Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integral operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Remotely-Sensed Geology from Lander-Based to Orbital Perspectives: Results for FIDO Rover Field Tests

Tests of the FIDO (Field Integration Design and Operations) rover and Athena-like operational scenarios were conducted May 7-16, 2000. A group located at the Jet Propulsion Lab, Pasadena, CA, formed the Core Operations Team (COT) that designed experiments and command sequences while another team tracked, maintained, and secured the rover in the field. The COT had no knowledge of the specific field location, thus the tests were done "blind." In addition to FIDO rover instrumentation, the COT had access to LANDSAT 7, TIMS, and AVIRIS regional coverage and color descent images. Using data from the FIDO instruments, primarily a color microscopic imager (CMI), infrared point spectrometer (IPS; 1.5-2.4 microns), and a three-color stereo panoramic camera (Pancam), the COT correlated lithologic features (mineralogy, rock types) from the simulated landing site to a regional scale. The May test results provide an example of how to relate site geology from landed rover investigations to the regional geology using remote sensing. The capability to relate mineralogic signatures using the point IR spectrometer to remotely sensed, multispectral or hyperspectral data proved to be key to integration of the in-situ and remote data. This exercise demonstrated the potential synergy between lander-based and orbital data, and highlighted the need to investigate a landing site in detail and at multiple scales.

Jolliff, B.↗

Reliability‐based layout optimization in offshore wind energy systems

Abstract Existing methods for optimizing wind array layouts typically use power or cost objectives and rarely consider reliability‐based objectives. Component and system failure rates, however, are dependent on location‐specific wind conditions, are influenced by array layout and wake interactions, and have a direct and significant impact on capital costs, operational costs, and power production. Although wind power plant models exist that calculate wind loads with sufficient resolution to capture component loading dynamics from wind conditions, they are computationally expensive and thus not suitable for research applications requiring many evaluations, particularly optimization. This study describes the development of computationally efficient, reliability‐based layout optimization methods, enabling us to explore the relationship between component reliability and layout optimization. These methods include the surrogate modeling of the planet bearing life based on varying wind conditions simulated in FAST.Farm and the formulation of reliability‐based objectives based on failure cost and power production models. Through demonstration of this method, we explore how wind conditions, objective functions, and capacity density influence reliability‐based layout optimization. Results indicate that considering reliability alongside power production can reduce failure costs associated with replacement costs and downtime while maintaining or improving power production. Our conclusions highlight the opportunity for wind power plant developers to integrate reliability and operational expenditures alongside performance and capital expenditure objectives in plant design and development to improve plant performance and costs.

17 WIND ENERGY↗

Progress in disruption prevention for ITER

Key plasma physics and real-time control elements needed for robustly stable operation of high fusion power discharges in ITER have been shown in recent research worldwide. Recent analysis has identified the current density profile as the main drive for disruptive instabilities in discharges simulating ITER's baseline scenario with high and low external torque. Ongoing development of model-based profile control and active control of magnetohydrodynamic instabilities is improving the stability of multiple scenarios. Significant advances have been made toward real-time physics-based prediction of instabilities, including path-oriented analysis, active sensing, and machine learning techniques for prediction that are beginning to go beyond simple disruption mitigation trigger applications. Active intervention adds to prevention of disruptions, including forced rotation of magnetic islands to prevent wall locking, and localized heating/current drive to shrink the islands. Stable discharge rampdowns have been achieved with the fastest ITER-like scaled current ramp rates, while maintaining an X-point configuration. Moreover, these elements are being integrated into stable operating scenarios and new event-handling systems for off-normal events in order to develop the physics basis and techniques for robust control in ITER.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Nuclear hybrid energy infrastructure

