Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCESSING EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Leaning the tank closure process at the Savannah River Site - 15515

The Savannah River Site liquid waste system consists of multiple facilities that safely receive and store legacy radioactive waste prior to treatment and disposition. The liquid radioactive waste is stored in large underground tanks. The waste inventory currently stored in these tanks is a complex mixture of insoluble metal hydroxide solids and soluble salt supernate. The high-level (radioactive) portion of the waste is vitrified into a glass waste form, while the low-level waste is immobilized into a cementitious grout waste form called salt-stone. Once the waste is retrieved and processed, the tanks are closed. The closure process includes; waste removal, characterizing residuals, isolating the tank systems, and stabilizing the tank with tailored grout formulations. The core of Lean is to eliminate waste or non-value added steps from processes to maximize customer value. From the perspective of the customer, 'value' is defined as any action or process for which a customer would willingly pay. In this case our product is to safely and efficiently remove waste from the underground storage tanks and demonstrate operational closure to the State of South Carolina. Savannah River Remediation (SRR) initiated the use of the Lean process in late 2013 and identified the Tank Closure process as one of the targeted areas to improve. The first step in the Lean process is to 'map' out the value stream and identify areas where non-value added steps are present and then prioritize Rapid Improvement Events (RIE). Based on this mapping process, there were a number of areas that SRR determined warranted further evaluation for improvements, including; standard equipment design, characterization, standard work packages, regulatory documentation, tank characterization, structural evaluations, engineering documentation and equipment re-use. This paper focuses on the application of the Lean process at SRR and more specifically, effective application to the Tank Closure Process. This paper discusses the value stream mapping process for Tank Closures, as well as, summarizes the RIEs and demonstrate the realized benefits. Benefits can come in a variety of forms, from schedule compression to decreased costs. Through the Lean process we have been able to identify close to $10 M in savings over the life cycle of the tank closure process and a 4 year schedule compression. Cost and schedule savings are used to accomplish further risk reduction efforts. In addition to hard benefits, there are also soft benefits. These soft benefits are a result of the process itself and help drive improved efficiencies through better communication with key stakeholders, such as regulators and customers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model quantification of the effect of coproducts and refinery co-hydrotreating on the economics and greenhouse gas emissions of a conceptual biomass catalytic fast pyrolysis process

Here we present model results for a scaled-up conceptual process informed by bench scale biomass catalytic fast pyrolysis (CFP) and hydrotreating experimental data. This process uses a Pt/TiO 2 catalyst during CFP, which produces a partially deoxygenated organic biocrude intermediate that is then hydroprocessed to a hydrocarbon fuel blendstock; the catalyst also enables high yields of acetone and methyl-ethyl-ketone (MEK) coproducts. Two options for hydroprocessing were modeled: (A) co-hydrotreating at a petroleum refinery using hydrogen sourced from steam reforming of natural gas and (B) standalone hydrotreating at a biorefinery using hydrogen sourced from CFP off gases. The results revealed that Case A was economically advantageous with a modeled minimum fuel selling price (MFSP) of $\$$2.83/GGE or gallon gasoline equivalent (in 2016 US dollars), while the additional cost of standalone hydrotreating facilities in Case B increased the MFSP to $3.13/GGE. Conversely, greenhouse gas (GHG) emissions were lower for Case B (3.9 g CO 2 e/MJ) compared to Case A (21.5 g CO 2 e/MJ) due to the use of biogenic (Case B) and fossil-derived (Case A) hydrogen. In a third option (Case C), the requirements for separation and purification of acetone and MEK were removed from the refinery co-processing scenario (Case A) to evaluate the impacts of this process simplification. Elimination of these coproducts increased the MFSP to $3.21/GGE and GHG emissions to 35 g CO 2 e/MJ. These comparisons based on our detailed conceptual models provide economic and sustainability guidance regarding processing choices for future biorefineries. While refinery coprocessing using existing equipment and the production of relatively valuable coproducts can benefit the economics, the hydrogen-source and biogenic coproducts can have significant impacts on the sustainability of the process, and feasibility to use CFP off-gases or other renewable sources for hydrogen production can help lower GHG emissions.

