Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “data services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Validation

The objective of this investigation was to evaluate the efficacy of ultrasonic testing (UT) for primary water leak path assessments of reactor pressure vessel (RPV) upper head penetrations. Operating reactors have experienced leakage when stress corrosion cracking of nickel-based alloy penetrations allowed primary water into the annulus of the interference fit between the penetration and the low-alloy steel RPV head. In this investigation, UT leak path data were acquired for an Alloy 600 control rod drive mechanism nozzle penetration, referred to as Nozzle 63, which was removed from the North Anna Unit 2 reactor when the RPV head was replaced in 2002. In-service inspection prior to the head replacement indicated that Nozzle 63 had a probable leakage path through the interference fit region. Nozzle 63 was examined using a phased-array UT probe with a 5.0-MHz, eight-element annular array. Immersion data were acquired from the nozzle inner diameter surface. The UT data were interpreted by comparing to responses measured on a mockup penetration with known features. Following acquisition of the UT data, Nozzle 63 was destructively examined to determine if the features identified in the UT examination, including leakage paths and crystalline boric acid deposits, could be visually confirmed. Additional measurements of boric acid deposit thickness and low-alloy steel wastage were made to assess how these factors affect the UT response. The implications of these findings for interpreting UT leak path data are described.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Target Diagnostic Menu Lawrence Livermore National Laboratory SYSM-5620: Design Thinking and Systems Engineering

Target Diagnostic’s Engineering Science (TDES) currently supports over 80 diagnostic systems, all of which draw from a fixed budget that covers staff time and procurement. As the division continues to add new diagnostics, demand on these limited resources increases, yet the budget remains unchanged. Shot Responsible Individuals (RIs) have unrestricted freedom to select any number or type of diagnostics for each experiment, often by copying previous shot configurations with only minor modifications. This practice makes it easy to generate new shots but does not encourage critical evaluation of diagnostic necessity. As a result, many diagnostics are routinely included in a shot without a clear justification, and in practice, much of the data collected is not analyzed. The ever-growing arsenal of diagnostics also increases the burden on TDES personnel, requiring more staff for support, maintenance, and service. This environment creates challenges in focusing resources on diagnostics that provide the greatest value to the NIF mission and raises concerns about the continued justification for maintaining all existing systems. The static TDES budget cannot sustain the ongoing growth in demand for new diagnostic systems. Shot RIs currently face no constraints on the number or type of diagnostics they assign to each experiment, often defaulting to previous configurations without critically assessing the necessity of each diagnostic. This results in the routine inclusion of diagnostics whose data may not be analyzed or may no longer directly support the NIF mission. Consequently, TDES is required to maintain and support an expanding set of diagnostics, straining limited resources and risking inefficient use of staff and funding. There is a need for TDES to efficiently allocate limited resources by establishing a process that requires shot RIs to critically evaluate and justify the inclusion of each diagnostic in their experiments. This process should discourage the routine, unexamined inclusion of diagnostics, support the identification of underutilized or obsolete systems, and ensure that only those diagnostics providing the greatest value to the NIF mission are maintained and supported. Ultimately, this approach must enable TDES to operate within budget constraints while maximizing scientific impact and operational efficiency.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

SunLine Transit Agency Fuel Cell Electric Bus Progress Report (Data Period Focus Jan-Jun 2020) [Slides]

This report presents early results from a deployment of fuel cell electric buses (FCEBs) operated by SunLine Transit Agency in the Coachella Valley area of California. The five FCEBs, produced by New Flyer, feature an electric drive propulsion system powered by a Ballard fuel cell system. The project team is collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The goal of this evaluation is to compare the FCEB performance to that of conventional technology and to track progress over time toward meeting the technical targets set by DOE and the Department of Transportation (DOT). The FCEBs were delivered beginning in mid-2019. The data period covers January 2020 through July 2020. NREL collects data on five 2019 model year compressed natural gas (CNG) buses as a baseline comparison at SunLine. These new CNG buses were phased into service beginning in April 2020.

