Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Expert system verification and validation study

Five workshops on verification and validation (V&V) of expert systems (ES) where taught during this recent period of performance. Two key activities, previously performed under this contract, supported these recent workshops (1) Survey of state-of-the-practice of V&V of ES and (2) Development of workshop material and first class. The first activity involved performing an extensive survey of ES developers in order to answer several questions regarding the state-of-the-practice in V&V of ES. These questions related to the amount and type of V&V done and the successfulness of this V&V. The next key activity involved developing an intensive hands-on workshop in V&V of ES. This activity involved surveying a large number of V&V techniques, conventional as well as ES specific ones. In addition to explaining the techniques, we showed how each technique could be applied on a sample problem. References were included in the workshop material, and cross referenced to techniques, so that students would know where to go to find additional information about each technique. In addition to teaching specific techniques, we included an extensive amount of material on V&V concepts and how to develop a V&V plan for an ES project. We felt this material was necessary so that developers would be prepared to develop an orderly and structured approach to V&V. That is, they would have a process that supported the use of the specific techniques. Finally, to provide hands-on experience, we developed a set of case study exercises. These exercises were to provide an opportunity for the students to apply all the material (concepts, techniques, and planning material) to a realistic problem.

French, Scott W.↗

A Section 110 Evaluation of the Project 57 Rad-Safe Area Personnel Decontamination Building, Nye County, Nevada

Project 57 was an open-air, plutonium-dispersal safety test conducted by the United States in 1957 on a portion of the Nevada Test and Training Range (NTTR) (formerly the Las Vegas Bombing and Gunnery Range). The Project 57 test area, once known as Area 13, was a block of land abutting the northeastern boundary of the Nevada Test Site (NTS). The NTS was renamed the Nevada National Security Site (NNSS) in 2010. In keeping with the historical Cold War period designation, NTS will be used when discussing historic period events, while NNSS will be applied for contemporary activities. During Project 57, the high explosives of a nuclear weapon were triggered asymmetrically to simulate an accidental detonation. The test was conducted to study the extent of plutonium contamination from a nonnuclear yield accident, as well as assess the biological and environmental hazards such an event could create. Following the conclusion of the experiment, the contaminated area surrounding the ground zero (GZ) was fenced off and some of the contaminated equipment was buried in place. The Project 57 Rad-Safe area was abandoned. In 1981, the U.S. Department of Energy (DOE) decontaminated and decommissioned the Project 57 site. This Section 110 documentation was prompted by recognition that more than five decades have passed since the abandonment of the Project 57 Rad-Safe area, particularly the personnel decontamination building, which leaves the temporary structure vulnerable to natural forces of weathering and decay. However, these temporary facilities remain partially standing, allowing for a condition assessment and recommendations regarding the Rad-Safe area’s historical significance. The National Nuclear Security Administration, Nevada Field Office (NNSA/NFO) determined there was no area of potential effect (APE) (direct, indirect, or visual) because there is no planned undertaking and the Project 57 Rad-Safe area will continue to remain unused. Instead, a 4.5-acre study area was established to facilitate recording the Project 57 personnel decontamination building and the remaining accessory resources. The study area is bounded on the east by Valley Road and it extends to the east far enough to encompass the former Project 57 Rad-Safe area (Figure A-2). The Section 110 study area is located in the northwest quarter of Section 35, Township 07S Range 54E Mount Diablo Base and Meridian. It is on the 1962 Groom Mine SW USGS 7.5-minute series topographic quadrangle. Desert Research Institute (DRI) surveyed the Section 110 study area, resulting in the recording and evaluation of the Project 57 Rad-Safe area personnel decontamination building and four accessory resources (AR-1 through AR-4). Copies of the building form and report are on file at DRI and with the NNSA/NFO in Las Vegas, Nevada.

