Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “collaborative teams”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Low-Latency Gravitational-Wave Alerts for Multimessenger Astronomy During the Second Advanced LIGO and Virgo Observing Run

Advanced LIGO’s second observing run (O2), conducted from 2016 November 30 to 2017 August 25, combined with Advanced Virgo’s first observations in 2017 August, witnessed the birth of gravitational-wave multimessenger astronomy. The first ever gravitational-wave detection from the coalescence of two neutron stars, GW170817, and its gamma-ray counterpart, GRB 170817A, led to an electromagnetic follow-up of the event at an unprecedented scale. Several teams from across the world searched for EM/neutrino counterparts to GW170817, paving the way for the discovery of optical, X-ray, and radio counterparts. In this article, we describe the online identification of gravitational-wave transients and the distribution of gravitational-wave alerts by the LIGO and Virgo collaborations during O2. We also describe the gravitational-wave observables that were sent in the alerts to enable searches for their counterparts. Finally, we give an overview of the online candidate alerts shared with observing partners during O2. Alerts were issued for 14 candidates, 6 of which have been confirmed as gravitational-wave events associated with the merger of black holes or neutron stars. Of the 14 alerts, 8 were issued less than an hour after data acquisition.

Gravtational waves↗

Cryogenic Fuel Aviation – Challenges and Opportunities

NASA aeronautics goals include pioneering new technology to increase efficiency and reduce emissions from air travel. The feasibility of using of on-board cryogenic fuels systems in combination with fuel cells, high efficiency engines, and electric motors for high efficiency commercial transport aircraft is being examined at NASA in collaborations with external partners. Growing emphasis on next generation air transportation resulted in the development of strategic investigations into cryogenic fuels aviation, including roadmaps for maturing new technologies, needs to improve testing and manufacturing capabilities, and the requirements for establishing regulatory and certification standards. A NASA cross-organizational multidisciplinary project team is exploring new aircraft architectures, enabling materials, and the engineering challenges associated with cryogenic fuels for aircraft. The engineering challenges include high performance cryogenic, thermal management, and power/propulsion components and subsystems to tackle the challenging problem of development of commercially viable aircraft that would radically transform air transportation.

liquid natural gas↗

The Fast-spectrum Transmutation Experimental Facility FASTEF: Main design achievements (part 2: Reactor building design and plant layout) within the FP7-CDT collaborative project of the European Commission

MYRRHA (Multi-purpose hybrid Research Reactor for High-tech Applications) is the flexible experimental accelerator-driven system (ADS) in development at SCK-CEN in replacement of its material testing reactor BR2. SCK-CEN in association with 17 European partners from industry, research centres and academia, responded to the FP7 (Seventh Framework Programme) call from the European Commission to establish a Central Design Team (CDT) for the design of a Fast Spectrum Transmutation Experimental Facility (FASTEF) able to demonstrate efficient transmutation and associated technology through a system working in subcritical and/or critical mode. The project has started on April 01, 2009 for a period of three years. In this paper, we present the latest concept of the reactor building and the plant layout. The FASTEF facility has evolved quite a lot since the intermediate reporting done at the ICAPP'10 and ICAPP'11 conferences 1,2. Many iterations have been performed to take into account the safety requirements. The present configuration enables an easy operation and maintenance of the facility, including the possibility to change large components of the reactor. In a companion paper 3, we present the latest configuration of the reactor core and primary system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Modeling and Simulation Support to Specia Nuclear Material Handling Facility Operations - 16053

