Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2010”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,675 records · Page 93

Coated Particle Fuel and Deep Burn Program Monthly Highlights April 2011

The baseline change proposal BCP-FCRD-11026 submitted to change the due date for M21AF080202 'Demonstrate fabrication of Transuranic kernels of Plutonium-239/3.5at%Neptunium-237 using newly installed glove box facilities in ORNL 7930 hot cell complex' from 4/25/11 to 3/30/12 was approved this month. During FY 2011 the CP & DB Program will report Highlights on a monthly basis, but will no longer produce Quarterly Progress Reports. Technical details that were previously included in the quarterly reports will be included in the appropriate Milestone Reports that are submitted to FCRD Program Management. These reports will also be uploaded to the Deep Burn website. The Monthly Highlights report for March 2011, ORNL/TM-2011/96, was distributed to program participants on April 8, 2011. As reported previously, the final Quarterly for FY 2010, Deep Burn Program Quarterly Report for July - September 2010, ORNL/TM-2010/301, was announced to program participants and posted to the website on December 28, 2010. This report discusses the following: (1) Thermochemical Data and Model Development - (a) Thermochemical Modeling, (b) Thermomechanical Behavior, (c) Actinide and Fission Product Transport, (d) Radiation Damage and Properties; (2) TRU (transuranic elements) TRISO (tri-structural isotropic) Development - (a) TRU Kernel Development, (b) Coating Development; (3) Advanced TRISO Applications - Metal Matrix Fuels for LWR; (4) LWR Fully Ceramic Fuel - (a) FCM Fabrication Development, (b) FCM Irradiation Testing; (5) Fuel Performance and Analytical Analysis - Fuel Performance Modeling; and (6) ZrC Properties and Handbook - Properties of ZrC.

Snead, Lance Lewis↗

Coated Particle Fuel and Deep Burn Program Monthly Highlights June 2011

During FY 2011 the CP & DB Program will report Highlights on a monthly basis, but will no longer produce Quarterly Progress Reports. Technical details that were previously included in the quarterly reports will be included in the appropriate Milestone Reports that are submitted to FCRD Program Management. These reports will also be uploaded to the Deep Burn website. The Monthly Highlights report for May 2011, ORNL/TM-2011/126, was distributed to program participants on June 9, 2011. As reported previously, the final Quarterly for FY 2010, Deep Burn Program Quarterly Report for July - September 2010, ORNL/TM-2010/301, was announced to program participants and posted to the website on December 28, 2010. This report discusses the following: (1) Fuel Performance Modeling - Fuel Performance Analysis; (2) Thermochemical Data and Model Development - (a) Thermochemical Behavior, (b) Thermomechanical Modeling, (c) Actinide and Fission Product Transport; (3) TRU (transuranic elements) TRISO (tri-structural isotropic) Development - (a) TRU Kernel Development, (b) Coating Development; and (4) LWR Fully Ceramic Fuel - (a) FCM Fabrication Development, (b) FCM Irradiation Testing.

Snead, Lance Lewis↗

SAPHIRE 8 Quality Assurance Software Metrics Report

The purpose of this review of software metrics is to examine the quality of the metrics gathered in the 2010 IV&V and to set an outline for results of updated metrics runs to be performed. We find from the review that the maintenance of accepted quality standards presented in the SAPHIRE 8 initial Independent Verification and Validation (IV&V) of April, 2010 is most easily achieved by continuing to utilize the tools used in that effort while adding a metric of bug tracking and resolution. Recommendations from the final IV&V were to continue periodic measurable metrics such as McCabe's complexity measure to ensure quality is maintained. The four software tools used to measure quality in the IV&V were CodeHealer, Coverage Validator, Memory Validator, Performance Validator, and Thread Validator. These are evaluated based on their capabilities. We attempted to run their latest revisions with the newer Delphi 2010 based SAPHIRE 8 code that has been developed and was successful with all of the Validator series of tools on small tests. Another recommendation from the IV&V was to incorporate a bug tracking and resolution metric. To improve our capability of producing this metric, we integrated our current web reporting system with the SpiraTest test management software purchased earlier this year to track requirements traceability.

