Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operating systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Space Station user Servicing System architecture and operational aspects

The structure of the Space Station Servicing System architecture, operational aspects of the system, and the potential evolution of the servicing capabilities to accomodate a variety of missions are disscussed. Services to be performed include replacement or repair of failed modules, subsystems or parts, replacement or upgrading of spacecraft or instrument subsystems, replacement of limited lifetime subsystems or components, replenishment of consumables, and assembly of attached payloads and instruments. Elements of the system discussed include intravehicular servicing, the flight telerobotic servicer, and the mobile servicing center. Ground, preservicing, extravehicular and intravehicular servicing, and postservicing operations are examined. Also, a typical mission scenario for mature servicing operations is given.

Cline, Helmut P.↗

A simulation study of crew performance in operating an advanced transport aircraft in an automated terminal area environment

A simulation study assessing crew performance operating an advanced transport aircraft in an automated terminal area environment is described. The linking together of the Langley Advanced Transport Operating Systems Aft Flight Deck Simulator with the Terminal Area Air Traffic Model Simulation was required. The realism of an air traffic control (ATC) environment with audio controller instructions for the flight crews and the capability of inserting a live aircraft into the terminal area model to interact with computer generated aircraft was provided. Crew performance using the advanced displays and two separate control systems (automatic and manual) in flying area navigation routes in the automated ATC environment was assessed. Although the crews did not perform as well using the manual control system, their performances were within acceptable operational limits with little increase in workload. The crews favored using the manual control system and felt they were more alert and aware of their environment when using it.

Houck, J. A.↗

A cyclic ground test of an ion auxiliary propulsion system: Description and operational considerations

The Ion Auxiliary Propulsion System (IAPS) experiment is designed for launch on an Air Force Space Test Program satellite (NASA-TM-78859; AIAA Paper No. 78-647). The primary objective of the experiment is to flight qualify the 8 cm mercury ion thruster system for stationkeeping applications. Secondary objectives are measuring the interactions between operating ion thruster systems and host spacecraft, and confirming the design performance of the thruster systems. Two complete 8 cm mercury ion thruster subsystems will be flown. One of these will be operated for 2557 on and off cycles and 7057 hours at full thrust. Tests are currently under way in support of the IAPS flight experiment. In this test an IAPS thruster is being operated through a series of startup/run/shut-down cycles which simulate thruster operation during the planned flight experiment. A test facility description and operational considerations of this testing using an engineering model 8 cm thruster (S/N 905) is the subject of this paper. Final results will be published at a later date when the ground test has been concluded.

Ling, Jerri S.↗

Desert Rats 2010 Operations Tests: Insights from the Geology Crew Members

Desert Research and Technology Studies (Desert RATS) is a multi-year series of tests of NASA hardware and operations deployed in the high desert of Arizona. Conducted annually since 1997, these activities exercise planetary surface hardware and operations in relatively harsh conditions where long-distance, multi-day roving is achievable. Such activities not only test vehicle subsystems, they also stress communications and operations systems and enable testing of science operations approaches that advance human and robotic surface exploration capabilities. Desert RATS 2010 tested two crewed rovers designed as first-generation prototypes of small pressurized vehicles, consistent with exploration architecture designs. Each rover provided the internal volume necessary for crewmembers to live and work for periods up to 14 days, as well as allowing for extravehicular activities (EVAs) through the use of rear-mounted suit ports. The 2010 test was designed to simulate geologic science traverses over a 14-day period through a volcanic field that is analogous to volcanic terrains observed throughout the Solar System. The test was conducted between 31 August and 13 September 2010. Two crewmembers lived in and operated each rover for a week with a "shift change" on day 7, resulting in a total of eight test subjects for the two-week period. Each crew consisted of an engineer/commander and an experienced field geologist. Three of the engineer/commanders were experienced astronauts with at least one Space Shuttle flight. The field geologists were drawn from the scientific community, based on funded and published field expertise.

