Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

NEVADA NATIONAL SECURITY SITE 2020 DATA REPORT- GROUNDWATER MONITORING PROGRAM AREA 5 RADIOACTIVE WASTE MANAGEMENT SITE

This report presents groundwater and leachate sample results from the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site in Nye County, Nevada. Since 1993, groundwater samples have been collected and static groundwater depths have been measured from the aquifer immediately below the Area 5 RWMS. The data are evaluated for evidence of effects on the aquifer related to the Area 5 RWMS. Leachate from the Cell 18 lined mixed waste cell has been sampled since 2011, and leachate from the Cell 25 lined mixed waste cell was first sampled in 2019 after it began receiving waste in August 2018. Leachate data are analyzed for hazardous contaminants to determine appropriate leachate handling and disposal. This report includes five years of data from 2016 through 2020.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 078 - Panel: Start-Up of Three Major DOE Treatment Facilities -SWPF, IWTU and DFLAW (2/2) (R2.4)

This panel focused on the successes and challenges of the DOE High-Level radioactive tank waste management program, with an emphasis on the completion of construction and startup of three major treatment facilities - the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste Treatment Unit (IWTU) at Idaho, and Direct Feed Low-Activity Waste (DFLAW) processing at Hanford. As a companion to Session 23, DOE managers and federal project directors discussed the status of facility startup efforts from a federal management and oversight perspective, highlighting readiness planning, challenges and lessons learned. Panelists with presentations: Transitioning Oversight: A Project Becomes an Operating Facility (James Folk); Tools for SU/C (Tom Fletcher); Startup and Commissioning -Integrate Waste Treatment Unit-Federal Perspective (Joel Case)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leak Testing with Simulated Waste of Hanford Tank Farm Valves Utilized for Double Valve Isolation - 16108

The existing Hanford Tank Farms Waste Transfer System has several models of ball valves used for double valve isolation (DVI) that have been installed for 10 or more years. The safety function of the safety-significant valves is to limit leakage of waste past the valves in order to decrease the consequences of a fine spray release due to a transfer misroute. While previous leak testing of the valves has been conducted, the testing did not address concerns in the Documented Safety Analysis concerns about the impact on valve operation and service life of the potential abrasive/erosive properties of the tank waste on the valves when cycled. Pacific Northwest National Laboratory (PNNL) conducted DVI tests at their Multi-Phase Transport Evaluation Loop Facility. Testing evaluated the leak rate of safety-significant isolation valves for DVI as a function of simulated operating cycles. PNNL developed a performance-based simulant specifically for this test program. The test environment simulated the abrasive characteristics of the Hanford Tank Farms Waste Transfer System during single-shell tank retrieval and waste feed delivery to the Hanford Tank Waste Treatment and Immobilization Plant. The testing consisted of periodically measuring leak rates and maximum operational torques on the DVI valves after prescribed numbers of valve operational cycles (open and close). The test results from the simulant cycle tests provide Washington River Protection Solutions with performance characteristics that can be used to verify compliance with the Documented Safety Analysis limits for valve seat leakage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Study of a Monitoring Program for Intermediate Depth Disposal of Low- Level Radioactive Waste - 20167

This study investigated a monitoring program for intermediate depth disposal of low-level radioactive waste. At first, it extracted monitoring targets, such as the status of cracks in the low diffusion layer after closure of the facility. Secondly, it focused on distributed optical fiber sensors which can minimize the amount of cable, and measurement positions and methods were specifically determined to propose the monitoring method. Finally, conformity to regulatory requirements was verified to clarify key points and issues to be addressed in performing monitoring. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SAMPLE RESULTS FROM THE INTEGRATED SALT DISPOSITION PROGRAM MACROBATCH 4 TANK 21H QUALIFICATION SAMPLES

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H to qualify them for use in the Integrated Salt Disposition Program (ISDP) Batch 4 processing. All sample results agree with expectations based on prior analyses where available. No issues with the projected Salt Batch 4 strategy are identified. This revision includes additional data points that were not available in the original issue of the document, such as additional plutonium results, the results of the monosodium titanate (MST) sorption test and the extraction, scrub strip (ESS) test. This report covers the revision to the Tank 21H qualification sample results for Macrobatch (Salt Batch) 4 of the Integrated Salt Disposition Program (ISDP). A previous document covers initial characterization which includes results for a number of non-radiological analytes. These results were used to perform aluminum solubility modeling to determine the hydroxide needs for Salt Batch 4 to prevent the precipitation of solids. Sodium hydroxide was then added to Tank 21 and additional samples were pulled for the analyses discussed in this report. This work was specified by Task Technical Request and by Task Technical and Quality Assurance Plan (TTQAP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of New Type-B Containers and the 'Alternative Approach' Disposal of High-Activity Sealed Sources - 17385