25 ENERGY STORAGE↗

Characterizing the flux effect on the irradiation embrittlement of reactor pressure vessel steels using machine learning

In-service exposure to high-energy neutrons embrittles reactor pressure vessel (RPV) steels. An increase in the yield stress (Δσ y ) results in a corresponding increase in the brittle to ductile transition temperature (ΔT c ). Most existing models underpredict ΔT c at higher fluence following accelerated irradiations in test reactors. High fluence, up to 10 20 n/cm 2 in some cases, will be reached over extended RPV vessel operation of 80 years, or more, at low service flux. Embrittlement has been extensively studied in accelerated, higher flux test reaction irradiations. However, the use of test reactor data naturally raises the question of flux effects. Here, this study used a machine learning approach trained on a set of hardening data, covering a wide range of flux, fluence, and steel compositions to determine the interactive effects of both irradiation and material variables on Δσ y . The analysis included machine learning-based cross-plots of the variable dependence of Δσ y for six core steels (i.e., CM6, LC, LD, LG, LH, and LI), with controlled differences in their Cu and Ni contents. A primary objective is to evaluate an effective to actual fluence (Φt e /Φt) ratio, as a function of flux, fluence, and steel composition. This is information critical to properly use intermediate flux-high fluence data in calibrating a low flux-high fluence embrittlement model. The predicted Φt e /Φt is reasonably consistent with estimates previously derived from a physics-based solute recombination trap model.

36 MATERIALS SCIENCE↗

Sedimentation and Nonlinear Trapping in Texas Reservoirs Identified Using Remote Sensing and Bathymetric Survey Records

Decreasing reservoir storage capacity due to sedimentation poses great challenges to aging U.S. reservoirs, as it reduces the efficacy and reliability of their socio‐economic services. However, systematic assessments of reservoir sedimentation rates and associated issues remain limited because of sparse and infrequent bathymetry survey data. In this study, we use remote sensing‐driven estimates of sediment concentrations to identify regions experiencing rapid reservoir capacity loss, as observed in repeated bathymetry surveys. Our analysis focuses on Texas, where one of the most reliable state‐level reservoir capacity loss data sets is available through a unique long‐term monitoring program by the Texas Water Development Board. We find that reservoirs with large storage capacities and high sedimentation rate are concentrated in Northeast Texas. We also show that reduced forest, increased barren land, and erosive soil properties are co‐varying with high reservoir sedimentation rates. Temporal changes in the longitudinal gradient of the remotely sensed sediment flux highlight the nonlinear nature of sediment trapping processes, and can be used to estimate the reservoir storage capacity loss over time. In combination with standard bathymetry surveys, our approach shows potential for more cost‐effective and frequent assessment of reservoir storage loss.

Lee, Jiyong [ORNL] (ORCID:0000000198957406)↗

iDDS: intelligent distributed dispatch and scheduling for workflow orchestration

The intelligent distributed dispatch and scheduling (iDDS) service is a versatile workflow orchestration system designed for large-scale, distributed scientific computing. iDDS extends traditional workload and data management by integrating data-aware execution, conditional logic, and programmable workflows, enabling automation of complex and dynamic processing pipelines. Originally developed for the ATLAS experiment at the large hadron collider, iDDS has evolved into an experiment-agnostic platform that supports both template-driven workflows and a Function-as-a-Task model for Python-based orchestration. This paper presents the architecture and core components of iDDS, highlighting its scalability, modular message-driven design, and integration with systems such as PanDA and Rucio. We demonstrate its versatility through real-world use cases: fine-grained tape resource optimization for ATLAS, orchestration of large Directed Acyclic Graph (DAG) workflows for the Rubin Observatory, distributed hyperparameter optimization for machine learning applications, active learning for physics analyses, and AI-assisted detector design at the electron–ion collider. By unifying workload scheduling, data movement, and adaptive decision-making, iDDS reduces operational overhead and enables reproducible, high-throughput workflows across heterogeneous infrastructures. We conclude with current challenges and future directions, including interactive, cloud-native, and serverless workflow support.