Bleacher, J. E.↗

Recent developments in catalyst-related PEM fuel cell durability

Cost and durability remain the two major barriers to the widespread commercialization of polymer electrolyte membrane fuel cell (PEMFC)-based power systems, especially for the most impactful but challenging fuel cell electric vehicle (FCEV) application. Commercial FCEVs are now on the road; however, their PEMFC systems do not meet the cost targets established by the U.S. Department of Energy, primarily due to the high platinum loading needed on the cathode to achieve the requisite performance and lifetime. Furthermore, while the activities of a number of commercial Pt-based alloy cathode catalysts exceed the beginning-of-life (BOL) targets, these activities, and the overall cathode performance, degrade via a variety of mechanisms described herein. Degradation is mitigated in current FCEVs by utilizing a cathode catalyst with a lower BOL activity (e.g., much lower transition metal alloy content and larger BOL nanoparticle size), necessitating higher catalyst loadings, and through the utilization of system controls that avoid conditions known to exacerbate degradation processes, such as limiting the fuel cell stack voltage range. The design and development of active and robust materials and eliminating the need for vehicle mitigation strategies would greatly simplify the operating system, allowing for greater transient operation, avoiding large hybridization, and curtailing of fuel cell power. Although system mitigation strategies have provided the near-term pathway for FCEV commercialization, material-specific solutions are required to further reduce costs and improve operability and efficiency. Future material developments should focus on stabilization of the electrode structure and minimization of the catalyst particle susceptibility to dissolution caused by oxide formation and reduction over PEMFC cathode-relevant operating potentials plus minimization of support corrosion. Ex situ accelerated stress tests have provided insight into the processes responsible for material and performance degradation and will continue to provide useful information on the relative stability of materials and benchmarks for robust and stable materials-based solutions not requiring system mitigation strategies to achieve adequate lifetime.

25 ENERGY STORAGE↗

Reliability Study: On-Site Electrical System, 1998-2015

This report documents an analysis of the reliability of on-site electrical systems at U.S. commercial nuclear plants during the period 1998-2015. The study contains both individual component studies and system studies. The component studies are focused on key electrical components including circuit breakers, battery chargers, buses, batteries, and transformers. Data from the range of 1998 to 2015 were gathered, reviewed, and statistically evaluated for impacts on reliability as a function of relevant parameters: manufacturer, system, operating environment, inspection/testing regimen, operating range (voltages, amperes), setpoints, and other factors. The system studies identify seven operating nuclear power plants/units that represent different designs of offsite power sources and interconnecting power circuit paths, develop electrical single line diagrams and detailed fault tree models for the representing designs, and evaluate the electrical system reliability using the reliability data obtained from the component studies.

99 GENERAL AND MISCELLANEOUS↗

Layered Coordination Architecture for Resilient Restoration of Power Distribution Systems

The current practices for restoring critical services in the distribution system during a disaster, align with the traditional centralized ideology of distribution systems operations. A central processor evaluates the distribution system after a disruption and attains a restoration plan. However, the centralized operational paradigm is susceptible to single-point failures, requires full situational awareness of the distribution system, and poses scalability challenges for large multifeeder distribution systems. This motivates a distributed decision-making paradigm where multiple agents solve smaller subproblems and jointly coordinate their individual decisions to achieve the global/network-level objective. Toward this goal, we propose a layered architecture for distributed algorithms for resilience and a two-stage distributed algorithm for distribution system restoration. The proposed distributed decision-making framework enables the bottom-up restoration of the distribution system using all available resources, including distributed generation, while only requiring local awareness and limited communications with neighboring connected regions. The proposed framework is robust to single-point failures, enables autonomy using distributed algorithms, and had reduced computational cost compared to centralized optimization solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Exploration EVA System Concept of Operations

The Exploration Extravehicular Activity (xEVA) System concept of operations (con ops) captures the National Aeronautics and Space Administration’s (NASA’s) current aims future missions to all potential Exploration destinations. This document captures the mission architectures, stakeholder expectations, and high level definitions of the capabilities and interfaces associated with the xEVA System. This includes missions to Gateway in cislunar space, the lunar surface, a redirected asteroid in cislunar space, Near Earth Asteroids (NEA), Mars’ orbit, the moons of Mars (Phobos and Deimos), and the surface of Mars. These missions, which include microgravity, milli-gravity, and partial-gravity surface EVAs, will involve a variety of engineering (maintenance, contingency, pioneering, construction) and science tasks. This document also captures information concerning vehicles and habitats with which the xEVA System will interface. The concepts of operations (con ops) detailed in this document are informed by the Artemis Program and a multitude of Exploration studies, and are also influenced by various integrated operational analog testing.