Newport News Shipbuilding (NNS) is the sole designer and provider of nuclear powered aircraft carriers and one of only two companies in the United States to build nuclear powered submarines. As part of the upkeep of aircraft carriers, the ships return to NNS once in their lifetime for a complex overhaul and to be refueled. In support of overhaul operations NNS maintains a state of the art Special Nuclear Material (SNM) handling facility. Due to the complex nature of the operations that occur within this facility, during the design and initial operation of the building NNS developed a facility simulation model to provide decision support during the project planning and operational phases. This tool allows users to experiment with process times, process order, equipment utilization, personnel utilization and spatial utilization. By capturing the planned operations, time distributions for operations, equipment sizes and uses and personnel requirements, the tool accurately reflects the planned use of the facility. This realism allows the user to experiment with any aspect of the facility, in a controlled and cost effective space, and determine how changes or potential delays may impact overall facility operations. Thus the model allows for rapid exploration of multiple scenarios to determine likely outcomes, allowing a user to identify risks well ahead of their realization and explore mitigation strategies in a controlled space, to determine the ideal path forward. The tool was successful during the initial operation of the facility in helping to identify and mitigate risks related to the complex operations occurring during SNM handling. The tool is now in use to support planning for the next series of operations that will occur within the facility. The initial operations the model supported occurred during the deactivation of the USS Enterprise, and future operation will focus on the overhaul of Nimitz class aircraft carriers. The NNS planning team is currently using the tool to assess potential risks and challenges that are identified as potentially impacting the schedule and timelines for these overhaul processes. In addition, the NNS development team is working to add new operational steps to the model, capturing work that is occurring near the facility, but which directly impacts the facilities operational abilities. In conjuncture with the engineering planning division, the NNS development team has run over 20 complex scenarios through the tool. The team has provided output from these scenarios to both NNS personnel and government representatives. To date the model has successfully supported the identification of several feasible paths to incorporate new processes, dictated by the work to support a overhaul vs a deactivation. The model also provides a spatial arrangement component that allows users to experiment with different equipment placement within the facility. Due to the fidelity of the model, arranging equipment with the spatial component allows a user to set up the facility in an experimental layout and run the processes inside the facility to determine if the layout will be feasible, or if it would impact operational capabilities. Additionally, the spatial component allows for visual collaboration between stakeholders to ensure all operational personnel are aware of the current and planned layout, and that they do not locate equipment or work stations in locations that would interfere with facility operations. The spatial component, in combination with the simulation component, has resulted in several documented improvements in process. These include: the identification of additional equipment which could be stored outside the facility, without impacting operations, to increase space; confirmation of the ideal placement of a large water tank; and identification of several risks related to planned equipment storage area, allowing the team to develop new plans and avoid realizing the risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Shift Ex-Core Calculations to a Detailed MSR Model

This report documents the collaborative research conducted between Argonne National Laboratory (ANL) and Oak Ridge National Laboratory (ORNL) on applying the Monte Carlo neutronics code Shift to calculate the radiation dose rates for a detailed molten salt reactor (MSR) model based on the Molten Salt Breeder Reactor (MSBR). In this work scope, the ANL and ORNL teams worked together and applied Shift to calculate the radiological environments of this detailed MSR facility modeled with explicit geometries. The radiological conditions within the MSR facility were modeled for when the reactor is at two different operation modes: normal full power and drained state. The FW-CADIS hybrid method in Shift was applied successfully to calculate the ex-core neutron and gamma dose rates for the MSBR at full power. Dose rate maps showed that in the current MSBR numerical model, potential pathways exist for neutrons and gammas to stream through the 8-foot concrete shield to reach the top of the MSBR reactor cell. Neutron and gamma dose rates within the drain cell were also calculated for the MSBR at the drained state by integrating the source terms obtained from an ORIGEN-S depletion calculation into the Shift simulation. The results indicate that in the drained state, the delayed gammas from the depleted fuel salt are the main contributors to the dose rates, which suggests that a steel liner in the tank model must be added for calculating the dose rates in the drain cell.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NASA's Participation in the National Computational Grid