09 BIOMASS FUELS↗

Nuclear Safety via Commercial Grade Dedication - Hitting the Right Target - 12163

S.A.Technology has developed and implemented a highly effective Commercial Grade Dedication program that has been used to qualify a variety of equipment to the rigorous requirements of ASTM NQA-1. In specific cases, S.A.Technology personnel have worked closely with clients to develop complex Commercial Grade Dedication plans that satisfy the scrutiny of the US Department of Energy. These projects have been as simple as Passive Mechanical systems, and as complicated as Active Mechanical and Electrical systems. S.A.Technology's Commercial Grade Dedication plans have even been used as presentation materials to a client's internal departments encompassing Engineering, Quality and Procurement. This is the new target of today's CGD: exposing the reasoning behind the dedication process. Previously, only test and inspection results were expected. Today's CGD now needs to show how the decisions presented are the right decisions to make. We must be willing to undergo the process of learning how each new piece of equipment is affected by the system it is placed into, as well as understanding how that equipment can affect the system itself. It is a much more complicated and time-consuming endeavor to undertake. On top of it all, we must be able to voice those discoveries and rationalizations in a clear and concise manner. Unless we effectively communicate our intentions to the reader, we will not be understood. If researched correctly and presented properly, today's Commercial Grade Dedication plans will answer the appropriate questions before they are asked. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the 247-F Fuel Manufacturing Facility at the Savannah River Site (SRS)

Building 247-F at SRS was a roughly 110,000 ft{sup 2} two-story facility designed and constructed during the height of the cold war naval buildup to provide additional naval nuclear fuel manufacturing capacity in early 1980's. The manufacturing process employed a wide variety of acids, bases, and other hazardous materials. As the need for naval fuel declined, the facility was shut down and underwent initial deactivation, which was completed in 1990. All process systems were flushed with water and drained using the existing process drain valves. However, since these drains were not always installed at the lowest point in piping and equipment systems, a significant volume of liquid remained after initial deactivation. After initial deactivation, a non-destructive assay of the process area identified approximately 17 ({+-}100%) kg of uranium held up in equipment and piping. The facility was placed in Surveillance and Maintenance mode until 2003, when the decision was made to perform final deactivation, and then decommission the facility. The following lessons were learned as a result of the D and D of building 247-F. Successful D and D of a major radiochemical process building requires significant up-front planning by a team of knowledgeable personnel led by a strong project manager. The level of uncertainty and resultant risk to timely, cost effective project execution was found to be high. Examples of the types of problems encountered which had high potential to adversely impact cost and schedule performance are described below. Low level and sanitary waste acceptance criteria do not allow free liquids in waste containers. These liquids, which are often corrosive, must be safely removed from the equipment before it is loaded to waste containers. Drained liquids must be properly managed, often as hazardous or mixed waste. Tapping and draining of process lines is a dangerous operation, which must be performed carefully. The temptation to become complacent when breaking into lines is great. Incidents of personnel exposure to liquids during draining are likely. Records from the initial 1990 deactivation led early work planners to assume the facility was cold, dark and dry. This turned out to be a poor assumption. Work instructions had to be modified to require that engineers evaluate each of several hundred process lines to identify the low point, where a tap and drain system could be installed to allow positive verification that the line was empty before the line was cut for removal. During the period between facility shut down in 1990 and the start of final deactivation in 2003, roof leaks had developed, allowing rain water to enter building 247-F, which provided an environment for mold growth. Sampling confirmed the presence of Stachybotrys chartarum, a toxic indoor mold that grows on wet cellulosic material, such as drywall paper. D and D workers in areas where this hazard was identified were required to where proper personal protective equipment, which complicated work execution. Discovery of the potential presence of uniquely hazardous chemicals such as shock sensitive compounds and toxic uranium hexafluoride became issues which required investigation and special handling strategies. Team access to subject matter experts, who could quickly provide the required guidance for safe material handling, was critical to keeping the project on schedule. In old legacy facilities, it is possible that the D and D workers will be exposed to undocumented energy sources such as energized electrical conductors and pipes containing hazardous materials that originate outside the boundaries of the facility. Significant effort must be expended on adequate mechanical and electrical isolation. Subdividing the facility into well defined zones for which detailed zone-specific end points could be developed proved to be a highly effective project management strategy. Waste management must be carefully planned. The rate of waste generation as the facility is converted from a structure to waste can frequently exceed the D and D team's resources to characterize, package, store and transport the waste to a disposal facility in a timely manner. This can lead to schedule delays and/or increased project cost.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Process Intensification and Scale-Up of a Continuous Enzymatic Hydrolysis and Separation Process