The nuclear hybrid energy concept is becoming a reality for the US energy infrastructure where combinations of the various potential energy sources (nuclear, wind, solar, biomass, and so on) are integrated in a hybrid energy system. This paper focuses on challenges facing a hybrid system with a Small Modular Reactor at its core. The core of the paper will discuss efforts required to develop supervisory control center that collects data, supports decision-making, and serves as an information hub for supervisory control center. Such a center will also be a model for integrating future technologies and controls. In addition, advanced operations research, thermal cycle analysis, energy conversion analysis, control engineering, and human factors engineering will be part of the supervisory control center. Nuclear hybrid energy infrastructure would allow operators to optimize the cost of energy production by providing appropriate means of integrating different energy sources. The data needs to be stored, processed, analyzed, trended, and projected at right time to right operator to integrate different energy sources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pattern-Recognition System for Approaching a Known Target

A closed-loop pattern-recognition system is designed to provide guidance for maneuvering a small exploratory robotic vehicle (rover) on Mars to return to a landed spacecraft to deliver soil and rock samples that the spacecraft would subsequently bring back to Earth. The system could be adapted to terrestrial use in guiding mobile robots to approach known structures that humans could not approach safely, for such purposes as reconnaissance in military or law-enforcement applications, terrestrial scientific exploration, and removal of explosive or other hazardous items. The system has been demonstrated in experiments in which the Field Integrated Design and Operations (FIDO) rover (a prototype Mars rover equipped with a video camera for guidance) is made to return to a mockup of Mars-lander spacecraft. The FIDO rover camera autonomously acquires an image of the lander from a distance of 125 m in an outdoor environment. Then under guidance by an algorithm that performs fusion of multiple line and texture features in digitized images acquired by the camera, the rover traverses the intervening terrain, using features derived from images of the lander truss structure. Then by use of precise pattern matching for determining the position and orientation of the rover relative to the lander, the rover aligns itself with the bottom of ramps extending from the lander, in preparation for climbing the ramps to deliver samples to the lander. The most innovative aspect of the system is a set of pattern-recognition algorithms that govern a three-phase visual-guidance sequence for approaching the lander. During the first phase, a multifeature fusion algorithm integrates the outputs of a horizontal-line-detection algorithm and a wavelet-transform-based visual-area-of-interest algorithm for detecting the lander from a significant distance. The horizontal-line-detection algorithm is used to determine candidate lander locations based on detection of a horizontal deck that is part of the lander.

Huntsberger, Terrance↗

Initial Approach to Collect Small Unmanned Aircraft System Off-Nominal Operational Situations Data

NASA is developing the Unmanned Aircraft System Traffic Management research platform to safely integrate small unmanned aircraft operations in large-scale at low-altitudes. As a part of this effort, small unmanned aircraft system off-nominal operational situations data collection process has been developed to take lessons learned and to reinforce operational compliance. In this paper, descriptions of variables used for digital data collection and an online report form for collection of observational data from the operators (contextual data) are provided. They are used to collect off-nominal data from the Unmanned Aircraft System Traffic Management National Campaign in 2017. The digital data show that 2 out of 118 campaign operations (1.7%) encountered loss of navigation. Since the campaign aircraft used Global Positioning System for navigation, it is likely that unobstructed view of the sky at the campaign locations contributed to this small number. Also, 4 out of 47 operations (8.5%) encountered loss of communications. A relatively short distance between ground control system and aircraft, ranging from 2300 feet to 4200 feet, likely contributed to this small number. There was no data to identify the loss of communications condition, aircraft received signal strength, for the remaining 71 operations suggesting that some operators may not be monitoring unmanned aircraft communications system performance or monitoring it with different parameters. For the contextual data, due to the low number of total reports during the campaign, no significant trends emerged. This is an initial attempt to collect contextual data from small unmanned aircraft operators about off-nominal situations, and changes will be made to the future data collection to improve the amount and quality of the information.

unmanned aviation systems traffic management (UTM)↗

Initial Approach to Collect Small Unmanned Aircraft System Off-Nominal Operational Situations Data