Over the last several years it has become evident that the character of NASA's supercomputing needs has changed. One of the major missions of the agency is to support the design and manufacture of aero- and space-vehicles with technologies that will significantly reduce their cost. It is becoming clear that improvements in the process of aerospace design and manufacturing will require a high performance information infrastructure that allows geographically dispersed teams to draw upon resources that are broader than traditional supercomputing. A computational grid draws together our information resources into one system. We can foresee the time when a Grid will allow engineers and scientists to use the tools of supercomputers, databases and on line experimental devices in a virtual environment to collaborate with distant colleagues. The concept of a computational grid has been spoken of for many years, but several events in recent times are conspiring to allow us to actually build one. In late 1997 the National Science Foundation initiated the Partnerships for Advanced Computational Infrastructure (PACI) which is built around the idea of distributed high performance computing. The Alliance lead, by the National Computational Science Alliance (NCSA), and the National Partnership for Advanced Computational Infrastructure (NPACI), lead by the San Diego Supercomputing Center, have been instrumental in drawing together the "Grid Community" to identify the technology bottlenecks and propose a research agenda to address them. During the same period NASA has begun to reformulate parts of two major high performance computing research programs to concentrate on distributed high performance computing and has banded together with the PACI centers to address the research agenda in common.

Feiereisen, William J.↗

LCROSS: A High Return, Small Satellite Mission

Early in 2006, the NASA Exploration Systems Mission Directorate (ESMD) held a competition for NASA Centers to propose innovative ideas for a secondary payload mission to launch with the Lunar Reconnaissance Orbiter (LRO) to the Moon. The successful proposal could cost no more than $80 million dollars (less was preferred), would have to be ready to launch with the LRO in 31 months, could weigh no more than 1000 kg (fuelled), and would be designated a risk-tolerant "Class D" mission. In effect, NASA was offering a fixed-price contract to the winning NASA team to stay within a cost and schedule cap by accepting an unusually elevated risk position. To address this Announcement of Opportunity to develop a cost-and-schedule-capped secondary payload mission to fly with LRO, NASA Ames Research Center (ARC) in Moffett Field, CA, USA embarked on a brainstorming effort termed "Blue Ice" in which a small team was asked to explore a number of mission scenarios that might have a good chance for success and still fit within the stated programmatic constraints. From this work, ARC developed and submitted six of the nineteen mission proposals received by ESMD from throughout the Agency, one of which was LCROSS - a collaborative effort between ARC and its industrial partner, Northrop-Grumman (NG) in Redondo Beach, CA, USA.

Andrews, Daniel R.↗

NASA's Spaceflight Visual Impairment and Intracranial Hypertension Research Plan: An accelerated Research Collaboration

To date six long duration astronauts have experienced in flight visual changes and post flight signs of optic disc edema, globe flattening, choroidal folds, hyperoptic shifts and or raised intracranial pressure. In some cases the changes were transient while in others they are persistent with varying degrees of visual impairment. Given that all astronauts exposed to microgravity experience a cephalad fluid shift, and that both symptomatic and asymptomatic patients have exhibited optic nerve sheath edema on MRI, there is a high probability that all astronauts develop in-flight idiopathic intracranial hypertension to some degree. Those who are susceptible, have an increased likelihood of developing treatment resistant papilledema resulting in visual impairment and possible long-term vision loss. Such an acquired disability would have a profound mission impact and would be detrimental to the long term health of the astronaut. The visual impairment and increased intracranial pressure phenomenon appears to have multiple contributing factors. Consequently, the working "physiological fault bush" with elevated intracranial pressure at its center, is divided into ocular effects, and CNS and other effects. Some of these variables have been documented and or measured through operational data gathering, while others are unknown, undocumented and or hypothetical. Both the complexity of the problem and the urgency to find a solution require that a unique, non-traditional research model be employed such as the Accelerated Research Collaboration(TM) (ARC) model that has been pioneered by the Myelin Repair Foundation. In the ARC model a single entity facilitates and manages all aspects of the basic, translational, and clinical research, providing expert oversight for both scientific and managerial efforts. The result is a comprehensive research plan executed by a multidisciplinary team and the elimination of stove-piped research. The ARC model emphasizes efficient and effective communication between management and investigators; and real-time sharing of scientific discoveries in an effort to solve complex problems.

