Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

The Extreme Ultraviolet Explorer Mission

The Extreme Ultraviolet Explorer (EUVE) mission, currently scheduled from launch in September 1991, is described. The primary purpose of the mission is to survey the celestial sphere for astronomical sources of extreme ultraviolet (EUV) radiation with the use of three EUV telescope, each sensitive to a different segment of the EUV band. A fourth telescope is planned to perform a high-sensitivity search of a limited sample of the sky in the shortest wavelength bands. The all-sky survey is planned to be carried out in the first six months of the mission in four bands, or colors, 70-180 A, 170-250 A, 400-600 A, and 500-700 A. The second phase of the mission is devoted to spectroscopic observations of EUV sources. A high-efficiency grazing-incidence spectrometer using variable line-space gratings is planned to provide spectral data with about 1-A resolution. An end-to-end model of the mission, from a stellar source to the resulting scientific data, is presented. Hypothetical data from astronomical sources were processed through this model and are shown.

Bowyer, S.↗

Magellan mission to Venus - Radar system design and operational challenges

The Magellan radar mission to Venus was launched in May 1989 and placed into orbit around Venus in August 1990. After several weeks of check-out including two complete signal loss events from the spacecraft, the mission began collecting data from the radar instrument in the three modes of synthetic aperture, altimetry, and passive radiometry. The author presents an overview of the mission and shows some results, concentrating on the engineering aspects of the results. He also describes how the many challenges were overcome and the system was adapted to the realities of Venus and the radar system that is being used to map the planet. It is concluded that this mission has presented many lessons learned about not only the design of an imaging and altimetric radar system but also the adaptation of this design to the mission operational constraints.

Johnson, William T. K.↗

Planetary missions using microspacecraft technology

Some of the planetary missions using microspacecraft of mass on the order of 10 kg which are presently being considered at JPL are discussed. The primary benefits offered by this type of spacecraft is the small and relatively inexpensive launch vehicles and short program development schedules. A mission presently considered by the Asteroid Investigation with Microspacecraft (AIM) study is described with special attention given to the spacecraft configuration; the AIM mission will launch three spacecraft from a single Pegasus vehicle, achieving separate flybys for three near-earth asteroids. Attention is also given to the salient features of the Mars Rover Sample Return mission, the Venus Atmospheric Sounder, and the Comet Nucleus Mission, for which the application of microspacecraft technology is considered.

Short, Kendra L.↗

Combined high and low thrust propulsion for fast piloted Mars missions

The mission benefits of using both high thrust nuclear thermal propulsion (NTP) and low acceleration, high specific impulse nuclear electric propulsion (NEP) to reduce piloted trip times to Mars with reasonable initial mass are assessed. Recent updates in mission design, such as the Earth fly-by return, are assessed for their impact on previous studies. In addition, the Synthesis Commission split mission to Mars in 2014 is also assessed using combined propulsion. Results show an 80 to 100 day reduction in trip time over the reference NTP or NEP systems and missions, with comparable or reduced vehicle initial masses. The impacts of the mission and system analyses upon technology planning and design are discussed.

Gilland, James H.↗

Near term NEP missions and systems

The topics covered are presented in viewgraph form and include the following: Nuclear Propulsion Office Nuclear Electric Propulsion (NEP) goals; near term systems definition, representative near term NEP systems; demonstration missions; primary missions; near term NEP Mars cargo mission; near term NEP Mars mission analysis; and near term NEP mars mission.

Gilland, Jim↗

Low cost missions to explore the diversity of near Earth objects

We propose a series of low-cost flyby missions to perform a reconnaissance of near-Earth cometary nuclei and asteroids. The primary scientific goal is to study the physical and chemical diversity in these objects. The mission concept is based on the Pegasus launch vehicle. Mission costs, inclusive of launch, development, mission operations, and analysis are expected to be near $50 M per mission. Launch opportunities occur in all years. The benefits of this reconnaissance to society are stressed.