97 MATHEMATICS AND COMPUTING↗

REPORTABLE RADIONUCLIDES IN DWPF SLUDGE BATCH 7A (MACROBATCH 8)

The Waste Acceptance Product Specifications (WAPS) 1.2 require that the waste producer 'shall report the curie inventory of radionuclides that have half-lives longer than 10 years and that are, or will be, present in concentrations greater than 0.05 percent of the total inventory for each waste type indexed to the years 2015 and 3115.' As part of the strategy to meet WAPS 1.2, the Defense Waste Processing Facility (DWPF) will report for each waste type all radionuclides that have half-lives longer than 10 years and contribute greater than 0.01 percent of the total curie inventory from the time of production through the 1100 year period from 2015 through 3115. The initial list of radionuclides to be reported is based on the design-basis glass identified in the Waste Form Compliance Plan (WCP) and Waste Form Qualification Report. However, it is required that the list be expanded if other radionuclides with half-lives greater than 10 years are identified that meet the 'greater than 0.01% of the curie inventory' criterion. Specification 1.6 of the WAPS, International Atomic Energy Agency Safeguards Reporting for High Level Waste (HLW), requires that the ratio by weights of the following uranium and plutonium isotopes be reported: U-233, U-234, U-235, U-236, and U-238; and Pu-238, Pu-239, Pu-240, Pu-241, and Pu-242. Therefore, the complete list of reportable radionuclides must also include these sets of U and Pu isotopes - and the U and Pu isotopic mass distributions must be identified. The DWPF receives HLW sludge slurry from Savannah River Site (SRS) Tank 40. For Sludge Batch 7a (SB7a), the waste in Tank 40 contained a blend of the heel from Sludge Batch 6 (SB6) and the Sludge Batch 7 (SB7) material transferred to Tank 40 from Tank 51. This sludge blend is also referred to as Macrobatch 8. Laboratory analyses of a Tank 40 sludge sample were performed to quantify the concentrations of pertinent radionuclides in the SB7a waste. Subsequently, radiological decay and in-growth were calculated over the time period from 2015 to 3115. This provided a basis for characterizing the radionuclide content of SB7a over time and for identifying the 'reportable radionuclides.' Details of the characterization methodology and the analytical results are the focus of this report. This work was performed at the request of the Waste Solidification Engineering Department of Savannah River Remediation, initiated via Technical Task Request (TTR) HLW-DWPF-TTR-2010-0031. A minor revision in the reporting requirements was requested via a subsequent email communication. The work was conducted in accordance with the protocols identified in Task Technical and Quality Assurance Plan SRNL-RP-2010-01218 and Analytical Study Plan SRNL-RP-2010-01219. All of the raw data related to this scope have been recorded in laboratory notebook SRNL-NB-2011-00061. The overall goal of this task was to characterize the radionuclide content of the SB7a waste sufficiently to meet the WAPS and DWPF reporting requirements. The specific objectives were: (1) Quantify the current concentrations of all radionuclides impacting (or potentially-impacting) the total curie content between calendar years 2011 and 3115. Also quantify the current concentrations of other radionuclides specifically requested in the TTR or required by the WAPS. (2) Calculate future concentrations of decayed and in-grown radionuclides impacting the total curie content between calendar years 2015 and 3115; (3) Identify as 'reportable' all radionuclides contributing {ge} 0.01% of the total curie content from 2015 to 3115 and having half-lives {ge} 10 years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Department of Energy – Office of Science: Pacific Northwest Site Office Environmental Monitoring Plan for the DOE-SC PNNL Site