Otto, Christian↗

NASA Virtual Institutes: International Bridges for Space Exploration

NASA created the first virtual institute, the NASA Astrobiology Institute (NAI), in 2009 with an aim toward bringing together geographically disparate and multidisciplinary teams toward the goal of answering broad questions in the then-new discipline of astrobiology. With the success of the virtual institute model, NASA then created the NASA Lunar Science Institute (NLSI) in 2008 to address questions of science and human exploration of the Moon, and then the NASA Aeronautics Research Institute (NARI) in 2012 which addresses key questions in the development of aeronautics technologies. With the broadening of NASA's human exploration targets to include Near Earth Asteroids and the moons of Mars as well as the Moon, the NLSI morphed into the Solar System Exploration Research Virtual Institute (SSERVI) in 2012. SSERVI funds domestic research teams to address broad questions at the intersection of science and human exploration, with the underlying principle that science enables human exploration, and human exploration enables science. Nine domestic teams were funded in 2014 for a five-year period to address a variety of different topics, and nine international partners (with more to come) also work with the U.S. teams on a variety of topics of mutual interest. The result is a robust and productive research infrastructure that is not only scientifically productive but can respond to strategic topics of domestic and international interest, and which develops a new generation of researchers. This is all accomplished with the aid of virtual collaboration technologies which enable scientific research at a distance. The virtual institute model is widely applicable to a range of space science and exploration problems.

SSERVI↗

Moon to Mars Planetary Autonomous Construction Technology (MMPACT) Lunar Surface Construction Activity at NASA Marshall Space Flight Center

Introduction: The goal of the Moon to Mars Planetary Autonomous Construction Technology (MMPACT) Project at NASA Marshall Space Flight Center (MSFC) is to develop, deliver, and demonstrate on-demand capabilities to protect astronauts and create infrastructure elements on the lunar surface via construction of landing pads, habitats, shelters, roadways, berms, and blast shields using lunar regolith-based materials. MSFC has strong collaborations with industry, academia, and other NASA Centers to accomplish this goal. The MMPACT project consists of three elements. The first focuses on the development of an autonomous construction system. The second focuses on construction feedstock materials development. The third element focuses on the development of a microwave sintering construction capability. The team plans to demonstrate construction on a small Commercial Lunar Payload Services (CLPS) lander in the 2025 timeframe, with a future goal of constructing a subscale landing pad in 2028-2029.The MMPACT project is funded through the Lunar Surface Innovation Initiative, which is part of the Space Technology Mission Directorate. Technology Development: The MMPACT team will evaluate multiple autonomous construction and microwave construction technologies, materials, and construction element forms. Selected technologies will be matured; processes and operations will be defined for the two flight missions. Evaluations of materials, as well as the technology itself, will be demonstrated in simulated lunar environments as part of the technology maturation process. The team is keenly aware of the properties of the lunar environment. Its temperature swings, negligible exosphere, and unprepared site foundations factor into the materials for both construction and hardware, the concept of operations, and the technology’s interdependencies. Materials: The team is looking at materials that can be produced from in-situ resources in an effort to make lunar construction cost-effective. The particular focus of the materials team is cementitious materials, metals, and sintered and melted regolith. These materials will be studied for tensile, compressive, and flexural strength. They will also be tested for their ability to handle thermal swings and vacuum. They will be fully characterized using various microscopy techniques to examine micro-structures, chemistry, and crystal formation. Interdependencies: There are many interdependencies that MMPACT has already identified. These include: •Excavation interface •Regolith feedstock beneficiation •Regolith feedstock storage and provision •Requirements for structures •Site-to-site mobility systems •Availability of lunar simulant •Lander off-loading capabilities •Navigation systems •Power •Regolith composition and mineralogy •Lander specifications •Communication protocols Technology developments in these additional areas would be beneficial to MMPACT.

