Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Task Force”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,670 records · Page 93

Robotic End Effectors for Hard-Rock Climbing

Special-purpose robot hands (end effectors) now under development are intended to enable robots to traverse cliffs much as human climbers do. Potential applications for robots having this capability include scientific exploration (both on Earth and other rocky bodies in space), military reconnaissance, and outdoor search and rescue operations. Until now, enabling robots to traverse cliffs has been considered too difficult a task because of the perceived need of prohibitively sophisticated planning algorithms as well as end effectors as dexterous as human hands. The present end effectors are being designed to enable robots to attach themselves to typical rock-face features with less planning and simpler end effectors. This advance is based on the emulation of the equipment used by human climbers rather than the emulation of the human hand. Climbing-aid equipment, specifically cams, aid hooks, and cam hooks, are used by sport climbers when a quick ascent of a cliff is desired (see Figure 1). Currently two different end-effector designs have been created. The first, denoted the simple hook emulator, consists of three "fingers" arranged around a central "palm." Each finger emulates the function of a particular type of climbing hook (aid hook, wide cam hook, and a narrow cam hook). These fingers are connected to the palm via a mechanical linkage actuated with a leadscrew/nut. This mechanism allows the fingers to be extended or retracted. The second design, denoted the advanced hook emulator (see Figure 2), shares these features, but it incorporates an aid hook and a cam hook into each finger. The spring-loading of the aid hook allows the passive selection of the type of hook used. The end effectors can be used in several different modes. In the aid-hook mode, the aid hook on one of the fingers locks onto a horizontal ledge while the other two fingers act to stabilize the end effector against the cliff face. In the cam-hook mode, the broad, flat tip of the cam hook is inserted into a non-horizontal crack in the cliff face. A subsequent transfer of weight onto the end effector causes the tip to rotate within the crack, creating a passive, self-locking action of the hook relative to the crack. In the advanced hook emulator, the aid hook is pushed into its retracted position by contact with the cliff face as the cam hook tip is inserted into the crack. When a cliff face contains relatively large pockets or cracks, another type of passive self-locking can be used. Emulating the function of the piece of climbing equipment called a "cam" (note: not the same as a "cam hook"; see Figure 1), the fingers can be fully retracted and the entire end effector inserted into the feature. The fingers are then extended as far as the feature allows. Any weight then transferred to the end effector will tend to extend the fingers further due to frictional force, passively increasing the grip on the feature. In addition to the climbing modes, these end effectors can be used to walk on (either on the palm or the fingertips) and to grasp objects by fully extending the fingers.

Kennedy, Brett↗

DOE-RCT-0003641 Final Technical Report

This program studied novel concepts for an Axial Flux Reluctance Machine to capture energy from marine hydrokinetic sources and compared their attributes to a Radial Flux Reluctance Machine which was designed under a prior Department of Energy program for the same application. Detailed electromagnetic and mechanical analyses were performed to determine the validity of the concept and to provide a direct comparison with the existing conventional Radial Flux Switched Reluctance Machine designed during the Advanced Wave Energy Conversion Project, DE-EE0003641. The alternate design changed the machine topology so that the flux that is switched flows axially rather than radially and the poles themselves are long radially, as opposed to the radial flux machine that has pole pieces that are long axially. It appeared possible to build an axial flux machine that should be considerably more compact than the radial machine. In an “apples to apples” comparison, the same rules with regard to generating magnetic force and the fundamental limitations of flux density hold, so that at the heart of the machine the same torque equations hold. The differences are in the mechanical configuration that limits or enhances the change of permeance with rotor position, in the amount of permeable iron required to channel the flux via the pole pieces to the air-gaps, and in the sizing and complexity of the electrical winding. Accordingly it was anticipated that the magnetic component weight would be similar but that better use of space would result in a shorter machine with accompanying reduction in housing and support structure. For the comparison the pole count was kept the same at 28 though it was also expected that the radial tapering of the slots between pole pieces would permit a higher pole count machine, enabling the generation of greater power at a given speed in some future design. The baseline Radial Flux Machine design was established during the previous DOE program. Its characteristics were tabulated for use in comparing to the Axial Flux Machine. Three basic conceptual designs for the Axial Flux Machine were considered: (1) a machine with a single coil at the inner diameter of the machine, (2) a machine with a single coil at the outside diameter of the machine, and (3) a machine with a coil around each tooth. Slight variations of these basic configurations were considered during the study. Analysis was performed on these configurations to determine the best candidate design to advance to preliminary design, based on size, weight, performance, cost and manufacturability. The configuration selected as the most promising was the multi-pole machine with a coil around each tooth. This configuration provided the least complexity with respect to the mechanical configuration and manufacturing, which would yield the highest reliability and lowest cost machine of the three options. A preliminary design was performed on this selected configuration. For this first ever axial design of the multi rotor configuration the 'apples to apples' comparison was based on using the same length of rotor pole as the axial length of rotor pole in the radial machine and making the mean radius of the rotor in the axial machine the same as the air gap radius in the radial machine. The tooth to slot ratio at the mean radius of the axial machine was the same as the tooth to slot ratio of the radial machine. The comparison between the original radial flux machine and the new axial flux machine indicates that for the same torque, the axial flux machine diameter will be 27% greater, but it will have 30% of the length, and 76% of the weight. Based on these results, it is concluded that an axial flux reluctance machine presents a viable option for large generators to be used for the capture of wave energy. In the analysis of Task 4, below, it is pointed out that our selection of dimensional similarity for the 'apples to apples' comparison did not produce an optimum axial flux design. There is torque capability to spare, implying we could reduce the magnetic structure, but the winding area, constrained by the pole separation at the inner pole radius has a higher resistance than desirable, implying we need more room for copper. The recommendation is to proceed via one cycle of optimization and review to correct this unbalance and then proceed to a detailed design phase to produce manufacturing drawings, followed by the construction of a prototype to test the performance of the machine against predicted results.

