Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Space Operations Center”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Initial Results from the Miniature Imager for Neutral Ionospheric Atoms and Magnetospheric Electrons (MINI-ME) on the FASTSAT Spacecraft

The MINI-ME instrument is a collaborative effort between NASA's Goddard Space Flight Center (GSFC) and the U.S. Naval Academy, funded solely through GSFC Internal Research and Development (IRAD) awards. It detects neutral atoms from about 10 eV to about 700 eV (in 30 energy steps) in its current operating configuration with an approximately 10 degree by 360 degree field-of-view, divided into six sectors. The instrument was delivered on August 3, 2009 to Marshall Space Flight Center (MSFC) for integration with the FASTSAT-HSV01 small spacecraft bus developed by MSFC and a commercial partner, one of six Space Experiment Review Board (SERB) experiments on FASTSAT and one of three GSFC instruments (PISA and TTI being the other two). The FASTSAT spacecraft was launched on November 21, 2010 from Kodiak, Alaska on a Minotaur IV as a secondary payload and inserted into a 650 km, 72 degree inclination orbit, very nearly circular. MINI-ME has been collecting science data, as spacecraft resources would permit, in "optimal science mode" since January 20, 2011. In this presentation, we report initial science results including the potential first observations of neutral molecular ionospheric outflow. At the time of this abstract, we have identified 15 possible molecular outflow events. All these events occur between about 65 and 82 degrees geomagnetic latitude and most map to the auroral oval. The MINI-ME results provide an excellent framework for interpretation of the MILENA data, two instruments almost identical to MINI-ME that will launch on the VISIONS suborbital mission

Collier, Michael R.↗

The JPL/KSC telerobotic inspection demonstration

An ASEA IRB90 robotic manipulator with attached inspection cameras was moved through a Space Shuttle Payload Assist Module (PAM) Cradle under computer control. The Operator and Operator Control Station, including graphics simulation, gross-motion spatial planning, and machine vision processing, were located at JPL. The Safety and Support personnel, PAM Cradle, IRB90, and image acquisition system, were stationed at the Kennedy Space Center (KSC). Images captured at KSC were used both for processing by a machine vision system at JPL, and for inspection by the JPL Operator. The system found collision-free paths through the PAM Cradle, demonstrated accurate knowledge of the location of both objects of interest and obstacles, and operated with a communication delay of two seconds. Safe operation of the IRB90 near Shuttle flight hardware was obtained both through the use of a gross-motion spatial planner developed at JPL using artificial intelligence techniques, and infrared beams and pressure sensitive strips mounted to the critical surfaces of the flight hardward at KSC. The Demonstration showed that telerobotics is effective for real tasks, safe for personnel and hardware, and highly productive and reliable for Shuttle payload operations and Space Station external operations.

Mittman, David↗

Deep Space 1 Ion Engine Completed a 3-Year Journey

A xenon ion engine and power processor system, which was developed by the NASA Glenn Research Center in partnership with the Jet Propulsion Laboratory and Boeing Electron Dynamic Devices, completed nearly 3 years of operation aboard the Deep Space 1 spacecraft. The 2.3-kW ion engine, which provided primary propulsion and two-axis attitude control, thrusted for more than 16,000 hr and consumed more than 70 kg of xenon propellant. The Deep Space 1 spacecraft was launched on October 24, 1998, to validate 12 futuristic technologies, including the ion-propulsion system. After the technology validation process was successfully completed, the Deep Space 1 spacecraft flew by the small asteroid Braille on July 29, 1999. The final objective of this mission was to encounter the active comet Borrelly, which is about 6 miles long. The ion engine was on a thrusting schedule to navigate the Deep Space 1 spacecraft to within 1400 miles of the comet. Since the hydrazine used for spacecraft attitude control was in short supply, the ion engine also provided two-axis attitude control to conserve the hydrazine supply for the Borrelly encounter. The comet encounter took place on September 22, 2001. Dr. Marc Rayman, project manager of Deep Space 1 at the Jet Propulsion Laboratory said, "Deep Space 1 plunged into the heart of the comet Borrelly and has lived to tell every detail of its spinetingling adventure! The images are even better than the impressive images of comet Halley taken by Europe's Giotto spacecraft in 1986." The Deep Space 1 mission, which successfully tested the 12 high-risk, advanced technologies and captured the best images ever taken of a comet, was voluntarily terminated on December 18, 2001. The successful demonstration of the 2-kW-class ion propulsion system technology is now providing mission planners with off-the-shelf flight hardware. Higher power, next generation ion propulsion systems are being developed for large flagship missions, such as outer planet explorers and sample-return missions.