The Pacific Northwest Site Office (PNSO) manages the contract for operations at the U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site in Richland, Washington. Radiological operations at the DOE-SC PNNL Site expanded in 2010 with the completion of facilities at the Physical Sciences Facility. As a result of the expanded radiological work at the site, the Washington State Department of Health (WDOH) has required that offsite environmental surveillance be conducted as part of the PNNL Site Radioactive Air Emissions License. The environmental monitoring and surveillance requirements of various orders, regulations, and guidance documents consider emission levels and subsequent risk of negative human and environmental impacts. This Environmental Monitoring Plan (EMP) describes air surveillance activities at the DOE-SC PNNL Site. The determination of offsite environmental surveillance needs evolved out of a Data Quality Objectives process (Barnett et al. 2010) and Implementation Plan (Snyder et al. 2010). The entire EMP is a compilation of several documents, which include: - the Main Document, this text, (PNNL-20919), - Attachment 1, Sampling and Analysis Plan (SAP) (PNNL-20919-1), - Attachment 2, Data Management Plan (DMP) (PNNL-20919-2), and - Attachment 3, Dose Assessment Guidance (DAG) (PNNL-20919-3). Although the EMP is considered the compilation of these documents, each covers topics that can be updated independently. As a result, each may have different publication dates. Current version dates can be verified with Effluent Management staff. The procedures, forms, and data management activities described herein may change with radiological research projects at the DOE-SC PNNL Site. The scope of this EMP will evolve as needed, during routine reviews or in response to changes in facility operations. This document provides the SAP, DMP, and DAG effective at the time of publication. Updates to this document will be published at the discretion of the Effluent Management group of PNNL.

54 ENVIRONMENTAL SCIENCES↗

Variability of K d Values in Cementitious Materials and Sediments

Measured distribution coefficients (K d values) for environmental contaminants provide input data for performance assessments (PA) that evaluate physical and chemical phenomena for release of radionuclides from wasteforms, degradation of engineered components and subsequent transport of radionuclides through environmental media. Research efforts at SRNL to study the effects of formulation and curing variability on the physiochemical properties of the saltstone wasteform produced at the Saltstone Disposal Facility (SDF) are ongoing and provide information for the PA and Saltstone Operations. Furthermore, the range and distribution of plutonium K d values in soils is not known. Knowledge of these parameters is needed to provide guidance for stochastic modeling in the PA. Under the current SRS liquid waste processing system, supernate from F & H Tank Farm tanks is processed to remove actinides and fission products, resulting in a low-curie Decontaminated Salt Solution (DSS). At the Saltstone Production Facility (SPF), DSS is mixed with premix, comprised of blast furnace slag (BFS), Class F fly ash (FA), and portland cement (OPC) to form a grout mixture. The fresh grout is subsequently placed in SDF vaults where it cures through hydration reactions to produce saltstone, a hardened monolithic waste form. Variation in saltstone composition and cure conditions of grout can affect the saltstone's physiochemical properties. Variations in properties may originate from variables in DSS, premix, and water to premix ratio, grout mixing, placing, and curing conditions including time and temperature (Harbour et al. 2007; Harbour et al. 2009). There are no previous studies reported in the literature regarding the range and distribution of K d values in cementitious materials. Presently, the Savannah River Site (SRS) estimate ranges and distributions of K d values based on measurements of K d values made in sandy SRS sediments (Kaplan 2010). The actual cementitious material K d values and solubility values differ from the sandy sediments. The K d value range and distribution currently used in the PA are estimated to range between 0.25*K d and 1.75*K d , where the minimum and maximum values of the ranges reflect the 95% confidence level for the mean K d value (Kaplan 2010). The objective of the research with cementitious materials was to measure the range and distribution of a monovalent (Cs) and I - (anion), divalent (Sr), and trivalent (Eu) ions for a variety of laboratory-prepared saltstone surrogate samples to establish a K d range other than that which is presently used in the PA. It has been observed in laboratory samples that cure temperature profiles can affect properties such as heat of hydration, permeability, porosity, compressive strength, and set time (Harbour et al. 2009). The intent was to identify a range and distribution that could be used by stochastic modelers for the PA. Furthermore, the intent was to replace the arbitrarily selected distributions based on geological sandy sediments and to base it on actual cementitious materials. The scope of this study did not include understanding saltstone sorption mechanisms responsible for increasing or decreasing sorption. Similar to the work with cementitious materials, the purpose of the Pu sediment K d dataset was not to attempt to understand through statistics how to better understand Pu sorption to sediments or to lower Pu K d variance. The sediment Pu K d data is included in this study because it is a key risk driver for the PAs on the SRS, and there is presently no direct studies of Pu variability in SRS soils. Instead the distribution of Pu sediment K d values was assumed to be similar to other cations, as presented by Kaplan (2010).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual report of groundwater monitoring at Everest, Kansas in 2011