Combining separate unit operations into one where the best of each part can be maximized is one of the benefits of process intensification. An example is the combination of lignocellulosic biomass enzymatic hydrolysis with the downstream solid-liquid separation step to produce clarified sugars ready for fermentation or catalytic upgrading. The productivity and endpoint yield of enzymatic hydrolysis both enjoy the benefits of reduced feedback inhibition through the continuous removal of sugars by incorporating separations into the reactor. Likewise, the efficiency of recovering clarified sugars from the enzymatic hydrolysis slurry can be enhanced by operating separations equipment at steady-state conditions simultaneously with the continuously fed hydrolysis process. A key parameter that enables greater processing capacity while also raising the risks of failure is the solids loading or concentration. Higher solids loading allows for smaller reactor vessels and results in clarified sugars of higher concentration; however, required pumping power increases, reactor agitation may become ineffective, and membrane flux suffers. Feedstock material attributes influenced by upstream pretreatment must also be scrutinized more carefully: dilute-acid pretreated and deacetylated-and-disc-refined feedstocks exhibit different characteristics that affect agitation and pumping. The authors invite you to further explore the process science enabling the scale-up of this technology from conceptual work at the bench to pilot-scale industrially-relevant equipment where the challenges and solutions of integration and process optimization are expounded upon.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Scale-Up of CdTe Photovoltaic Device Processes for Commercial Application: Cooperative Research and Development (Final Report)

Through this Cooperative Research and Development Agreement, NREL and PrimeStar Solar will work together to scale up the NREL CdTe photovoltaic process from the laboratory to produce photovoltaic devices in a size that is commercially viable. The work in this phase will focus on the transference of NREL CdTe device fabrication techniques to PrimeStar Solar. NREL and PrimeStar Solar will engage in a series of technical exchange meetings and laboratory training sessions to transfer the knowledge of CdTe PV film growth from NREL to PrimeStar Solar. PrimeStar Solar will grow thin films on PrimeStar Solar equipment and interleave them with NREL-grown films in an effort to develop a commercial scale process on PrimeStar Solar equipment. Select NREL film growth equipment will be upgraded either by PrimeStar Solar or at PrimeStar Solar's expense to increase equipment reliability and throughput.

14 SOLAR ENERGY↗

Atmospheric Modeling And Sensor Simulation (AMASS) study

The capabilities of the atmospheric modeling and sensor simulation (AMASS) system were studied in order to enhance them. This system is used in processing atmospheric measurements which are utilized in the evaluation of sensor performance, conducting design-concept simulation studies, and also in the modeling of the physical and dynamical nature of atmospheric processes. The study tasks proposed in order to both enhance the AMASS system utilization and to integrate the AMASS system with other existing equipment to facilitate the analysis of data for modeling and image processing are enumerated. The following array processors were evaluated for anticipated effectiveness and/or improvements in throughput by attachment of the device to the P-e: (1) Floating Point Systems AP-120B; (2) Floating Point Systems 5000; (3) CSP, Inc. MAP-400; (4) Analogic AP500; (5) Numerix MARS-432; and (6) Star Technologies, Inc. ST-100.

