Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid resources”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,657 records · Page 92

Advanced Demonstration and Test Reactor Options Study

Global efforts to address climate change will require large-scale decarbonization of energy production in the United States and elsewhere. Nuclear power already provides 20% of electricity production in the United States (U.S.) and is increasing in countries undergoing rapid growth around the world. Because reliable, grid-stabilizing, low emission electricity generation, energy security, and energy resource diversity will be increasingly valued, nuclear power’s share of electricity production has a potential to grow. In addition, there are non electricity applications (e.g., process heat, desalination, hydrogen production) that could be better served by advanced nuclear systems. Thus, the timely development, demonstration, and commercialization of advanced nuclear reactors could diversify the nuclear technologies available and offer attractive technology options to expand the impact of nuclear energy for electricity generation and non-electricity missions. The purpose of this planning study is to provide transparent and defensible technology options for a test and/or demonstration reactor(s) to be built to support public policy, innovation and long term commercialization within the context of the Department of Energy’s (DOE’s) broader commitment to pursuing an “all of the above” clean energy strategy and associated time lines. This planning study includes identification of the key features and timing needed for advanced test or demonstration reactors to support research, development, and technology demonstration leading to the commercialization of power plants built upon these advanced reactor platforms. This planning study is consistent with the Congressional language contained within the fiscal year 2015 appropriation that directed the DOE to conduct a planning study to evaluate “advanced reactor technology options, capabilities, and requirements within the context of national needs and public policy to support innovation in nuclear energy”. Advanced reactors are defined in this study as reactors that use coolants other than water. Advanced reactor technologies have the potential to expand the energy applications, enhance the competitiveness, and improve the sustainability of nuclear energy.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Analysis Framework for Distribution Network DER Integration Analysis in India: Distributed Solar in Tamil Nadu

This report is part of a two-part series that represents a year-long collaboration with the Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) on power sector planning. The first report in this series, the Pathways for Tamil Nadu’s Electric Power Sector 2017-2030 report outlines NREL’s work with TANGEDCO's electricity sector planning department to develop a model of the State’s power system and evaluate multiple scenarios of system growth given resource constraints, costs of technologies, and power sector policies. This second report in this series focuses on the rapidly transforming distribution network in the State. The report outlines a framework developed by NREL with TANGEDCO's distribution utility to quickly and accurately analyze the impacts of integrating renewable energy, specifically rooftop solar PV onto Tamil Nadu's distribution system. Together these studies help to prepare Tamil Nadu for a rapidly transforming power system.

14 SOLAR ENERGY↗

An Overview of Issues Related to IEEE Std 1547-2018 Requirements Regarding Voltage and Reactive Power Control

The revised Institute of Electrical and Electronics Engineers (IEEE) 1547 Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018) was published in April 2018. This standard is one of the foundational documents in the United States needed for integrating distributed energy resources (DERs), including solar energy systems, with the electric distribution grid. The revised standard contains 11 chapters (clauses) and 8 annexes that comprise 136 pages. The revision is significantly different from the 2003 version, and it contains new concepts and new technical requirements. Each clause specifies information or requirements that apply to certain aspects important to the interconnection of DERs to the electric power system. Implementing the requirements necessitates a careful study of the underlying technical concept and requires the appropriate information required to calculate relevant settings and configurations. Various stakeholders have different roles in implementing the standard, and portions of the standard are directed toward a specific audience who must possess specialized information and technical training to use and apply the requirements. This document aims to (1) summarize a specific portion of the standard as concisely as possible and (2) provide the reader with introductory knowledge and information to support the utilization of the requirements.

14 SOLAR ENERGY↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Alternative Approaches to Traditional Net Energy Metering