NASA is developing the Unmanned Aircraft System Traffic Management research platform to safely integrate small unmanned aircraft operations in large-scale at low-altitudes. As a part of this effort, small unmanned aircraft system off-nominal operational situations data collection process has been developed to take lessons learned and to reinforce operational compliance. In this paper, descriptions of variables used for digital data collection and an online report form for collection of observational data from the operators (contextual data) are provided. They are used to collect off-nominal data from the Unmanned Aircraft System Traffic Management National Campaign in 2017. The digital data show that 2 out of 118 campaign operations (1.7%) encountered loss of navigation. Since the campaign aircraft used Global Positioning System for navigation, it is likely that unobstructed view of the sky at the campaign locations contributed to this small number. Also, 4 out of 47 operations (8.5%) encountered loss of communications. A relatively short distance between ground control system and aircraft, ranging from 2300 feet to 4200 feet, likely contributed to this small number. There was no data to identify the loss of communications condition, aircraft received signal strength, for the remaining 71 operations suggesting that some operators may not be monitoring unmanned aircraft communications system performance or monitoring it with different parameters. For the contextual data, due to the low number of total reports during the campaign, no significant trends emerged. This is an initial attempt to collect contextual data from small unmanned aircraft operators about off-nominal situations, and changes will be made to the future data collection to improve the amount and quality of the information.

Jung, Jaewoo↗

Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report

Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

Source record↗

NEEMO 18-20: Analog Testing for Mitigation of Communication Latency During Human Space Exploration

NASA Extreme Environment Mission Operations (NEEMO) is an underwater spaceflight analog that allows a true mission-like operational environment and uses buoyancy effects and added weight to simulate different gravity levels. Three missions were undertaken from 2014-2015, NEEMO's 18-20. All missions were performed at the Aquarius undersea research habitat. During each mission, the effects of communication latencies on operations concepts, timelines, and tasks were studied. METHODS: Twelve subjects (4 per mission) were weighed out to simulate near-zero or partial gravity extravehicular activity (EVA) and evaluated different operations concepts for integration and management of a simulated Earth-based science team (ST) to provide input and direction during exploration activities. Exploration traverses were preplanned based on precursor data. Subjects completed science-related tasks including pre-sampling surveys, geologic-based sampling, and marine-based sampling as a portion of their tasks on saturation dives up to 4 hours in duration that were designed to simulate extravehicular activity (EVA) on Mars or the moons of Mars. One-way communication latencies, 5 and 10 minutes between space and mission control, were simulated throughout the missions. Objective data included task completion times, total EVA times, crew idle time, translation time, ST assimilation time (defined as time available for ST to discuss data/imagery after data acquisition). Subjective data included acceptability, simulation quality, capability assessment ratings, and comments. RESULTS: Precursor data can be used effectively to plan and execute exploration traverse EVAs (plans included detailed location of science sites, high-fidelity imagery of the sites, and directions to landmarks of interest within a site). Operations concepts that allow for pre-sampling surveys enable efficient traverse execution and meaningful Mission Control Center (MCC) interaction across communication latencies and can be done with minimal crew idle time. Imagery and contextual information from the EVA crew that is transmitted real-time to the intravehicular (IV) crewmember(s) can be used to verify that exploration traverse plans are being executed correctly. That same data can be effectively used by MCC (across comm latency) to provide meaningful feedback and instruction to the crew regarding sampling priorities, additional tasks, and changes to the EVA timeline. Text / data capabilities are preferred over voice capabilities between MCC and IV when executing exploration traverse plans over communication latency.

Chappell, Steven P.↗

Virtualization - A Key Cost Saver in NASA Multi-Mission Ground System Architecture