16 TIDAL AND WAVE POWER↗

Impact response of US Army and National Football League helmet pad systems

Lawrence Livermore National Laboratory [LLNL] was tasked to compare the impact response of NFL helmet pad systems and U.S. Army pad systems compatible with an Advanced Combat Helmet [ACH] at impact velocities up to 20 ft/s. This was a one-year study funded by the U.S. Army and JIEDDO. The Army/JIEDDO point of contact is COL R. Todd Dombroski, DO, JIEDDO Surgeon. LLNL was chosen by committee to perform the research based on prior published computational studies of the mechanical response of helmets and skulls to blast. Our collaborators include the U.S. Army Aeromedical Research Laboratory [USAARL] (a DoD laboratory responsible for impact testing helmets), Team Wendy and Oregon Aero (current and former ACH pad manufacturers), Riddell and Xenith (NFL pad manufacturers), and d3o (general purpose sports pad manufacturer). The manufacturer-supplied pad systems that were studied are shown in the figure below. The first two are the Army systems, which are bilayer foam pads with both hard and soft foam and a water-resistant airtight wrapper (Team Wendy) or a water-resistant airtight coating (Oregon Aero). The next two are NFL pad systems. The Xenith system consists of a thin foam pad and a hollow air-filled cylinder that elastically buckles under load. The Riddell system is a bilayer foam pad that is encased in an inflatable airbag with relief channels to neighboring pads in the helmet. The inflatable airbag is for comfort and provides no enhancement to impact mitigation. The d3o system consists of a rate-sensitive homogeneous dense foam. LLNL performed experiments to characterize the material properties of the individual foam materials and the response of the complete pad systems, to obtain parameters needed for the simulations. LLNL also performed X-ray CT scans of an ACH helmet shell that were used to construct a geometrically accurate computational model of the helmet. Two complementary sets of simulations were performed. The first set of simulations reproduced the experimental helmet impact certification tests performed by USAARL, who provided data for comparison. The goal of this set of simulations was to demonstrate the overall validity of LLNL's computational analyses and methods and understand the general physics of helmet impacts. In these tests and the corresponding simulations, an inverted ACH containing pads and a head-form are dropped onto a hemispherical anvil, at 10 and 14.14 ft/s impact velocities. The simulations predicted peak accelerations (the metric used by USAARL for comparing the performance of pad systems), rebound velocities, and impact durations consistent with the experimental data, thus demonstrating the validity and relevance of the simulation methods. Because the NFL pad systems are approximately double the thickness of the U.S. Army pads, they do not fit into the ACH. As a result, the NFL pads could not be simply placed into an ACH shell in either a simulation or an experiment without modifying their size and shape. Since impact mitigation depends critically on the available stopping distance and the area over which the stopping force is applied, it is important to consider identically shaped pads in order to compare their performance in a fair and meaningful manner. Consequently, the second set of simulations utilized a simplified simulation geometry consisting of a 5 kg cylindrical impactor (equal in mass to a head) striking equally sized pads from each manufacturer. The simulated bilayer foam pads had the same proportions of hard and soft foam as the actual pad systems, while the Xenith pads were simulated as a bilayer foam pad with material properties adjusted to give the same response as the actual Xenith pads. The effects of trapped air were included in the simulations of the Team Wendy and Oregon Aero pads. All simulations used material properties derived from the experiments conducted at LLNL. The acceleration history of the center of mass of the impactor was used to calculate the Head Injury Criterion (HIC) for each simulation, to assess the pad performance. The HIC is a well-established metric that combines both acceleration and duration of impact to assess the danger of injury, and is a more robust measure than peak acceleration. Our key findings are: (1) The performance of a pad depends on the range of impact velocities. At lower impact velocity, softer pads perform better. At higher impact velocity, harder pads perform better; (2) Thicker pads perform better at all velocities, but especially at high velocities; and (3) For comparable thicknesses, neither the NFL systems nor the Oregon Aero pads outperform the Team Wendy pads currently used in the ACH system in militarily-relevant impact scenarios (impact speeds less than 20 ft/s). The second finding suggests a commercial off-the-shelf solution for mitigating impact-related traumatic brain injury to soldiers.