Everest, Kansas, is a small rural community (population approximately 300) located in the southeast corner of Brown County, in the northeastern corner of Kansas. Carbon tetrachloride and chloroform contamination in groundwater at Everest was initially identified in 1997 as a result of testing performed under the Commodity Credit Corporation/U.S. Department of Agriculture (CCC/USDA) private well sampling program conducted by the Kansas Department of Health and Environment (KDHE). The KDHE collected samples from seven private wells in and near Everest. Carbon tetrachloride and chloroform were found in only one of the wells, the Donnie Nigh domestic well (owned at that time by Tim Gale), approximately 3/8 mi northwest of the former Everest CCC/USDA facility. Carbon tetrachloride and chloroform were detected at 121 {mu}g/L and 4 {mu}g/L, respectively. Nitrate was found at 12.62 mg/L. The USDA subsequently connected the Nigh residence to the Everest public water supply system. The findings of the 2011 monitoring at Everest support the following conclusions: (1) Measurements of groundwater levels obtained manually during annual monitoring in 2009-2011 (and through the use of automatic recorders in 2002-2010) have consistently indicated an initial direction of groundwater flow from the former CCC/USDA facility to the north-northwest and toward the Nigh property, then west-southwest from the Nigh property toward the intermittent creek that lies west of the former CCC/USDA facility and the Nigh property. (2) At most of the monitored locations, carbon tetrachloride concentrations decreased in April 2011 relative to 2010 results. Noteworthy decreases of > 50% occurred at locations MW4, MW60, and MW88, in the most concentrated part of the plume. (3) Comparison of accumulated data demonstrates that the area of the carbon tetrachloride plume with concentrations > 200 {mu}g/L has decreased markedly over time and suggests a generally decreasing trend in contaminant levels. (4) The trace increases in carbon tetrachloride concentrations observed in 2010 at locations SB63 and SB64 were notable because of the locations proximity to the downgradient intermittent creek. However, these increases were not confirmed in sampling in 2011. (5) The results of the April 2011 monitoring event continue to support the interpretation, made during the 9-yr observation period from 2001 to 2010, that the migration rate for contamination in groundwater toward the intermittent creek is very slow. (6) No carbon tetrachloride was detected in five samples of surface water collected from the intermittent creek west of the former CCC/USDA facility and the Nigh property, or in tree branch tissue samples collected at locations along the banks of the creek. These observations indicate that the carbon tetrachloride contamination identified at Everest has, to date, not impacted the surface waters of the intermittent creek.