With science team budgets being slashed, and a lack of adequate facilities for science payload teams to operate their instruments, there is a strong need for innovative new ground systems that are able to provide necessary levels of capability processing power, system availability and redundancy while maintaining a small footprint in terms of physical space, power utilization and cooling.The ground system architecture being presented is based off of heritage from several other projects currently in development or operations at Goddard, but was designed and built specifically to meet the needs of the Science and Planetary Operations Control Center (SPOCC) as a low-cost payload command, control, planning and analysis operations center. However, this SPOCC architecture was designed to be generic enough to be re-used partially or in whole by other labs and missions (since its inception that has already happened in several cases!)The SPOCC architecture leverages a highly available VMware-based virtualization cluster with shared SAS Direct-Attached Storage (DAS) to provide an extremely high-performing, low-power-utilization and small-footprint compute environment that provides Virtual Machine resources shared among the various tenant missions in the SPOCC. The storage is also expandable, allowing future missions to chain up to 7 additional 2U chassis of storage at an extremely competitive cost if they require additional archive or virtual machine storage space.The software architecture provides a fully-redundant GMSEC-based message bus architecture based on the ActiveMQ middleware to track all health and safety status within the SPOCC ground system. All virtual machines utilize the GMSEC system agents to report system host health over the GMSEC bus, and spacecraft payload health is monitored using the Hammers Integrated Test and Operations System (ITOS) Galaxy Telemetry and Command (TC) system, which performs near-real-time limit checking and data processing on the downlinked data stream and injects messages into the GMSEC bus that are monitored to automatically page the on-call operator or Systems Administrator (SA) when an off-nominal condition is detected. This architecture, like the LTSP thin clients, are shared across all tenant missions.Other required IT security controls are implemented at the ground system level, including physical access controls, logical system-level authentication authorization management, auditing and reporting, network management and a NIST 800-53 FISMA-Moderate IT Security plan Risk Assessment Contingency Plan, helping multiple missions share the cost of compliance with agency-mandated directives.The SPOCC architecture provides science payload control centers and backup mission operations centers with a cost-effective, standardized approach to virtualizing and monitoring resources that were traditionally multiple racks full of physical machines. The increased agility in deploying new virtual systems and thin client workstations can provide significant savings in personnel costs for maintaining the ground system. The cost savings in procurement, power, rack footprint and cooling as well as the shared multi-mission design greatly reduces upfront cost for missions moving into the facility. Overall, the authors hope that this architecture will become a model for how future NASA operations centers are constructed!

Ground System Architecture↗

An Integrated Hydroclimatic Assessment of Future Reservoir and Hydropower Operations in the U.S.

The engineering of rivers by dams is a formative feature of human-nature systems and the interconnectivity of water, energy, and the climate. Sufficient and broad-based representations of dams in large-scale hydrological models prove essential to mapping their extensive regulation of river flow and biogeochemistry and gauging climate-linked provisions, including freshwater supply and hydropower. We present an integrated modeling framework to investigate future streamflow and hydropower generation in the Contiguous U.S. (1990–2075), leveraging an ensemble of six downscaled and bias-corrected General Circulation Models (GCMs) from the high-end SSP585 scenario of the CMIP6. To achieve this, we develop a reservoir operations and parameterization scheme for 1,384 dams in a high-resolution river network, including simulated hydropower generation for 326 dams. For the GCM ensemble mean, we simulate a widespread increase in regulated streamflow into the late-century (11% annual and 17% in winter for the dam median) with region-specific changes in summer streamflow that feature prominent declines in the Northwest (−7%). Mediation by reservoirs is shown to dampen intra-annual streamflow changes, delivering additional summer releases that partially mitigate declining flows. Total hydropower generation is projected to increase modestly (+3%), with boosted generation in the winter (+9%) and spring (+5%) offsetting declined summer generation (−3.4%), suggesting strong adaptation potential for hydropower in the future energy portfolio. Further analysis reveals that the choice of GCM, particularly in western regions, has significant bearing on projected streamflow and hydropower changes.

13 HYDRO ENERGY↗

Analog Testing of Operations Concepts for Mitigation of Communication Latency During Human Space Exploration