97 MATHEMATICS AND COMPUTING↗

Implementation Approach for Electric Vehicles at Marine Corps Base Camp Lejeune. Task 4

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for U.S. Department of Energy Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (Intertek) to conduct several U.S. Department of Defense base studies to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). This study is focused on the Marine Corps Base Camp Lejeune (MCBCL) located in North Carolina. Task 1 consisted of a survey of the non-tactical fleet of vehicles at MCBCL to begin the review of vehicle mission assignments and types of vehicles in service. In Task 2, daily operational characteristics of vehicles were identified to select vehicles for further monitoring and attachment of data loggers. Task 3 recorded vehicle movements in order to characterize the vehicles’ missions. The results of the data analysis and observations were provided. Individual observations of the selected vehicles provided the basis for recommendations related to PEV adoption, i.e., whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively PEVs) can fulfill the mission requirements. It also provided the basis for recommendations related to placement of PEV charging infrastructure. This report focuses on an implementation plan for the near-term adoption of PEVs into the MCBCL fleet. Intertek acknowledges the support of Idaho National Laboratory, Marine Corps headquarters, and Marine Corps Base Camp Lejeune fleet management and personnel for participation in this study. Intertek is pleased to provide this report and is encouraged by enthusiasm and support from MCBCL personnel.

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Preparedness - Implementation Approach for Electric Vehicles at Naval Air Station Whidbey Island. Task 4

Several U.S. Department of Defense base studies have been conducted to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). This study is focused on the Naval Air Station Whidbey Island (NASWI) located in Washington State. Task 1 consisted of a survey of the non-tactical fleet of vehicles at NASWI to begin the review of vehicle mission assignments and types of vehicles in service. In Task 2, daily operational characteristics of vehicles were identified to select vehicles for further monitoring and attachment of data loggers. Task 3 recorded vehicle movements in order to characterize the vehicles’ missions. The results of the data analysis and observations were provided. Individual observations of the selected vehicles provided the basis for recommendations related to PEV adoption, i.e., whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively PEVs) can fulfill the mission requirements. It also provided the basis for recommendations related to placement of PEV charging infrastructure. This report focuses on an implementation plan for the near-term adoption of PEVs into the NASWI fleet.

33 ADVANCED PROPULSION SYSTEMS↗

Task 1. Monitoring real time materials degradation. NRC extended In-situ and real-time Monitoring

The overall objective of this project was to perform a scoping study to identify, in concert with the nuclear industry, those sensors and techniques that have the most promising commercial viability and fill a critical inspection or monitoring need. Candidates to be considered include sensors to monitor real-time material degradation, characterize residual stress, monitor and inspect component fabrication, assess radionuclide and associated chemical species concentrations in ground water and soil, characterize fuel properties, and monitor severe accident conditions. Under Task 1—Monitoring Real-Time Materials Degradation—scoping studies were conducted to assess the feasibility of potential inspection and monitoring technologies (i.e., a combination of sensors, advanced signal processing techniques, and data analysis methods) that could be utilized in LWR and/or advanced reactor applications for continuous monitoring of degradation in-situ. The goal was to identify those techniques that appear to be the most promising, i.e., those that are closest to being both technically and commercially viable and that the nuclear industry is most likely to pursue. Current limitations and associated issues that must be overcome before commercial application of certain techniques have also been addressed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration Results: Fifth Report

This report presents results of a demonstration of fuel cell electric buses (FCEB) operating in Oakland, California. Alameda-Contra Costa Transit District (AC Transit) leads the Zero Emission Bay Area (ZEBA) demonstration, which includes 13 advanced-design fuel cell buses and two hydrogen fueling stations. The ZEBA partners are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. NREL has published four previous reports describing operation of these buses. This report presents new and updated results covering data from January 2015 through December 2015.

30 DIRECT ENERGY CONVERSION↗

Analysis of Electric Power Board of Chattanooga Smart Grid Investment

The deployment of a Smart Grid within the EPB electrical system has brought significant value to EPB customers and to EPB operations. The Smart Grid implementation has permitted the capability to automate many of the existing systems, increasing the overall efficiency and decreasing round trip time for many required operation functions. This has both reduced the cost of operations and increased the reliability of customer service. This boost in performance can be primarily linked to two main components: the communication network and the availability of data. The existence of a fiber communication backbone has opened numerous opportunities for EPB. Large data sets from remote devices can be continuously polled and used to compute numerous metrics. The speed of communication has provided a pathway to sophisticated distribution automation that would not otherwise be possible. The data have been shown to provide a much broader view of the actual electrical system that was not previously available, opening many new opportunities in data analytics. This report documents many of the existing systems and operational features of the EPB system. Many of these systems have seen significant improvement with the deployment of Smart Grid technologies. The research behind this report found that in some cases, the value was directly computable or estimable for these enhancements. Currently, several ongoing research topics are under investigation within EPB. Through a grant from TVA, EPB is currently installing a 1.3MW solar photovoltaic system, which will be the first-generation asset owned by EPB.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration Results: Sixth Report