54 ENVIRONMENTAL SCIENCES↗

DOE-NE Proliferation and Terrorism Risk Assessment: FY12 Plans Update [Slides]

This presentation provides background information on FY12 plans for the DOE Office of Nuclear Energy Proliferation and Terrorism Risk Assessment program. Program plans, organization, and individual project elements are described. Research objectives are: (1) Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of current reactors; (2) Develop improvements in the affordability of new reactors to enable nuclear energy; (3) Develop Sustainable Nuclear Fuel Cycles; and (4) Understand and minimize the risks of nuclear proliferation and terrorism - Goal is to enable the use of risk information to inform NE R&D program planning.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Systems aspects of COBE science data compression

A general approach to compression of diverse data from large scientific projects has been developed and this paper addresses the appropriate system and scientific constraints together with the algorithm development and test strategy. This framework has been implemented for the COsmic Background Explorer spacecraft (COBE) by retrofitting the existing VAS-based data management system with high-performance compression software permitting random access to the data. Algorithms which incorporate scientific knowledge and consume relatively few system resources are preferred over ad hoc methods. COBE exceeded its planned storage by a large and growing factor and the retrieval of data significantly affects the processing, delaying the availability of data for scientific usage and software test. Embedded compression software is planned to make the project tractable by reducing the data storage volume to an acceptable level during normal processing.

Freedman, I.↗

WINS. Market Simulation Tool for Facilitating Wind Energy Integration

Integrating 20% or more wind energy into the system and transmitting large sums of wind energy over long distances will require a decision making capability that can handle very large scale power systems with tens of thousands of buses and lines. There is a need to explore innovative analytical and implementation solutions for continuing reliable operations with the most economical integration of additional wind energy in power systems. A number of wind integration solution paths involve the adoption of new operating policies, dynamic scheduling of wind power across interties, pooling integration services, and adopting new transmission scheduling practices. Such practices can be examined by the decision tool developed by this project. This project developed a very efficient decision tool called Wind INtegration Simulator (WINS) and applied WINS to facilitate wind energy integration studies. WINS focused on augmenting the existing power utility capabilities to support collaborative planning, analysis, and wind integration project implementations. WINS also had the capability of simulating energy storage facilities so that feasibility studies of integrated wind energy system applications can be performed for systems with high wind energy penetrations. The development of WINS represents a major expansion of a very efficient decision tool called POwer Market Simulator (POMS), which was developed by IIT and has been used extensively for power system studies for decades. Specifically, WINS provides the following superiorities; (1) An integrated framework is included in WINS for the comprehensive modeling of DC transmission configurations, including mono-pole, bi-pole, tri-pole, back-to-back, and multi-terminal connection, as well as AC/DC converter models including current source converters (CSC) and voltage source converters (VSC); (2) An existing shortcoming of traditional decision tools for wind integration is the limited availability of user interface, i.e., decision results are often text-based demonstrations. WINS includes a powerful visualization tool and user interface capability for transmission analyses, planning, and assessment, which will be of great interest to power market participants, power system planners and operators, and state and federal regulatory entities; and (3) WINS can handle extended transmission models for wind integration studies. WINS models include limitations on transmission flow as well as bus voltage for analyzing power system states. The existing decision tools often consider transmission flow constraints (dc power flow) alone which could result in the over-utilization of existing resources when analyzing wind integration. WINS can be used to assist power market participants including transmission companies, independent system operators, power system operators in vertically integrated utilities, wind energy developers, and regulatory agencies to analyze economics, security, and reliability of various options for wind integration including transmission upgrades and the planning of new transmission facilities. WINS can also be used by industry for the offline training of reliability and operation personnel when analyzing wind integration uncertainties, identifying critical spots in power system operation, analyzing power system vulnerabilities, and providing credible decisions for examining operation and planning options for wind integration. Researches in this project on wind integration included (1) Development of WINS; (2) Transmission Congestion Analysis in the Eastern Interconnection; (3) Analysis of 2030 Large-Scale Wind Energy Integration in the Eastern Interconnection; (4) Large-scale Analysis of 2018 Wind Energy Integration in the Eastern U.S. Interconnection. The research resulted in 33 papers, 9 presentations, 9 PhD degrees, 4 MS degrees, and 7 awards. The education activities in this project on wind energy included (1) Wind Energy Training Facility Development; (2) Wind Energy Course Development.

