Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RISK ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,657 records · Page 92

Prototype System for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions. This report describes a prototype tool designed to support plant personnel in controlling work during NPP outages to prevent unintended interactions. A software application was created to manage and display important configuration information and utilize natural language processing to access the impacts of upcoming procedures and work orders. Initial industry feedback is also presented.

99 GENERAL AND MISCELLANEOUS↗

Characteristics of Whipple Shield Performance in the Shatter Regime

Between the onset of projectile fragmentation and the assumption of rear wall failure due to an impulsive load, multi-wall ballistic limit equations are linearly interpolated to provide reasonable yet conservative predictions of perforation thresholds with conveniently simple mathematics. Although low velocity and hypervelocity regime predictions are based on analytical expressions, there is no such scientific foundation for predictions in the intermediate (or shatter) regime. As the debris flux in low earth orbit (LEO) becomes increasingly dominated by manmade pollution, the profile of micrometeoroid and orbital debris (MMOD) risk shifts continually towards lower velocities. For the International Space Station (ISS), encounter velocities below 7 km/s now constitute approximately 50% of the penetration risk. Considering that the transition velocity from shatter to hypervelocity impact regimes described by common ballistic limit equations (e.g. new non-optimum Whipple shield equation [1]) occurs at 7 km/s, 50% of station risk is now calculated based on failure limit equations with little analytical foundation. To investigate projectile and shield behavior for impact conditions leading to projectile fragmentation and melt, a series of hypervelocity impact tests have been performed on aluminum Whipple shields. In the experiments projectile diameter, bumper thickness, and shield spacing were kept constant, while rear wall thickness was adjusted to determine spallation and perforation limits at various impact velocities and angles. The results, shown in Figure 1 for normal and 45 impacts, demonstrated behavior that was not sufficiently described by the simplified linear interpolation of the NNO equation (also shown in Figure 1). Hopkins et al. [2] investigated the performance of a nominally-identical aluminum Whipple shield, identifying the effects of phase change in the shatter regime. The results (conceptually represented in Figure 2) were found to agree well with those obtained in this study at normal incidence, suggesting that shielding performance in the shatter regime could be well described by considering more complex phase conditions than currently implemented in most BLEs. Furthermore, evidence of these phase effects were found in the oblique test results, providing the basis for an empirical description of these effects that can be applied in MMOD risk assessment software. In this paper, results of the impact experiments are presented, and characteristics of target damage are evaluated. A comparison of intermediate velocity impact failure mechanisms in current BLEs are discussed and compared to the findings of the experimental study. Risk assessment calculations have been made on a simplified structure using currently implemented penetration equations and predicted limits from the experimental program, and the variation in perceived mission risk is discussed. It was found that ballistic limit curves that explicitly incorporated phase change effects within the intermediate regime lead to a decrease in predicted MMOD risk for ISS-representative orbits. When considered for all Whipple-based shielding configurations onboard the ISS, intermediate phase change effects could lead to significant variations in predicted mission risk.

Ryan, Shannon↗

Geologic Modeling and Simulation Report for the Aquistore Project

The Plains CO 2 Reduction (PCOR) Partnership, through the Energy & Environmental Research Center (EERC), is collaborating with the Petroleum Technology Research Centre (PTRC) on site characterization; modeling and simulation; risk assessment; public outreach; and monitoring, verification, and accounting (MVA) activities for the Aquistore project. The Aquistore project is a carbon capture, utilization, and storage (CCUS) project situated near the town of Estevan, Saskatchewan, Canada, and the U.S.–Canada border. This project is managed by PTRC and will serve as buffer storage of carbon dioxide (CO 2 ) from the SaskPower Boundary Dam CCUS project, the world’s first commercial-scale postcombustion CCUS project from a coal-fired electric generating facility. To date, an injection well and an observation research well (~500 ft apart) have been drilled and completed at the Aquistore site, with injection anticipated to begin in 2014. Using a combination of site characterization data provided by PTRC and independently acquired information, the PCOR Partnership has constructed a static geologic model to assess the potential storage capacity of the Aquistore site and provide the foundation for dynamic simulation. The geologic model and the results of the predictive simulations will be used in the risk assessment process to help define an overall monitoring plan for the project and to assure stakeholders that the injected CO 2 will remain safely stored at the Aquistore site.

