Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

The UK's National Policy and Programme for the Management of Spent Fuel and Radioactive Waste - 16574

This paper provides a broad overview of the United Kingdom's (UK's) national policies and national programme for the management of spent fuel and radioactive waste. The aim of the paper is to ensure a clear understanding of the approach taken in the UK so that opportunities for learning lessons and joint working, where they exist, can be identified and to ensure a general understanding of the interdependencies between the various approaches taken in the UK. With a legacy that dates back to the late 1940's/early 1950's the UK have a range of complex and difficult issues to resolve that have evolved over time. What was considered to be acceptable in the past is not thought of in the same way today. We therefore need to be forward thinking, innovative and above all ready to adapt our practices and policies to address previously unknown issues and complications. Due to the wide range of types of radioactive wastes and materials to be managed in the UK we have needed to establish a set of high level principles to cover all radioactive waste types while at the same time ensure that specific approaches for specific issues are developed within that framework. In the UK we have also had to consider the issue of integration to ensure that an approach that addresses one issue does not inadvertently cause a problem elsewhere - for example: in disposing of the high volumes of very low level waste we needed an approach to ensure that other low level waste has a disposal route. Financing of decommissioning and future waste management is clearly one of the biggest challenges to be addressed. As mentioned above ensuring that the legacy left for future generation is not one of a burden - we need to ensure that measures are in place to fund and manage long lived radioactive wastes. Finally, it is clear that not all radioactive wastes are the same and therefore different approaches are needed for managing the different types of material. This requires a proportionate and prioritised approach so while the same ultimate goal is applied (i.e.: the safe and responsible management of radioactive waste) some radioactive wastes are more equal than others and need to be treated accordingly. In the UK we believe that we have a broad programme in place that allows the right balance to be struck in managing all our radioactive waste and spent fuel in a proportionate, safe and responsible manner.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Collaborative Management for Complex Closure Teams - 19246

The closure documentation for government waste management sites requires a multidisciplinary approach to achieve success. This approach is necessary and similar to approaches utilized across remediation projects in the private and public sectors [1]. Closure documentation for government projects can range from tens of pages to upwards of thousands of pages. They normally take more than six months to put together - although, in many cases, it takes years - with multiple revisions. These documents, while all unique, share common themes with regards to communication and conflict with the other waste management projects. This paper explores the challenges in management and leadership approaches for generating technical documents, such as those found in the closure missions at government hazardous waste management sites. These matrixed teams are composed of many different members with varying expertise and experience, each with different stakeholder backgrounds. These teams experience challenges not only from using a matrixed approach - where the majority of the members are only partially engaged in the project - but also from integrating each of their respective stakeholder group's cultural individualities [2]. The Project Leads, who head up these highly matrixed projects, operate in environments comprised of virtual project teams- or more specifically in this context, intensive virtual project teams. Most of the participants are within the same city, but all of the document project teams operate with some level of organizational dispersion. Moreover, the larger a project becomes the more dispersed the team becomes. The frequent addition of sub-contracting resources by Project Leads further disperses the group and dilutes communication. The difficulties in communication derive from complications in the goal setting stages of a project and can manifest across the project team in the form of motivational issues, disengagement, quality expectations, and a loss of understanding. This puts a considerable amount of importance on a Project Lead to establish goals through the appropriate tools and methodology. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 16: Hot Topics and Emerging Issues in US Commercial LLRW Management and Disposal

This panel focused on emerging issues in commercial LLW management in the US from the perspective of active members of the Low-Level Radioactive Waste Forum, Inc. State, compact, federal and industry officials will share their views on a variety of timely and significant topics related to low-level radioactive waste management, disposal and related issues. Presentations proposed include: 1 - Overview of NRC Activities and Initiatives (John Tappert, US NRC (USA)); 2 - Advocates for Responsible Disposal in Texas (Edward Selig, Advocates for Responsible Disposal in Texas (ARDT) (USA)); 3 - Hot Topics and Emerging Issues in U.S. Commercial LLW Management and Disposal (Joe Weismann, US Ecology (USA)); 4 - DOE/NNSA Office of Radiological Security (ORS) Sealed Source Management and Disposal (David Martin, Energetics Incorporated (USA), Temeka Taplin, US DOE NNSA (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 105: US DOE LLW On-Site Disposal: LLW Disposal Facility Federal Review Group Review Process