Parker, K. G.↗

Risk analysis of heat recovery steam generator with semi quantitative risk based inspection API 581

Corrosion is a major problem that most often occurs in the power plant. Heat recovery steam generator (HRSG) is an equipment that has a high risk to the power plant. The impact of corrosion damage causing HRSG power plant stops operating. Furthermore, it could be threaten the safety of employees. The Risk Based Inspection (RBI) guidelines by the American Petroleum Institute (API) 58 has been used to risk analysis in the HRSG 1. By using this methodology, the risk that caused by unexpected failure as a function of the probability and consequence of failure can be estimated. This paper presented a case study relating to the risk analysis in the HRSG, starting with a summary of the basic principles and procedures of risk assessment and applying corrosion RBI for process industries. The risk level of each HRSG equipment were analyzed: HP superheater has a medium high risk (4C), HP evaporator has a medium-high risk (4C), and the HP economizer has a medium risk (3C). The results of the risk assessment using semi-quantitative method of standard API 581 based on the existing equipment at medium risk. In the fact, there is no critical problem in the equipment components. Damage mechanisms were prominent throughout the equipment is thinning mechanism. The evaluation of the risk approach was done with the aim of reducing risk by optimizing the risk assessment activities.

42 ENGINEERING↗

Computer security approach for Rolls-Royce spinline{sup R} safety platform - 227

The number of digital assets at commercial nuclear power plants is significant and will likely continue to increase with time. As a consequence, these plants have become potential targets for cyber-attacks. Around the world, nuclear safety authorities and national Computer and Information Security Agencies are implementing stricter regulations and inspections for critical systems in nuclear plants. There is a particular focus on instrumentation and control systems as they implement key nuclear safety functions. Rolls-Royce follows a strict computer and information security program based on general and nuclear specific norms, Rolls-Royce group processes, and proven technologies. The Spinline digital safety platform has been designed specifically for nuclear applications and features a secure development and operational environment that provides barriers against unauthorized modifications and implements design requirements promoting integrity and reliability during operation and maintenance. The Rolls-Royce secure development environment provides layers of protection utilizing physical and environmental security, human resource security, and information technology systems access control. The Spinline platform strengthens security functions by providing protection against unauthorized, unintended, and unsafe modifications to the system. The Spinline platform has design features promote integrity and reliability during operation and maintenance in the event of inadvertent operator actions or undesirable behavior of connected equipment. The Spinline technology and these computer security processes are based in a wide spectrum of international standards that were accepted as providing a secure development and operating environment by the United States Nuclear Regulatory Commission in 2014. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Program documentation crew system vidar data reduction (CSVIDR) program

The Crew System Vidar Data Reduction (CSVIDR) program was written to process selected portions of data acquired from long term tests of space shuttle crew equipment. Data are recorded on a seven track computer compatible tape using the Vidar autodata eight processing system. The input tape is in a six bit binary coded decimal format. The 1110 hardware conversion option is used to convert all data from a BCD format to Fieldata since the majority of the data is output without further conversion. Data is retrieved from a character string, calibrated, tabulated, printed, and output on a fixed sample rate tape for use as input to a general purpose plot program.

Vanwie, H. B.↗

Advantages of a Modular Mars Surface Habitat Approach

Early crewed Mars mission concepts developed by the National Aeronautics and Space Administration (NASA) assumed a single, large habitat would house six crew members for a 500-day Mars surface stay. At the end of the first mission, all surface equipment, including the habitat, -would be abandoned and the process would be repeated at a different Martian landing site. This work was documented in a series of NASA publications culminating with the Mars Design Reference Mission 5.0 (NASA-SP-2009-566). The Evolvable Mars Campaign (EMC) explored whether re-using surface equipment at a single landing site could be more affordable than the Apollo-style explore-abandon-repeat mission cadence. Initial EMC assumptions preserved the single, monolithic habitat, the only difference being a new requirement to reuse the surface habitat for multiple expedition crews. A trade study comparing a single large habitat versus smaller, modular habitats leaned towards the monolithic approach as more mass-efficient. More recent work has focused on the operational aspects of building up Mars surface infrastructure over multiple missions, and has identified compelling advantages of the modular approach that should be considered before making a final decision. This paper explores Mars surface mission operational concepts and integrated system analysis, and presents an argument for the modular habitat approach.