54 ENVIRONMENTAL SCIENCES↗

Alternative Pozzolans for Replacement of Fly Ash in Grout: Literature Review for Continuous Improvement of Cement Waste Forms

The Department of Energy (DOE) is currently responsible for treating radioactive and mixed waste, performing environmental restoration, and closing contaminated tanks and facilities resulting from nuclear weapons production during the Cold War. Cementitious reagents are the most widely used materials for (1) chemically stabilizing and encapsulating radionuclides and hazardous metals and (2) solidifying radioactive wastewater. Cementitious grouts and flowable concretes are also the most widely used materials for tank and facility closures and are used extensively for physical as well as chemical stabilization in environmental restoration projects. Ambient temperature radioactive waste cementation is a widely used technology for producing waste forms for final disposal. The current practice of designing and testing waste forms is based on a mid to late 20th century technology approach (i.e., materials, characterization, and test methods) for generating parameters for risk assessments. DOE technology development is needed to address both current, long-term, and emerging issues in this area as new waste streams come online and as regulations, performance knowledge, and risk assessment methodology continue to evolve. Consequently, the use of cementation as a means of treating chemically challenging radioactive liquid waste streams and reactive debris requires an enduring effort.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consideration of liners and covers in performance assessments

On-site disposal cells are in use and being considered at several United States Department of Energy (USDOE) sites as the final disposition for large amounts of waste associated with cleanup of contaminated areas and facilities. These disposal cells are typically regulated by States and/or the U.S. Environmental Protection Agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in addition to having to comply with requirements in DOE Order 435.1, Radioactive Waste Management due to the radioactive waste. The USDOE-Environmental Management Office of Site Restoration formed a working group to foster improved communication and sharing of information for personnel associated with these CERCLA disposal cells and work towards more consistent assumptions, as appropriate, for technical and policy considerations related to CERCLA risk assessments and DOE Order 435.1 performance assessments in support of a Record of Decision and Disposal Authorization Statement, respectively. One of the issues considered by the working group, which is addressed in this report, was how to appropriately consider the performance of covers and liners/leachate collections systems in the context of a DOE Order 435.1 performance assessment (PA). This same information may be appropriate for consideration within CERCLA risk assessments for these facilities. These OSDCs are generally developed to meet hazardous waste (HW) disposal design standards under the Resource Conservation and Recovery Act (RCRA) as well as the DOE Order 435.1 performance based standards for disposal of radioactive waste. To meet the standards for HW, the facilities typically include engineered covers and liner/leachate collection systems. Thus, when considering such facilities in the context of a DOE Order 435.1 PA, there is a need to address the evolution of performance of covers and liner/leachate collection systems in the context of meeting a performance standard considering time frames of 1,000 years for compliance and potentially thousands of years based on the wastes to test the robustness of the system. Experience has shown that there are a range of expectations and perspectives from the different regulators involved at different sites when reviewing assumptions related to cover and liner/leachate collection system performance. However for HW disposal alone under RCRA the design standards are typically considered sufficient by the regulators without a requirement to assess long-term performance thus avoiding the need to consider the details addressed in this report. This report provides suggestions for a general approach to address covers and liners/leachate collection systems in a DOE Order 435.1 PA and how to integrate assessments with defense-in-depth considerations such as design, operations, and waste acceptance criteria to address uncertainties. The emphasis is on water balances and management in such assessments. Specific information and references are provided for details needed to address the evolution of individual components of cover and liner/leachate collection systems. This information was then synthesized into suggestions for best practices for cover and liner system design and examples of approaches to address the performance of covers and liners as part of a performance assessment of the disposal system. Numerous references are provided for sources of information to help describe the basis for performance of individual components of cover and liner systems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Common-Cause Failure Treatment in Event Assessment: Basis for a Proposed New Model