Belton, Michael J. S.↗

Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 6: Lunar systems

NASA's two Office of Space Flight (Code M) Space Transfer Vehicle (STV) contractors supported development of Space Exploration Initiative (SEI) lunar transportation concepts. This work treated lunar SEI missions as the far end of a more near-term STV program, most of whose missions were satellite delivery and servicing requirements derived from Civil Needs Data Base (CNDB) projections. Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) began to address the complete design of a lunar transportation system. The following challenges were addressed: (1) the geometry of aerobraking; (2) accommodation of mixed payloads; (3) cryogenic propellant transfer in Low Lunar Orbit (LLO); (4) fully re-usable design; and (5) growth capability. The leveled requirements, derived requirements, and assumptions applied to the lunar transportation system design are discussed. The mission operations section includes data on mission analysis studies and performance parametrics as well as the operating modes and performance evaluations which include the STCAEM recommendations. Element descriptions for the lunar transportation family included are a listing of the lunar transfer vehicle/lunar excursion vehicle (LTV/LEV) components; trade studies and mass analyses of the transfer and excursion modules; advanced crew recovery vehicle (ACRV) (modified crew recovery vehicle (MCRV)) modifications required to fulfill lunar operations; the aerobrake shape and L/D to be used; and some costing methods and results. Commonality and evolution issues are also discussed.

Source record↗

Using AI/expert system technology to automate planning and replanning for the HST servicing missions

This paper describes a knowledge-based system that has been developed to automate planning and scheduling for the Hubble Space Telescope (HST) Servicing Missions. This new system is the Servicing Mission Planning and Replanning Tool (SM/PART). SM/PART has been delivered to the HST Flight Operations Team (FOT) at Goddard Space Flight Center (GSFC) where it is being used to build integrated time lines and command plans to control the activities of the HST, Shuttle, Crew and ground systems for the next HST Servicing Mission. SM/PART reuses and extends AI/expert system technology from Interactive Experimenter Planning System (IEPS) systems to build or rebuild time lines and command plans more rapidly than was possible for previous missions where they were built manually. This capability provides an important safety factor for the HST, Shuttle and Crew in case unexpected events occur during the mission.

Bogovich, L.↗

Clementine 2: a Double Asteroid Flyby and Impactor Mission

Recently JPL was asked by SDIO to analyze and develop a preliminary design for a deep-space mission to fly by two near-Earth asteroids, Eros and Toutatis. As a part of this mission, JPL was also asked to assess the feasibility of deploying a probe on approach to impact Toutatis. This mission is a candidate for SDIO's Clementine 2. SDIO's motivations were to provide further demonstrations of precision, autonomous navigation for controlling the flight paths of both a spacecraft and a probe. NASA's interest in this mission is driven by the opportunity to obtain the first close-up images and other scientific measurements from a spacecraft of two important near-Earth objects. For Toutatis this is especially important since it was observed and imaged extensively just last Dec. using Earth-based radar; Clementine 2 will provide the opportunity to corroborate the radar data and validate the ultimate potential of the radar technique. Scientifically, the probe impact at Toutatis will allow the acquisition of data pertaining to the dynamic strength of surface material and data on the properties of the regolith and on stratification below the surface, and will potentially allow the measurement of thermal diffusivity between the interior and the surface. These determinations will be accomplished by means of high-resolution imagery of the impact crater and its surroundings in visible, ultraviolet, and infrared wave bands from the spacecraft flying by some 30 min. after the probe strike. In addition, if the spacecraft can be equipped with a lightweight mass spectrometer and dust analyzer, the potential also exists to measure the particle sizes and distribution and the composition of the eject a cloud. This mission is planned to be launched in Jul. 1995, with the Eros encounter on 13 Mar. 1996, and the Toutatis flyby on 4 Oct. 1996, some 440 days after launch.

Boain, R. J.↗

Mars integrated transportation system multistage Mars mission

In accordance with the objective of the Mars Integrated Transport System (MITS) program, the Multistage Mars Mission (MSMM) design team developed a profile for a manned mission to Mars. The purpose of the multistage mission is to send a crew of five astronauts to the martian surface by the year 2019. The mission continues man's eternal quest for exploration of new frontiers. This mission has a scheduled duration of 426 days that includes experimentation en route as well as surface exploration and experimentation. The MSMM is also designed as a foundation for a continuing program leading to the colonization of the planet Mars.