This panel focuses on risk-informed provision for waste management of US DOE radioactive wastes. Detailed information on the high-level radioactive waste interpretation Federal Register Notice will be discussed to better educate the audience in understanding that interpretation. The Co-Chairs and panelists each introduced themselves. Presentations proposed include: 1 - Overview of Public Comments on the Proposed High-Level Radioactive Waste Interpretation (Theresa Kliczewski, US DOE EM (USA)); 2 - ECA Presentation on Implementation Approaches and Expectations for Radwaste Management; DOE Order 435.1 (Kara Colton, Energy Communities Alliance (USA)); 3 - 2019 Grassroots Efforts to Clarify HLW Definition (Rick McLeod, Savannah River Site Community Reuse Organization - SRSCRO (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evolution of DOE/Stakeholder Relationships at the Fernald Preserve, Ohio, Site - 19559

The Fernald Preserve, Ohio, Site is managed by the US Department of Energy (DOE) Office of Legacy Management. It is approximately 29 km (18 miles) northwest of Cincinnati, Ohio, on the site of a former uranium-processing plant established by the US Atomic Energy Commission in 1951. The production mission officially ended in 1991 when it was replaced by a remediation mission. Extensive environmental remediation was subsequently conducted under the Superfund program by the DOE Office of Environmental Management. After most of the remediation was concluded in 2006, the site was transferred to the DOE Office of Legacy Management, which continued comprehensive ecological restoration and is responsible for an ongoing aquifer remediation operation. The site was renamed the Fernald Preserve and opened to the public in 2008 as an undeveloped park, encompassing a diversity of natural habitats native to the area. The site now serves as a community asset, offering a Visitors Center with exhibits that tell the site story, hiking trails, wildlife observation opportunities, meeting spaces for community groups, educational program opportunities, and Interpretive Services personnel to engage the public. There was a long history of community mistrust about government operations at the site, beginning in the 1950's when land for the site was acquired by eminent domain, and continuing when contamination and hazardous waste management concerns were revealed in the 1980's. Resulting media coverage on possible contamination and cover-up concerns was extensive. In 1986, sitewide studies to determine the nature and extent of contamination and to consider cleanup options were instigated. In 1989, the site was placed on the National Priorities List of the Superfund program. Because of the longstanding mistrust held by many stakeholders, DOE faced a very serious challenge in achieving consensus among stakeholder groups about the cleanup levels, waste disposition, and the future uses of the site. Starting in the late 1980's, DOE, the regulators, site contractors and the community took a number of steps over many years to increase trust and achieve consensus among the many stakeholder groups. These steps included establishing a single cleanup mission, involving the community early and often as a critically important stakeholder, creating a citizens taskforce and community envoys, and providing extensive educational outreach. As a result, DOE, regulators, contractors, and community members moved from a position of very little trust to one of increased trust and collaboration among all concerned parties. The lessons learned from the Fernald site can be invaluable in the resolution of difficult environmental issues and should be considered as DOE seeks increased collaboration and consensus with stakeholders to solve other environmental remediation challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 94: US DOE Procurement Opportunities and End-State Contracting Model Status

This panel focused on DoE's procurement implementation strategy and planned activities for its first-tier contractors (Tier 1 procurements). This panel also focused on the implementation status of DoE's End State Contracting Model, which uses a single-award ID/IQ approach to give DOE flexibility to better define discrete scopes of work for site closure or end states. The panelists provided their prospective on progress toward the implementation of this new approach, lessons learned and the path forward for upcoming opportunities utilizing this contracting model. Panelists with presentations: EFCOG (Billy Morrison); DOE Procurement Opportunities - 4 Ways for Small Business Participation (Anne Marie Bird); US DOE Procurement and Contracting Opportunities (Aaron Deckard)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 097C - Panel: Reuse of Federal Land on the Oak Ridge Reservation, TN (3/4) (R.16c)