OBJECTIVES: NASA Extreme Environment Mission Operations (NEEMO) is an underwater spaceflight analog that allows a true mission‐like operational environment and uses buoyancy effects and added weight to simulate different gravity levels. Three missions were undertaken from 2014‐2015, NEEMO's 18‐20. All missions were performed at the Aquarius undersea research habitat. During each mission, the effects of varying operations concepts and tasks type and complexity on representative communication latencies associated with Mars missions were studied. METHODS: 12 subjects (4 per mission) were weighed out to simulate near‐zero or partial gravity extravehicular activity (EVA) and evaluated different operations concepts for integration and management of a simulated Earth‐based science backroom team (SBT) to provide input and direction during exploration activities. Exploration traverses were planned in advance based on precursor data collected. Subjects completed science‐related tasks including presampling surveys, geologic‐based sampling, and marine‐based sampling as a portion of their tasks on saturation dives up to 4 hours in duration that were to simulate extravehicular activity (EVA) on Mars or the moons of Mars. One‐way communication latencies, 5 and 10 minutes between space and mission control, were simulated throughout the missions. Objective data included task completion times, total EVA times, crew idle time, translation time, SBT assimilation time (defined as time available for SBT to discuss data/imagery after it has been collected, in addition to the time taken to watch imagery streaming over latency). Subjective data included acceptability, simulation quality, capability assessment ratings, and comments. RESULTS: Precursor data can be used effectively to plan and execute exploration traverse EVAs (plans included detailed location of science sites, high‐fidelity imagery of the sites, and directions to landmarks of interest within a site). Operations concepts that allow for presampling surveys enable efficient traverse execution and meaningful Mission Control Center (MCC) interaction across long communication latencies and can be done with minimal crew idle time. Imagery and information from the EVA crew that is transmitted real‐time to the intravehicular (IV) crewmember(s) can be used to verify that exploration traverse plans are being executed correctly. That same data can be effectively used by MCC (across comm latency) to provide further instructions to the crew from a SBT on sampling priorities, additional tasks, and changes to the plan. Text / data capabilities are preferred over voice capabilities between MCC and IV when executing exploration traverse plans over communication latency. Autonomous crew planning tools can be effective at modifying existing plans if the objectives and constraints are clearly defined.

Chappell, Steven P.↗

Second-Generation Six-Limbed Experimental Robot

The figure shows the LEMUR II - the second generation of the Limbed Excursion Mechanical Utility Robot (LEMUR), which was described in "Six-Legged Experimental Robot" (NPO-20897), NASA Tech Briefs, Vol. 25, No. 12 (December 2001), page 58. The LEMUR II incorporates a number of improvements, including new features, that extend its capabilities beyond those of its predecessor, which is now denoted the LEMUR I. To recapitulate: the LEMUR I was a six-limbed robot for demonstrating robotic capabilities for assembly, maintenance, and inspection. The LEMUR I was designed to be capable of walking autonomously along a truss structure toward a mechanical assembly at a prescribed location and to perform other operations. The LEMUR I was equipped with stereoscopic video cameras and image-data-processing circuitry for navigation and mechanical operations. It was also equipped with a wireless modem, through which it could be commanded remotely. Upon arrival at a mechanical assembly, the LEMUR I would perform simple mechanical operations with one or both of its front limbs. It could also transmit images to a host computer. Each of the six limbs of the LEMUR I was operated independently. Each of the four rear limbs had three degrees of freedom (DOFs), while each of the front two limbs had four DOFs. The front two limbs were designed to hold, operate, and/or be integrated with tools. The LEMUR I included an onboard computer equipped with an assortment of digital control circuits, digital input/output circuits, analog-to-digital converters for input, and digital-to-analog (D/A) converters for output. Feedback from optical encoders in the limb actuators was utilized for closed-loop microcomputer control of the positions and velocities of the actuators. The LEMUR II incorporates the following improvements over the LEMUR I: a) The drive trains for the joints of the LEMUR II are more sophisticated, providing greater torque and accuracy. b) The six limbs are arranged symmetrically about a hexagonal body platform instead of in straight lines along the sides. This symmetrical arrangement is more conducive to omnidirectional movement in a plane. c) The number of degrees of freedom of each of the rear four limbs has been increased by one. Now, every limb has four degrees of freedom: three at the hip (or shoulder, depending on one s perspective) and one at the knee (or elbow, depending on one s perspective). d) Now every limb (instead of only the two front limbs) can perform operations. For this purpose, each limb is tipped with an improved quick-release mechanism for swapping of end-effector tools. e) New end-effector tools have been developed. These include an instrumented rotary driver that accepts all tool bits that have 0.125-in. (3.175-mm)-diameter shanks, a charge-coupled-device video camera, a super bright light-emitting diode for illuminating the work area of the robot, and a generic collet tool that can be quickly and inexpensively modified to accept any cylindrical object up to 0.5 in. (12.7 mm) in diameter. f) The stereoscopic cameras are mounted on a carriage that moves along a circular track, thereby providing for omnidirectional machine vision. g) The control software has been augmented with software that implements innovations reported in two prior NASA Tech Briefs articles: the HIPS algorithm ["Hybrid Image-Plane/Stereo Manipulation" (NPO-30492), Vol. 28, No. 7 (July 2004), page 55] and the CAMPOUT architecture ["An Architecture for Controlling Multiple Robots" (NPO-30345), Vol. 28, No. 10 (October 2004), page 65].