Sovey, James S.↗

Intelligent (Autonomous) Power Controller Development for Human Deep Space Exploration

As NASAs Evolvable Mars Campaign and other exploration initiatives continue to mature they have identified the need for more autonomous operations of the power system. For current human space operations such as the International Space Station, the paradigm is to perform the planning, operation and fault diagnosis from the ground. However, the dual problems of communication lag as well as limited communication bandwidth beyond GEO synchronous orbit, underscore the need to change the operation methodology for human operation in deep space. To address this need, for the past several years the Glenn Research Center has had an effort to develop an autonomous power controller for human deep space vehicles. This presentation discusses the present roadmap for deep space exploration along with a description of conceptual power system architecture for exploration modules. It then contrasts the present ground centric control and management architecture with limited autonomy on-board the spacecraft with an advanced autonomous power control system that features ground based monitoring with a spacecraft mission manager with autonomous control of all core systems, including power. It then presents a functional breakdown of the autonomous power control system and examines its operation in both normal and fault modes. Finally, it discusses progress made in the development of a real-time power system model and how it is being used to evaluate the performance of the controller and well as using it for verification of the overall operation.

Power Systems↗

Fire and safety materials utilization at the John F. Kennedy Space Center

The special needs of the Kennedy Space Center in the area of protective garments for personnel engaged in hazardous emergency operations are discussed. The materials used in the protective clothing and the specialized applications of various materials are described. It is concluded that Nomex is the best general purpose nonflammable material for protective clothing.

Reynolds, J. R.↗

Artificial stereo presentation of meteorological data fields

The innate capability to perceive three-dimensional stereo imagery has been exploited to present multidimensional meteorological data fields. Variations on an artificial stereo technique first discussed by Pichel et al. (1973) are used to display single and multispectral images in a vivid and easily assimilated manner. Examples of visible/infrared artificial stereo are given for Hurricane Allen and for severe thunderstorms on 10 April 1979. Three-dimensional output from a mesoscale model also is presented. The images may be viewed through the glasses inserted in the February 1981 issue of the Bulletin of the American Meteorological Society, with the red lens over the right eye. The images have been produced on the interactive Atmospheric and Oceanographic Information Processing System (AOIPS) at Goddard Space Flight Center. Stereo presentation is an important aid in understanding meteorological phenomena for operational weather forecasting, research case studies, and model simulations.

Hasler, A. F.↗

Shuttle Program Information Management System (SPIMS) data base

The Shuttle Program Information Management System (SPIMS) is a computerized data base operations system. The central computer is the CDC 170-730 located at Johnson Space Center (JSC), Houston, Texas. There are several applications which have been developed and supported by SPIMS. A brief description is given.

Source record↗

Research and technology, 1983

Highlights of major accomplishments and applications made during the past year illustrate the broad range of research and technology activities at the Langley Research Center. Advances are reported in the following areas: systems engineering and operation; aeronautics; electronics; space applications; aircraft and spacecraft structures; composite structures; laminar flow control; subsonic transport aircraft; and supersonic fighter concepts. Technology utilization efforts described cover a hyperthermia monitor, a lightweight composite wheelchair; and a vehicle ride quality meter.

Source record↗

Calibrated Ancillary System (CAS) user's guide, volume 1

The Calibrated Ancillary System (CAS) provides real-time calibrated parameters from the orbiter downlink (ancillary data) to the Goddard Space Flight Center (GSFC). This user's guide contains the introduction to the equipment, operation, general procedures, and specific procedures of the CAS. Volume 1 includes a general overview of the CAS relationships with other equipment, physical design, and hardware and software subsystems. In addition, a description of the user levels and tasks, an introduction to CAS operation, and an outline of general operating procedures are included.