Moon to Mars Planetary Autonomous Construction Tec↗

Advancing Open Source Science Initiatives Through Public-Private Partnerships

Collaboration is fundamental to advancing open science within the science community. With the recent developments in technology and research, the establishment of formal partnerships between the private sector and government agencies are needed to bridge the knowledge gaps and expedite the time to actionable science. NASA’s Interagency Implementation and Advanced Concepts Team (IMPACT) seeks to address this challenge by establishing non-reimbursable Space Act Agreements with industry leaders in cloud computing, artificial intelligence (AI) and machine learning. The purpose of these agreements is to advance open source science initiatives in the areas of data discovery, access and use of high value NASA science data sets on the cloud. As well as, jointly work on common research problems to accelerate the development and adoption of new AI technologies. Current success stories include co-locating NASA datasets from multiple science disciplines on one platform using Amazon Web Services Open Data Registry, developing AI Foundation Models for Science with IBM and co-hosting training workshops and tutorials for the science community aimed at providing hands-on experience with using NASA data and AI models on the cloud. In summary, we will present an overview of our partnerships supporting open source science initiatives, describe current activities and lessons learned that may be useful to others considering similar partnerships with the private sector.

Elizabeth Fancher↗

Port Hope Are Initiative Port Granby Project - Water Management in Extreme Weather Conditions - 19257

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) through which Canadian Nuclear Laboratory (CNL) is managing long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF), which accepted waste until the 1980's, to the newly constructed LTWMF. This paper provides an overview of the challenges of water management (control of storm and groundwater at the LTWMF and PGWMF) on a large-scale construction project with changing and unpredictable weather patterns. Consistent with increased observations of extreme weather events, over two consecutive construction seasons, weather changed from one of the driest on record (high temperatures, dry conditions and strong wind) to one of the wettest on record (short duration high-intensity rainfall that flooded the LTWMF, excavations and on-site PGWMF and LTWMF retention ponds). This paper describes the collaborative approach among Wood (Constructor), AECOM (Engineer of Record), and CNL to adjust to extremes in weather to control dust and excessive water during construction. The summer of 2016, one of the driest summers on record in southern Ontario, was followed by one of the wettest in 2017. In 2016, the project team used water from the uncontaminated on-site storm water ponds, applied a polymer product for dust control across the site to augment water applications, obtained a Permit to Take Water from the provincial government to pump water from Lake Ontario, procured large tanks for storage of Lake Ontario water to meet peak demand, and retained additional water trucks/operators for day to day site operations. In stark contrast, to accommodate heavy rains in 2017 the project team installed ∼6 million liter aboveground storage tanks with secondary containment for contaminated water storage; procured 100+ mobile water storage tanks to supplement the on-site storage, utilized LTWMF cells sumps, excavations and retention ponds to store and manage onsite water; and adjusted additional staff resources (more staff and longer shifts) during anticipated periods of high-intensity rainfall, at times managing water around the clock. Recognizing the need to minimize the release of contaminated soil and water from the construction site at all times, these efforts illustrate the importance of anticipating and reacting to extreme weather events on a more regular basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Value of abstraction in performance assessment – When is a higher level of detail necessary?

In this study, different approaches in performance assessment (PA) of the long-term safety of a repository for radioactive waste were examined. This investigation was carried out as part of the DECOVALEX-2023 project, an international collaborative effort for research and model comparison. One specific task of the DECOVALEX-2023 project was the Salt Performance Assessment Modelling task (Salt PA), which aimed at comparing various models and methods employed in the performance assessment of deep geological repositories in salt. In the context of the Salt PA task, three distinct teams from SNL (United States), Quintessa Ltd (United Kingdom), and GRS (Germany) examined the consequences of employing different levels of abstractions when modelling the repository's geometry and implementing various features and processes, using the example of a simple hypothetical repository structure in domal salt. Each team applied their own tools: PFLOTRAN (SNL), QPAC (Quintessa) and LOPOS (GRS). These differ essentially regarding numerical concept and degree of detail in the representation of the underlying physical processes. The discussion focused on when simplifications can be appropriately applied and what consequences result from them. Furthermore, it was explored when and if a higher level of fidelity in geometry or physical processes is required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A pre-registered short-term forecasting study of COVID-19 in Germany and Poland during the second wave