Kennedy, Brett↗

Outdoor annual algae productivity improvements at the pre-pilot scale through crop rotation and pond operational management strategies

The Development of Integrated Screening, Cultivar Optimization, and Verification Research (DISCOVR) collaborative consortium operated pre-pilot scale outdoor ponds to deliver much-needed multi-year, long-term and consistent, algae cultivation data relevant to understanding the current state of technology in terms of expected seasonal algae biomass productivity. Over the course of four years from 2018 to 2021, twelve identical 4.2 m 2 mini-ponds were run in triplicate sets to test strains and operational strategies demonstrated in small-, indoor photobioreactors, in pursuit of increasing overall algae areal productivity and projected farm yield. Fourteen different cultivars derived from a strain screening pipeline were tested. Through deliberate seasonal crop rotation and improvements in operational strategies, annual biomass productivity increased from 11.6 to 17.6 g m -2 day -1 , a > 50% increase over the 2018 baseline. Both brackish and marine strains were included and four out of the fourteen strains consistently yielded high productivity across multiple years; brackish strains Monoraphidium minutum (26BAM) and Scenedesmus obliquus (UTEX393), and marine strains Tetraselmis striata (LANL1001) and Picochlorum celeri (TG2). These freely available datasets, which represent nearly complete annual daily coverage of cultivation metrics including weather, pond temperature and pH, nutrients, and productivity, are unique in the public domain and seek to fill agronomic and operational knowledge gaps to help in the eventual commercialization of algal biofuels and bioproducts.

09 BIOMASS FUELS↗

Spectral-density estimation with the Gaussian integral transform

The spectral-density operator $\hat{ρ}(ω) = δ(ω–\hat{H})$ plays a central role in linear response theory as its expectation value, the dynamical response function, can be used to compute scattering cross sections. In this work, we describe a near optimal quantum algorithm providing an approximation to the spectral density with energy resolution $\Delta$ and error $\epsilon$ using $O(\sqrt{\text{log}_2 (1/ε)[\text{log}_2 (1 / Δ) + \text{log}_2 (1/ε)]/ Δ)}$ operations. This is achieved without using expensive approximations to the time-evolution operator, but instead exploiting qubitization to implement an approximate Gaussian integral transform of the spectral density. Finally, we also describe appropriate error metrics to assess the quality of the spectral function approximations more generally.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Quantum Computing Strategy 2026