Source record↗

Calibrated Ancillary System (CAS) user's guide, volume 2

The Calibrated Ancillary System (CAS) provides real-time calibrated parameters from the orbiter downlink (ancillary data) to the Goddard Space Flight Center (GSFC). This user's guide contains the introduction to the equipment, operation, general procedures, and specific procedures of CAS. Volume 2 describes the central status and control (CSAC) procedures, supervisor procedures, and logging procedures.

Source record↗

Calibrated Ancillary System (CAS) user's guide, volume 3

The Calibrated Ancillary System (CAS) provides real-time calibrated parameters from the orbiter downlink (ancillary data) to the Goddard Space Flight Center (GSFC). This user's guide contains the introduction to the equipment, operation, general procedures, and specific procedures of the CAS. Volume 3 describes logging and delogging procedures, real-time procedures, and error messages.

Source record↗

Calibrated Ancillary System (CAS) user's guide, volume 4

The Calibrated Ancillary System (CAS) provides real-time calibrated parameters from the orbiter downlink (ancillary data) to the Goddard Space Flight Center (GSFC). This user's guide contains the introduction to the equipment, operation, general procedures, and specific procedures of the CAS. Volume 4 presents the GSFC user mission planning procedures covering the mission planning main menu, bulletin board system, ancillary products menu, utility menu procedures, and ancillary support files procedures.

Source record↗

Calibrated Ancillary System (CAS) user's guide, volume 5

The Calibrated Ancillary System (CAS) provides real-time parameters from the orbiter downlink (ancillary data) to the Goddard Space Flight Center (GSFC). This user's guide contains the introduction to the equipment, operation, general procedures, and specific procedures of CAS. Volume 5 describes the testing user mission planning procedures including the bulletin board system and ancillary products procedures. Instructions for viewing the SDT/TDT (shuttle data tape/telemetry descriptor tape) data base and the file management menu are also given.

Source record↗

Calibrated Ancillary System (CAS) user's guide, volume 6

The Calibrated Ancillary System (CAS) provides real-time calibrated parameters from the orbiter downlink (ancillary data) to the Goddard Space Flight Center (GSFC). This user's guide contains the introduction to the equipment, operation, general procedures, and specific procedures of CAS. Volume 6 describes ancillary products procedures, enhancement menu and processing task procedures for SDT/TDT (shuttle data tape/telemetry descriptor tape), database errors and network data driver (NDD) product menu procedures, and utility menu procedures.

Source record↗

Calibrated Ancillary System (CAS) user's guide, volume 7

The Calibrated Ancillary System (CAS) provides real-time calibrated parameters from the orbiter downlink (ancillary data) to the Goddard Space Flight Center (GSFC). This user's guide contains the introduction to the equipment, operation, general procedures, and specific procedures of CAS. Volume 7 describes the data flow engineer (DFE) user mission planning procedures which include instructions for processing the SDT/TDT (shuttle data tape/telemetry descriptor tape).

Source record↗

Calibrated Ancillary System (CAS) user's guide, volume 8

The Calibrated Ancillary System (CAS) provides real-time calibrated parameters from the orbiter downlink (ancillary data) to the Goddard Space Flight Center (GSFC). This user's guide contains the introduction to the equipment, operation, general procedures, and specific procedures of CAS. Volume 8 describes procedures for invoking checkout software, file maintenance procedures, system manager procedures.

Source record↗

Calibrated Ancillary System (CAS) user's guide, volume 9

The Calibrated Ancillary System (CAS) provides real-time calibrated parameters from the orbiter downlink (ancillary data) to the Goddard Space Flight Center (GSFC). This user's guide contains the introduction to the equipment, operation, general procedures, and specific procedures of CAS. Volume 9 contains the menu-independent CAS commands. Examples of each command and command parameters are presented. A listing of acronyms and applicable documentation is also provided.

Source record↗

STS safety approval process for small self-contained payloads

The safety approval process established by the National Aeronautics and Space Administration for Get Away Special (GAS) payloads is described. Although the designing organization is ultimately responsible for the safe operation of its payload, the Get Away Special team at the Goddard Space Flight Center will act as advisors while iterative safety analyses are performed and the Safety Data Package inputs are submitted. This four phase communications process will ultimately give NASA confidence that the GAS payload is safe, and successful completion of the Phase 3 package and review will clear the way for flight aboard the Space Transportation System orbiter.

Gum, Mary A.↗