42 ENGINEERING↗

Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind Energy

The Coastal Ohio Wind Project was created to establish the viability of wind turbines on the coastal and offshore regions of Northern Ohio. The project’s main goal was to improve operational unit strategies used for environmental impact assessment of offshore turbines on lake wildlife by optimizing and fusing data from the multi-instrument surveillance system and providing an engineering analysis of potential design/operational alternatives for offshore wind turbines. The project also developed a general economic model for offshore WTG deployment to quantify potential revenue losses due to wind turbine shutdown related to ice and avian issues. In a previous phase of this project (Award Number: DE-FG36-06GO86096), we developed a surveillance system that was used to collect different parameters such as passage rates, flight paths, flight directions, and flight altitudes of nocturnal migrating species, movements of birds and bats, and bird calls for assessing patterns and peak passage rates during migration. To derive such parameters we used thermal IR imaging cameras, acoustic recorders, and marine radar Furuno (XANK250), which was coupled with a XIR3000B digitizing card from Russell Technologies and open source radR processing software. The integration yielded a development of different computational techniques and methods, which we further developed and optimized as a combined surveillance system. To accomplish this task we implemented marine radar calibration, optimization of processing parameters, and fusion of the multi-sensor data in order to make inferences about the potential avian targets. The main goal of the data fusion from the multi-sensor environment was aimed at reduction of uncertainties while providing acceptable confidence levels with detailed information about the migration patterns. Another component comprised of an assessment of wind resources in a near lake environment and an investigation of the effectiveness of ice coating materials to mitigate adverse effects of ice formation on wind turbine structures. Firstly, a Zephir LiDAR system was acquired and installed at Woodlands School in Huron, Ohio, which is located near Lake Erie. Wind resource data were obtained at ten measurement heights, 200m, 150m, 100m, 80m, 60m, 40m, 38m, 30m, 20m, and 10m. The Woodlands School’s wind turbine anemometer also measured the wind speed at the hub height. These data were collected for approximately one year. The hub anemometer data correlated well with the LiDAR wind speed measurements at the same height. The data also showed that on several days different power levels were recorded by the turbine at the same wind speed as indicated by the hub anemometer. The corresponding LiDAR data showed that this difference can be attributed to variability in the wind over the turbine rotor swept area, which the hub anemometer could not detect. The observation suggests that single point hub wind velocity measurements are inadequate to accurately estimate the power generated by a turbine at all times since the hub wind speed is not a good indicator of the wind speed over the turbine rotor swept area when winds are changing rapidly. To assess the effectiveness of ice coatings to mitigate the impact of ice on turbine structures, a closed-loop icing research tunnel (IRT) was designed and constructed. By controlling the temperature, air speed, water content and liquid droplet size, the tunnel enabled consistent and repeatable ice accretion under a variety of conditions with temperatures between approximately 0°C and -20°C and wind speeds up to 40 miles per hour in the tunnel’s test section. The tunnel’s cooling unit maintained the tunnel temperature within ±0.2°C. The coatings evaluated in the study were Boyd Coatings Research Company’s CRC6040R3, MicroPhase Coatings Inc.’s PhaseBreak TP, ESL and Flex coatings. Similar overall performance was observed in all coatings tested in that water droplets form on the test articles beginning at the stagnation region and spreading in the downstream direction in time. When comparing ice accumulation characteristics for the four coatings tested, for ice thickness during accumulation the CRC6040R3 had the least, followed by the ESL, Flex, and TP. However, when comparing the coatings’ ability to reduce ice adhesion, the Flex showed the highest adhesion reduction, followed by the ESL, TP and CRC 6040R3 coatings. The ice accumulated on the Flex coated surface shed under gravity when rotated 90 degrees following the tests while the other coatings required application of varying degrees of force to remove the ice. In conclusion, the ice coatings tested were not sufficient in preventing ice accumulation on all surfaces. However, Flex coating shows promise in mitigating ice on the rotor blades under the gravitational and centrifugal forces. Only the effect of gravity in shedding the ice was considered in this study. Further research will be needed to evaluate this coating on rotating blades in the icing tunnel to characterize its effectiveness. Lastly, the development of economic feasibility models used existing approaches adapted for offshore deployment in marine settings to one more suitable for Lake Erie deployment. Two different wind turbine models were tested and dynamic return on investment (ROI) model scenarios were generated. For the purpose of estimating power generation three bladed wind turbines of 3 MW capacity were selected including Model1- Leitwind LTW101-3.000-kW and Model2-Vostro V90-3.0 MW. The analysis were based on the revenue aspect of decision making of deploying wind turbines in the Ohio coastal region. The installation cost, maintenance and operational aspects were disregarded due to unavailability of data. The adjusted varying price (residential and industrial sector) and projected future price of electricity in different years suggested that the Leitwind model could generate $\$ $32.4 million of revenue in 25 years if the supply electricity is in the residential sector, while it would be $\$ $14.7million if the supply is in the industrial sector. For the Vostro model these figures are $\$ $28.6 million for residential sector and $\$ $12.9 million for industrial sector for 25 years.

17 WIND ENERGY↗

Modeling and Analysis of Coupled Flow Through Packed Beds as a Diagnostic Tool for Packed Bed Reactor Health - 17172

The US Department of Energy, Office of River Protection, is building the Waste Treatment and Immobilization Plant (WTP) in Richland, Washington, to immobilize the hundreds of millions of liters of radioactive waste stored at the Hanford Site in Washington state. The offgas generated during vitrification of these wastes requires treatment to remove and/or destroy chemical and radioactive hazardous components before release to the atmosphere. In particular, volatile and semi-volatile hydrocarbon components are to be catalytically oxidized to carbon dioxide and water, whereas nitrogen oxides (NOx) are to be catalytically reduced to nitrogen and water. These tasks are accomplished in a series of packed bed reactors. Achieving the requisite Destruction/Removal Efficiency (DRE) for each of the tracked components is highly dependent on the flow characteristics of the offgas through the packed beds. The flow kinetics may be monitored and characterized during the initial warm-up of the system. The gases, initially at 76 deg. C (169 deg. F), (a) flow through one side of a countercurrent heat exchanger to recover heat from the exiting gases (which have already passed through the catalytic beds), (b) are then further heated electrically to approximately 400 deg. C (750 deg. F; the preferred operating temperature of the Thermo Catalytic Oxidizer (TCO)), (c) pass through the TCO where the reduced components of the offgas are oxidized over a supported Pt catalyst bed, (d) are partially cooled to approximately 315 deg. C (600 deg. F) by addition of approximately 25% (by weight) diluted ammonia/air mixture, (e) pass through the Selective Catalytic Reducer (SCR) where the NOx components are converted to N{sub 2} and H{sub 2}O over a supported V2O{sub 5}/TiO{sub 2} catalyst bed, and (f) exit through the hot side of the countercurrent heat exchanger. The electrical heater is not powerful enough to raise the temperature of the offgas to the desired 400 deg. C without the contribution of the heat recovered in the heat exchanger. Moreover, the thermal mass of the beds and housings of the TCO and SCR require a significant input of thermal energy to reach the desired operating temperatures; the better part of a day is required to bring the unit from ambient temperatures to operating temperatures. Therefore, the temperature of the stream during the initial warm-up of the system at each point in the system is dependent upon the thermal mass, flow dispersion, and permeability of the components, quantified as characteristic/representative volumes and residence times. By monitoring the temperature of the offgas as it enters and exits each portion of the system during this warm-up period one may model the system as a series of small Continuously Stirred Tank Reactors (CSTR)s (referred to as 'CSTRlets') to explain the flow kinetics through the catalyst beds. These component CSTRlets are adjustable in size and number, that one may model the flow profile of the gases through the catalyst beds. For example, a single large CSTR will present an effluent temperature profile with a simple exponential decay shape. Concatenating more CSTRlets generate more complex sigmoidal responses. Concatenating one CSTRlet significantly larger than the others in the train also alters the shape of the effluent temperature profile, in a fashion not replicable by a train of equal-sized CSTRlets. The ultimate goal is to accurately emulate the entire system as a representative CSTRlet train. Once accomplished, this characterization may be used in subsequent warm-ups (following shutdown for catalyst maintenance, for example) or by an intentional step change in inlet offgas temperature to detect/diagnose anomalies in flow through the beds (e.g., channeling or partial blockage.) This work presents development of this model through analytical, calculational, and empirical means. - The analytic model is accomplished by Laplace transform analysis of each component to recover component process transfer functions. - The calculational portion is performed via brute force finite element calculation. - Fitting empirical data from the warm-up of the TCO skid allows one to select the hypothetical CSTRlet trains which best fit the TCO and SCR beds for the analytical and finite element calculations. The first portion of this paper presents the development of the analytical (Laplace space) model of the coupled system. Estimated values for the initial temperature, mass, specific heat, electrical heat, and relative quantities of the offgas, catalyst beds, stainless steel housings, and ammonia dilution stream are used to generate expected temperature profiles at several selected junctures of the system. The number and size of the component hypothetical CSTRlets are calculated from the analytical model and are used to predict temperature profiles at the exit of the system and at intermediate junctions between system components (where thermocouples are present in the actual unit.) The finite element calculations employ a series of CSTRlet volumes to produce a similar suite of temperature profiles, for comparison with the analytical model results. Finally, empirical data from the Factory Acceptance Test system warm-up are used to select and compare the results from each modeling strategy to select the CSTRlet train(s) which best model the behavior of the actual system. This work presents a novel method of system component characterization, of value to the WTP plant and similar vitrification facilities as well as chemical process industries unrelated to waste management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Configuration and Projected Capabilities of the Common Habitat Medical Care Facility