Quantum computing (QC) is a rapidly maturing technology with the potential for revolutionary impacts on stockpile stewardship science and national security. Recent developments in fault-tolerant architectures have compressed vendor roadmaps, and predictions of a production-ready quantum computer by the mid-2030s are becoming increasingly credible. This strategy provides a roadmap for integrating QC into the Advanced Simulation and Computing (ASC) program by investing in four strategic focus areas: 1. Develop Capabilities in Mission-Relevant Quantum Applications: ASC will prioritize developing quantum-ready applications in mission areas that have shown significant promise for quantum advantage, including simulations of materials in extreme environments, nuclear dynamics, solving linear and nonlinear partial differential equations, and uncertainty quantification. These applications directly support stockpile stewardship science and modernization objectives. 2. Conduct R&D in Algorithms, Software, and Hardware: Sustained research into quantum algorithms, robust software tools, and quantum hardware is essential. ASC will develop efficient quantum algorithms; invest in quantum compilers, debuggers, and performance tools; and explore specialized quantum hardware tailored to NNSA’s unique requirements. 3. Engage with Vendors and Partners: Early and active collaboration with commercial quantum hardware vendors and academic partners is critical. Through testbeds, co-design agreements, and quantum demonstration facilities, ASC will influence hardware design, gain early access to emerging technologies, and ensure that quantum platforms evolve to meet mission needs. 4. Build Knowledge, Experience, and Workforce: Expanding and upskilling the quantum-trained workforce is essential to long-term success. This includes hiring, internal training, university outreach, and postdoctoral support to ensure ASC maintains the expertise required to operate, program, and integrate quantum systems as they become available. While quantum computing will never replace classical computing, it has the potential to solve certain problems with speed and accuracy that would be unachievable using any conceivable classical high-performance computing (HPC) system. By investing strategically in QC, ASC will help propel the emergent QC industry, maintain U.S. technological leadership, ensure mission readiness, and position itself to rapidly adopt quantum technologies as they mature.

97 MATHEMATICS AND COMPUTING↗

STK Integrated Message Production List Editor (SIMPLE) for CEO Operations

Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade and replace its mission planning and mission operations software systems, which were developed in the Space Shuttle era of the 1980s and 1990s. The impetuses for this change were the planned transition of all workstations to the Windows 7 64-bit operating system and the desire for more efficient and effective use of Satellite Tool Kit (STK) software required for reliable International Space Station (ISS) Earth location tracking. An additional requirement of this new system was the use of the same SQL database of CEO science sites from the SMMS, which was also being developed. STK Integrated Message Production List Editor (SIMPLE) is the essential, all-in-one tool now used by CEO staff to perform daily ISS mission planning to meet its requirement to acquire astronaut photography of specific sites on Earth. The sites are part of a managed, long-term database that has been defined and developed for scientific, educational, and public interest. SIMPLE's end product is a set of basic time and location data computed for an operator-selected set of targets that the ISS crew will be asked to photograph (photography is typically planned 12 to 36 hours out). The CEO operator uses SIMPLE to (a) specify a payload operations planning period; (b) acquire and validate the best available ephemeris data (vectors) for the ISS during the planning period; (c) ingest and display mission-specific site information from the CEO database; (d) identify and display potential current dynamic event targets as map features; (e) compute and display time and location information for each target; (f) screen and select targets based on known crew availability constraints, obliquity constraints, and real-time evaluated constraints to target visibility due to illumination (sun elevation) and atmospheric conditions (weather); and finally (g) incorporate basic, computed time and location information for each selected target into the daily CEO Target List product (message) for submission to ISS payload planning and integration teams for their review and approval prior to uplink. SIMPLE requires and uses the following resources: an ISS mission planning period Greenwich Mean Time start date/time and end date/time), the best available ISS mission ephemeris data (vectors) for that planning period, the STK software package configured for the ISS, and an ISS mission-specific subset of the CEO sites database. The primary advantages realized by the development and implementation of SIMPLE into the CEO payload operations support activity are a smooth transition to the Windows 7 operating system upon scheduled workstation refresh; streamlining of the input and verification of the current ISS ephemeris (vector data); seamless incorporation of selected contents of the SQL database of science sites; the ability to tag and display potential dynamic event opportunities on orbit track maps; simplification of the display and selection of encountered sites based on crew availability, illumination, obliquity, and weather constraints; the incorporation of high-quality mapping of the Earth with various satellite-based datasets for use in describing targets; and the ability to encapsulate and export the essential selected target elements in XML format for use by onboard Earth-location systems, such as Worldmap. SIMPLE is a carefully designed and crafted in-house software package that includes detailed help files for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in May 2012.

Trenchard, Mike↗