Event assessment is an application of probabilistic risk assessment in which observed equipment failures and outages are mapped into the risk model to obtain a numerical estimate of the event’s risk significance. In this paper, we focus on retrospective assessments to estimate the risk significance of degraded conditions such as equipment failure accompanied by a deficiency in a process such as maintenance practices. In modeling such events, the basic events in the risk model that are associated with observed failures and other off-normal situations are typically configured to be failed, while those associated with observed successes and unchallenged components are assumed capable of failing, typically with their baseline probabilities. This is referred to as the failure memory approach to event assessment. The conditioning of common-cause failure probabilities for the common cause component group associated with the observed component failure is particularly important, as it is insufficient to simply leave these probabilities at their baseline values, and doing so may result in a significant underestimate of risk significance for the event. Past work in this area has focused on the mathematics of the adjustment. In this paper, we review the Basic Parameter Model for common-cause failure, which underlies most current risk modelling, discuss the limitations of this model with respect to event assessment, and introduce a proposed new framework for common-cause failure, which uses a Bayesian network to model underlying causes of failure, and which has the potential to overcome the limitations of the Basic Parameter Model with respect to event assessment.

99 GENERAL AND MISCELLANEOUS↗

Benzo[a]pyrene (BaP) metabolites predominant in human plasma following escalating oral micro-dosing with [ 14 C]-BaP

Benzo[a]pyrene (BaP) is formed by incomplete combustion of organic materials (petroleum, coal, tobacco, etc.). BaP is designated by the International Agency for Research on Cancer as a group 1 known human carcinogen; a classification supported by numerous studies in preclinical models and epidemiology studies of exposed populations. Risk assessment relies on toxicokinetic and cancer studies in rodents at doses 5–6 orders of magnitude greater than average human uptake. Using a dose–response design at environmentally relevant concentrations, this study follows uptake, metabolism, and elimination of [ 14 C]-BaP in human plasma by employing UPLC - accelerator mass spectrometry (UPLC-AMS). Volunteers were administered 25, 50, 100, and 250 ng (2.7–27 nCi) of [ 14 C]-BaP (with interceding minimum 3-week washout periods) with quantification of parent [ 14 C]-BaP and metabolites in plasma measured over 48 h. [ 14 C]-BaP median T max was 30 min with C max and area under the curve (AUC) approximating dose-dependency. Marked inter-individual variability in plasma pharmacokinetics following a 250 ng dose was seen with 7 volunteers as measured by the C max (8.99 ± 7.08 ng × mL -1 ) and AUC0-48hr (68.6 ± 64.0 fg × hr -1 × mL -1 ). Approximately 3–6% of the [ 14 C] recovered (AUC 0-48 hr ) was parent compound, demonstrating extensive metabolism following oral dosing. Metabolite profiles showed that, even at the earliest time-point (30 min), a substantial percentage of [ 14 C] in plasma was polar BaP metabolites. The best fit modeling approach identified non-compartmental apparent volume of distribution of BaP as significantly increasing as a function of dose (p = 0.004). Bay region tetrols and dihydrodiols predominated, suggesting not only was there extensive first pass metabolism but also potentially bioactivation. AMS enables the study of environmental carcinogens in humans with de minimus risk, allowing for important testing and validation of physiologically based pharmacokinetic models derived from animal data, risk assessment, and the interpretation of data from high-risk occupationally exposed populations.

59 BASIC BIOLOGICAL SCIENCES↗

Panel Session 6: Interagency Community of Practice in Risk and Performance Assessments

This panel focused on the status of the Inter-agency Performance and Risk Assessment Community of Practice (P and RA COP). Representatives from the P and RA COP and subject matter experts discussed lessons learned and provide feedback on building the P and RA COP to support risk-informed environmental decision making. Each panelist provided a brief presentation followed by open discussion. Presentations proposed include: 1 - Applying Lessons Learned on Engineered Barrier Service Life to Performance Assessment (Craig Benson, University of Virginia - CRESP (USA)); 2 - Decision Analysis in Integrated Risk and Performance Assessment: Challenges (Paul Black, Neptune and Company, Inc. (USA)); 3 - Managing Uncertainty (Roger Seitz, IEI (USA)); 4 - U.S. EPA Superfund Program's Need for Model Comparison for Radioactive Contamination (Stuart Walker, Office of Remediation and Technology Innovation (OSRTI), US EPA (USA)); 5 - CRESP Activities Supporting Performance and Risk Assessments (Kevin Brown, Vanderbilt University - CRESP (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advancing Risk Analysis for Nanoscale Materials: Report from an International Workshop on the Role of Alternative Testing Strategies for Advancement: Advancing Risk Analysis for Nanoscale Materials