The Common Habitat is a large, long-duration habitat being explored as part of a conceptual study (not an active NASA program) that uses an SLS core stage Liquid Oxygen (LOX) tank as its primary structure. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. Additional work outside the scope of this paper is developing a vertical translation system, a crew mobility aids system based on wearable gecko-derived grippers, and a crew seating/restraint system. These systems are all assumed for use in conjunction with the Medical Care Facility, which is needed to maintain crew well-being during these missions, where distance from Earth precludes the possibility of evacuation to Earth. This paper describes recent improvements in the Common Habitat Medical Care Facility and associated benefits for crew survivability in long duration missions beyond Earth orbit. These improvements were made with the assistance of a NASA Pathways intern whose experience includes a tour of duty in Afghanistan as an Army combat medic with the 691st GHOST-T, attached to the 1st and 7th US Special Forces Groups as part of Operation Freedom’s Sentinel, where he helped provide far-forward surgical capabilities in austere combat environments. The initial baseline Medical Care Facility was developed working in conjunction with University of Houston Space Architecture graduate students. The facility was placed on the upper deck of the Common Habitat in a location that provided privacy, operational volume, and was close to the vertical translation pathway. The notional outfitting repurposed component CAD models from unrelated studies and notionally indicated a level of care roughly equivalent to that aboard the International Space Station. The CAD modeling provided notional stowage volumes, a deployable surface, some fixed equipment, an ultrasound, and a potentially reconfigurable treatment table. While this facility is clearly a competent arrangement, it was desired to leverage available expertise and upgrade the station given the vast distances from Earth to be experienced by the Common Habitat. Key driving requirements applied to the upgrade included to provide Medical Level of Care V, offer enhanced telemedicine capabilities, provide patient physical accommodation, provide caregiver access to the patient from all sides, include sliding pocket doors for access to hygiene and to the Vertical Translation System, and to add any additional capability possible for the best achievable medical care. The first step in the facility upgrade was to quantify the current medical inventory on the International Space Station and ensure that sufficient stowage volume was present for this purpose. To that end, the ISS medical kits were reviewed, and eight full size mid deck lockers were placed in the facility. A number of additional devices were also added, based on the intern’s combat medic experience. Also, two fixed shelves and one horizontal work surface were added to the Medical Care Facility, with the shelves providing storage space for the additional devices and the work surface providing a location for the caregiver to work or stage equipment. Four display monitors were added to the wall above the horizontal work surface, supporting data display, telemedicine, conferencing, or other needs. The existing treatment table was replaced with a mobile surgical stretcher-chair. Two additional doors were added to the Medical Care Facility. One leads directly to the hygiene compartment, allowing it to support medical operations in addition to providing galley/wardroom support. The other door leads directly into the Vertical Translation System. The wall adjacent to the subsystems bay was moved, adding additional volume to the Medical Care Facility. This improved caregiver access to the patient and allowed for a larger number of caregivers to be present. It also provided options for relocation of support equipment relative to the patient as needed. In the upgraded Medical Care Facility, the Surgical Stretcher-Chair and the Vertical Translation System can work together to provide incapacitated crew member transport from a site of injury on any deck of the Common Habitat to the Medical Care Facility. It can also support patient treatment in a variety of positions including a variety of sitting postures and a supine posture at a variety of pitch angles. The facility can also support caregiver office work for review of examination results, private consultation, inventory and maintenance, and a variety of other purposes. A forward activity will be to conduct evaluations of the Medical Care Facility with different medical scenarios. Additionally, ambient and task lighting selections remain as forward work. The eight mid deck lockers can be augmented to use as portable equipment carts, similar to a manner in which maintenance facility stowage was used as portable carts during the NASA Desert Research and Technology Studies in the Constellation Program. Trash accommodation will also need forward work to assess, including provision for wet trash, dry trash, and biological waste. It will be important to assess a redesign of the surgical stretcher-chair. The commercial version used in the upgrade can only enable vertical translation in the seated configuration, requiring the patient to bend both hips and knees. A possible redesign of the chair will allow for vertical translation without requiring any bending at the hip or knees. Also, the commercial version is wheeled, making it mobile in gravity but unanchored in microgravity. Work will be needed to adapt the chair for gravity-independent performance. The hygiene compartment can be redesigned for dual-use medical scrub and galley handwash facility. Pending sufficient volume, it may also be possible to place sanitation equipment in this location to clean medical tools. Finally, most space architectures have never allowed for more than one incapacitated crew member, but several scenarios could potentially injure two or more crew in the same incident. This facility could be assessed to determine its present ability to address two or more injured crew in parallel and determine the potential upper limit for number of treatable crew in a multi-crew injury scenario, or to treat polytrauma of a single patient.

