Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Tanks”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,657 records · Page 92

Results of Long-Term Analyses of the Salt (Macro) Batch 11 Tank 21H Qualification Sample

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 11. This document reports the long-term results of the analyses of the sample of Tank 21H. Analysis of this sample indicates that the material does not display any unusual characteristics or observations, such as visually apparent solids. However, the sample was dark colored. This report satisfies Deliverable 3 of the Technical Task Request (TTR). This revision adds a further triplicate analysis for 129 I content.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 13 Tank 42H Qualification Sample

Savannah River National Laboratory (SRNL) analyzed samples from Tank 42H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 13. This document reports the long-term results of the analyses of the sample of Tank 42H. Analysis of this sample indicates that the material does not display any unusual characteristics or observations, such as visually apparent solids. This report satisfies Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of tank designs for hydrogen storage on heavy duty vehicles using metal hydrides

The objective of this project was to evaluate material-based hydrogen storage solutions as a replacement for high-pressure hydrogen gas or liquid hydrogen on Class 7 or 8 tractor fuel cell electric vehicles. The project focused on low-density main-group hydrides, a well-known class of materials for hydrogen storage. Prior research has considered metal amides as storage materials for light-duty vehicles but not for heavy-duty applications. The project established the basis for further development of storage systems of this type for heavy duty vehicles (HDV). Systems analysis of an HDV storage system comprised of a tank and associated balance of plant (piping, coolant tubes, burner) was performed to determine the usable hydrogen capacity. A composite storage material comprised of a metal hydride mixed with a high thermal-conductivity carbon is predicted to have a usable hydrogen volumetric capacity comparable to or exceeding that of 700 bar pressurized hydrogen gas. The gravimetric capacity of this material is also predicted to be competitive with pressurized gas, particularly if costly carbon fiber composite Type III or Type IV tanks are excluded. The storage system design parameters and material properties served as inputs to a second model that simulates fuel cell operation in conjunction with the storage system during an HDV drive cycle. The results show that sufficient hydrogen pressure can be produced to operate a Class 8 HDV, yielding a range of ~480 miles. These results are particularly relevant for high-impact regions, such as the South Coast Air Quality Management District, for which an economical vehicular hydrogen storage system with minimal impact on cargo capacity could accelerate adoption of heavy-duty fuel cell electric vehicles. An additional benefit is that knowledge generated by this project can assist in development of material-based storage for stationary applications such as microgrids and backup power for data centers.

08 HYDROGEN↗

AMPP-4 Tank Tracking Tools

The Material Recovery & Recycle group (AMPP-4) Tank Tracking Tools are Microsoft Excel-based tools used to visualize the liquid levels in the tanks used by teams within AMPP-4. The tools rely on reports generated by the Tracking Hydrogen Accumulation in Aqueous Operations spreadsheet to provide daily data of the volume occupied by radioactive liquid waste (RLW). This set-up allows for rapid-response in viewing historical (from October 2024) and current data in thermometer-type charts.

97 MATHEMATICS AND COMPUTING↗

Cesium Removal from AP-106 Tank Waste Using Crystalline Silicotitanate

The Tank Side Cesium Removal (TSCR) system, currently operated by Washington River Protection Solutions, LLC, prepares Hanford waste tank supernate feeds for the Low-Activity Waste Facility at the Hanford Waste Treatment and Immobilization Plant (WTP). In addition to entrained solids removal from the supernate, the primary goal of TSCR is to remove cesium-137 ( 137 Cs) by ion exchange (IX), allowing contact handling of the liquid effluent product at the WTP as governed by a waste acceptance criterion (WAC). Specific to 137 Cs, this requirement is <3.18E-5 Ci 137 Cs/mole of Na. Crystalline silicotitanate (CST), manufactured by Honeywell UOP, LLC (product IONSIV R9140-B), was selected as the ion exchange media for TSCR.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification of Hanford Tank 241-AN-107 Waste and Equivalent Simulant

