity monitoring purposes). These cameras currently employ glass enclosed, vacuum processed image sensors. A camera that uses a solid-state image sensor offers many extremely attractive advantages. This paper presents the current status of development of solid-state television cameras - monochrome and NTSC color - for use in various aspects of the Space Shuttle program. Results of in depth design and testing programs are discussed as well as the plans for employing these cameras in the Shuttle program.

Embrey, B. C., Jr.↗

Language for Allocation and Network Scheduling

Programing Language for Allocation and Network Scheduling, Plans, handles many scheduling requirements of Space Shuttle program. Also generalized, high-level tree manipulation language.

Willoughby, J. K.↗

Results of a Cyclic Load Test of an RB-47E Airplane

Results of a cyclic load test made by NASA on an EB-47E airplane are given. The test reported on is for one of three B-47 airplanes in a test program set up by the U. S. Air Force to evaluate the effect of wing structural reinforcements on fatigue life. As a result of crack development in the upper fuselage longerons of the other two airplanes in the program, a longeron and fuselage skin modification was incorporated early in the test. Fuselage strain-gage measurements made before and after the longeron modification and wing strain-gage measurements made only after wing reinforcement are summarized. The history of crack development and repair is given in detail. Testing was terminated one sequence short of the planned end of the program with the occurrence of a major crack in the lower right wing skin.

Huston, Wilber B.↗

Status and plans of NASA's Materials Science and Manufacturing in Space /MS-MS/ program.

Following two years of relatively low-level exploratory work, the Materials Science and Manufacturing in Space program is now in a phase of expansion toward higher levels of effort. The main thrust of this effort is toward initiation of a research and development program on the Space Shuttle missions that can prepare the way for possible commercial manufacturing operations on permanently orbiting space stations. Experiment capabilities currently being planned for the Space Shuttle will be based on an inventory of reusable general-purpose equipment that can be configured in many different ways to meet individual experiment requirements. It is expected that this approach can support very large numbers of experiments and make flight opportunities accessible to many potential experimenters who would not be prepared to involve themselves in the development of flight hardware.

Armstrong, W. O.↗

System design of the Pioneer Venus spacecraft. Volume 12: International cooperation

A spectrum of plans has been prepared to illustrate the range of practical sharing possibilities available so as to assist Ames Research Center (ARC) and European Space Research Organization (ESRO) in selection of a program meeting mutual goals. Five plans are described showing increased participation by ESRO WITH ascending plan number. Each of these has sharing properties fulfilling particular requirements such as available ESRO budget level, extent of ESRO program responsibility, matching particular ESRO capability, and cost saving to ARC through sharing. All plans apply to orbiter sharing only. A sharing plan based on the model Plan 4 may offer the most attractive division of Pioneer Venus between ARC and ESRO. This plan allows ESRO to bear primary responsibility for the orbiter and to avoid an extensive financial burden. Savings to ARC are commensurate with ARC loss of program control. Duplication of effort is avoided by using orbiter subsystems that are common to the probe bus and orbiter.

Kelly, R. S.↗

Spacecraft Orbit Design and Analysis (SODA), version 1.0 user's guide

The Spacecraft Orbit Design and Analysis (SODA) computer program, Version 1.0 is described. SODA is a spaceflight mission planning system which consists of five program modules integrated around a common database and user interface. SODA runs on a VAX/VMS computer with an EVANS & SUTHERLAND PS300 graphics workstation. BOEING RIM-Version 7 relational database management system performs transparent database services. In the current version three program modules produce an interactive three dimensional (3D) animation of one or more satellites in planetary orbit. Satellite visibility and sensor coverage capabilities are also provided. One module produces an interactive 3D animation of the solar system. Another module calculates cumulative satellite sensor coverage and revisit time for one or more satellites. Currently Earth, Moon, and Mars systems are supported for all modules except the solar system module.

Stallcup, Scott S.↗

Spacecraft Orbit Design and Analysis (SODA). Version 2.0: User's guide

The Spacecraft Orbit Design and Analysis (SODA) computer program, Version 2.0, is discussed. SODA is a spaceflight mission planning system that consists of six program modules integrated around a common database and user interface. SODA runs on a VAX/VMS computer with an Evans and Sutherland PS300 graphics workstation. In the current version, three program modules produce an interactive three dimensional animation of one or more satellites in planetary orbit. Satellite visibility and sensor coverage capabilities are also provided. Circular and rectangular, off nadir, fixed and scanning sensors are supported. One module produces an interactive three dimensional animation of the solar system. Another module calculates cumulative satellite sensor coverage and revisit time for one or more satellites. Currently, Earth, Moon, and Mars systems are supported for all modules except the solar system module.

Stallcup, Scott S.↗