Supervisory Optimal Control for Photovoltaics Connected to an Electric Power Grid [Slides]
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Most of the renewable energy sources are not distributed directly to consumer. It gone through several section to get optimum output voltage and current with the almost zero distortion. Direct Matrix converters are well known of its better power quality and low power distortion to the reactive loads. Conversely, multilevel H bridge inverters are broadly used to attain a sinusoidal output voltage in solar photovoltaic application. Reactive power is subject to high importance for the operation of alternating current (AC) power systems. Moreover there is always a challenge to obtain the balance current control from an unbalanced supply voltage with minimum harmonic distortion for reactive load application from solar power system. The main objective of the proposed system is to maximize the power usage by maintaining the current and power factor nearby unity. There are many different optimization techniques are used so far in matrix converter, a novel method of optimization BAT algorithm is proposed for the power quality to get the best result. This work mainly deals with the compensation of reactive power used in Solar Photovoltaic Power System. Bidirectional energy flow is possible with matrix converter for battery charging. Simulation results are presented to confirm the appropriate operation of the system under different of operating conditions. Also, in the proposed method the percentage of the higher order harmonics can reduced less than 9% of matrix converter for solar photovoltaic application.
Accurately and efficiently predicting wind turbine structural loading is a crucial step in wind farm design. Without considering structural loading, wind farm optimization could negatively impact turbine fatigue and ultimate loads, especially for waked and partially waked turbines, which could result in higher maintenance costs and reduced turbine lifetime. However, predicting turbine loads throughout an array is a costly step, as these quantities require time-accurate results across long time histories, which is often intractable for large array optimization. Therefore, surrogate models that link array spacing to load outputs are often used, but the surrogates are then unique to the inflow conditions and array configurations in the training library. This work develops surrogate models for many wind turbine load outputs based solely on rotor plane velocity measurements, with no required input about array configuration or freestream inflow parameters. Surrogate models were constructed for many turbine quantities of interest (QoI), considering mean, standard deviation, ultimate, and fatigue loads. In general, most QoI statistics were accurately captured, as measured by predicted vs. actual correlation coefficient, confirming the suitability of the approach. Temporal mean values of the QoI required only temporal mean measurements of the rotor plane inflow velocity. However, accurate prediction of temporal standard deviation, ultimate, and fatigue values of QoI also required temporal standard deviations of the rotor plane velocity field. Poor surrogate performance was observed when too many correlated inputs were used, such as multiple velocity components. If the fewest inflow parameters are used to construct the surrogates, the average correlation coefficient value for all output QoI statistics is 0.89. Surrogates for standard deviations and damage equivalent loads (DELs) of turbine QoIs generally had lower accuracy and tower-base and shaft load channels posed the most difficult to capture accurately. The results suggest that these surrogates could be easily paired with analytic wake models, which are frequently used for pre-construction wind farm array optimization, to account for turbine loading in addition to power production. By including the optimal inflow conditions, the surrogate accuracy can improve to an average correlation coefficient value for all output QoI statistics of 0.92. This work has established the ability to build accurate surrogates for mean, standard deviation, ultimate load, and DEL turbine QoI values based on the rotor plane inflow velocity, and identified which inflow conditions lead to greater surrogate accuracy.
The optimal scheduling of hydropower generation holds significant importance to power system operation. The unique requirements of environmental constraints and the power system, depending on their respective objectives, demand distinct flow patterns. While power system stakeholders strive to optimize revenue in electricity markets, stakeholders from boating recreation seeks to identify flow ranges that optimize the boating experience. In pursuit of a win-win solution, this study aims to reconcile the interests of various stakeholders in hydropower scheduling. The maximum revenue from day-ahead electricity market is explored through an optimization process considering both plant operation constraints, boating flow constraints, water availability, and market prices. Results of real world case studies at a river in California show that the proposed approach can achieve dual objectives: maximizing market revenue while addressing boating recreation necessities. In addition, as the accuracy of electricity price forecasting and flow forecasting increase, the optimal revenue becomes increasingly advantageous to hydropower plant operators.