17 WIND ENERGY↗

Software Program: Software Management Guidebook

The purpose of this NASA Software Management Guidebook is twofold. First, this document defines the core products and activities required of NASA software projects. It defines life-cycle models and activity-related methods but acknowledges that no single life-cycle model is appropriate for all NASA software projects. It also acknowledges that the appropriate method for accomplishing a required activity depends on characteristics of the software project. Second, this guidebook provides specific guidance to software project managers and team leaders in selecting appropriate life cycles and methods to develop a tailored plan for a software engineering project.

Source record↗

Using Remote Sensing to Assess of Growth and Distribution for Floating Invasive Plants and Growth Response Times to Altered Environments

Management of aquatic weeds in complex watersheds and river systems present many challenges to assessment, planning and implementation of management practices for aquatic invasive plants. The Delta Region Areawide Aquatic Weed Project (DRAAWP), a USDA (U. S. Dept. of Agriculture)-sponsored area-wide project, is working to enhance planning, decision-making and operational efficiency of invasive plant management in the California Sacramento-San Joaquin Delta. Satellite and airborne remote sensing are used to map area of plant coverage and estimate biomass density to aid operations and assess management impacts on plant communities. Modeling at local and watershed scales using the SWAT (Soil Water Assessment Tool) modeling tool provides insight into land-use effects on water quality. Environmental variability in the Delta occurs across a range of time scales from long-term climate and seasonal trends to short-term water flow mediated variations. Controlled environment growth studies have been conducted to quantify the growth response of invasive aquatic plants to water quality and other environmental factors. Response time for invasive species response are examined at time scales of weeks, day, and hours using a combination of study duration and growth assessment techniques to assess water quality, temperature (air and water), and light effects. These provide response parameters for plant growth models in response to environmental variation and interact with management and economic models associated with aquatic weed management. Plant growth models are to be informed by remote sensing and applied spatially across the Delta to balance location and type of aquatic plant, growth response to altered environments and phenology. Initial utilization of remote sensing tools developed for mapping of aquatic invasive plants improved operational efficiency in management practices. These assessment methods provide a comprehensive and quantitative view of aquatic invasive plant communities in the California Delta.

Floating↗

Processing Plan for Potentially Reactive/Ignitable Remote Handled Transuranic Waste at the Idaho Cleanup Project - 12090

Remote Handle Transuranic (RH-TRU) Waste generated at Argonne National Laboratory - East, from the examination of irradiated and un-irradiated fuel pins and other reactor materials requires a detailed processing plan to ensure reactive/ignitable material is absent to meet WIPP Waste Acceptance Criteria prior to shipping and disposal. The Idaho Cleanup Project (ICP) approach to repackaging Lot 2 waste and how we ensure prohibited materials are not present in waste intended for disposal at Waste Isolation Pilot Plant 'WIPP' uses an Argon Repackaging Station (ARS), which provides an inert gas blanket. Opening of the Lot 2 containers under an argon gas blanket is proposed to be completed in the ARS. The ARS is an interim transition repackaging station that provides a mitigation technique to reduce the chances of a reoccurrence of a thermal event prior to rendering the waste 'Safe'. The consequences, should another thermal event be encountered, (which is likely) is to package the waste, apply the reactive and or ignitable codes to the container, and store until the future treatment permit and process are available. This is the same disposition that the two earlier containers in the 'Thermal Events' were assigned. By performing the initial handling under an inert gas blanket, the waste can sorted and segregate the fines and add the Met-L-X to minimize risk before it is exposed to air. The 1-gal cans that are inside the ANL-E canister will be removed and each can is moved to the ARS for repackaging. In the ARS, the 1-gal can is opened in the inerted environment. The contained waste is sorted, weighed, and visually examined for non compliant items such as unvented aerosol cans and liquids. The contents of the paint cans are transferred into a sieve and manipulated to allow the fines, if any, to be separated into the tray below. The fines are weighed and then blended with a minimum 5:1 mix of Met-L-X. Other debris materials found are segregated from the cans into containers for later packaging. Recoverable fissile waste material (Fuel and fuel-like pieces) suspected of containing sodium bonded pieces) are segregated and will remain in the sieve or transferred to a similar immersion basket in the ARS. The fuel like pieces will be placed into a container with sufficient water to cover the recoverable fissile waste. If a 'reactive characteristic' is present the operator will be able to observe the formation of 'violent' hydrogen gas bubbles. When sodium bonded fuel-like pieces are placed in water the expected reaction is a non-violent reaction that does not meet the definition of reactivity. It is expected that there will be a visible small stream of bubbles present if there is any sodium-bonded fuel-like piece placed in the water. The test will be completed when there is no reaction or the expected reaction is observed..At that point, the fuel like pieces complete the processing cycle in preparation for characterization and shipment to WIPP. If a violent reaction occurs, the fuel-like pieces will be removed from the water, split into the required fissile material content, placed into a screened basket in a 1 gallon drum and drummed out of the hot cell with appropriate RCRA codes applied and placed into storage until sodium treatment is available. These 'violent' reactions will be evidenced by gas bubbles being evolved at the specimen surface where sodium metal is present. The operators will be trained to determine if the reaction is 'violent' or 'mild'. If a 'violent' reaction occurs, the sieve will be immediately removed from the water, placed in a 1 gallon paint can, canned in the argon cover gas and removed from the hot cell to await a future treatment. If the reaction is 'mild', the sieve will then be removed from the water; the material weighed for final packaging and allowed to dry by air exposure. Lot 2 waste cans can be opened, sorted, processed, and weighed while mitigating the potential of thermal events that could occur prior to exposing to air. Exposure to air is a WIPP compliance step demonstrating the absence of reactive or ignitable characteristics. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing Government and Industry Roles to Accelerate Commercialization of Advanced Reactors and Supporting Fuel Cycles