Most jurisdictions in the United States originally implemented net energy metering (NEM) tariffs to support the deployment and interconnection of distributed generation (DG) resources (e.g., rooftop solar photovoltaic systems). Since then, NEM has proven effective in promoting adoption of DG resources. Recently, due to concerns about sufficient recovery of utilities’ revenue requirements and cost-shifting, there is increasing interest in—or statutory requirements to pursue—alternative compensation approaches, especially in U.S. states and territories with robust growth in distributed solar. Recent increases in other forms of distributed energy resources (DERs) that can potentially send power to the distribution grid (e.g., distributed battery energy storage system (BESS)) are further driving compensation reforms. This brief provides an overview of design elements associated with alternative approaches to traditional NEM, summarizes common arguments for and against them, and identifies implementation issues that utilities may need to address. Although this brief may be most useful in jurisdictions that are interested in or required to move beyond NEM, it is also applicable to those jurisdictions that have already done so—and are looking to further implement reforms to their existing compensation mechanisms. In the broadest sense, there are three primary tariff-related components when interconnecting a DER onto the local utility’s distribution system (adapted from Zinaman et al., 2017): 1. Metering and Billing Arrangements: How utilities measure and bill electricity consumption and production. 2. DER Export Tariff Design: The structure under which utilities compensate customers for electricity they export to the grid. 3. Consumption Tariff Design: The structure under which customers pay for electricity they consume from the grid. When implementing changes to any of these primary tariff-related components, there are likely implications for a utility’s metering system, billing system, and other technology systems. Where applicable, this brief explicitly identifies such implementation challenges.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Maintaining Grid Reliability: Lessons From Renewable Integration Studies

The U.S. Department of Energy (DOE) and other organizations have sponsored numerous research studies over the last two decades to examine the effect of increased wind and solar deployment on grid reliability, including a number of studies that examine grids deriving more than 50% of annual energy from wind and solar. In this report, we discuss key findings from both the research body of knowledge and real-world practice related to grid reliability, and we demonstrate how to plan for and achieve continued reliability in the future as wind and solar deployment increase.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity Standards for Distributed Energy Resources: Gaps and Harmonization Strategy

This report examines cybersecurity standards for Distributed Energy Resources (DERs) in light of their rapid growth and increasing integration into energy systems. It identifies critical gaps in existing frameworks, including inadequate coverage of DER-specific challenges, complexities in implementing comprehensive standards, integration issues with legacy systems, adoption hurdles for newer standards, and a lack of harmonization across regulatory landscapes. The analysis highlights vulnerabilities such as data integrity risks, unauthorized device control, and denial-of-service attacks across various DER technologies like solar PV, wind turbines, energy storage systems, and hydrogen fuel cells. The report proposes a harmonization strategy to address these deficiencies by developing unified cybersecurity requirements, certification programs, and training resources while fostering collaboration among stakeholders such as government agencies, industry groups, DER operators, manufacturers, and research institutions. A phased roadmap is outlined to refine and implement these measures through pilot testing and widespread adoption. Ultimately, the report underscores the urgent need for coordinated efforts to enhance DER cybersecurity and ensure the reliable operation of future energy systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Field Verification of Grid-Forming Inverter-Based Power Plant Performance for Transmission System Reliability

This report describes some examples of the operation of two grid-forming (GFM) inverter-based photovoltaic-battery hybrid power plants connected to the electric system of the island of Kauai in Hawaii. Both plants are photovoltaic power plants with battery energy storage and are connected to the networked transmission system operated by Kauai Island Utility Cooperative (KIUC), along with several other power plants including an oil-fired plant, diesel generators, small hydroelectric plants, a biofuel plant, and several other photovoltaic plants.

14 SOLAR ENERGY↗

Advancing Concentrating Solar Thermal Modeling Using System Advisor Model (SAM)

Concentrating solar thermal (CST) technologies play a critical role in enabling dispatchable power and high-temperature industrial heat applications. Accurate and flexible modeling tools are essential for evaluating system performance, guiding technology research and development, and informing investment decisions. The National Laboratory of the Rockies's System Advisor Model (SAM) is a widely used techno-economic simulation platform for CST systems, providing detailed performance and financial modeling capabilities for multiple CST system configurations. SAM integrates physics-based performance models with financial analysis to simulate the behavior of complex energy systems under realistic operating conditions. For CST technologies (including tower, parabolic trough, and linear Fresnel), SAM enables hourly simulations using site-specific weather data that ensure feasible operating conditions and convergence of mass and energy between core system components (i.e., solar field, receiver, thermal energy storage, and power cycle). These capabilities allow researchers and developers to evaluate annual energy production, capacity factors, levelized cost of energy (LCOE), and system dispatch strategies. A key advantage of SAM lies in its flexibility for parametric analysis and large-scale computational studies. Users can vary system design parameters such as heliostat field layout, receiver dimensions, thermal energy storage capacity, power block sizing, and installation cost assumptions to investigate their impact on system performance and financial metrics. When combined with automated scripting through LK, SDKTool, or Python interfaces, SAM enables high-throughput simulation workflows that support sensitivity analysis, technology benchmarking, and optimization studies. These approaches are particularly valuable for next-generation CST concepts, where design spaces are large and system interactions are complex. Another important capability of SAM is its support for dispatch optimization and thermal energy storage modeling, which are central to the value proposition of CST technologies. The ability to simulate integrated storage and flexible power generation allows researchers to explore strategies that maximize grid value, improve capacity utilization, and enhance integration with variable resources such as photovoltaic and wind generation. This poster will present an overview of SAM's thermal system modeling capabilities including concentrating solar. Additionally, we will highlight new feature developments including: 1) implementing Google's OR-Tools optimization platform for faster and more robust dispatch optimization, 2) developing a new power load following controller for modeling behind-the-meter applications, 3) enabling direct modeling of CSP-PV hybrid systems with the inclusion of battery storage, and 4) developing a multi-receiver falling particle Gen3 system model.