54 ENVIRONMENTAL SCIENCES↗

Performance of Variable Capacity Heat Pumps in a Mixed Humid Climate

Variable capacity heat pumps represent the next wave of technology for heat pumps. In this report, the performance of two variable capacity heat pumps (HPs) is compared to that of a single or two stage baseline system. The units were installed in two existing research houses located in Knoxville, TN. These houses were instrumented to collect energy use and temperature data while both the baseline systems and variable capacity systems were installed. The homes had computer controlled simulated occupancy, which provided consistent schedules for hot water use and lighting. The temperature control and energy use of the systems were compared during both the heating and cooling seasons. Multiple linear regression models were used along with TMY3 data for Knoxville, TN in order to normalize the effect that the outdoor air temperature has on energy use. This enables a prediction of each system's energy use over a year with the same weather. The first system was a multi-split system consisting of 8 indoor units and a single outdoor unit. This system replaced a 16 SEER single stage HP with a zoning system, which served as the baseline. Data was collected on the baseline system from August 2009 to December 2010 and on the multi-split system from January 2011 to January 2012. Soon after the installation of the multi-split system, some of the smaller rooms began over-conditioning. This was determined to be caused by a small amount of continuous refrigerant flow to all of the indoor units when the outdoor unit was running regardless of whether they were calling for heat. This, coupled with the fact that the indoor fans run continuously, was providing enough heat in some rooms to exceed the set point. In order to address this, the indoor fans were disabled when not actively heating per the manufacturer's recommendation. Based on the measured data, the multi-split system was predicted to use 40% more energy in the heating season and 16% more energy in the cooling season than the baseline system, for the typical meteorological year weather data. The AHRI ratings indicated that the baseline system would perform slightly better than the multi-split system, but not by as large of a margin as seen in this study. The multi-split system was able to maintain more consistent temperature throughout the house than the baseline system, but it did allow relative humidity levels to increase above 60% in the summer. The second system was a split system with an inverter driven compressor and a single ducted air handler. This unit replaced a 16 SEER two stage HP with a zoning system. Data was collected on the baseline system from July 2009 to November 2010 and on the ducted inverter system from December 2010 to January 2012. The ducted inverter system did not offer a zone controller, so it functioned as a single zone system. Due to this fact, the registers had to be manually adjusted in order to better maintain consistent temperatures between the two levels of the house. The predicted heating season energy use for the ducted inverter system, based on the measured energy use, was 30% less than that of the baseline system for the typical meteorological year. However, the baseline system was unable to operate in its high stage due to a wiring issue with the zone controller. This resulted in additional resistance heat use during the winter and therefore higher energy use than would be expected in a properly performing unit. The AHRI ratings would indicate that the baseline system would use less energy than the ducted inverter system, which is opposite to the results of this study. During the cooling season, the ducted inverter system was predicted to use 23% more energy than the baseline system during the typical meteorological year. This is also opposite of the results expected by comparing the AHRI ratings. After a detailed comparison of the ducted inverter system's power use compared to that of a recently installed identical system at a retro-fit study house, there is concern that the unit is not operating as intended. The power use and cycles indicate that the unit is performing more like a single stage unit than a variable capacity unit. Analysis of the data indicates that a change in operating behavior occurred during a service call shortly after the installation of the unit. The logbook only indicates that refrigerant charge was added, but does not indicate any other change. This is being investigated further. While the energy comparison results of these two variable capacity heat pumps is generally underwhelming, it is difficult to draw any hard conclusions about the maximum attainable efficiency of these units when optimally installed. Both units appear to have undesirable conditions associated with the installation or operation, which could have had an adverse effect on their energy use.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Concentrating Solar Panels: Bringing the Highest Power and Lowest Cost to the Rooftop

Soliant Energy is a venture-capital-backed startup focused on bringing advanced concentrating solar panels to market. Our fundamental innovation is that we are the first company to develop a racking solar concentrator specifically for commercial rooftop applications, resulting in the lowest LCOE for rooftop electricity generation. Today, the commercial rooftop segment is the largest and fastest-growing market in the solar industry. Our concentrating panels can make a major contribution to the SAI's objectives: reducing the cost of solar electricity and rapidly deploying capacity. Our commercialization focus was re-shaped in 2009, shifting from an emphasis solely on panel efficiency to LCOE. Since the inception of the SAI program, LCOE has become the de facto standard for comparing commercial photovoltaic systems. While estimation and prediction models still differ, the emergence of performance-based incentive (PBI) and feed-in tariff (FIT) systems, as well as power purchase agreement (PPA) financing structures make LCOE the natural metric for photovoltaic systems. Soliant Energy has designed and demonstrated lower-cost, higher-power solar panels that consists of 6 (500X) PV module assemblies utilizing multi-junction cells and an integrated two-axis tracker. In addition, we have designed and demonstrated a prototype 1000X panel assembly with 8. Cost reductions relative to conventional flat panel PV systems were realized by (1) reducing the amount of costly semiconductor material and (2) developing strategies and processes to reduce the manufacturing costs of the entire system. Performance gains against conventional benchmarks were realized with (1) two-axis tracking and (2) higher-efficiency multi-junction PV cells capable of operating at a solar concentration ratio of 1000X (1000 kW/m2). The program objectives are: (1) Develop a tracking/concentrating solar module that has the same geometric form factor as a conventional flat, roof mounted photovoltaic (PV) panel - the Soliant module will produce more power and cost less than conventional panels of the same size; (2) Target LCOE: $0.079/kWh in 2010; (3) Target efficiency - 26% in 2010 (22% for 2008 prototype, 24% for 2009 pilot); and (4) Target performance - equivalent to 650Wp in 2010 (490W for 2008 prototype, 540W for 2009 pilot).