As worldwide energy consumption continues to increase, so does the demand for renewable energy sources. The total available wave energy resource for the United States alone is 2,640 TWh/yr; nearly two thirds of the 4,000 TWh of electricity used in the United States each year. It is estimated that nearly half of that available energy is recoverable through wave energy conversion techniques. In this thesis, a two-body ‘point absorber’ type wave energy converter with a mechanical power-takeoff is investigated. The two-body wave energy converter extracts energy through the relative motion of a floating buoy and a neutrally buoyant submerged body. Using a linear frequency-domain model, analytical solutions of the optimal power and the corresponding power-takeoff components are derived for the two-body wave energy converter. Using these solutions, a case study is conducted to investigate the influence of the submerged body size on the absorbed power of the device in regular and irregular waves. Here it is found that an optimal mass ratio between the submerged body and floating buoy exists where the device will achieve resonance. Furthermore, a case study to investigate the influence of the submerged body shape on the absorbed power is conducted using a time-domain numerical model. Here it is found that the submerged body should be designed to reduce the effects of drag, but to maintain relatively large hydrodynamic added mass and excitation force. To validate the analytical and numerical models, a 1/30th scale model of a two-body wave energy converter is tested in a wave tank. The results of the wave tank tests show that the two-body wave energy converter can absorb nearly twice the energy of a single-body ‘point absorber’ type wave energy converter.
Purpose: To investigate the performance of a new penalized-likelihood PET image reconstruction algorithm using the 1{sub 1}-norm total-variation (TV) sum of the 1st through 4th-order gradients as the penalty. Simulated and brain patient data sets were analyzed. Methods: This work represents an extension of the preconditioned alternating projection algorithm (PAPA) for emission-computed tomography. In this new generalized algorithm (GPAPA), the penalty term is expanded to allow multiple components, in this case the sum of the 1st to 4th order gradients, to reduce artificial piece-wise constant regions (“staircase” artifacts typical for TV) seen in PAPA images penalized with only the 1st order gradient. Simulated data were used to test for “staircase” artifacts and to optimize the penalty hyper-parameter in the root-mean-squared error (RMSE) sense. Patient FDG brain scans were acquired on a GE D690 PET/CT (370 MBq at 1-hour post-injection for 10 minutes) in time-of-flight mode and in all cases were reconstructed using resolution recovery projectors. GPAPA images were compared PAPA and RMSE-optimally filtered OSEM (fully converged) in simulations and to clinical OSEM reconstructions (3 iterations, 32 subsets) with 2.6 mm XYGaussian and standard 3-point axial smoothing post-filters. Results: The results from the simulated data show a significant reduction in the 'staircase' artifact for GPAPA compared to PAPA and lower RMSE (up to 35%) compared to optimally filtered OSEM. A simple power-law relationship between the RMSE-optimal hyper-parameters and the noise equivalent counts (NEC) per voxel is revealed. Qualitatively, the patient images appear much sharper and with less noise than standard clinical images. The convergence rate is similar to OSEM. Conclusions: GPAPA reconstructions using the 1{sub 1}-norm total-variation sum of the 1st through 4th-order gradients as the penalty show great promise for the improvement of image quality over that currently achieved with clinical OSEM reconstructions.
The command and data-handling subsystem of the Atmosphere Explorer satellite provides the necessary controls for the instrumentation and telemetry, and also controls the satellite attitude and trajectory. The subsystem executes all command information within the spacecraft, either in real time (as received over the S-band command transmission link) or remote from the command site (as required by the orbit operations schedule). Power consumption in the spacecraft is optimized by suitable application and removal of power to various instruments; additional functions include control of magnetic torquers and of the orbit-adjust propulsion subsystem. Telemetry data from instruments and the spacecraft equipment are formatted into a single serial bit stream. Attention is given to command types, command formats, decoder operation, and command processing functions.
An ac motor controller for an induction motor electric vehicle drive system was designed, fabricated, tested, evaluated, and cost analyzed. A vehicle performance analysis was done to establish the vehicle tractive effort-speed requirements. These requirements were then converted into a set of ac motor and ac controller requirements. The power inverter is a three-phase bridge using power Darlington transistors. The induction motor was optimized for use with an inverter power source. The drive system has a constant torque output to base motor speed and a constant horsepower output to maximum speed. A gear shifting transmission is not required. The ac controller was scaled from the base 20 hp (41 hp peak) at 108 volts dec to an expanded horsepower and battery voltage range. Motor reversal was accomplished by electronic reversal of the inverter phase sequence. The ac controller can also be used as a boost chopper battery charger. The drive system was tested on a dynamometer and results are presented. The current-controlled pulse width modulation control scheme yielded improved motor current waveforms. The ac controller favors a higher system voltage.