The DOE/NNSA Office of Radiological Security (ORS) is undertaking two projects to enable the recovery and disposal of high-activity sealed sources. First, ORS has completed the development, certification, and fabrication of a new Type B package to support the recovery and transportation of high-activity sources commonly used in irradiators and cancer treatment devices. A second design is currently undergoing certification. The new containers will enable DOE/NNSA shipment of nearly 100 percent of all commercially used devices containing Cs-137 and Co-60, which are particularly significant from a National security, public health, and safety standpoint. Second, ORS and the Conference of Radiation Control Program Directors (CRCPD) Source Collection and Threat Reduction (SCATR) are piloting the commercial disposal of a high-activity device under the NRC's revised guidance on concentration averaging and encapsulation. The Cs-137 blood irradiator is being proposed for disposal at the U.S. Ecology facility in Richland, WA. The project is intended to serve as a model for commercial disposal of similar Class C sources that for decades have been without a commercial disposal pathway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ambient Radon-222 Monitoring in Amargosa Valley, Nevada

As part of a program to characterize and baseline selected environmental parameters in the region around the proposed repository at Yucca Mountain, Nevada, ambient radon-222 monitoring was conducted in the rural community of Amargosa Valley, the community closest to the proposed repository site. Passive integrating radon monitors and a continuous radon monitoring instrument were deployed adjacent to the Community Environmental Monitoring Program (CEMP) (http://www.cemp.dri.edu/index.html) station located in the Amargosa Valley Community Center near the library. The CEMP station provided real-time ambient gamma exposure and meteorological data used to correct the integrated radon measurements as well as verify meteorological data collected by the continuous radon monitoring instrument. Additionally, different types of environmental enclosures that housed the monitors and instrument were used to determine if particular designs influenced the ambient radon measurements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Nuclear Fuel Cycle Effects on the Treatment of Uncertainty in the Long-Term Assessment of Geologic Disposal Systems - EBS Input

The Used Fuel Disposition (UFD) Campaign within the Department of Energy's Office of Nuclear Energy (DOE-NE) Fuel Cycle Technology (FCT) program has been tasked with investigating the disposal of the nation's spent nuclear fuel (SNF) and high-level nuclear waste (HLW) for a range of potential waste forms and geologic environments. The planning, construction, and operation of a nuclear disposal facility is a long-term process that involves engineered barriers that are tailored to both the geologic environment and the waste forms being emplaced. The UFD Campaign is considering a range of fuel cycles that in turn produce a range of waste forms. The UFD Campaign is also considering a range of geologic media. These ranges could be thought of as adding uncertainty to what the disposal facility design will ultimately be; however, it may be preferable to thinking about the ranges as adding flexibility to design of a disposal facility. For example, as the overall DOE-NE program and industrial actions result in the fuel cycles that will produce waste to be disposed, and the characteristics of those wastes become clear, the disposal program retains flexibility in both the choice of geologic environment and the specific repository design. Of course, other factors also play a major role, including local and State-level acceptance of the specific site that provides the geologic environment. In contrast, the Yucca Mountain Project (YMP) repository license application (LA) is based on waste forms from an open fuel cycle (PWR and BWR assemblies from an open fuel cycle). These waste forms were about 90% of the total waste, and they were the determining waste form in developing the engineered barrier system (EBS) design for the Yucca Mountain Repository design. About 10% of the repository capacity was reserved for waste from a full recycle fuel cycle in which some actinides were extracted for weapons use, and the remaining fission products and some minor actinides were encapsulated in borosilicate glass. Because the heat load of the glass was much less than the PWR and BWR assemblies, the glass waste form was able to be co-disposed with the open cycle waste, by interspersing glass waste packages among the spent fuel assembly waste packages. In addition, the Yucca Mountain repository was designed to include some research reactor spent fuel and naval reactor spent fuel, within the envelope that was set using the commercial reactor assemblies as the design basis waste form. This milestone report supports Sandia National Laboratory milestone M2FT-12SN0814052, and is intended to be a chapter in that milestone report. The independent technical review of this LLNL milestone was performed at LLNL and is documented in the electronic Information Management (IM) system at LLNL. The objective of this work is to investigate what aspects of quantifying, characterizing, and representing the uncertainty associated with the engineered barrier are affected by implementing different advanced nuclear fuel cycles (e.g., partitioning and transmutation scenarios) together with corresponding designs and thermal constraints.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Employing MACS/ViBRANT as a Surrogate MARVEL Reactor for Startup Reactivity Tuning and Supervisory Control Processes