14 SOLAR ENERGY↗

CFD analysis of hypersonic, chemically reacting flow fields

Design studies are underway for a variety of hypersonic flight vehicles. The National Aero-Space Plane will provide a reusable, single-stage-to-orbit capability for routine access to low earth orbit. Flight-capable satellites will dip into the atmosphere to maneuver to new orbits, while planetary probes will decelerate at their destination by atmospheric aerobraking. To supplement limited experimental capabilities in the hypersonic regime, computational fluid dynamics (CFD) is being used to analyze the flow about these configurations. The governing equations include fluid dynamic as well as chemical species equations, which are being solved with new, robust numerical algorithms. Examples of CFD applications to hypersonic vehicles suggest an important role this technology will play in the development of future aerospace systems. The computational resources needed to obtain solutions are large, but solution adaptive grids, convergence acceleration, and parallel processing may make run times manageable.

Edwards, T. A.↗

Generic Divide and Conquer Internet-Based Computing

The rapid growth of internet-based applications and the proliferation of networking technologies have been transforming traditional commercial application areas as well as computer and computational sciences and engineering. This growth stimulates the exploration of new, internet-oriented software technologies that can open new research and application opportunities not only for the commercial world, but also for the scientific and high -performance computing applications community. The general goal of this research project is to contribute to better understanding of the transition to internet-based high -performance computing and to develop solutions for some of the difficulties of this transition. More specifically, our goal is to design an architecture for generic divide and conquer internet-based computing, to develop a portable implementation of this architecture, to create an example library of high-performance divide-and-conquer computing agents that run on top of this architecture, and to evaluate the performance of these agents. We have been designing an architecture that incorporates a master task-pool server and utilizes satellite computational servers that operate on the Internet in a dynamically changing large configuration of lower-end nodes provided by volunteer contributors. Our designed architecture is intended to be complementary to and accessible from computational grids such as Globus, Legion, and Condor. Grids provide remote access to existing high-end computing resources; in contrast, our goal is to utilize idle processor time of lower-end internet nodes. Our project is focused on a generic divide-and-conquer paradigm and its applications that operate on a loose and ever changing pool of lower-end internet nodes.

Radenski, Atanas↗

A Framework for Managing Inter-Site Storage Area Networks using Grid Technologies

The NASA Goddard Space Flight Center and the University of Maryland Institute for Advanced Computer Studies are studying mechanisms for installing and managing Storage Area Networks (SANs) that span multiple independent collaborating institutions using Storage Area Network Routers (SAN Routers). We present a framework for managing inter-site distributed SANs that uses Grid Technologies to balance the competing needs to control local resources, share information, delegate administrative access, and manage the complex trust relationships between the participating sites.

Kobler, Ben↗

A Framework for Managing Inter-Site Storage Area Networks using Grid Technologies

The NASA Goddard Space Flight Center and the University of Maryland Institute for Advanced Computer Studies are studying mechanisms for installing and managing Storage Area Networks (SANs) that span multiple independent collaborating institutions using Storage Area Network Routers (SAN Routers). We present a framework for managing inter-site distributed SANs that uses Grid Technologies to balance the competing needs to control local resources, share information, delegate administrative access, and manage the complex trust relationships between the participating sites.

McCall, Fritz↗