Recent growth in private sector interest and investment in advanced reactor designs signals a new period in the greater than six decade pursuit of commercial nuclear technology. This nuclear entrepreneurship is primarily centered in the North America; meanwhile, national programs in China, France, India, Russia, and South Korea also feature active efforts to design, construct, operate and export advanced reactors .The business case for most private ventures calls for an aggressive commercialization timeline-tied to expectations for returns on investment. Finally, strategic energy portfolio projections and utility resource planning point to the 2030 - 2050 window as the period of greatest need for dispatchable, energy intensive, low-carbon generation options to address retirement of baseload capacity, increased penetration of renewables and economy-scale decarbonization. However, lead times for commercialization range from 30 to 50 years based on more traditional government-centric timelines. Fuel development and fuel cycle infrastructure deployment represent parallel timelines that directly influence the timeline for commercialization of many advanced reactor concepts. While multi-decade development periods appear to be commonplace for new nuclear projects, such timelines were not always the norm-three separate countries set out to develop civilian commercial power from fundamental nuclear principles, in just over a decade, on average. The US led light-water reactor (LWR) development in the 1950's, the UK pioneered a gas-cooled reactor (GCR) concept in the same time period, and Canada forged the path to commercializing the heavy-water reactor (HWR) starting in the mid-1950's and into the mid-1960's. The necessary fuel cycle facilities to support the commercial reactor design also did not appear suddenly, but were a collaborative effort between government and private partners. In this paper, the efforts of these three governments and their private industry partnerships in reactor and fuel cycle development are explored, and a select sample of representative milestones for each is presented, with the roles that each group played. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Plans and status of the NASA-Lewis Research Center wind energy project

This report describes that portion of the national five-year wind energy program that is being managed by the NASA-Lewis Research Center for the ERDA. The Lewis Research Center's Wind Power Office, its organization and plans and status are briefly described. The three major elements of the wind energy project at Lewis are the experimental 100 kW wind-turbine generator; the first generation industry-built and user-operated wind turbine generators; and the supporting research and technology tasks which are each briefly described.

Thomas, R.↗

Development of a research project selection model: Application to a civil helicopter research program

A model is described for planning and decision making in research project selection. Evaluations of each project's direct and indirect benefits, uncertainty in achieving these benefits, and schedule priority with resource budget and program balance constraints are considered. The combination of the interactive effect of project selection, resource allocation and scheduling considerations into one model permits tradeoff alternatives to be studied. Clients' value judgments are used in evaluating the benefits from each proposed project. The model is applied to the NASA Civil Helicopter Technology Program. Research project priorities for this program are established, strengths and weaknesses of the model are discussed, and areas of future development are recommended.