David Coan↗

LANDSAT-D Mission Operations Review (MOR)

The integrated LANDSAT-D systems operation plan is presented and discussed with respect to functional elements, personnel, and procedures. Specifically, a review of the LANDSAT-D program, mission requirements and management, and flight operations is given.

Source record↗

Satellite Ground Operations Automation: Lessons Learned and Future Approaches

Reducing spacecraft ground system operations costs is a major goal in all missions. The Fast Auroral Snapshot (FAST) flight operations team at the NASA/Goddard Spacecraft Flight Center developed in-house scripts and procedures to automate monitoring of critical spacecraft functions. The initial staffing profile of 16x7 was reduced first to 8x5 and then to 'lights out'. Operations functions became an offline review of system performance and the generation of future science plans for subsequent upload to the spacecraft. Lessons learned will be applied to the challenging Triana mission, where 24x7 contact with the spacecraft will be necessary at all times.

Catena, John↗

Engineering flight evaluation report

The primary objective was to determine if the two-segment profile equipment, and operational procedures as defined by the B-727 Simulation Evaluation are operationally sound under all flight conditions expected to be encountered in line service. The evaluation was divided into the following areas: (1) to verify that the two-segment system operates as it was designed; (2) to conduct sufficient tests to secure a supplemental type certificate for line operation of the system; (3) to evaluate the normal operation of the equipment and procedures; (4) to evaluate the need for an autothrottle system for two-segment approaches; (5) to investigate abnormal operation of the equipment and procedures, including abused approaches and malfunctions of airborne and ground components; (6) to determine the accuracy and ease of flying the two-segment approach; (7) to determine the improvement in ground noise levels; and (8) to develop a guest pilot flight test syllabus.

Morrison, J. A.↗

A hierarchical framework for aggregating grid-interactive buildings with thermal and battery energy storage

The behind-the-meter (BTM) thermal and battery energy storage can help improve energy efficiency, reduce energy costs, and enhance energy resilience, particularly in rural areas and for disadvantaged communities. Aggregating numerous BTM energy storage systems can act as a price influencer with a significant source of load shifting and peak demand reduction. An integrated and scalable control mechanism is required to effectively utilize energy storage systems and flexible building loads to maximize the economic benefits, considering various distribution system constraints. Here, this paper presents an innovative hierarchical coordination framework for energy storage and flexible load in buildings, considering various factors such as electricity prices, thermal comfort, and distribution system modeling and constraints. At the upper level, a distribution system operator optimizes the power flow to minimize its power procurement costs from the electricity wholesale market, while at the lower level, aggregators determine the optimal dispatch of battery and thermal energy storage systems in multiple buildings on behalf of end-users to minimize operating costs according to the power prices. These problems are solved using a game-theoretic approach through negotiations between the distribution system operator and aggregators as a bi-level decision model. Simulation case studies have been performed for a test distribution network with a number of building end-users using energy storage systems to quantify the performance of aggregators. The results demonstrate that the proposed strategy can reduce peak load for a reliable electricity distribution network while saving electricity bills for customers.

25 ENERGY STORAGE↗

Spaceport Processing System Development Lab

The Spaceport Processing System Development Lab (SPSDL), developed and maintained by the Systems Hardware and Engineering Branch (NE-C4), is a development lab with its own private/restricted networks. A private/restricted network is a network with restricted or no communication with other networks. This allows users from different groups to work on their own projects in their own configured environment without interfering with others utilizing their resources in the lab. The different networks being used in the lab have no way to talk with each other due to the way they are configured, so how a user configures his software, operating system, or the equipment doesn't interfere or carry over on any of the other networks in the lab. The SPSDL is available for any project in KSC that is in need of a lab environment. My job in the SPSDL was to assist in maintaining the lab to make sure it's accessible for users. This includes, but is not limited to, making sure the computers in the lab are properly running and patched with updated hardware/software. In addition to this, I also was to assist users who had issues in utilizing the resources in the lab, which may include helping to configure a restricted network for their own environment. All of this was to ensure workers were able to use the SPSDL to work on their projects without difficulty which would in turn, benefit the work done throughout KSC. When I wasn't working in the SPSDL, I would instead help other coworkers with smaller tasks which included, but wasn't limited to, the proper disposal, moving of, or search for essential equipment. I also, during the free time I had, used NASA's resources to increase my knowledge and skills in a variety of subjects related to my major as a computer engineer, particularly in UNIX, Networking, and Embedded Systems.