Disease modelling has had considerable policy impact during the ongoing COVID-19 pandemic, and it is increasingly acknowledged that combining multiple models can improve the reliability of outputs. Here we report insights from ten weeks of collaborative short-term forecasting of COVID-19 in Germany and Poland (12 October–19 December 2020). The study period covers the onset of the second wave in both countries, with tightening non-pharmaceutical interventions (NPIs) and subsequently a decay (Poland) or plateau and renewed increase (Germany) in reported cases. Thirteen independent teams provided probabilistic real-time forecasts of COVID-19 cases and deaths. These were reported for lead times of one to four weeks, with evaluation focused on one- and two-week horizons, which are less affected by changing NPIs. Heterogeneity between forecasts was considerable both in terms of point predictions and forecast spread. Ensemble forecasts showed good relative performance, in particular in terms of coverage, but did not clearly dominate single-model predictions. The study was preregistered and will be followed up in future phases of the pandemic.

60 APPLIED LIFE SCIENCES↗

The Trinity Center of Excellence Co-Design Best Practices

Co-design between application developers and the vendors providing high-performance computing systems is essential to efficiently using current-generation HPC systems and shaping next-generation architectures. Application developers are faced with the challenge of effectively orchestrating many hardware threads and exploiting vector instructions, which can require code modifications. Will refactoring applications for current-generation systems apply to future-generation systems? Is there help available for this enormous task? Over the past 10 years, a partnership has evolved to address these issues. Centers of Excellence are mutually beneficial collaborations between application developers and vendors; vendors receive a better understanding of the needs of their users, and users receive a better understanding of the characteristics of the hardware, system software, and tools available to address their challenges. Lastly, this article describes the partnership between two vendors, Cray and Intel, and the application teams working together in the Trinity Center of Excellence.

97 MATHEMATICS AND COMPUTING↗

Material Needs and Measurement Challenges for Advanced Semiconductor Packaging: Understanding the Soft Side of Science

This Perspective builds upon insights from the National Institute of Standards and Technology (NIST)-organized workshop, “Materials and Metrology Needs for Advanced Semiconductor Packaging Strategies,” held at the 35th annual Electronics Packaging Symposium in Binghamton, NY, on September 5, 2024. It outlines critical challenges and opportunities related to polymer-based “soft” materials in advanced semiconductor packaging, with emphasis on polymer science, measurement science (metrology), and the strategic development of Research-Grade Test Materials (RGTMs). These efforts, led by the NIST CHIPS team, aim to advance the fundamental understanding of structure-property-processing relationships, promote standardized guidelines and innovative methods for material characterization, and accelerate the development, qualification, and adoption of next-generation packaging materials. The Perspective also distills key insights from the panel discussion with industry experts, emphasizing the need for close collaboration among materials scientists, process engineers, and metrology experts to enable a holistic strategy, further highlighting the importance of cross-sector partnerships among industry, academia, and government to address pressing challenges in packaging materials and processes.

97 MATHEMATICS AND COMPUTING↗

Data and Communications in Basic Energy Sciences: Creating a Pathway for Scientific Discovery