Source record↗

Mars sample return mission: Two alternate scenarios

Two scenarios for accomplishing a Mars Sample Return mission are presented. Mission A is a low-cost, low-mass scenario, while Mission B is a high-technology, high-science alternative. Mission A begins with the launch of one Titan 4 rocket with a Centaur G' upper stage. The Centaur performs the trans-Mars injection burn and is then released. The payload consists of two lander packages and the orbital transfer vehicle, which is responsible for supporting the landers during launch and interplanetary cruise. Near Mars, the landers separate - one bound for a polar site and the other for an equatorial site. After descending to the surface, the landers deploy small, local rovers to collect samples. The rovers return these samples to the landers for loading on the direct return rockets, which return the samples directly to the Earth's surface. Mission B starts with four Titan 4 launches, used to place the components of the planetary transfer vehicle (PTV) into orbit. The fourth launch payload is able to move to assemble the entire vehicle by simple docking routines. Once complete, the PTV begins a low-thrust trajectory out from low Earth orbit, through interplanetary space, and into low Mars orbit. It deploys a communications satellite into a one half sol orbit and then releases the lander pad cage at 500 km altitude. The lander package contains the lander, the Mars ascent vehicle (MAV), two lighter-than-air rovers (called Aereons), and one conventional land rover. The entire package is contained within a biconic aeroshell. After release from the PTV the lander package descends to the surface, where all three rovers are released to collect samples and map the terrain. The Aereons attempt to circumnavigate Mars and collect samples from a wide variety of sites, while the land rover examines a local area more thoroughly. The Aereons are equipped with small sample return rockets that can return their samples to the lander in the event that an Aereon is incapable of returning to the lander itself. Once all samples have been collected they are loaded onto the MAV and launched into orbit. The PTV then collects the samples and returns them to Earth orbit for recovery.

Source record↗

Natural environment application for NASP-X-30 design and mission planning

The NASA/MSFC Mission Analysis Program has recently been utilized in various National Aero-Space Plane (NASP) mission and operational planning scenarios. This paper focuses on presenting various atmospheric constraint statistics based on assumed NASP mission phases using established natural environment design, parametric, threshold values. Probabilities of no-go are calculated using atmospheric parameters such as temperature, humidity, density altitude, peak/steady-state winds, cloud cover/ceiling, thunderstorms, and precipitation. The program although developed to evaluate test or operational missions after flight constraints have been established, can provide valuable information in the design phase of the NASP X-30 program. Inputting the design values as flight constraints the Mission Analysis Program returns the probability of no-go, or launch delay, by hour by month. This output tells the X-30 program manager whether the design values are stringent enough to meet his required test flight schedules.

Johnson, D. L.↗

Power systems for the Mars Environmental Survey (MESUR) Mission

Mars Environmental Survey Mission (MESUR) is intended to be a low cost, near term mission to study the chemical composition of Martian surface, structure and circulation of Mars' atmosphere, and the structure and dynamics of Mars' interior. To meet the science objectives of the mission, a network of 16 landers will be placed at various latitudes and longitudes of Mars. The paper identifies various options for powering the landers and lists the attributes of each option. The current strategy is to precede the lander launch and deployment with an engineering demo mission called the Pathfinder which would demonstrate the landing strategy and the engineering subsystems. The paper briefly describes the challenges involved in the power system development for the Pathfinder mission.

Shirbacheh, Mike↗

Spacecraft design considerations for an Inner Magnetosphere Imager mission

Imaging the Earth's magnetosphere from space will enable scientists to better understand the global shape of the inner magnetosphere, its components and processes. The proposed Inner Magnetosphere Imager (IMI) mission will obtain the first simultaneous images of the component regions of the inner magnetosphere and will enable scientists to relate these global images to internal and external influences as well as local observations. NASA's Marshall Space Flight Center (MSFC) is performing a concept definition study of the proposed mission. As currently envisioned, the baseline mission calls for an instrument complement of approximately seven imagers to be flown in an elliptical Earth orbit with an apogee of seven Earth Radii (RE). Several spacecraft concepts have been examined for the mission. The baseline concept utilizes a spinning spacecraft with a despun platform, the second uses a three-axis stabilized spacecraft with a spinning platform, while the third option splits the instruments onto two small satellites; a spinning spacecraft and a complementary three-axis stabilized spacecraft. This paper will address the mission objectives, the rationale for using proven spacecraft designs, and the preliminary concept definition study team results for all three options.