Schoultz, M. B.↗

Small Unmanned Aircraft Electromagnetic Interference (EMI) Initial Assessment

With many applications envisioned for small Unmanned Aircraft Systems (sUAS), and potentially millions of sUAS expected to be in operation in the future, the electromagnetic interference environment associated with the sUAS is of interest to understanding the potential performance impacts on the sUAS command and control communications link as well as the sUAS payload and payload links. As part of NASA's UAS Traffic Management (UTM) Project, flight experiments are planned to characterize the RF environment at altitudes up to 400 ft to better understand how UTM command and control links can be expected to perform. The flight experiments will use an RF channel sensing payload attached to an sUAS. In terms of the payload being capable of measuring relatively low level signals at altitude, electromagnetic interference (EMI) emanating from the sUAS vehicle itself could potentially complicate the measurement process. For this reason, NASA was interested in measuring the EMI performance of the sUAS planned for these flight experiments, a DJI model S1000. The S1000 was thus measured in a controlled EMI test chamber at the NASA Ames Research Center. The S1000 is a carbon fiber based platform with eight rotors. As such, the EMI test results represent potential performance of a number of similar sUAS types. sUAS platforms significantly different from the S1000 may also require EMI testing, and the method employed for NASA's S1000 EMI tests can be applied to other platforms. In this paper we describe the UTM project, the RF channel sensing payload, the EMI testing method and EMI test results for the S1000, and discuss the implications of these results.

Unmanned aircraft↗

Small Unmanned Aircraft Electromagnetic Interference (EMI) Initial Assessment

With many applications envisioned for small Unmanned Aircraft Systems (sUAS), and potentially millions of sUAS expected to be in operation in the future, the electromagnetic interference environment associated with the sUAS is of interest to understanding the potential performance impacts on the sUAS command and control communications link as well as the sUAS payload and payload links. As part of NASAâ€"TM"s UAS Traffic Management (UTM) Project, flight experiments are planned to characterize the RF environment at altitudes up to 400 ft to better understand how UTM command and control links can be expected to perform. The flight experiments will use an RF channel sensing payload attached to an sUAS. In terms of the payload being capable of measuring relatively low level signals at altitude, electromagnetic interference (EMI) emanating from the sUAS vehicle itself could potentially complicate the measurement process. For this reason, NASA was interested in measuring the EMI performance of the sUAS planned for these flight experiments, a DJI model S1000. The S1000 was thus measured in a controlled EMI test chamber at the NASA Ames Research Center. The S1000 is a carbon fiber based platform with eight rotors. As such, the EMI test results represent potential performance of a number of similar sUAS types. sUAS platforms significantly different from the S1000 may also require EMI testing, and the method employed for NASAâ€"TM"s S1000 EMI tests can be applied to other platforms. In this paper we describe the UTM project, the RF channel sensing payload, the EMI testing method and EMI test results for the S1000, and discuss the implications of these results.

traffic management↗

Project Management Using Modern Guidance, Navigation and Control Theory

Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state of the system. The behavior of a system, as captured in the system modeling, when properly done will aid in accurately predicting future system performance. The Feedback Control system understands the state and behavior of the system and uses feedback to adjust control inputs into the system. The feedback, which is the right arm of the Control system, allows change to be affected in the overall system; it therefore is important to not only correctly identify the system feedback inputs, but also the system response to the feedback inputs. The Navigation system takes multiple data inputs and based on a priori knowledge of the inputs, develops a statistically based weighting of the inputs and measurements to determine the system's state. Guidance and Planning Logic of the system, complete with an understanding of where the system is (provided by the Navigation system), will in turn determine where the system needs to be and how to get it there. With any system/project, it is critical that the objective of the system/project be clearly defined -- not only to plan but to measure performance and to aid in guiding the system or the project. The system principles discussed above, which can be and have been applied to the current CxP space suit development project, can also be mapped to real-world constituents, thus allowing project managers to apply systems theories that are well defined in engineering and mathematics to a discipline (i.e., Project Management) that historically has been based in personal experience and intuition. This mapping of GN&C theory to Project Management will, in turn, permit a direct, methodical approach to Project Management, planning and control providing a tool to help predict (and guide) performance and an understanding of the project constraints, how the project can be controlled, and the impacts to external influences and inputs. This approach, to a project manager, flows down to the three bottom-line variables of cost, schedule, and scope ando the needed control of these three variables to successfully perform and complete a project.