Hanford Site nuclear waste is to be vitrified at the Waste Treatment and Immobilization Plant (WTP), which is a part of the safe and efficient retrieval, treatment, and disposal mission of the U.S. Department of Energy Office of River Protection. Hanford tank 241-AN-107 (referred to herein as AN-107) is one of the initial Hanford radioactive tank wastes planned to be processed and vitrified. A portion of AN-107 waste was retrieved by Washington River Protection Solutions, LLC (WRPS) and transferred to Pacific Northwest National Laboratory (PNNL). Compared to previously received and vitrified wastes (AP-107, AP-105, and AP-105), the concentration of organics in AN-107 was greater by an order of magnitude, while the activity of radionuclides was multiple orders of magnitude greater.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 14 Tank 21H Qualification Sample

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 14. This document reports the long-term results of the analyses of the sample of Tank 21H. Analysis of this sample indicates that the material does not display any unusual characteristics or observations, such as visually apparent solids. This report satisfies Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rescue of Unique Liquid IP-2 Portable Tanks at Savannah River Site

Introduction • Savanah River Site procured six large IP-2 portable tanks capable of transporting liquids in 2003 to support layup of F Canyon at SRS. • Tanks are being rescued and recertified to support eventual disposition of up to 171,000 L of contaminated solvent solutions from H Canyon at SRS and to potentially transport Depleted Uranium solutions to support the ABD Program.

Fee, Nathaniel C. [Savannah River Nuclear Solution↗

Vitrification of Hanford Tank 241-AW-105 Waste and Equivalent Simulant

Hanford Site nuclear waste is to be vitrified at the Waste Treatment and Immobilization Plant (WTP), which is a part of the safe and efficient retrieval, treatment, and disposal mission of the U.S. Department of Energy - Hanford Field Office. A portion of Hanford tank 241-AW-105 (referred to herein as AW-105) waste was retrieved by Hanford Tank Waste Operations and Closure (H2C) and transferred to Pacific Northwest National Laboratory (PNNL). Compared to previously received and vitrified wastes (AP-107, AP-101, AN-107 and AP-105), the concentration of potassium in AW-105 was greater by an order of magnitude.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geology Data Package for the Single-Shell Tank Waste Management Areas at the Hanford Site

This data package discusses the geology of the single-shell tank (SST) farms and the geologic history of the area. The purpose of this report is to provide the most recent geologic information available for the SST farms. This report builds upon previous reports on the tank farm geology and Integrated Disposal Facility geology with information available after those reports were published.

Reidel, Stephen P↗

Closure Report for Corrective Action Unit 124, Storage Tanks, Nevada Test Site, Nevada with Errata Sheet, Revision 0

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 124, Storage Tanks, Nevada Test Site (NTS), Nevada. This report complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended January 2007). This CR provides documentation and justification for the closure of CAU 124 without further corrective action. This justification is based on process knowledge and the results of the investigative activities conducted in accordance with the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 124: Storage Tanks, Nevada Test Site, Nevada (NNSA/NSO, 2007). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. Therefore, this information will not be repeated in this CR.

54 ENVIRONMENTAL SCIENCES↗

SLURRY PUMP MIXING EFFECTIVENESS IN TANK 50H

Computational Fluid Dynamics (CFD) models of Tank 50 with different numbers of pumps and operational modes, including pump rotation, have been developed to estimate flow patterns and the resultant sludge mixing. Major solid obstructions including the tank wall, the pump housing, the pump columns, and the 82-in central support column were included in the model. Transient analyses with a two-equation turbulence model were performed with FLUENT{trademark}, a commercial CFD code. All analyses were based on three-dimensional results. Recommended operational guidance was developed assuming that local fluid velocity and characteristic measures of local turbulence could be used as indicators of sludge suspension and spatial mixing. The calculation results show that three pumps, the maximum number of pumps studied, will give acceptable homogeneous mixing in about 6 minutes in terms of flow patterns and turbulent energy dissipation. These qualitative results are consistent with literature results. Sensitivity calculations have also been performed to assess the impact of different operating modes on sludge suspension and mixing. Two-pump operation provides a marginal level of sludge suspension and turbulent mixing, while one pump does not provide acceptable flow patterns and turbulent eddies for good mixing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CHARACTERIZATION AND ALUMINUM DISSOLUTION DEMONSTRATION WITH A 3 LITER TANK 51H SAMPLE