14 SOLAR ENERGY↗

Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin

The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Annual Report of Monitoring at Morrill, Kansas, in 2011

Carbon tetrachloride contamination in groundwater at Morrill, Kansas, was initially identified in 1985 during statewide testing of public water supply wells for volatile organic compounds (VOCs). High levels of nitrate were also present in the wells. The city of Morrill is located in Brown County in the northeastern corner of the state, about 7 mi east of Sabetha (Figure 1.1). The population of Morrill as of the 2010 Census was approximately 230 (down from 277 in 2000). All residents of Morrill now obtain their drinking water from the Sabetha municipal water system via a pipeline constructed in 1991. The findings of the April 2011 and October 2011 monitoring events at Morrill support the following conclusions: (1) Groundwater flow during the 2011 review period (as in prior years) was predominantly to the south, from the vicinity of the former CCC/USDA facility toward Terrapin Creek. Automatic water level monitoring data suggest that spring precipitation and recharge represent the predominant factors affecting the local groundwater level patterns. (2) No significant changes were observed in the concentration or distribution of carbon tetrachloride in groundwater during the spring and fall 2011 monitoring events versus the spring and fall 2010 monitoring events. In October 2011, a maximum carbon tetrachloride concentration of 49 μg/L was identified in groundwater at well MW3S on the former CCC/USDA facility, with concentrations decreasing downgradient toward Terrapin Creek. (3) Since 2004, the accumulated results of 15 sampling events have demonstrated a significant decline in the maximum detected concentration of carbon tetrachloride in groundwater. In 1995, the contaminant was detected at the former CCC/USDA facility at 390 μg/L, while the current maximum levels are < 50 μg/L. The residual contaminant plume extending from the former CCC/USDA facility southward toward Terrapin Creek is well-defined and slowly declining in concentration naturally. (4) No carbon tetrachloride contamination was detected in 2011 in surface waters or shallow streambed sediments sampled at five locations along Terrapin Creek, downgradient from the former CCC/USDA facility. These results indicate that Terrapin Creek remains unaffected by the carbon tetrachloride plume. (5) Since 2007, the accumulated results of 10 monitoring events for surface water and sediment in Terrapin Creek have demonstrated no impact to the sediment and surface waters of the creek by carbon tetrachloride and no imminent risk for further degradation of the creek. (6) Terrapin Creek (tributary segment 308 to Walnut Creek) receives discharge from the Morrill wastewater treatment plant and several confined animal feeding operations regulated by the KDHE. The Walnut Creek watershed is designated by the KDHE as impaired by fecal coliform bacteria. Terrapin Creek is classified by the KDHE as not open to or accessible by the public for contact recreation and does not support the food procurement designated use (KDHE 2010b). (7) In July 2011, trace concentrations of carbon tetrachloride were detected in vegetation samples collected from trees at 2 of the 42 sampled locations south (downgradient) of the former CCC/USDA facility. (8) Sampling of indoor air in August 2010 to evaluate the potential for vapor intrusion into homes overlying and within 100 ft laterally of the identified carbon tetrachloride plume resulted in no detections of carbon tetrachloride. Low concentrations of chloroform, indicative of indoor air sources, were detected. Low radon levels were also detected. The results indicate no evidence of upward migration of vapors from the low-level carbon tetrachloride contamination in groundwater to indoor air.

54 ENVIRONMENTAL SCIENCES↗

B2R1 Version Description Document (VDD) Unattended and Remote Monitoring Baseline 2 Revision 1 Software

The purposes of this Version Description Document (VDD) are: 1. to precisely describe the content of the Unattended Remote Monitoring (UNARM) Baseline 2 Revision 1 software product (B2R1), and 2. to document the differences between the latest B2R1 [16] and its predecessors, B2R1 Phase 2 Mar. 29, 2012, Aug. 2, 2011, Aug. 28, 2010, Aug. 7, 2010, Feb. 20, 2010, and Oct. 8, 2009, and the original UNARM Baseline 2 Revision 0 (B2R0), 2005. This VDD is the authoritative and encompassing definition of B2R1. This VDD includes all configuration items (CI's) comprising B2R1: changed, unchanged, and new