Advanced nuclear reactors are a key part of the future of nuclear energy both in the United States and globally. They offer unique benefits for various energy-demanding applications, including use in remote locations, compact size, modular manufacturing, remote monitoring, low and/or variable power rating operation, and reliance on novel technologies to enhance operational safety. To achieve economic feasibility, advanced reactors must significantly reduce their workforces in comparison with the current fleet. Achieving this reduction will occur through reducing staff workloads using technology to achieve autonomous or semi-autonomous operations, demonstrated by comprehensive testing and validation activities. These operations will require both software and hardware platforms during the design and testing phases. While simulations are useful during the design phase, their performance can significantly deviate during actual deployment on hardware. This report presents the outcomes of a collaborative technical initiative between the U.S. Department of Energy (DOE) Microreactor Program (MRP) and Advanced Sensors and Instrumentation (ASI) Program. The collaboration utilized the Microreactor Automated Control System (MACS) hardware platform to bridge the gap between theoretical reactor design and actual startup and control operations. Two key use cases were investigated: facilitating the startup testing period and demonstrating supervisory control. The first use case details the key Microreactor Applications Research Validation and Evaluation (MARVEL) reactor startup physics testing activities conducted using the MACS platform. These activities included drum worth measurements, shutdown margin assessment, temperature feedback analysis, and scram time evaluation, as well as unique testing that would apply to the MARVEL reactor to demonstrate the testing methodologies in a low-risk environment. The MACS platform, serving as a surrogate representation of the MARVEL reactor, proved instrumental in performing these tests. The exercise revealed aspects that led to optimized processes, refined hardware design, and enhanced base software capabilities. By maturing methods and technologies in this manner, the initiative promises to reduce wasted time in the actual on-site reactor deployment effort, thereby saving significant time and resources. The second use case focuses on the development and implementation of supervisory control methods aimed at managing core tilt, which can result from asymmetrical operations or manufacturing imperfections in fuel rods or reactivity control devices. A key objective was to assess and compare the use of artificial intelligence (AI) for supervisory control. The effort aimed to define the role of supervisory control to enhance performance without risking control instability. This effort explored three distinct approaches: rules-based (RB) methods, optimization techniques, and reinforcement learning (RL) algorithms. Each approach was evaluated for its ease of implementation, its usability, and its effectiveness in responding to asymmetries in neutron flux. Comparative analysis of these approaches provided valuable insights into their applicability and effectiveness, offering a robust framework for advanced reactor operations. Together, these two use cases highlight the potential of hardware test beds to help streamline the design, operation, and control of advanced nuclear reactors. This collaborative effort underscores the importance of continued innovation and experimentation in achieving the next generation of safe, reliable, and economically viable nuclear energy solutions.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Dry Storage of Research Reactor Spent Nuclear Fuel - 13321

Spent fuel from domestic and foreign research reactors is received and stored at the Savannah River Site's L Area Material Storage (L Basin) Facility. This DOE-owned fuel consists primarily of highly enriched uranium in metal, oxide or silicide form with aluminum cladding. Upon receipt, the fuel is unloaded and transferred to basin storage awaiting final disposition. Disposition alternatives include processing via the site's H Canyon facility for uranium recovery, or packaging and shipment of the spent fuel to a waste repository. A program has been developed to provide a phased approach for dry storage of the L Basin fuel. The initial phase of the dry storage program will demonstrate loading, drying, and storage of fuel in twelve instrumented canisters to assess fuel performance. After closure, the loaded canisters are transferred to pad-mounted concrete overpacks, similar to those used for dry storage of commercial fuel. Unlike commercial spent fuel, however, the DOE fuel has high enrichment, very low to high burnup, and low decay heat. The aluminum cladding presents unique challenges due to the presence of an oxide layer that forms on the cladding surface, and corrosion degradation resulting from prolonged wet storage. The removal of free and bound water is essential to the prevention of fuel corrosion and radiolytic generation of hydrogen. The demonstration will validate models predicting pressure, temperature, gas generation, and corrosion performance, provide an engineering scale demonstration of fuel handling, drying, leak testing, and canister backfill operations, and establish 'road-ready' storage of fuel that is suitable for offsite repository shipment or retrievable for onsite processing. Implementation of the Phase I demonstration can be completed within three years. Phases II and III, leading to the de-inventory of L Basin, would require an additional 750 canisters and 6-12 years to complete. Transfer of the fuel from basin storage to dry storage requires integration with current facility operations, and selection of equipment that will allow safe operation within the constraints of existing facility conditions. Examples of such constraints that are evaluated and addressed by the dry storage program include limited basin depth, varying fuel lengths up to 4 m, (13 ft), fissile loading limits, canister closure design, post-load drying and closure of the canisters, instrument selection and installation, and movement of the canisters to storage casks. The initial pilot phase restricts the fuels to shorter length fuels that can be loaded to the canister directly underwater; subsequent phases will require use of a shielded transfer system. Removal of the canister from the basin, followed by drying, inerting, closure of the canister, and transfer of the canister to the storage cask are completed with remotely operated equipment and appropriate shielding to reduce personnel radiation exposure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of SRNL Support to the DOE-ORP Enhanced Waste Glass Program for FY23