Habitat↗

Configuration and Projected Capabilities of the Common Habitat Medical Care Facility

The Common Habitat is a large, long-duration habitat being explored as part of a conceptual study (not an active NASA program) that uses an SLS core stage Liquid Oxygen (LOX) tank as its primary structure. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. Additional work outside the scope of this paper is developing a vertical translation system, a crew mobility aids system based on wearable gecko-derived grippers, and a crew seating/restraint system. These systems are all assumed for use in conjunction with the Medical Care Facility, which is needed to maintain crew well-being during these missions, where distance from Earth precludes the possibility of evacuation to Earth. This paper describes recent improvements in the Common Habitat Medical Care Facility and associated benefits for crew survivability in long duration missions beyond Earth orbit. These improvements were made with the assistance of a NASA Pathways intern whose experience includes a tour of duty in Afghanistan as an Army combat medic with the 691st GHOST-T, attached to the 1st and 7th US Special Forces Groups as part of Operation Freedom’s Sentinel, where he helped provide far-forward surgical capabilities in austere combat environments. The initial baseline Medical Care Facility was developed working in conjunction with University of Houston Space Architecture graduate students. The facility was placed on the upper deck of the Common Habitat in a location that provided privacy, operational volume, and was close to the vertical translation pathway. The notional outfitting repurposed component CAD models from unrelated studies and notionally indicated a level of care roughly equivalent to that aboard the International Space Station. The CAD modeling provided notional stowage volumes, a deployable surface, some fixed equipment, an ultrasound, and a potentially reconfigurable treatment table. While this facility is clearly a competent arrangement, it was desired to leverage available expertise and upgrade the station given the vast distances from Earth to be experienced by the Common Habitat. Key driving requirements applied to the upgrade included to provide NASA’s Medical Level of Care V, offer enhanced telemedicine capabilities, provide patient physical accommodation, provide caregiver access to the patient from all sides, include sliding pocket doors for access to hygiene and to the Vertical Translation System, and to add any additional capability possible for the best achievable medical care. The first step in the facility upgrade was to quantify the current medical inventory on the International Space Station and ensure that sufficient stowage volume was present for this purpose. To that end, the ISS medical kits were reviewed, and eight full size mid deck lockers were placed in the facility. A number of additional devices were also added, based on the co-author’s combat medic experience. Also, two fixed shelves and one horizontal work surface were added to the Medical Care Facility, with the shelves providing storage space for the additional devices and the work surface providing a location for the caregiver to work or stage equipment. Four display monitors were added to the wall above the horizontal work surface, supporting data display, telemedicine, conferencing, or other needs. The existing treatment table was replaced with a mobile surgical stretcher-chair. Two additional doors were added to the Medical Care Facility. One leads directly to the hygiene compartment, allowing it to support medical operations in addition to providing galley/wardroom support. The other door leads directly into the Vertical Translation System. The wall adjacent to the subsystems bay was moved, adding additional volume to the Medical Care Facility. This improved caregiver access to the patient and allowed for a larger number of caregivers to be present. It also provided options for relocation of support equipment relative to the patient as needed. In the upgraded Medical Care Facility, the Surgical Stretcher-Chair and the Vertical Translation System can work together to provide incapacitated crew member transport from a site of injury on any deck of the Common Habitat to the Medical Care Facility. It can also support patient treatment in a variety of positions including a variety of sitting postures and a supine posture at a variety of pitch angles. The facility can also support caregiver office work for review of examination results, private consultation, inventory and maintenance, and a variety of other purposes. A forward activity will be to conduct evaluations of the Medical Care Facility with different medical scenarios. Additionally, ambient and task lighting selections remain as forward work. The eight middeck lockers can be augmented to use as portable equipment carts, similar to a manner in which maintenance facility stowage was used as portable carts during the NASA Desert Research and Technology Studies in the Constellation Program. Trash accommodation will also need forward work to assess, including provision for wet trash, dry trash, and biological waste. It will be important to assess a redesign of the surgical stretcher-chair. The commercial version used in the upgrade can only enable vertical translation in the seated configuration, requiring the patient to bend both hips and knees. A possible redesign of the chair will allow for vertical translation without requiring any bending at the hip or knees. Also, the commercial version is wheeled, making it mobile in gravity but unanchored in microgravity. Work will be needed to adapt the chair for gravity-independent performance. The hygiene compartment can be redesigned to serve both as a medical scrub facility and for galley hand washing. Pending sufficient volume, it may also be possible to place sanitation equipment in this location to clean medical tools. Finally, most space architectures have never allowed for more than one incapacitated crew member, but several scenarios could potentially injure two or more crew in the same incident. This facility could be assessed to determine its present ability to address two or more injured crew in parallel and determine the potential upper limit for number of treatable crew in a multi-crew injury scenario, or to treat polytrauma of a single patient.

Common Habitat↗

California CO 2 Storage Assurance Facility Enterprise (C2SAFE): Final Technical Report