This panel was to focus on what is being done to enable federal reuse across the DOE's Oak Ridge Reservation, including how the Community Reuse Organization of East Tennessee (CROET) plays a critical role, how the community is benefiting, and the experience of the private sector companies now occupying the site. The Panelists were to discuss how resources from the East Tennessee Technology Park (ETTP) are being transitioned to support cleanup efforts that enable critical NNSA and Office of Science missions. This session integrated with panel sessions 97A, 97B, and 97D. Panelists with presentations: Community Reuse Organization of East Tennessee (CROET) (Ryan Overton); Community Perspective (Ron Woody); ETTP Tenant Point of View (Bradley Spears); Enabling NNSA and Office of Science Missions (Stephen Phillips); Enabling Federal Land Reuse (David Adler)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing Decommissioning Cost Estimating Relationships and the Decommissioning Estimate Analysis Library Estimating System - 20423

DOE-EM's Consolidated Business Center (EM-CBC) Office of Cost Estimating has developed a system of Decommissioning Cost Estimating Relationships (CERs) and Models to improve the reliability and efficiency of its estimates. The development builds on the multi-year process of collecting and organizing historical cost data from DOEEMs decommissioning projects and estimate model development to support project and program-level decommissioning estimates. The latest work has extended these models down to project scope element and component building area levels, allowing the actual costs of work for these estimate components to be assembled into estimates that reflect specific projects. The CERs have been incorporated into two estimator-friendly products - as cost libraries in the MII estimating program and as an MS Excel-based model, and are available for DOE federal staff use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TECHNOLOGY NEEDS AND STATUS ON CLOSURE OF DOE RADIOACTIVE WASTE TANK ANCILLARY SYSTEMS

This paper summarizes the current state of art of sampling, characterizing, retrieving, transferring and treating the incidental waste and stabilizing the void space in tank ancillary systems and the needs involved with closure of these systems. The overall effort for closing tank and ancillary systems is very large and is in the initial stages of being addressed in a systematic manner. It was recognized in doing this effort, that gaps in both technology and material application for characterization and removal of residual waste and closure of ancillary systems would be identified. Great efficiencies are to be gained by defining the technology need areas early in the closure process and providing recommendations for technical programs to improve the closure strategies. Therefore, this paper will not only summarize the state of closure of ancillary systems but also provide recommendations to address the technology gaps identified in this assessment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Acquisition and Implementation of a Comprehensive Environmental Permits Linking Tool at Savannah River Site - 20234

Historically, Savannah River Nuclear Solutions LLC (SRNS) tracked environmental regulatory commitments and the requirements from hundreds of permits at the Savannah River Site (SRS) using several separate methods, making integrated compliance assurance cumbersome and labor-intensive. When SRNS experienced an increase in environmental issues in 2017, SRNS management and U.S. Department of Energy - Savannah River (DOE-SR) management decided a single, proactive approach was needed to capture environmental permit information (including regulations, Consent Orders, DOE Orders, and any other state or federally issued statement of requirements), track the tasks necessary to ensure compliance with these requirements, and thereby mitigate the risk of noncompliance. SRNS developed a list of mandatory objectives that the tool must meet to function as a Comprehensive Environmental Permits Linking Tool (CEPLT). A key requirement was the ability to map Site permits to their governed locations and display the associated requirements at the compliance point (e.g., outfall, stack, waste unit, etc.). Several options included modifying existing onsite resources, building a custom onsite solution, purchasing an off-the-shelf solution, and contracting an offsite developer to build a custom solution. SRNS concluded an off-the-shelf solution with configuration and customization options would provide the flexibility to fit the unique needs of Savannah River Site (SRS) while taking advantage of industry-tested software and providing a reduced deployment timeline. SRNS chose Gensuite{sup R} a, a cloud-based solution that offers numerous a la carte applications in the environmental, health, and safety arenas, as the best candidate. SRNS selected three (3) integrated applications (Compliance Calendar, Permit Manager, and Mapper) to function as the CEPLT. The Compliance Calendar module allows for creation and tracking of regulatory commitment tasks assigned to responsible environmental professionals. Permit Manager organizes permits and other requirement documents, linking the commitments in each to Compliance Calendar tasks and/or implementing procedures. Mapper provides GIS capability for mapping the data from the other two modules to their physical onsite locations. The CEPLT was configured to allow for other SRS Site Tenants to eventually utilize the applications. Additionally, DOE-SR uses the CEPLT to provide an overview of contractor environmental compliance activities and to organize DOE-specific documents and tasks. The CEPLT fulfilled the requirement of meeting current compliance needs as well as providing the ability to grow as new organizations are incorporated and functionality is expanded. SRNS now uses the CEPLT to more effectively manage permit requirements, improve knowledge transfer, and increase the Site's overall protection of the environment, the Site worker, and the public. Possible future uses of the system include integration of mobile applications for timely communication of potential non-compliant conditions and DOE complex-wide deployment allowing for enhanced DOE site and Head Quarters oversight. Implementation of CEPLT will result in cost savings, both in terms of dollars and man-hours. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scientific Opportunities to Reduce Risk in Nuclear Process Science