The examination of wind power forecasting errors is crucial for optimal unit commitment and economic dispatch of power systems with significant wind power penetrations. This scheduling process includes both renewable and nonrenewable generators, and the incorporation of wind power forecasts will become increasingly important as wind fleets constitute a larger portion of generation portfolios. This research considers the Western Wind and Solar Integration Study database of wind power forecasts and numerical actualizations. This database comprises more than 30,000 locations spread over the western United States, with a total wind power capacity of 960 GW. Error analyses for individual sites and for specific balancing areas are performed using the database, quantifying the fit to theoretical distributions through goodness-of-fit metrics. Insights into wind-power forecasting error distributions are established for various levels of temporal and spatial resolution, contrasts made among the frequency distribution alternatives, and recommendations put forth for harnessing the results. Empirical data are used to produce more realistic site-level forecasts than previously employed, such that higher resolution operational studies are possible. This research feeds into a larger work of renewable integration through the links wind power forecasting has with various operational issues, such as stochastic unit commitment and flexible reserve level determination.
The optimization and guidance of penetration landing trajectories in a windshear are considered. It is assumed that the aircraft is controlled by the angle of attack and the power setting. For the optimal trajectory, the performance index being minimized measures the deviation of the flight trajectory from the nominal trajectory. In turn, the nominal trajectory includes two parts: the approach part (nominal glide slope constant) and the flare part (nominal glide slope varying linearly with the horizontal distance). Numerical results show that the optimal trajectory deviates somewhat from the nominal trajectory in the shear region. A guidance scheme is developed to approximate the optimal trajectory. The angle of attack is determined by the windshear intensity, the absolute path inclination, and the glide slope angle, while the power setting is determined by the windshear intensity and the velocity. Numerical results indicate that the guidance trajectory is close to the optimal trajectory.
Preliminary activities to develop and refine a lightweight 30 cm engineering model ion thruster are discussed. The approach is to develop a 'derated' ion thruster capable of performing both auxiliary and primary propulsion roles over an input power range of at least 0.5 to 5.0 kilo-W. Design modifications to a baseline thruster to reduce mass and volume are discussed. Performance data over an order of magnitude input power range are presented, with emphasis on the performance impact of engine throttling. Thruster design modifications to optimize performance over specific power envelopes are discussed. Additionally, lifetime estimates based on wear test measurements are made for the operation envelope of the engine.
MSPI (Mitigation System Performance Index) is one of the risk-informed, plant-specific performance indicators of NRC’s Reactor Oversight Process. MSPI is used by the regulator and nuclear industry to monitor and assess the performance of plant mitigating systems. In this project, a calculation tool has been developed by incorporating the plant operation data, Probabilistic Risk Assessment (PRA) data, and industry baseline values to automate the calculation process of MSPI and the generation of the report. This is the first stage in an effort to optimize the MSPI through advanced artificial intelligence (AI) and machine learning (ML) techniques to improve nuclear power plant safety and efficiency.
Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.
Achieving 100% carbon-free or renewable power systems can be facilitated by the deployment of energy storage technologies at all timescales, including short-duration, long-duration, and seasonal scales; however, most current literature focuses on cost assessments of energy storage for a given timescale or type of technology. In this work, we use an optimization framework with high spatial and temporal resolution to simultaneously assess the variable renewable power deployment and the optimal storage portfolio for seven independent system operators in the United States. Results indicate that achieving high (75–90%) and ultrahigh (>90%) energy mixes requires combining several flexibility options, including renewable curtailment, short-duration, long-duration, and seasonal storage. For instance, carbon-free and renewable energy mix targets of up to 80% are achieved with economic curtailment and a combination of short- and long-duration energy storage for the performance and cost assumptions used. After that, there is a point between 80% and 95% where seasonal storage becomes cost-competitive, depending on the specific power system. Moreover, our results indicate that storage-to-storage operation—one storage device used to charge another storage device—and the decoupling of charging and discharging storage power capacity are cost-effective options for the integration of high and ultrahigh shares of carbon-free or renewable power sources. Additionally, the results from this study show that an 85% carbon-free or renewable energy mix can be achieved at a cost of avoided CO 2 emissions of US$66.0 per tonne or less, regardless of the power system.
The conceptual design and proof-of-concept testing of a furling vertical axis wind turbine, suited to large-scale offshore deployment, is described. Through the implementation of variable geometry capabilities, extreme storm loads can be reduced, and unsteady flow-related fatigue loads can be minimized thereby reducing capital (structural) and maintenance costs. Moreover, annual power generation can be optimized in real-time to account for unsteady wind effects related to weather and siting thus improving efficiency and annual power generation.