Rucker, Michelle A.↗

Advantages of a Modular Mars Surface Habitat Approach

Early crewed Mars mission concepts developed by the National Aeronautics and Space Administration (NASA) assumed a single, large habitat would house six crew members for a 500-day Mars surface stay. At the end of the first mission, all surface equipment?including the habitat--would be abandoned and the process would be repeated at a different Martian landing site. This work was documented in a series of NASA publications culminating with the Mars Design Reference Mission 5.0 (NASA-SP-2009-566). The Evolvable Mars Campaign (EMC) explored whether re-using surface equipment at a single landing site could be more affordable than the Apollo-style explore-abandon-repeat mission cadence. Initial EMC assumptions preserved the single, monolithic habitat?the only difference being a new requirement to reuse the surface habitat for multiple expedition crews. A trade study comparing a single large habitat versus smaller, modular habitats leaned towards the monolithic approach as more mass-efficient. More recent work has focused on the operational aspects of building up Mars surface infrastructure over multiple missions, and has identified compelling advantages of the modular approach that should be considered before making a final decision. This paper explores Mars surface mission operational concepts and integrated system analysis, and presents an argument for the modular habitat approach.

Rucker, Michelle↗

Hydrogen applications in airport operations: a review using the Port Authority of New York and New Jersey as an illustrative airport system

Airports combine aircraft propulsion, ground operations, stationary power systems, and fuel logistics in ways that make emissions reduction technically and operationally complex. Existing studies often assess hydrogen applications in these areas separately, limiting understanding of the shared infrastructure, safety, and operational constraints that shape airport deployment. This review evaluates hydrogen across three airport-relevant operational domains: aviation propulsion, ground support equipment and vehicles, and stationary power systems. Within aviation propulsion, the review examines sustainable aviation fuel production and hydrogen-powered aircraft as two distinct hydrogen-relevant pathways. The Port Authority of New York and New Jersey is used as an illustrative airport system to relate the literature to a real operating context. Drawing on peer-reviewed studies, technical reports, demonstration projects, and public operational information, the review also includes screening-level calculations of hydrogen demand and potential CO 2 e reductions for selected applications. The findings show that hydrogen's role is highly application-specific. Near-term opportunities are strongest where hydrogen serves as a low-carbon process input, supports selected high-utilization ground equipment, or contributes to resilient stationary power-system configurations. Hydrogen-powered aircraft remain a longer-term option because storage, fueling infrastructure, certification, cost, and NO x management continue to constrain deployment. Across all domains, infrastructure readiness, fuel logistics, safety requirements, and leakage management emerge as recurring determinants of viability. Future research should focus on cross-domain infrastructure planning, comparative assessment of hydrogen against alternative pathways, improved treatment of leakage and non-CO 2 effects, and clearer safety and regulatory frameworks for airport deployment.

08 HYDROGEN↗

Lake Charles CCS Project (Final Technical Report, Phase 2)

In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2 ) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Few-photon optical diode

We propose a scheme of realizing an optical diode at the few-photon level. The system consists of a one-dimensional waveguide coupled asymmetrically to a two-level system. The two or multiphoton transport in this system is strongly correlated. We derive exactly the single and two-photon current and show that the two-photon current is asymmetric for the asymmetric coupling. Thus the system serves as an optical diode which allows transmission of photons in one direction much more efficiently than the opposite.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Life sciences payloads analyses and technical program planning studies

Contractural requirements, project planning, equipment specifications, and technical data for space shuttle biological experiment payloads are presented. Topics discussed are: (1) urine collection and processing on the space shuttle, (2) space processing of biochemical and biomedical materials, (3) mission simulations, and (4) biomedical equipment.

Source record↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