Herrmann, Melody C.↗

Influence of interplanetary trajectory selection on Earth atmospheric entry velocity of Mars missions

Many current manned Mars mission studies are using low lift-to-drag ratio vehicles to aerobrake at both Mars and Earth. This paper will demonstrate that if entry velocity constraints are incorporated into the interplanetary analysis of aerobraking Mars missions, more opportunities can be achieved for only a small increase in initial mass in low-Earth orbit (IMLEO). These additional opportunities result from varying the initial launch date and the encounter dates and possibly using a powered Venus swingby on either the inbound or outbound transfer. This paper not only presents unconstrained entry velocity missions but also includes results for entry velocities below 12.5 and 14 km/s on Earth return and between 6.0-8.5 km/s at Mars arrival. The results indicate that, regardless of the Mars entry velocity range selected, an Earth entry velocity below 14 km/s is easily attainable for a minimal IMLEO increase. Although there are fewer 12.5 km/s Earth entry velocity missions possible, both Mars entry velocity constraint cases have over 50 percent of their missions requiring a negligible IMLEO increase.

Striepe, Scott A.↗

Mars rover sample return mission utilizing in situ production of the return propellants

This paper presents an unmanned Mars sample return mission that utilizes propellants manufactured in situ from the Martian atmosphere for the return trip. A key goal of the mission is to demonstrate the considerable benefits that can be realized through the use of indigenous resources and to test the viability of this approach as a precursor to manned missions to Mars. Two in situ propellant combinations, methane/oxygen and carbon monoxide/oxygen, are compared to imported terrestrial hydrogen/oxygen within a single mission architecture, using a single Earth launch vehicle. The mission is assumed to be launched from Earth in 2003. Upon reaching Mars, the landing vehicle aerobrakes, deploys a small satellite, and lands on the Martian surface. Once on the ground, the propellant production unit is activated, and the product gases are liquefied and stored in the empty tanks of the Earth Return Vehicle (ERV). Power for these activities is provided by a dynamic isotope power system. A semiautonomous rover, powered by the indigenous propellants, gathers between 25 and 30 kg of soil and rock samples which are loaded aboard the ERV for return to Earth. After a surface stay time of approximately 1.5 years, the ERV leaves Mars for the return voyage to Earth. When the vehicle reaches the vicinity of Earth, the sample return capsule detaches, and is captured and circularized in LEO via aerobraking maneuvers.

Bruckner, A. P.↗

Effect of mission cycling on the fatigue performance of SiC-coated carbon-carbon composites

The effects of thermal and pressure cycling on the fatigue performance of carbon-carbon composites, and the influence of mission cycling on these effects, were investigated by subjecting both virgin and mission-cycled two-dimensional specimens of SiC-coated carbon-carbon composites to fatigue tests, conducted at room temperature in three-point bending, with a stress ratio of 0.2 and a frequency of 1 Hz. It was found that the fatigue strength of C-C composites is high (about 90 percent of the ultimate flexural strength), but decreased with the mission cycling. The lowering of the fatigue strength with mission cycling is attributed to the increase in interfacial bond strength due to thermal and pressure cycling of the material. The already high sensitivity of C-C composites to stress during cyclic loading increases further with the amount of mission cycling. Results of NDE suggest that the damage growth in virgin C-C, in the high-cycle range, is slow at the initial stage of the cyclic life, but propagates rapidly after certain threshold cycles of the fatigue life.

Mahfuz, H.↗

Modeling the Deep Space Network costs for future space missions by using major cost drivers

This paper develops a cost model to do long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The model is a function of eight major mission cost drivers such as uplink frequency upgrade, telemetry upgrade, and antenna gain/noise temperature upgrade. This paper focuses on the costs required to modify and/or enhance the DSN to prepare for supporting future space missions. Two models are derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. Model A makes it possible to estimate the total cost, and Model B makes it possible to estimate the time profile cost and total cost for DSN support of a similar future space mission. The models were back tested against the total cost and the time profile cost for DSN support of the three projects, and gave cost estimates which range from 17 percent below to 19 percent above actual costs for Model A, and 22.5 percent below to 17.5 percent above for Model B. The total cost Model A was also applied to estimate the total costs for DSN support of two other independent projects: Mariner Jupiter/Saturn (MJS later became Voyager), and Viking. This model gave total cost estimates for DSN support which range from 15 percent to 4 percent above actual total costs for MJS and Viking, respectively.

Remer, Donald S.↗