A 3-liter sludge slurry sample was sent to SRNL for demonstration of a low temperature aluminum dissolution process. The sludge was characterized before and after the aluminum dissolution. Post aluminum dissolution sludge settling and the stability of the decanted supernate were also observed. The characterization of the as-received 3-liter sample of Tank 51H sludge slurry shows a typical high aluminum HM sludge. The XRD analysis of the dried solids indicates Boehmite is the predominant crystalline form of aluminum in the sludge solids. However, amorphous phases of aluminum present in the sludge would not be identified using this analytical technique. The low temperature (55 C) aluminum dissolution process was effective at dissolving aluminum from the sludge. Over the three week test, {approx}42% of the aluminum was dissolved out of the sludge solids. The process appears to be selective for aluminum with no other metals dissolving to any appreciable extent. At the termination of the three week test, the aluminum concentration in the supernate had not leveled off indicating more aluminum could be dissolved from the sludge with longer contact times or higher temperatures. The slow aluminum dissolution rate in the test may indicate the dissolution of the Boehmite form of aluminum however; insufficient kinetic data exists to confirm this hypothesis. The aluminum dissolution process appears to have minimal impact on the settling rate of the post aluminum dissolution sludge. However, limited settling data were generated during the test to quantify the effects. The sludge settling was complete after approximately twelve days. The supernate decanted from the settled sludge after aluminum dissolution appears stable and did not precipitate aluminum over the course of several months. A mixture of the decanted supernate with Tank 11 simulated supernate was also stable with respect to precipitation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mechanism of Phosphorus Removal from Hanford Tank Sludge by Caustic Leaching

Two experiments were conducted to explore the mechanism by which phosphorus is removed from Hanford tank sludge by caustic leaching. In the first experiment, a series of phosphate salts were treated with 3 M NaOH under conditions prototypic of the actual leaching process to be performed in the Waste Treatment and Immobilization Plant (WTP). The phosphates used were aluminum phosphate, bismuth phosphate, chromium(III) phosphate, and β-tri-calcium phosphate; all of these phases have previously been determined to exist in Hanford tank sludge. The leachate solution was sampled at selected time intervals and analyzed for the specific metal ion involved (Al, Bi, Ca, or Cr) and for P (total and as phosphate). The solids remaining after completion of the caustic leaching step were analyzed to determine the reaction product. In the second experiment, the dependence of P removal from bismuth phosphate was examined as a function of the hydroxide ion concentration. It was anticipated that a plot of log[phosphate] versus log[hydroxide] would provide insight into the phosphorus-removal mechanism. This report describes the test activities outlined in Section 6.3.2.1, Preliminary Investigation of Phosphate Dissolution, in Test Plan TP-RPP-WTP-467, Rev.1. The objectives, success criteria, and test conditions of Section 6.3.2.1 are summarized here.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SUMMARY AND RECOMMENDATIONS OF THE EXPERT PANEL OVERSIGHT COMMITTEE MEETING ON DOUBLE-SHELL TANK CORROSION MONITORING AND TESTING HELD AUGUST 4-5 2008

The Expert Panel Oversight Committee (EPOC) on Double-Shell Tank Corrosion Monitoring and Testing has been overseeing the Fiscal Year FY 2008 experimental program being performed at CC Technologies (CCT) to optimize the chemistry control for corrosion limits in Double-Shell Tanks (DSTs). The EPOC met at the M & D Professional Services Conference Facility on August 4 and 5, 2008 to discuss various aspects of that responsibility including FY 2009 planning. Formal presentations were made to update the EPOC on the these subjects.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANK 12 SLUDGE CHARACTERIZATION AND ALUMINUM DISSOLUTION DEMONSTRATION