The California CO 2 Storage Assurance Facility Enterprise (C2SAFE) project conducted a preliminary study into the feasibility of a commercial-scale carbon dioxide (CO 2 ) storage complex located in California’s Southern San Joaquin Valley (SSJV). The work represents the first phase of a multi-phased development approach outlined by the United States Department of Energy’s (DOE’s) Carbon Storage Assurance and Facility Enterprise (CarbonSAFE) program meant to develop carbon storage sites capable of permanently storing 50 million metric tonnes of CO 2 , or greater, injected over a typical facility life of 20 to 30 years. This report represents the culmination of work performed under C2SAFE and outlines a phased implementation plan for large-scale, industrial carbon capture and permanent storage in California’s SSJV. The report is meant to be a standalone document and as such provides high-level summaries of all tasks of the project, but is also meant to complement the other three topical reports issued by the project – reports referenced herein. The study considered multiple scenarios including an east-side storage facility, a west-side storage facility, and potential multi-site storage facilities. The east-side storage facility is to be located at Clean Energy Systems, Inc.’s Kimberlina Power Plant, or nearby, and the west-side facility will be located at the California Resources Corporation’s (CRC’s) Elk Hills oil field. The majority of carbon emissions are planned to be captured from existing sources and transported to the selected and verified storage site(s). Capture from the single closest source to the eastern storage facility and the sources within the Elk Hills field would meet the CarbonSAFE storage goal of 50 million tonnes. The study has shown there is sufficient storage capacity to meet this requirement and more; thus, capture from any of the numerous additional large nearby sources would substantially leverage the CarbonSAFE investment. A comparison of preliminary CO 2 capture, transportation, and storage costs to economic value and incentives in the state shows current market conditions make it economically feasible to develop large-scale industrial storage sites in California’s SSJV. The business case for Carbon Capture and Storage (CCS) in California’s SSJV appears economically viable today for large CO 2 point sources involved in the production of transportation fuels, such as oilfield cogeneration units and steam boilers. The overall levelized CCS cost is estimated at roughly 125 per tonne of CO 2 , which includes CO 2 amine-solvent post-combustion capture, transportation, and storage. The levelized CO 2 capture cost is based on today’s technology, with no future cost reduction factored in for technology improvement. The sum of the value of incentives and revenue from California Low Carbon Fuel Standard (LCFS) credits (discounted roughly 20% from their current transaction value), sale of California cap-and-trade emission allowances, and Section 45Q tax credits—either for saline storage or the Enhanced Oil Recovery (EOR) credit plus CO 2 sales revenue—is about 165/tonne-CO 2 . The economic viability of CCS for Natural Gas Combined Cycle (NGCC) power plants in the SSJV is more site-specific. A plant providing power solely to the electric grid, if it added CCS, should be eligible for Section 45Q tax credits and could sell its excess cap-and-trade emission allowances, but it would not generate LCFS credits. Using the cost and incentive values detailed in this report, it would not be economical for such a plant to add CCS today, barring other considerations. An NGCC plant within an oilfield (e.g., CRC Elk Hills and NRG Sunrise) that provides power to the oilfield as well as to the grid should receive “partial credit” in terms of generating LCFS credits if it added CCS (pro-rated for the fraction of power going to the oilfield). Such a plant should also be eligible for Section 45Q tax credits and garner revenue from selling its excess cap-and-trade emission allowances. Using the cost and incentive values described in this report, the economic viability of adding CCS today would depend on the relative fractions of electricity supplied to the oilfield and the grid. As the value of cap-and-trade emission allowances grows over time (either by market forces or the escalating floor price), the relative fraction of power needing to remain in the oilfield to achieve “breakeven” would diminish. At some point, even plants providing all their power to the grid would be candidates for economical CCS application. The C2SAFE team has proposed to expand upon the knowledge gained during this study by conducting a detailed feasibility assessment under a follow-on phase of the program, Phase II – Feasibility. This would include detailed data collection at the two sites, analysis, reporting, stakeholder outreach, and risk mitigation activities to support the development of a commercial carbon storage complex in the SSJV.

58 GEOSCIENCES↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Thorium Fuel Options for Sustained Transuranic Burning in Pressurized Water Reactors - 12381

As described in companion papers, Westinghouse is proposing the adoption of a thorium-based fuel cycle to burn the transuranics (TRU) contained in the current Used Nuclear Fuel (UNF) and transition towards a less radio-toxic high level waste. A combination of both light water reactors (LWR) and fast reactors (FR) is envisaged for the task, with the emphasis initially posed on their TRU burning capability and eventually to their self-sufficiency. Given the many technical challenges and development times related to the deployment of TRU burners fast reactors, an interim solution making best use of the current resources to initiate burning the legacy TRU inventory while developing and testing some technologies of later use is desirable. In this perspective, a portion of the LWR fleet can be used to start burning the legacy TRUs using Th-based fuels compatible with the current plants and operational features. This analysis focuses on a typical 4-loop PWR, with 17x17 fuel assembly design and TRUs (or Pu) admixed with Th (similar to U-MOX fuel, but with Th instead of U). Global calculations of the core were represented with unit assembly simulations using the Linear Reactivity Model (LRM). Several assembly configurations have been developed to offer two options that can be attractive during the TRU transmutation campaign: maximization of the TRU transmutation rate and capability for TRU multi-recycling, to extend the option of TRU recycling in LWR until the FR is available. Homogeneous as well as heterogeneous assembly configurations have been developed with various recycling schemes (Pu recycle, TRU recycle, TRU and in-bred U recycle etc.). Oxide as well as nitride fuels have been examined. This enabled an assessment of the potential for burning and multi-recycling TRU in a Th-based fuel PWR to compare against other more typical alternatives (U-MOX and variations thereof). Results will be shown indicating that Th-based PWR fuel is a promising option to multi-recycle and burn TRU in a thermal spectrum, while satisfying top-level operational and safety constraints. Various assembly designs have been proposed to assess the TRU burning potential of Th-based fuel in PWRs. In addition to typical homogeneous loading patterns, heterogeneous configurations exploiting the breeding potential of thorium to enable multiple cycles of TRU irradiation and burning have been devised. The homogeneous assembly design, with all pins featuring TRU in Th, has the benefit of a simple loading pattern and the highest rate of TRU transmutation, but it can be used only for a few cycles due to the rapid rise in the TRU content of the recycled fuel, which challenges reactivity control, safety coefficients and fuel handling. Due to its simple loading pattern, such assembly design can be used as the first step of Th implementation, achieving up to 3 times larger TRU transmutation rate than conventional U-MOX, assuming same fraction of MOX assemblies in the core. As the next step in thorium implementation, heterogeneous assemblies featuring a mixed array of Th-U and Th-U-TRU pins, where the U is in-bred from Th, have been proposed. These designs have the potential to enable burning an external supply of TRU through multiple cycles of irradiation, recovery (via reprocessing) and recycling of the residual actinides at the end of each irradiation cycle. This is achieved thanks to a larger breeding of U from Th in the heterogeneous assemblies, which reduces the TRU supply and thus mitigates the increase in the TRU core inventory for the multi-recycled fuel. While on an individual cycle basis the amount of TRU burned in the heterogeneous assembly is reduced with respect to the homogeneous design, TRU burning rates higher than single-pass U-MOX fuel can still be achieved, with the additional benefits of a multi-cycle transmutation campaign recycling all TRU isotopes. Nitride fuel, due its higher density and U breeding potential, together with its better thermal properties, ideally suits the objectives and constraints of the heterogeneous assemblies. However, significant technological advancements must be made before nitride fuels can be employed in an LWR: its water resistance needs to be improved and a viable technology to enrich N in N-15 must be devised. Moreover, for the nitride heterogeneous configurations examined in this study, the enhancement in TRU burning performance is achieved not only by replacing oxide with nitride fuel, but also by increasing the fuel rod size. This latter modification, allowed by the high thermal conductivity of nitride fuel, leads however to a very tight lattice, which may challenge reactor coolant pumps and assembly hold-down mechanisms, the former through an increase in core pressure drop and the latter through an increase in assembly lift-off forces. To alleviate these issues, while still achieving the large fuel-to-moderator ratios resulting from using tight lattices, wire wraps could be used in place of grid spacers. For tight lattices, typical grid spacers are hard to manufacture and their replacement with wire wraps is known to allow for a pressure drop reduction by at least 2 times. The studies, while certainly very preliminary, provide a starting point to devise an optimum strategy for TRU transmutation in Th-based PWR fuel. The viability of the scheme proposed depends on the timely phasing in of the associated technologies, with proper lead time and to solve the many challenges. These challenges are certainly substantial, and make the current once-through U-based scheme pursued in the US by far a more practical (and cheaper) option. However, when compared to other transmutation schemes, the proposed one has arguably similar challenges and unknowns with potentially bigger rewards. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High Performance EVA Glove Collaboration: Glove Injury Data Mining Effort