Nuclear Disarmament, Safeguards, & Physical Protec↗

Summary of Carbon Storage Project Public Information Meeting and Open House

The Kentucky Geological Survey (KGS) completed a second phase of carbon dioxide (CO 2 ) injection and seismic imaging in the Knox Group, a Cambrian Ordovician dolomite and sandstone sequence in September 2010. This work completed 2 years of activity at the KGS No. 1 Marvin Blan well in Hancock County, Kentucky. The well was drilled in 2009 by a consortium of State and industry partners (Kentucky Consortium for Carbon Storage). An initial phase of CO 2 injection occurred immediately after completion of the well in 2009. The second phase of injection and seismic work was completed in September 2010 as part of a U.S. DOE funded project, after which the Blan well was plugged and abandoned. Following completion of research at the Blan well, a final public meeting and open house was held in Hancock County on October 28, 2010. This meeting followed one public meeting held prior to drilling of the well, and two on site visits during drilling (one for news media, and one for school teachers). The goal of the final public meeting was to present the results of the project to the public, answer questions, and address any concerns. Despite diligent efforts to publicize the final meeting, it was poorly attended by the general public. Several local county officials and members of the news media attended, but only one person from the general public showed up. We attribute the lack of interest in the results of the project to several factors. First, the project went as planned, with no problems or incidents that affected the local residents. The fact that KGS fulfilled the promises it made at the beginning of the project satisfied residents, and they felt no need to attend the meeting. Second, Hancock County is largely rural, and the technical details of carbon sequestration were not of interest to many people. The county officials attending were an exception; they clearly realized the importance of the project in future economic development for the county.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High Efficiency, Low Emissions Homogeneous Charge Compression Ignition (HCCI) Engines

This is the final report of the High Efficiency Clean Combustion (HECC) Research Program for the U.S. Department of Energy. Work under this co-funded program began in August 2005 and finished in July 2010. The objective of this program was to develop and demonstrate a low emission, high thermal efficiency engine system that met 2010 EPA heavy-duty on-highway truck emissions requirements (0.2g/bhp-hr NOx, 0.14g/bhp-hr HC and 0.01g/bhp-hr PM) with a thermal efficiency of 46%. To achieve this goal, development of diesel homogenous charge compression ignition (HCCI) combustion was the chosen approach. This report summarizes the development of diesel HCCI combustion and associated enabling technologies that occurred during the HECC program between August 2005 and July 2010. This program showed that although diesel HCCI with conventional US diesel fuel was not a feasible means to achieve the program objectives, the HCCI load range could be increased with a higher volatility, lower cetane number fuel, such as gasoline, if the combustion rate could be moderated to avoid excessive cylinder pressure rise rates. Given the potential efficiency and emissions benefits, continued research of combustion with low cetane number fuels and the effects of fuel distillation are recommended. The operation of diesel HCCI was only feasible at part-load due to a limited fuel injection window. A 4% fuel consumption benefit versus conventional, low-temperature combustion was realized over the achievable operating range. Several enabling technologies were developed under this program that also benefited non-HCCI combustion. The development of a 300MPa fuel injector enabled the development of extended lifted flame combustion. A design methodology for minimizing the heat transfer to jacket water, known as precision cooling, will benefit conventional combustion engines, as well as HCCI engines. An advanced combustion control system based on cylinder pressure measurements was developed. A Well-to-wheels analysis of the energy flows in a mobile vehicle system and a 2nd Law thermodynamic analysis of the engine system were also completed under this program.

33 ADVANCED PROPULSION SYSTEMS↗

Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.

13 HYDRO ENERGY↗

In-Line Crack and Stress Detection in Silicon Solar Cells Using Resonance Ultrasonic Vibrations

The Phase II project has the following specific tasks: (i) specify optimal configurations of the in-line system's component hardware and software; (ii) develop and justify a system prototype that meets major specifications for an in-line crack detection unit, such as high throughput rate, high level of stability, reproducibility of data acquisition and analysis, and high sensitivity with respect to crack length and crack location; (iii) design a system platform that allows easy integration within and adaptation to various solar cell belt-type production lines; (iv) develop a testing protocol providing quality certification of the production-grade system. Commercial Application of the proposed activity consists of bringing to the solar market a new high-tech product based on an innovative solution and patented methodology to contribute to cost reduction of silicon solar module production. The solar industry, with crystalline silicon as a dominant segment, shows outstanding performance, with approximately 25% yearly growth during the last years. Despite a slowdown with only 5.6 GW installations in 2009, solar module production for the 2010 and 2011 years was recovered. According to European Photonics Industry Consortium new solar PV installations grow by 56% compared to 2010 reached 64.7 GW in 2011. Revenues in the PV industry reached a record high of $93 billion in 2011, a 13.4 percent gain over 2010 and 150 percent over 2009. This growth was forecasted to continue in 2013 with double digits growth. The solar industry is economically driven to make solar panels of the highest conversion efficiency and reliability at the lowest production cost. The Resonance Ultrasonic Vibration system addresses critical needs of the silicon-based solar industry by providing a quality control method and tool, which will improve productivity, increase reliability of products and reduce manufacturing cost of solar panels.