This report presents results of a demonstration of fuel cell electric buses (FCEB) operating in Oakland, California. Alameda-Contra Costa Transit District (AC Transit) leads the Zero Emission Bay Area (ZEBA) demonstration, which includes 13 advanced-design fuel cell buses and two hydrogen fueling stations. The ZEBA partners are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. NREL has published five previous reports describing operation of these buses. This report presents new and updated results covering data from January 2016 through December 2016.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrification Futures Study: End-Use Electric Technology Cost and Performance Projections through 2050

This report provides projected cost and performance assumptions for electric technologies considered in the Electrification Futures Study, a detailed and comprehensive analysis of the effects of widespread electrification of end-use service demands in all major economic sectors - transportation, residential and commercial buildings, and industry - for the contiguous United States through 2050. Using extensive literature searches and expert assessment, the authors identify slow, moderate, and rapid technology advancement sensitivities on technology cost and performance, and they offer a comparative analysis of levelized cost metrics as a reference indicator of total costs. The identification and characterization of these end-use service demand technologies is fundamental to the Electrification Futures Study. This report, the larger Electrification Futures Study, and the associated data and methodologies may be useful to planners and analysts in evaluating the potential role of electrification in an uncertain future. The report could be broadly applicable for other analysts and researchers who wish to assess electrification and electric technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Performance Evaluation of Aquila's Aquarius Fixed Cold Plate Cooling System at NREL's High Performance Computing Center

In the first half of 2018, as part of a partnership with Sandia National Laboratories, Aquila installed its fixed cold plate, liquid-cooled Aquarius rack solution for high-performance computing (HPC) clustering at the National Renewable Energy Laboratory's (NREL's) Energy Systems Integration Facility (ESIF). This new fixed cold plate, warm-water cooling technology together with a manifold design provides easy access to service nodes and eliminates the need for server auxiliary fans altogether. Aquila and Sandia National Laboratories chose NREL's HPC Data Center for the initial installation and evaluation because the data center is configured for liquid cooling and has the required instrumentation to measure flow and temperature differences to facilitate testing. This paper gives an overview of the Aquarius fixed cold plate cooling technology and provides results from early energy performance evaluation testing.

97 MATHEMATICS AND COMPUTING↗

Continuation Report: Creep-fatigue Behavior and Damage Accumulation of a Candidate Structural Material for Concentrating Solar Thermal Receiver

At the start of this phase, six alloys were determined to be candidate materials for the concentrating solar power (CSP) thermal receiver: Alloys 617, 625, 740H, 230, 282 and Alloy X. From these, Alloys 740H and 282 were determined to be the most suitable, with both alloys exhibiting similar high temperature strength properties. Alloy 740H was selected due to its ease to work with (simpler heat treatments and welding procedures) and a larger database of existing data. Fatigue testing was started in this phase, with four fatigue tests having been completed, with additional fatigue testing planned, as well as tensile, creep and creep-fatigue tests starting in the next phase. Two fatigue tests performed at 850 °C and were completed in significantly fewer cycles than the two tests performed at 750 °C. Metallography was performed on the fatigued specimens to examine crack path and surrounding microstructure. These preliminary results suggest a significant drop in strength at elevated temperatures above 750 °C, however, more test results will be needed prior to setting design limits. Several potential model high temperature design methods were evaluated that could form the basis of our final recommended creep-fatigue design method for Alloy 740H. To do this we expanded on the receiver finite element model to develop a model representative of a potential Gen 3 design using KCl-MgCl2 salt coolant and operating with a salt inlet temperature of 550°C and salt outlet temperature of 720°C. Using the temperature fields from the model thermohydraulic analysis we determined the design life of the reference receiver assuming it was constructed from 740H seamless tubing and assuming high temperature design properties for 740H from literature data and, where required, naïve extrapolation. As experimental data is generated, these tentative design parameters will be updated to match the actual performance of 740H in elevated temperature service. The results of this design study are a rank ordering of potential design methods for two criteria: ease of use and design margin. The end goal of this project is to develop a creep-fatigue design method with adequate, but not over conservative, design margin that is straightforward to execute. Our receiver model is based on the preliminary design provided to DOE by Solar Reserve. Our analysis indicates a peak metal temperature of around 840° C for this design (comparable to Solar Reserve’s analysis, which shows a peak metal temperature of around 830° C). The Solar Reserve tube thickness is too thin to sustain creep-fatigue loading at this temperature. This means that the current trial design is not well-suited for evaluating different design methodologies, as we predict it will have a very short design life. We suggest that we modify our reference design with input from DOE in order to lower the maximum metal temperature to less than 800° C. We can then repeat these analyses and give a more meaningful comparison of different design methods before making a final selection.

