Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Directors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Loads Produced During the Ingression and Egression of the Portable Foot Restraint on the Hubble Space Telescope

The Hubble Space Telescope (HST) was deployed from the Space Shuttle Discovery on April 25, 1990. It is capable of performing observations in the visible, near-ultraviolet, and near-infrared (1150 A to 1 mm). The HST weighs 12 tons, and collects light with an 8-ft-diameter mirror. The attitude control and maneuvering is performed by four of six gyroscopes, or reaction wheels. The HST contains fine guidance sensors that lock onto guide stars to reduce the spacecraft drift and increase the pointing accuracy. The HST was designed to last 15 years, with crewed service missions approximately every three years. The first service mission, STS-61, took place in 1993. The second service mission took place in 1997. In 1999, the STS-103 crew performed the third service mission to the HST. This mission's purpose was to replace the right sensor units and make improvements on the fine guidance sensors. To perform these tasks on the HST, the STS-103 crewmembers used a portable foot restraint to anchor themselves to the HST in the zero-gravity environment. The solar arrays currently used on the telescope are second-generation, and therefore susceptible to loads placed on the telescope. The crew and Mission Operations Directorate worried about the damage that the crew could possibly cause during ingress and egress of the PFR and by transferring loads to the solar arrays. The purpose of this study is to inform the crewmembers of the loads they are imparting on the HST, and train them to decrease these loads to a safer level. Minimizing these loads will significantly decrease the chance of crewmembers causing damage to the solar arrays while repairing the HST.

Ramsey, Susan↗

Space Elevators: Building a Permanent Bridge for Space Exploration and Economic Development

A space elevator is a physical connection from the surface of the Earth to a geo-stationary orbit above the Earth approximately 35,786 km in altitude. Its center of mass is at the geo-stationary point such that it has a 24-hour orbit, and stays over the same point above the equator as the Earth rotates on its axis. The structure is utilized as a transportation and utility system for moving payloads, power, and gases between the surface of the Earth and space. It makes the physical connection from Earth to space in the same way a bridge connects two cities across a body of' water. The space elevator may be an important concept for the future development of space in the latter part of the 21th century. It has the potential to provide mass-transportation to space in the same way highways, railroads, power lines, and pipelines provide mass-transportation across the Earth's surface. The low energy requirements for moving payloads up and down the elevator make it one of only a few concepts that has the potential of lowering the cost to orbit to less than $10 per kilogram. This paper will summarize the findings from a 1999 NASA workshop on Space Elevators held at the NASA Marshall Space Flight Center (MSFC). The workshop was sponsored by the Advanced Projects Office in the Flight Projects Directorate at MSFC, and was organized in cooperation with the Advanced Space Transportation Program at MSFC and the Advanced Concepts Office in the Office of Space Flight at NASA Headquarters. New concepts will be examined for space elevator construction and a number of issues will be discussed that has helped to bring the space elevator concept out of the realm of science fiction and into the realm of possibility. In conclusion, it appears that the space elevator concept may well he possible in the latter part of the 21st century if proper planning and technology development is emphasized to resolve key issues in the development of this advanced space infrastructure concept.

Smitherman, David V., Jr.↗

STS-47 Mission Overview

Flight Director Milt Heflin gives an overview of the goals of the Space Shuttle Endeavour. He describes the crew, the role of the orbiter, the planned experiments, and the timeline of activities on board. Mission Manager Aubray King introduces the Spacelab-J mission. He discusses the planned experiments and Japanese involvement in development. Heflin and King then take questions from the press.

Source record↗

STS-50 Countdown Status

George Diller of the NASA Public Affairs Office introduces Mike Leinbach, NASA Shuttle Test Director, Russ Lunnen, Kennedy Space Center (KSC) USML Payload Manager, and Ed Priselac, U.S. Airforce/KSC Weather Officer to give a briefing on the countdown status for STS-50. Leinbach gives an overview of when certain tests are run and what problems are encountered. Lunnen outlines the payload activities for the shuttle. Priselac describes the current weather as well as the conditions needed for launch. They also take questions from the press.

Source record↗

Support to X-33/Reusable Launch Vehicle Technology Program

The Primary activities of Lee & Associates for the referenced Purchase Order has been in direct support of the X-33/Reusable Launch Vehicle Technology Program. An independent review to evaluate the X-33 liquid hydrogen fuel tank failure, which recently occurred after-test of the starboard tank has been provided. The purpose of the Investigation team was to assess the tank design modifications, provide an assessment of the testing approach used by MSFC (Marshall Space Flight Center) in determining the flight worthiness of the tank, assessing the structural integrity, and determining the cause of the failure of the tank. The approach taken to satisfy the objectives has been for Lee & Associates to provide the expertise of Mr. Frank Key and Mr. Wayne Burton who have relevant experience from past programs and a strong background of experience in the fields critical to the success of the program. Mr. Key and Mr. Burton participated in the NASA established Failure Investigation Review Team to review the development and process data and to identify any design, testing or manufacturing weaknesses and potential problem areas. This approach worked well in satisfying the objectives and providing the Review Team with valuable information including the development of a Fault Tree. The detailed inputs were made orally in real time in the Review Team daily meetings. The results of the investigation were presented to the MSFC Center Director by the team on February 15, 2000. Attached are four charts taken from that presentation which includes 1) An executive summary, 2) The most probable cause, 3) Technology assessment, and 4) Technology Recommendations for Cryogenic tanks.