14 SOLAR ENERGY↗

Regional Community Wind Conferences: Great Plains Windustry Project

Windustry organized and produced five regional Community Wind Across America (CWAA) conferences in 2010 and 2011 and held two CWAA webinars in 2011 and 2012. The five conferences were offered in regions throughout the United States: Denver, Colorado October 2010 St. Paul, Minnesota November 2010 State College, Pennsylvania February 2011 Ludington, Michigan (co-located with the Michigan Energy Fair) June 2011 Albany, New York October 2011

17 WIND ENERGY↗

The La Mesa Fire: Studies and Observations from 1975 through 2012

In 1996, Swetnam and Baisan stated the following: “The 1977 La Mesa burn was a wake-up call to perhaps the most pressing forest health problem in Southwestern forests—historically anomalous, catastrophic wildfire in the ponderosa pine—created by many decades of fire exclusion.” However, the wake-up call was only momentary and was forgotten until the Dome Fire (1996), Oso Complex Fire (1998), and Cerro Grande Fire (2000) burned lands within the community of Los Alamos, Los Alamos National Laboratory (LANL), Bandelier National Monument (BNM), and Santa Fe National Forest (SFNF). After the Dome Fire, several initiatives were under way to understand the wildland-urban interface and the conditions that have brought the forests of the Pajarito Plateau dangerously close to multiple, large, and intense wildfires. After the Dome Fire, the Interagency Wildfire Management Team was formed, bringing together adjoining agencies to deal with the ever-increasing threat of conflagration that could result in loss of property and human life. This study is about the history before and after the La Mesa Fire—at the time, the first large wildfire on the Pajarito Plateau in over 80 years. It represents 37 years of research and observations that began when management of fire on the Pajarito Plateau was first being explored by BNM. It documents changes in vegetation composition since June 1977 and shows the progression of change in understanding fire’s essential place in the ecosystems of the Pajarito Plateau. The study began in 1975 and 1976, when Loren Potter and I examined previously burned areas to determine a fire frequency for the east Jemez Mountains. We had examined areas of 10 acres or more that had burned at various times, e.g., 1939, 1945, 1950, 1955, 1960, and 1976. A year and a half into the study, the La Mesa Fire ignited on Mesa del Rito, ultimately burning about 15,000 acres of BNM, SFNF, and LANL, including our established plots. After the fire, we set up 20- by 50-meter permanent plots along four ornithological transects established by ornithologist Roland Wauer. Wauer’s transects were mostly in ponderosa pine, with one in mixed conifer and one in the piñon-juniper woodland. Plots within the ponderosa pine were visited in 1977, 1978, 1985, 1992, 1998, 1999, 2010, 2011 and 2012. We mapped the standing trees, photographed each plot, and collected data on the understory components. Transects in the mixed conifer were visited in 1977, 1992, 1999, 2010 and 2012. Plots in the piñon-juniper were visited in 1977, 1999, and 2010 for taking photographs and data years after the fire. Additionally, plots were established in LANL Technical Area 49 as a control to post-fire seeding. We visited these plots in 1977, 1992, and 1998. Ironically, this study ends with another large fire burning over the plots we have followed all these years. In June 2011, the Las Conchas Fire became the largest fire in New Mexico’s history to that time and burned most of the area of the La Mesa Fire and the plots studied over the years. In this report, we summarize information about the vegetation changes within the boundaries of the La Mesa Fire. Thirty-seven years of observations and studies have provided long-term data related to regeneration of trees, water relations of grasses and pines, the influence of seeding with non-native grasses, pyrodendrochronology, and plant succession as related to fire.

54 ENVIRONMENTAL SCIENCES↗