Hill, Terry R.↗

The Center for Astrophysics in Antarctica

Nowhere on Earth are the infrared skies clearer, darker, or more stable than on the high Antarctic Plateau. At some wavelengths, Antarctic telescopes may be more than one to two orders of magnitude more efficient than at other sites. However, exploiting these advantages requires first addressing the formidable practical difficulties of working in the remote and frigid polar environment. This was the motivation for the Center for Astrophysical Research in Antarctica (CARA), one of twenty-five National Science Foundation Science and Technology Centers. At its inception, the Center organized its research into four projects. Three - AST/RO, COBRA, and SPIREX - address key problems in star formation, evolution of galaxies, and the distribution of matter in the early universe. They feature surveys which can be conducted effectively with moderate-size telescopes operated in a highly automated mode. They also explore the potential of the Antarctic Plateau for a broad range of astrophysical research over a spectral range extending from the near-infrared to millimeter wavelengths. A fourth, ATP, was created to obtain quantitative data on the qualities of the South Pole site and to plan for future scientific projects. During the next five years, AST/RO, COBRA, and SPIREX will become operational, and the Center will begin to build a second generation of telescopes which can address a broader range of problems and accommodate a larger community of users.

Pernic, Robert J.↗

Internal Climate Variability Obscures Future Freezing Rain Changes Despite Global Warming Trend

Abstract Although numerous studies have projected changes in freezing rain under future climate conditions, the internal variability of freezing rain remains poorly quantified. Here, we introduce a framework utilizing a novel machine‐learning algorithm to diagnose freezing rain in reanalysis and climate model simulations. By employing multivariate quantile mapping, we decompose the projected freezing rain trend into contributions from changes in temperature, relative humidity, and precipitation, which helps separate the forced response from internal climate variability. Our finding reveals a notable decrease in freezing rain occurrence in most areas. Despite a substantial temperature increase, internal variability overshadows climate forcing across a large portion of the eastern United States until about 2050. This insight has implications for practitioners, suggesting that the observed freezing rain frequency climatology continues to provide a relevant baseline for decision‐making in the near term. However, longer‐term design and adaptation plans should consider the projected changes in these regions.

Zhuang, Haoyu (Richard) [Department of Atmospheric↗

A document describing shuttle considerations for the design of large space structures

A Shuttle user guide document to aid designers and analysis associated with large space structures projects is described. The format and contents are a compromise designed to satisfy the needs of several levels of users. Special features include checklists and references to source documents as a convenience to very knowledgeable readers. In addition, general, introductory and explanatory text, and art work are included for the reader less familiar with shuttle systems. Also, there are a subject index, glossary, list of acronyms, and many cross references. Throughout the document, there are suggested implications or references to the importance of the included orbiter interfaces material as it pertains to designing and planning large space structures projects. The content of the document is outlined. Shuttle payload accommodations and constraints, connections for orbiter construction fixtures, packaging, and construction space eometry are addressed.

Roebuck, J. A., Jr.↗

The Test and Evaluation of Non-Chromate Finishing Agent

Clark Atlanta University (CAU) has engaged a team comprised of university faculty members, student research assistants, and consultants from industrial and technology firms in order to ensure that NASA receives a quality product on time and within budget. In addition to the current related expertise which CAU possess, we have enlisted materials and aid from several other agencies, and machine manufacturers to assist us in completing the project on time and according to plan and budget. The research team is employing sound engineering principles in its approach to this project. Each phase of the project is preceded by a thorough and complete planning session that details the work plan and provide a comprehensive review of the work to be accomplished during the particular phase and by whom. Maximum use is being made of existing or already planned capabilities to ensure maximum economy, and frequent online reviews are being held to measure progress and to identify a potential problem in sufficient time to allow for corrective action.

Okhio, Cyril↗