Source record↗

Plans for a STRV-2 to AMOS High Data Rate Bi-Directional Optical Communications Link

The Ballistic Missile Defense Organization has developed a high-data rate (155 Mbps - 1 Gbps) optical communications terminal that will be flown on the STRV-2 satellite. The satellite is scheduled for launch in November 1999, and NASA/JPL has been asked to investigate the use of the AMOS facility as a backup ground terminal to a small transportable terminal constructed by Astroterra Corporation of San Diego. The ground terminal built by Astroterra is designed to support a links out to 2000 km, and will be located at the Table Mountain Facility in Wrightwood, California. Subject to BMDO approval, the demonstration from AMOS will begin in early 2000. For the demonstration, the beam-director tracker will serve as the uplink transmitter, and the 1.6-m telescope as the downlink receiver. It will support bi-directional links out to the 3500-km maximum slant range of the satellite's pass.

Wilson, K. E.↗

STS-55 Mission Overview, Preflight Briefing from JSC

Gary Cohen, Lead Flight Director, gives an overview of the STS-55 Columbia mission activities, objectives, payload, crew, and Spacelab operations. Dr. H. Dodeck, D-2 Mission Manager, discusses Germany's contributions to the mission and describes the German aeronautics facilities. They then answer questions from the press.

Source record↗

STS-56 Launch Attempt Press Conference

Dick Young introduces Dr. Jack Kaye, Program Scientist for NASA, Brewster Shaw, Deputy Program Manager Space Shuttle, and Robert Sieck, Kennedy Space Center (KSC) Launch Director in a press conference regarding the failed launch attempt of the Discovery Orbiter. The hardware problem causing the failure is discussed, and questions from the press are answered.

Source record↗

STS-56 Preflight Briefs/Mission Overview from MSFC

Chuck Shaw, Lead Flight Director, and Teresa Vanhooser, Mission Manager, each give an overview of of the STS-56 Discovery mission's objectives, activities, payloads (ATLAS-2, SPARTAN-201, etc.), and experiments. They then answer questions from the press.

Source record↗

STS-51 Mission Overview

Robert Castle, Lead Flight Director, gives an overview of the STS-51 Discovery mission, including details on the Space Shuttle, the payloads (ACTS-TOS, ORFEUS-SPAS, etc.), the crew, mission objectives, and the spacewalks to be performed. Simulations of the ACT-TS deployment and the ORPFEUS-SPAS operations are shown.

Source record↗

STS-97 Countdown Status

Joel Wells, NASA Public Affairs, introduces Steve Altemus, NASA Test Director, David Flowers, P-6 Truss Integration Engineer, and Ed Priselac, Shuttle Weather Officer. Mr. Altemus describes the successful countdown thus far, and some of the prelaunch activities. Mr. Flowers gives an overview of the P-6 Truss and its role on the International Space Station (ISS). Mr. Priselac gives a forecast for good launching weather. The men then answer questions from the press.

Source record↗

STS-97 Countdown Status

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, David Flowers, P-6 Truss Integration Engineer, and Ed Priselac, Shuttle Weather Officer. Mr. Spaulding discusses the Shuttle status, successful countdown, and preflight preparations. Mr. Priselac describes a good weather forecast for the upcoming STS-97 Endeavour launch. The men then answer questions from the press.

Source record↗

STS-97 Prelaunch Press Conference

Bruce Buckingham, NASA Public Affairs, introduces Ron Dittemore, NASA Shuttle Program Manager, Bob Cabana, International Space Station (ISS) Manager, International Operations, NASA, Michael Vachon, Canadian Space Agency, David King, NASA Director of Shuttle Processing, and Lieutenant Ken Ferland, 45th Weather Squadron, US Air Force. They each give a brief statement on the STS-97 Endeavour mission, launch, and weather status and answer questions from the press.

Source record↗

STS-106 Countdown Status Briefing

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Scott Higginbotham, KSC Payload Manager, and Ed Priselac, Shuttle Weather Officer. Mr. Spaulding discusses the successful countdown thus far and some of the prelaunch activities. Mr. Higginbotham describes the stow operations and possible changes in the payload configuration. Mr. Priselac forecasts good weather for the upcoming launch. The men then answer questions from the press.

Source record↗

STS-45 Post Launch Press Conference

Dick Young, NASA Public Affairs, introduces Bob Sieck, Launch Director, Kennedy Space Center, who gives an overview of the successful countdown and launch of the STS-45 Atlantis mission. He then answers questions from the press.

Source record↗

STS-56 Post Launch Press Conference

Dick Young, NASA Public Affairs, introduces Brewster Shaw, Deputy Program Manager Space Shuttle, and Bob Sieck, Launch Director, Kennedy Space Center, who give an overview of the successful countdown and launch of the STS-56 Discovery Orbiter. They then answer questions from the press.

Source record↗

STS-56 Post Landing Press Conference

Dick Young, NASA Public Affairs, introduces Brewster Shaw, Deputy Program Manager Space Shuttle, and Bob Sieck, Launch Director, Kennedy Space Center, who give brief statements about the successful STS-56 Discovery mission and landing. They then answer questions from the press.

Source record↗

STS-55 Post Launch Press Conference

Dick Young, NASA Public Affairs, introduces Brewster Shaw, Deputy Program Manager Space Shuttle, Professor Heinz Stoewer, D-2 Program Manager German Space Agency, and Bob Sieck, Launch Director, Kennedy Space Center, who give an overview of the mission and the launch countdown. They then answer questions from the press.

Source record↗