In fiscal year 2023 (FY23) Savannah River National Laboratory (SRNL) continued tasked work for the Office of River Protection (ORP) to expand glass compositional regions accessible for low-activity waste (LAW) and high-activity waste (HLW) vitrification processing. Experimental work continued in four primary technical areas focused on processing and performance of glasses relevant to the Hanford missions. The data and results from this work will be used to expand and validate the glass models being developed at Pacific Northwest National Laboratory (PNNL) for waste processing and acceptance. This report summarizes the activities and deliverables associated with work performed in FY23.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phenix Power Plant Decommissioning Project. Treatment of the Primary Cold Trap

Phenix is a sodium-cooled fast neutron reactor located at the CEA's Rhone Valley Center where it was commissioned in 1974. It has an electric power rating of 250 MW and is operated jointly by the CEA and EDF. Its primary role today is to investigate the transmutation of long-lived radioactive waste into shorter-lived wasteform. Its final shutdown is scheduled for the beginning of 2009. In this context the Phenix Power Plant Decommissioning Project was initiated in 2003. It covers the definitive cessation of plant operation and the dismantling (D and D) operations together with the final shutdown preparatory phase. The final shutdown phase includes the operations authorized within the standard operating methodological framework. The dismantling phase also comprises treatment of sodium-bearing waste and dismantling of the nuclear facilities (reactor block, shielded cells, etc.). Treatment of the Phenix primary cold trap is scheduled to begin in 2016. The analysis program includes the following steps: - Accurately determine the contamination in the trap by carrying out gamma spectrometry measurement campaigns from 2007 to 2013 (the remaining difficulty will be to accurately determine the distribution of the contamination). - Validate the safety studies for the ELA facility. This work is currently in progress; ELA will be commissioned following inactive qualification testing. - Proceed with cutting tests on the knit mesh filter, which are scheduled to begin in 2008.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Radiation from Low-Level Radioactive Waste Leachate on Antioxidant Depletion in HDPE Geo-membrane - 16087

Low-level radioactive waste (LLW) and mixed waste (MW) disposal facilities in the US are required to have a service life in excess of 1000 yr. Understanding the rate of degradation of high-density polyethylene (HDPE) geo-membranes (GMs) used in LLW and MW facilities is necessary to assess their service life when conducting a performance assessment for a disposal facility. In LLW and MW disposal facilities, GMs may be exposed to radionuclides that may accelerate antioxidant depletion and degradation. This paper evaluates how radiation dosage affects antioxidant depletion in HDPE GMs and makes inferences regarding the impact of radiation on GM service life. Specimens of 0.04-mm-, 0.1-mm-, and 2-mm-thick HDPE GMs were exposed to a sealed source of Am-241 to simulate alpha radiation from LLW leachate (e.g., uranium). The specimens were exposed to the sealed source for 1-50 h, followed by oxidative induction time (OIT) testing to determine depletion of antioxidants in response to exposure. Penetration of alpha particles in the HDPE GM exposed to the sealed source was evaluated with the program Geometry And Tracking (GEANT4). The GEANT4 modeling indicates that physical dose deposition for alpha particles largely occurs on the superficial layers and decreased monotonically with depth to a negligible dose (∼ 28 μm). For a 2-mm-thick HDPE GM, there was no change in OIT after exposure, whereas in much thinner GMs (e.g., 0.04 mm), significant antioxidant depletion occurred after exposure, reflecting the shallow penetration of alpha radiation at the surface of HDPE GM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford double-shell tank testing program - 15341

The corrosion testing program and Hanford regularly tests waste chemistries to analyze threats and develop new corrosion chemistry guidelines. Over the past few years, the focus of testing has been on the threat of leaked wastes in Tank 241-AY-102 (AY-102). From the tests conducted to date, it appears that the potential waste compositions in the annulus of tank AY-102 do not show a propensity for localized corrosion or stress corrosion cracking. The threat of exterior corrosion from the liquid and moisture in the leak detection pit (LDP) is a potential concern that will continue to be evaluated in the coming year. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Annual Site Environmental Report for 2010

The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) Characterize site environmental management performance. (2) Summarize environmental occurrences and responses reported during the calendar year. (3) Confirm compliance with environmental standards and requirements. (4) Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the WIPP. DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit Number NM4890139088-TSDF (Permit) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sample Results from the Integrated Salt Disposition Program Macrobatch 5 Tank 21H Qualification Samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 5 for the Integrated Salt Disposition Project (ISDP). This document reports partial results of the analyses of samples of Tank 21H. No issues with the projected Salt Batch 5 strategy are identified. Results of the analyses of the Tank 21H samples from this report in conjunction with the findings of the previous report, indicates that the material does not display any unusual characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