Cleaning up the nation’s nuclear weapons complex remains as one of the most technologically challenging and financially costly problems facing the U.S. Department of Energy (DOE). Safety, cost, and technological challenges have often delayed progress in retrieval, processing, and final disposition of high-level waste, spent nuclear fuel, and challenging materials. Some of the issues result from the difficulty and complexity of the technological issues; others have programmatic bases, such as strategies that may provide undue focus on near-term goals or difficulty in developing and maintaining stakeholder confidence in the proposed solutions. We propose that independent basic fundamental science research, addressing the full cleanup life-cycle, offers an opportunity to help address these challenges by providing 1) scientific insight into the fundamental mechanisms involved in currently selected processing and disposal options, 2) a rational path to the development of alternative technologies should the primary options fail, 3) confidence that models that predict long-term performance of different disposal options are based upon the best available science, and 4) fundamental science discovery that enables transformational solutions to revolutionize the current baseline processes. Over the last 3 years, DOE’s Office of Environmental Management (EM) has experienced a fundamental shift in philosophy. The mission focus of driving to closure has been replaced by one of enabling the long-term needs of DOE and the nation. Resolving new challenges, such as the disposition of DOE spent nuclear fuel, have been added to EM’s responsibilities. In addition, the schedules for addressing several elements of the cleanup mission have been extended. As a result, EM’s mission is no longer focused only on driving the current baselines to closure. Meeting the mission will require fundamental advances over at least a 30-year window if not longer as new challenges are added. The overall intent of this paper is to foster a dialogue on how basic scientific research can assist DOE in executing its cleanup and environmental management mission. In this paper, we propose that such scientific investments not be focused solely on what may be viewed as current DOE needs, but also be based upon longer-term investments in specific areas of science that underpin technologies presently in use. In the latter regard, we propose four science theme areas: 1) the structure and dynamics of materials and interfaces, 2) coupled chemical and physical processes, 3) complex solution phase phenomena, and 4) chemical recognition phenomena. The proposed scientific focus for each of these theme areas and the scientific opportunities are identified, along with links to major risks within the initiative areas identified in EM’s Engineering and Technology Roadmap.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nevada National Security Site 2012 Waste Management Monitoring Report Area: 3 and Area 5 Radioactive Waste Management Sites