14 SOLAR ENERGY↗

Los Alamos Climatology 2021 Update

The Los Alamos National Laboratory (LANL or the Laboratory) operates a Meteorological Monitoring (Met) Program to support LANL emergency response, engineering designs, environmental compliance, environmental assessments, safety evaluations, weather forecasting, environmental monitoring, research programs, and environmental restoration. Weather data has been collected in Los Alamos since 1910. A 30-year averaging period is termed by the National Weather Service (NWS) as a climatic normal, and these statistics are updated every 10 years to represent the current climatic normal conditions. Previous climate statistics are provided in Bowen (1990) for the 1961–1990 averaging period and Dewart et al. (2017) for the 1981–2010 averaging period. No climate statistics were developed for the 1971-2000 averaging period. This report provides climate statistics for the current 30-year 1991–2020 averaging period.

54 ENVIRONMENTAL SCIENCES↗

Development of a Cloud-based Application to Enable a Scalable Risk-informed Predictive Maintenance Strategy at Nuclear Power Plants

Light-water reactor operations and maintenance (O&M) costs are prohibitively high, thus contributing to the premature decommissioning of nuclear power plants (NPPs). This is partly due to how the equipment is monitored. In recent years, cloud computing has emerged as a dominant technology by virtue of its low costs, computing and storage adaptability, and ability to host applications over numerous types of virtual infrastructures. Cloud computing can be a cost-effective alternative to onsite storage and diagnostics. This paper conducts a techno-economic assessment of a provisional cloud deployment architecture for a NPP predictive monitoring (PdM) system. The cloud-based monitoring system would enable maintenance and diagnostics (M&D) analysts and other authorized plant users to remotely monitor equipment functionality so as to enable PdM practices and early detection of faults. The Microsoft Azure cloud platform is included in the proposed cloud architecture to provide data processing and storage, sensor device networking, and database management; however, this analysis could be extended to other cloud computing service providers as well. For the techno-economic assessment, technical feasibility is measured in terms of network performance metrics such as response time, latency, and throughput, whereas economic feasibility is measured in terms of operational costs and capital expenditures. Finally, this report covers certain regulatory and security aspects that may concern licensees looking to implement cloud computing. The report focuses on the integration of sensor database storage, the application of cloud resources to PdM, and the identification of technological and economic hurdles associated with moving to a cloud-computing-based architecture.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

ASX O-ring Life Testing Using a LAW High Bound Melter Feed Simulant (Final Report)

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is planning to utilize an Isolok sampler to sample the contents of the Low Activity Waste (LAW) and High Level Waste (HLW) Melter Feed Preparation Vessels (MFPV) as well as the contents of the LAW Concentrate Receipt Vessel (CRV). Over the course of testing, it has been recognized that the long term reliability of the o-ring seals in the Isolok sampler are an important component in sampling. The Isolok sampler will be collecting samples of melter feed that contain a high percentage of highly abrasive particles which can impact the life of the o-rings. Although o-ring life in normal service is typically several hundred thousand cycles (such as in the air cylinders and other non-abrasive environments), no data are available for the life of the o-ring seals in this abrasive environment. To address this concern, a Test Exception was issued to perform testing to determine whether the o-rings in an Isolok sampler will continue to function through one year of projected HLW MFPV sampler operation, or approximately 7,000 sampler piston cycles. This final report provides results of the o-ring testing that was performed with the ASX sampler.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