This report is based on the Department of Energy (DOE) Workshop on “Data and Communications in Basic Energy Sciences: Creating a Pathway for Scientific Discovery” that was held at the Bethesda Marriott in Maryland on October 24-25, 2011. The workshop brought together leading researchers from the Basic Energy Sciences (BES) facilities and Advanced Scientific Computing Research (ASCR). The workshop was co-sponsored by these two Offices to identify opportunities and needs for data analysis, ownership, storage, mining, provenance and data transfer at light sources, neutron sources, microscopy centers and other facilities. Their charge was to identify current and anticipated issues in the acquisition, analysis, communication and storage of experimental data that could impact the progress of scientific discovery, ascertain what knowledge, methods and tools are needed to mitigate present and projected shortcomings and to create the foundation for information exchanges and collaboration between ASCR and BES supported researchers and facilities. The workshop was organized in the context of the impending data tsunami that will be produced by DOE’s BES facilities. Current facilities, like SLAC National Accelerator Laboratory’s Linac Coherent Light Source, can produce up to 18 terabytes (TB) per day, while upgraded detectors at Lawrence Berkeley National Laboratory’s Advanced Light Source will generate ~10TB per hour. The expectation is that these rates will increase by over an order of magnitude in the coming decade. The urgency to develop new strategies and methods in order to stay ahead of this deluge and extract the most science from these facilities was recognized by all. The four focus areas addressed in this workshop were: Workflow Management - Experiment to Science: Identifying and managing the data path from experiment to publication. Theory and Algorithms: Recognizing the need for new tools for computation at scale, supporting large data sets and realistic theoretical models. Visualization and Analysis: Supporting near-real-time feedback for experiment optimization and new ways to extract and communicate critical information from large data sets. Data Processing and Management: Outlining needs in computational and communication approaches and infrastructure needed to handle unprecedented data volume and information content. It should be noted that almost all participants recognized that there were unlikely to be any turn-key solutions available due to the unique, diverse nature of the BES community, where research at adjacent beamlines at a given light source facility often span everything from biology to materials science to chemistry using scattering, imaging and/or spectroscopy. However, it was also noted that advances supported by other programs in data research, methodologies, and tool development could be implemented on reasonable time scales with modest effort. Adapting available standard file formats, robust workflows, and in-situ analysis tools for user facility needs could pay long-term dividends. Workshop participants assessed current requirements as well as future challenges and made the following recommendations in order to achieve the ultimate goal of enabling transformative science in current and future BES facilities: Theory and analysis components should be integrated seamlessly within experimental workflow. Develop new algorithms for data analysis based on common data formats and toolsets. Move analysis closer to experiment. Move the analysis closer to the experiment to enable real-time (in-situ) streaming capabilities, live visualization of the experiment and an increase of the overall experimental efficiency. Match data management access and capabilities with advancements in detectors and sources. Remove bottlenecks, provide interoperability across different facilities/beamlines and apply forefront mathematical techniques to more efficiently extract science from the experiments. This workshop report examines and reviews the status of several BES facilities and highlights the successes and shortcomings of the current data and communication pathways for scientific discovery. It then ascertains what methods and tools are needed to mitigate present and projected data bottlenecks to science over the next 10 years. The goal of this report is to create the foundation for information exchanges and collaborations among ASCR and BES supported researchers, the BES scientific user facilities, and ASCR computing and networking facilities. To jumpstart these activities, there was a strong desire to see a joint effort between ASCR and BES along the lines of the highly successful Scientific Discovery through Advanced Computing (SciDAC) program in which integrated teams of engineers, scientists and computer scientists were engaged to tackle a complete end-to-end workflow solution at one or more beamlines, to ascertain what challenges will need to be addressed in order to handle future increases in data

97 MATHEMATICS AND COMPUTING↗

Nuclear Magnetic Resonance Project at the Medical University of South Carolina

Department of Energy funds were used to support the development of a Center for Marine Structural Biology at the Marine Resources Center at Ft. Johnson in Charleston, South Carolina. The Ft. Johnson site is home to five institutions in a unique state/federal/academic partnership whose member institutions include the National Ocean Service (NOS), the National Institute of Standards and Technology (NIST), the Medical University of South Carolina (MUSC), the SC Department of Natural Resources, and the College of Charleston. The Center for Marine Structural Biology sits adjacent to the newly completed Hollings Marine Laboratory and houses a 700 and 800 MHz nuclear magnetic resource instruments. The completed center is operational and meets it goal to provide state-of-the-art nuclear magnetic resonance capabilities to resolve the molecular structures of compounds that have direct relevance to human health, including marine-derived biotoxins that are tested against cancer cell lines through collaborative studies with researchers at the Hollings Cancer Center at MUSC. Funds from the DOE assisted, in part, with the purchase of NMR probes and ancillary equipment for the 800 MHz NMR instrument. In addition, developmental funds was used to support the visit of an Scientific Advisory Board and for the NMR Planning Team to visit currently operational high field NMR facilities to guide their choice of instrumentation and design of the building.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