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2012 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2012; 2013a; 2013b). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are only slightly above detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. The 133.9 millimeters (mm) (5.27 inches [in.]) of precipitation at the Area 3 RWMS during 2012 is 12% below the average of 153.0 mm (6.02 in.), and the 137.6 mm (5.42 in.) of precipitation at the Area 5 RWMS during 2012 is 11% below the average of 122.4 mm (4.82 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Automated vadose zone monitoring on Area 5 and Area 3 RWMS cell covers show no evidence of precipitation percolating through the cover to the waste. Moisture from precipitation did not percolate below 60 centimeters (cm) (2 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS, and moisture from precipitation and irrigation did not percolate below 45 cm (1.5 ft) on the 92-Acre Area final cover. Irrigation was applied to this cover for seed germination and plant growth. During 2012, there was no drainage through 2.4 meters (8 ft) of soil from the Area 3 drainage lysimeters that received only natural precipitation. Twenty percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter that received 3 times natural precipitation. All 2012 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Direct Assessment Approaches and Methodologies to Cathodically Protected Nuclear Waste Transfer Lines

The U.S. Department of Energy's (DOE) Hanford Site is responsible for the safe storage, retrieval, treatment, and disposal of approximately 54 million gallons (204 million liters) of radioactive waste generated since the site's inception in 1943. Today, the major structures involved in waste management at Hanford include 149 carbon steel single-shell tanks, 28 carbon-steel double-shell tanks, plus a network of buried metallic transfer lines and ancillary systems (pits, vaults, catch tanks, etc.) required to store, retrieve, and transfer waste within the tank farm system. Many of the waste management systems at Hanford are still in use today. In response to uncertainties regarding the structural integrity of these systems,' an independent, comprehensive integrity assessment of the Hanford Site piping system was performed. It was found that regulators do not require the cathodically protected pipelines located within the Hanford Site to be assessed by External Corrosion Direct Assessment (ECDA) or any other method used to ensure integrity. However, a case study is presented discussing the application of the direct assessment process on pipelines in such a nuclear environment. Assessment methodology and assessment results are contained herein. An approach is described for the monitoring, integration of outside data, and analysis of this information in order to identify whether coating deterioration accompanied by external corrosion is a threat for these waste transfer lines.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Proposed Path Forward for Standardization - 17131

Incorporation of a standardized canister system into the commercial waste management system represents an opportunity to develop an integrated approach to storage, transportation, and disposal issues. However, regardless of timing and method, deployment of such a system would have the potential to cause significant system-wide impacts. The current inventory of commercial spent nuclear fuel dry storage systems is diverse and increasing. In addition, the currently loaded systems are large-capacity systems (up to 37 pressurized water reactor assemblies or 89 boiling water reactor assemblies) that are now able to accommodate large (greater than 45 kilowatts) amounts of heat during storage, with the potential to accommodate fairly high heat loads (∼32 kilowatts) for transportation as well. A standardized canister system designed with disposition in mind would likely be significantly smaller than the current systems and have dramatically lower heat limit maximums. Over the past few years, the Department of Energy (DOE) Office of Nuclear Energy Fuel Cycle Technologies Nuclear Fuels Storage and Transportation Planning Project (NFST) has performed a number of system analyses using logistic simulations to evaluate the impacts of incorporating these smaller canisters into the commercial waste management system. These simulations predict the amount of resources (e.g., staff, canisters/casks, rail-cars, facilities), the size of facilities, and the timing of operations, as well as provide rough order-of-magnitude cost estimates. In addition to system analyses, DOE funded efforts by EnergySolutions to develop a generic design of a small-capacity standardized canister system and investigate innovative operational approaches to minimize the at-reactor operational impacts of loading such smaller canisters. A result of EnergySolutions' work was the development of a 'canister-in-carrier' concept that would allow for loading, storing, transporting, and potentially disposing of groups of small canisters at the same time. With the inclusion of this new concept, the most recent system analyses show that incorporating standardized canister systems into the commercial waste management system has the potential for some system-wide cost reductions in addition to the flexibility that smaller canisters would provide to the system. Based on these analyses, the authors of this paper recommend that DOE fund (1) a demonstration of the ability to weld up to four small canisters at the same time to confirm the feasibility and practicality of the canister-in-carrier concept and (2) the development of a more detailed conceptual design for future applications for Certificates of Compliance, if standardized canisters were incorporated into the commercial waste management system. This paper documents both the results of the latest assessment of standardized canister concepts including the canister-in-carrier concept and the authors' recommendations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transmutation, Burn-Up and Fuel Fabrication Trade-Offs in Reduced-Moderation Water Reactor Thorium Fuel Cycles - 13502