Human hands play a significant role during Extravehicular Activity (EVA) missions and Neutral Buoyancy Lab (NBL) training events, as they are needed for translating and performing tasks in the weightless environment. Because of this high frequency usage, hand and arm related injuries are known to occur during EVA and EVA training in the NBL. The primary objectives of this investigation were to: 1) document all known EVA glove related injuries and circumstances of these incidents, 2) determine likely risk factors, and 3) recommend interventions where possible that could be implemented in the current and future glove designs. METHODS: The investigation focused on the discomforts and injuries of U.S. crewmembers who had worn the pressurized Extravehicular Mobility Unit (EMU) spacesuit and experienced 4000 Series or Phase VI glove related incidents during 1981 to 2010 for either EVA ground training or in-orbit flight. We conducted an observational retrospective case-control investigation using 1) a literature review of known injuries, 2) data mining of crew injury, glove sizing, and hand anthropometry databases, 3) descriptive statistical analyses, and finally 4) statistical risk correlation and predictor analyses to better understand injury prevalence and potential causation. Specific predictor statistical analyses included use of principal component analyses (PCA), multiple logistic regression, and survival analyses (Cox proportional hazards regression). Results of these analyses were computed risk variables in the forms of odds ratios (likelihood of an injury occurring given the magnitude of a risk variable) and hazard ratios (likelihood of time to injury occurrence). Due to the exploratory nature of this investigation, we selected predictor variables significant at p≤0.15. RESULTS: Through 2010, there have been a total of 330 NASA crewmembers, from which 96 crewmembers performed 322 EVAs during 1981-2010, resulting in 50 crewmembers being injured inflight and 44 injured during 11,704 ground EVA training events. Of the 196 glove related injury incidents, 106 related to EVA and 90 to EVA training. Over these 196 incidents, 277 total injuries (126 flight; 151 training) were reported and were then grouped into 23 types of injuries. Of EVA flight injuries, 65% were commonly reported to the hand (in general), metacarpophalangeal (MCP) joint, and finger (not including thumb) with fatigue, abrasion, and paresthesia being the most common injury types (44% of total flight injuries). Training injuries totaled to more than 70% being distributed to the fingernail, MCP joint, and finger crotch with 88% of the specific injuries listed as pain, erythema, and onycholysis. Of these training injuries, when reporting pain or erythema, the most common location was the index finger, but when reporting onycholysis, it was the middle finger. Predictor variables specific to increased risk of onycholysis included: female sex (OR=2.622), older age (OR=1.065), increased duration in hours of the flight or training event (OR=1.570), middle finger length differences in inches between the finger and the EVA glove (OR=7.709), and use of the Phase VI glove (OR=8.535). Differentiation between training and flight and injury reporting during 2002-2004 were significant control variables. For likelihood of time to first onycholysis injury, there was a 24% reduction in rate of reporting for each year increase in age. Also, more experienced crewmembers, based on number of EVA flight or training events completed, were less likely to report an onycholysis injury (3% less for every event). Longer duration events also found reporting rates to occur 2.37 times faster for every hour of length. Crewmembers with larger hand size reported onycholysis 23% faster than those with smaller hand size. Finally, for every 1/10th of an inch increase in difference between the middle finger length and the glove, the rate of reporting increased by 60%. DISCUSSION: One key finding was that the Series 4000 glove had a lower injury risk than the Phase VI, which provides a platform for further evaluation. General interventions that reduce hand overexertion and repetitive use exposure through tool development, procedural changes and shorter exposures may be one mitigation path, but due to the way the training event times were reported, we cannot provide a guideline for a specific event duration change. When the finger length was different from the glove length, the risk of injury increased indicating that the use of larger finger take-ups could be contributing to injury and therefore may not be recommended. Prior to this investigation, there was one previous investigation indicating hand anthropometry may be related to onycholysis. We found different hand anthropometry variables indicated by this investigation as compared to the prior, specifically differences in middle finger length compared to glove finger length, which point more towards a sizing issue than a specific anthropometry issue. Additionally, although this investigation has identified sizing as an issue, the force and environmental-related variables of the EVA glove that could also cause injury were not accounted for.

Reid, C. R.↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Climate data, analysis and models for the study of natural variability and anthropogenic change