A 3-L sludge slurry sample from Tank 12 was characterized and then processed through an aluminum dissolution demonstration. The dominant constituent of the sludge was found to be aluminum in the form of boehmite. The iron content was minor, about one-tenth that of the aluminum. The salt content of the supernatant was relatively high, with a sodium concentration of {approx}7 M. Due to these characteristics, the yield stress and plastic viscosity of the unprocessed slurry were relatively high (19 Pa and 27 cP), and the settling rate of the sludge was relatively low ({approx}20% settling over a two and a half week period). Prior to performing aluminum dissolution, plutonium and gadolinium were added to the slurry to simulate receipt of plutonium waste from H-Canyon. Aluminum dissolution was performed over a 26 day period at a temperature of 65 C. Approximately 60% of the insoluble aluminum dissolved during the demonstration, with the rate of dissolution slowing significantly by the end of the demonstration period. In contrast, approximately 20% of the plutonium and less than 1% of the gadolinium partitioned to the liquid phase. However, about a third of the liquid phase plutonium became solubilized prior to the dissolution period, when the H-Canyon plutonium/gadolinium simulant was added to the Tank 12 slurry. Quantification of iron dissolution was less clear, but appeared to be on the order of 1% based on the majority of data (a minor portion of the data suggested iron dissolution could be as high as 10%). The yield stress of the post-dissolution slurry (2.5 Pa) was an order of magnitude lower than the initial slurry, due most likely to the reduced insoluble solids content caused by aluminum dissolution. In contrast, the plastic viscosity remained unchanged (27 cP). The settling rate of the post-dissolution slurry was higher than the initial slurry, but still relatively low compared to settling of typical high iron content/low salt content sludges. Approximately 40% of the post-dissolution sludge settled over a three week period. The corresponding volume of supernatant that was decanted from the waste was approximately 35% of the total waste volume. The decanted supernatant contained approximately one-third of the dissolved aluminum and exhibited a mild greenish-grey hue.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RHEOLOGICAL AND ELEMENTAL ANALYSES OF SIMULANT SB5 SLURRY MIX EVAPORATOR-MELTER FEED TANK SLURRIES

The Defense Waste Processing Facility (DWPF) will complete Sludge Batch 5 (SB5) processing in fiscal year 2010. DWPF has experienced multiple feed stoppages for the SB5 Melter Feed Tank (MFT) due to clogs. Melter throughput is decreased not only due to the feed stoppage, but also because dilution of the feed by addition of prime water (about 60 gallons), which is required to restart the MFT pump. SB5 conditions are different from previous batches in one respect: pH of the Slurry Mix Evaporator (SME) product (9 for SB5 vs. 7 for SB4). Since a higher pH could cause gel formation, due in part to greater leaching from the glass frit into the supernate, SRNL studies were undertaken to check this hypothesis. The clogging issue is addressed by this simulant work, requested via a technical task request from DWPF. The experiments were conducted at Aiken County Technology Laboratory (ACTL) wherein a non-radioactive simulant consisting of SB5 Sludge Receipt and Adjustment Tank (SRAT) product simulant and frit was subjected to a 30 hour SME cycle at two different pH levels, 7.5 and 10; the boiling was completed over a period of six days. Rheology and supernate elemental composition measurements were conducted. The caustic run exhibited foaming once, after 30 minutes of boiling. It was expected that caustic boiling would exhibit a greater leaching rate, which could cause formation of sodium aluminosilicate and would allow gel formation to increase the thickness of the simulant. Xray Diffraction (XRD) measurements of the simulant did not detect crystalline sodium aluminosilicate, a possible gel formation species. Instead, it was observed that caustic conditions, but not necessarily boiling time, induced greater thickness, but lowered the leach rate. Leaching consists of the formation of metal hydroxides from the oxides, formation of boric acid from the boron oxide, and dissolution of SiO{sub 2}, the major frit component. It is likely that the observed precipitation of Mg(OH){sub 2} and Mn(OH){sub 2} caused the increase in yield stress. The low pH run exhibited as much as an order of magnitude greater B and Li (frit components) leachate concentrations in the supernate. At high pH a decrease of B leaching was found and this was attributed to adsorption onto Mg(OH){sub 2}. A second leaching experiment was performed without any sludge to deconvolute the leach rate behavior of Frit 418 from those of the SB5 sludge-Frit 418 system. At high pH, the sludgeless system demonstrated very fast leaching of all the frit components, primarily due to fast dissolution of the main component, silica, by hydroxide anion; various semiconductor studies have established this reactivity. Overall, the frit-water system exhibited greater leaching from a factor two to almost three orders of magnitude (varying by conditions and species). The slower leaching of the sludge system is possibly due to a greater ionic strength or smaller driving force. Another possible reason is a physical effect, coating of the frit particles with sludge; this would increase the mass transfer resistance to leaching. Based on this study, the cause of clogs in the melter feed loop is still unknown. A possible explanation is that the SME product, like the simulant, is too thin and could contribute to a loss of two-phase flow which could cause plugging of a restricted and poorly mixed zone like the melter feed loop. This is feasible since a previous study of a slurry showed an increase in resistance to flow at lower flow rates. Testing with a radioactive SME sample is underway and should help understand this potential mechanism.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