Systems Engineering↗

Value of Faster Computation for Power Grid Operation

As a result of the grid evolution meeting the information revolution, the power grid is becoming far more complex than it used to be. How to feed data in, perform analysis, and extract information in a real-time manner is a fundamental challenge in today’s power grid operation, not to mention the significantly increased complexity in the smart grid environment. Therefore, high performance computing (HPC) becomes one of the advanced technologies used to meet the requirement of real-time operation. This paper presents benefit case studies to show the value of fast computation for operation. Two fundamental operation functions, state estimation (SE) and contingency analysis (CA), are used as examples. In contrast with today’s tools, fast SE can estimate system status in a few seconds—comparable to measurement cycles. Fast CA can solve more contingencies in a shorter period, reducing the possibility of missing critical contingencies. The benefit case study results clearly show the value of faster computation for increasing the reliability and efficiency of power system operation.

high performance computing↗

Floating-point system quantization errors in digital control systems

The results are reported of research into the effects on system operation of signal quantization in a digital control system. The investigation considered digital controllers (filters) operating in floating-point arithmetic in either open-loop or closed-loop systems. An error analysis technique is developed, and is implemented by a digital computer program that is based on a digital simulation of the system. As an output the program gives the programing form required for minimum system quantization errors (either maximum of rms errors), and the maximum and rms errors that appear in the system output for a given bit configuration. The program can be integrated into existing digital simulations of a system.

Phillips, C. L.↗

Impact of Distributed Energy Resources on the Bulk Electric System: Combined Modeling of Transmission and Distribution Systems and Benchmark Case Studies

The high penetration of distributed energy resources (DERs) on modern distribution systems introduces intermittent power generation, stochastic system operating conditions, and bi-directional power flows that impact the system responses to various types of disturbances and may pose challenges to the operations and reliability of the Bulk Electric System (BES). In order to understand the impact of DERs on the planning and operation of the BES, the distribution system can no longer be represented as a single load at a node on the transmission system. At the same time, advanced control capabilities of DERs offer potential opportunities for improving BES reliability by transforming DERs from a passive “do no harm” resource to an active “support reliability” resource when applied in a planned and well-thought-out manner. This concept is often described as DER “flexibility.” With the persistent trend towards a high- penetration of DERs in distribution systems, regulators such as the North American Electric Reliability Corporation (NERC), planning coordinators and grid operators are in serious need of understanding the full-spectrum impact of DERs on the BES to ensure secure and reliable grid planning and operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Intermediate Levels of Autonomy within the SSM/PMAD Breadboard

The Space Station Module Power Management and Distribution (SSM/PMAD) bread-board is a test bed for the development of advanced power system control and automation. Software control in the SSM/PMAD breadboard is through co-operating systems, called Autonomous Agents. Agents can be a mixture of algorithmic software and expert systems. The early SSM/PMAD system was envisioned as being completely autonomous. It soon became apparent, though, that there would always be a need for human intervention, at least as long as a human interacts with the system in any way. In a system designed only for autonomous operation, manual intervention meant taking full control of the whole system, and loosing whatever expertise was in the system. Several methods for allowing humans to interact at an appropriate level of control were developed. This paper examines some of these intermediate modes of autonomy. The least humanly intrusive mode is simple monitoring. The ability to modify future behavior by altering a schedule involves high-level interaction. Modification of operating activities comes next. The coarsest mode of control is individual, unplanned operation of individual Power System components. Each of these levels is integrated into the SSM/PMAD breadboard, with support for the user (such as warnings of the consequences of control decisions) at every level.

Dugal-Whitehead, Norma R.↗

Operational aspects of a spacecraft planning/scheduling expert system

Various operational aspects of the Earth Radiation Budget Satellite (ERBS) Tracking and Data Relay Satellite System (TDRSS) are described. The ERBS-TDRSS Contract Planning System is an expert system which has been used operationally since June 1987 by the ERBS Flight Operations Team (FOT) at Goddard Space Flight Center to build weekly schedules of requests for service from the TDRSS. The basic operation of the system and significant enhancements and changes are discussed.

Mclean, David R.↗