Multiple recycle of long-lived actinides has the potential to greatly reduce the required storage time for spent nuclear fuel or high level nuclear waste. This is generally thought to require fast reactors as most transuranic (TRU) isotopes have low fission probabilities in thermal reactors. Reduced-moderation LWRs are a potential alternative to fast reactors with reduced time to deployment as they are based on commercially mature LWR technology. Thorium (Th) fuel is neutronically advantageous for TRU multiple recycle in LWRs due to a large improvement in the void coefficient. If Th fuel is used in reduced-moderation LWRs, it appears neutronically feasible to achieve full actinide recycle while burning an external supply of TRU, with related potential improvements in waste management and fuel utilization. In this paper, the fuel cycle of TRU-bearing Th fuel is analysed for reduced-moderation PWRs and BWRs (RMPWRs and RBWRs). RMPWRs have the advantage of relatively rapid implementation and intrinsically low conversion ratios. However, it is challenging to simultaneously satisfy operational and fuel cycle constraints. An RBWR may potentially take longer to implement than an RMPWR due to more extensive changes from current BWR technology. However, the harder neutron spectrum can lead to favourable fuel cycle performance. A two-stage fuel cycle, where the first pass is Th-Pu MOX, is a technically reasonable implementation of either concept. The first stage of the fuel cycle can therefore be implemented at relatively low cost as a Pu disposal option, with a further policy option of full recycle in the medium term. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Safety Aspects of Dry Spent Fuel Storage and Spent Fuel Management - 13559

Dry storage systems are characterized by passive and inherent safety systems ensuring safety even in case of severe incidents or accidents. After the events of Fukushima, the advantages of such passively and inherently safe dry storage systems have become more and more obvious. As with the storage of all radioactive materials, the storage of spent nuclear fuel (SF) and high-level radioactive waste (HLW) must conform to safety requirements. Following safety aspects must be achieved throughout the storage period: - safe enclosure of radioactive materials, - safe removal of decay heat, - securing nuclear criticality safety, - avoidance of unnecessary radiation exposure. The implementation of these safety requirements can be achieved by dry storage of SF and HLW in casks as well as in other systems such as dry vault storage systems or spent fuel pools, where the latter is neither a dry nor a passive system. Furthermore, transport capability must be guaranteed during and after storage as well as limitation and control of radiation exposure. The safe enclosure of radioactive materials in dry storage casks can be achieved by a double-lid sealing system with surveillance of the sealing system. The safe removal of decay heat must be ensured by the design of the storage containers and the storage facility. The safe confinement of radioactive inventory has to be ensured by mechanical integrity of fuel assembly structures. This is guaranteed, e.g. by maintaining the mechanical integrity of the fuel rods or by additional safety measures for defective fuel rods. In order to ensure nuclear critically safety, possible effects of accidents have also to be taken into consideration. In case of dry storage it might be necessary to exclude the re-positioning of fissile material inside the container and/or neutron moderator exclusion might be taken into account. Unnecessary radiation exposure can be avoided by the cask or canister vault system itself. In Germany dry storage of SF in casks fulfills both transport and storage requirements. Mostly, storage facilities are designed as concrete buildings above the ground, but due to regional constraints, one storage facility has also been built as a rock tunnel. The decay heat is always removed by natural air flow; further technical equipment is not needed. The removal of decay heat and shielding had been modeled and calculated by state-of-the-art computer codes before such a facility has been built. TueV and BAM present their long experience in the licensing process for sites and casks and inform about spent nuclear fuel management and issues concerning dry storage of spent nuclear fuel. Different storage systems and facilities in Germany, Europe and world-wide are compared with respect to the safety aspects mentioned above. Initial points are the safety issues of wet storage of SF, and it is shown how dry storage systems can ensure the compliance with the mentioned safety criteria over a long storage period. The German storage concept for dry storage of SF and HLW is presented and discussed. Exemplarily, the process of licensing, erection and operation of selected German dry storage facilities is presented. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