Gridded Temperature Under prior/current support, we completed and published (Jones et al., 2012) the fourth major update to our global land dataset of near-surface air temperatures, CRUTEM4. This is one of the most widely used records of the climate system, having been updated, maintained and further developed with DoE support since the 1980s. We have continued to update the CRUTEM4 (Jones et al., 2012) database that is combined with marine data to produce HadCRUT4 (Morice et al., 2012). The emphasis in our use of station temperature data is to access as many land series that have been homogenized by National Meteorological Services (NMSs, including NCDC/NOAA, Asheville, NC). Unlike the three US groups monitoring surface temperatures in a similar way, we do not infill areas that have no or missing data. We can only infill such regions in CRUTEM4 by accessing more station temperature series. During early 2014, we have begun the extensive task of updating as many of these series as possible using data provided by some NMSs and also through a number of research projects and programs around the world. All the station data used in CRUTEM4 have been available since 2009, but in Osborn and Jones (2014) we have made this more usable using a Google Earth interface (http://www.cru.uea.ac.uk/cru/data/crutem/ge/ ). We have recently completed the update of our infilled land multi-variable dataset (CRU TS 3.10, Harris et al., 2014). This additionally produces complete land fields (except for the Antarctic) for temperature, precipitation, diurnal temperature range, vapour pressure and sunshine/cloud. Using this dataset we have calculated sc-PDSI (self-calibrating Palmer Drought Severity Index) data and compared with other PDSI datasets (Trenberth et al., 2014). Also using CRU TS 3.10 and Reanalysis datasets, we showed no overall increase in global temperature variability despite changing regional patterns (Huntingford et al., 2013). Harris et al. (2014) is an update of an earlier dataset (Mitchell and Jones, 2005) which also had earlier DoE support. The earlier dataset has been cited over 1700 times according to ResearcherID on 31/July/2014 and the recent paper has already been cited 22 times. Analyses of Temperature Data Using the ERA-Interim estimate of the absolute surface air temperature of the Earth (instead of in the more normal form of anomalies) we compared the result against estimates we produced in 1999 with earlier DoE support. The two estimates are surprisingly close (differing by a couple of tenths of a degree Celsius), with the average temperature of the world (for 1981-2010) being very close to 14°C (Jones and Harpham, 2013). We have assessed ERA-Interim against station temperatures from manned and automatic weather station measurements across the Antarctic (Jones and Lister, 2014). Agreement is generally excellent across the Antarctic Peninsula and the sparsely sampled western parts of Antarctica. Differences tend to occur over eastern Antarctica where ERA-Interim is biased warm (up to 6°C) in the interior of the continent and biased cool (up to 6°C) for some of the coastal locations. Opportunities presented themselves during 2012 for collaborative work with a couple of Chinese groups. Three papers develop new temperature series for China as a whole and also for the eastern third of China (Wang et al., 2014, Cao et al., 2013 and Zhao et al., 2014). A dataset of ~400 daily Chinese temperature stations has been added to the CRU datasets. The latter paper finds that urban effects are generally about 10% of the long-term warming trend across eastern China. A fourth paper (Wang et al., 2013) illustrates issues with comparisons between reanalyses and surface temperatures across China, a method that has been widely used by some to suggest urban heating effects are much larger in the region. ERA-Interim can be used but NCEP/NCAR comparisons are very dependent on the period analysed. Earlier a new temperature dataset of homogenized records was developed for China (Li et al., 2009). Urbanization has also been addressed for London (Jones and Lister, 2009) where two rural sites have not warmed more than a city centre site since 1900. Additionally, in Ethymiadis and Jones (2010) we show that land air temperatures agree with marine data around coastal areas, further illustrating that urbanization is not a major component of large-scale surface air temperature change. Early instrumental data (before the development of modern thermometer screens) have always been suspected of being biased warm in summer, due to possible direct exposure to the sun. Two studies (Böhm et al., 2010 and Brunet et al., 2010) show this for the Greater Alpine Region (GAR) and for mainland Spain respectively. The issue is important before about 1870 in the GAR and before about 1900 in Spain. After correction for the problems, summer temperature estimates before these dates are cooler by about 0.4°C. In Jones and Wigley (2010), we discussed the importance of the biases in global temperature estimation. Exposure and to a lesser extent urbanization are the most important biases for the land areas, but both are dwarfed by the necessary adjustments for bucket SST measurements before about 1950. Individual station homogeneity is only important at the local scale. This was additionally illustrated by Hawkins and Jones (2013) where we replicated the temperature record developed by Guy Stewart Callendar in papers in 1938 and 1961. Analyses of Daily Climate Data Work here indicates that ERA-Interim (at least in Europe, Cornes and Jones, 2013, discussed in more detail in this proposal) can be used to monitor extremes (using the ETCCDI software – see Zhang et al., 2011). Additionally, also as a result of Chinese collaboration, a new method of daily temperature homogenization has been developed (Li et al., 2014). In Cornes and Jones (2011) we assessed storm activity in the northeast Atlantic region using daily gridded data. Even though the grid resolution is coarse (5° by 5° lat/long) the changes in storm activity are similar to those developed from the pressure triangle approach with station data. Analyses of humidity and pressure data In Simmons et al. (2010) we showed a reduction in relative humidity over low-latitude and mid-latitude land areas for the 10 years to 2008, based on monthly anomalies of surface air temperature and humidity from ECMWF reanalyses (ERA-40 and ERA-Interim) and our earlier land-only dataset (CRUTEM3) and synoptic humidity observations (HadCRUH). Updates of this station-based humidity dataset (now called HadISDH) extend the record, showing continued reductions (Willett et al., 2013). Analyses of Proxy Temperature Data In Vinther et al. (2010), relationships between the seasonal stable isotope data from Greenland Ice Cores and Greenland and Icelandic instrumental temperatures were investigated for the past 150-200 years. The winter season stable isotope data are found to be influenced by the North Atlantic Oscillation (NAO) and very closely related to SW Greenland temperatures. The summer season stable isotope data display higher correlations with Icelandic summer temperatures and North Atlantic SST conditions than with local SW Greenland temperatures. In Jones et al. (2014) we use these winter isotope reconstructions to show the expected inverse correlation (due to the NAO) with winter-season documentary reconstructions from the Netherlands and Sweden over the last 800 years. Finally, in this section Jones et al. (2013) shows the agreement between tree-ring width measurements from Northern Sweden and Finland and an assessment of the link to explosive volcanic eruptions. An instrumental record for the region in the early 19th century indicates that the summer of 1816 was only slightly below normal, explaining why this year has normal growth for both ring width and density. GCM/RCM/Reanalysis Evaluation In this section we have intercompared daily temperature extremes across Europe in Cornes and Jones (2013) using station data, E-OBS and ERA-Interim. We have additionally considered the impact of the urban issue on the global scale using the results of the Compo et al. (2011) Reanalyses, 20CR. These only make use of SST and station pressure data. Across the world’s land areas, they indicate similar warming since 1900 to that which has occurred (Compo et al., 2013), again illustrating that urbanization is not the cause of the long-term warming. Changes in HadCRUH global land surface specific humidity and CRUTEM3 surface temperatures from 1973 to 1999 were compared to the CMIP3 archive of climate model simulations with 20th Century forcings (Willett et al., 2010). The models reproduce the magnitude of observed interannual variance over all large regions. Observed and modelled trends and temperature-humidity relationships are comparable with the exception of the extra-tropical Southern Hemisphere where observations exhibit no trend but models exhibit moistening.

54 ENVIRONMENTAL SCIENCES↗