The Society for Risk Analysis (SRA) has a history of bringing thought leadership to topics of emerging risk. In September 2014, the SRA Emerging Nanoscale Materials Specialty Group convened an international workshop to examine the use of alternative testing strategies (ATS) for manufactured nanomaterials (NM) from a risk analysis perspective. Experts in NM environmental health and safety, human health, ecotoxicology, regulatory compliance, risk analysis, and ATS evaluated and discussed the state of the science for in vitro and other alternatives to traditional toxicology testing for NM. Based on this review, experts recommended immediate and near-term actions that would advance ATS use in NM risk assessment. Three focal areas-human health, ecological health, and exposure considerations-shaped deliberations about information needs, priorities, and the next steps required to increase confidence in and use of ATS in NM risk assessment. The deliberations revealed that ATS are now being used for screening, and that, in the near term, ATS could be developed for use in read-across or categorization decision making within certain regulatory frameworks. Participants recognized that leadership is required from within the scientific community to address basic challenges, including standardizing materials, protocols, techniques and reporting, and designing experiments relevant to real-world conditions, as well as coordination and sharing of large-scale collaborations and data. Experts agreed that it will be critical to include experimental parameters that can support the development of adverse outcome pathways. Numerous other insightful ideas for investment in ATS emerged throughout the discussions and are further highlighted in this article.

36 MATERIALS SCIENCE↗

Radiation safety system

The goal of this work is to provide an overview of a Radiation safety system (RSS) designed for protection from prompt radiation hazard at accelerator facilities. RSS design parameters, functional requirements and constraints are derived from hazard analysis and risk assessment undertaken in the design phase of the facility. The two main subsystems of a RSS are access control system (ACS) and radiation control system (RCS). In this text, a common approach to risk assessment, typical components of ACS and RCS, desirable features and general design principles applied to RSS are described.

Vylet, V.↗

Safety Metrics for Human-Computer Controlled Systems

The rapid growth of computer technology and innovation has played a significant role in the rise of computer automation of human tasks in modem production systems across all industries. Although the rationale for automation has been to eliminate "human error" or to relieve humans from manual repetitive tasks, various computer-related hazards and accidents have emerged as a direct result of increased system complexity attributed to computer automation. The risk assessment techniques utilized for electromechanical systems are not suitable for today's software-intensive systems or complex human-computer controlled systems.This thesis will propose a new systemic model-based framework for analyzing risk in safety-critical systems where both computers and humans are controlling safety-critical functions. A new systems accident model will be developed based upon modem systems theory and human cognitive processes to better characterize system accidents, the role of human operators, and the influence of software in its direct control of significant system functions Better risk assessments will then be achievable through the application of this new framework to complex human-computer controlled systems.

Leveson, Nancy G↗

Failure detection system risk reduction assessment

A process includes determining a probability of a failure mode of a system being analyzed reaching a failure limit as a function of time to failure limit, determining a probability of a mitigation of the failure mode as a function of a time to failure limit, and quantifying a risk reduction based on the probability of the failure mode reaching the failure limit and the probability of the mitigation.

Aguilar, Robert B.↗

Software Safety Risk in Legacy Safety-Critical Computer Systems

Safety-critical computer systems must be engineered to meet system and software safety requirements. For legacy safety-critical computer systems, software safety requirements may not have been formally specified during development. When process-oriented software safety requirements are levied on a legacy system after the fact, where software development artifacts don't exist or are incomplete, the question becomes 'how can this be done?' The risks associated with only meeting certain software safety requirements in a legacy safety-critical computer system must be addressed should such systems be selected as candidates for reuse. This paper proposes a method for ascertaining formally, a software safety risk assessment, that provides measurements for software safety for legacy systems which may or may not have a suite of software engineering documentation that is now normally required. It relies upon the NASA Software Safety Standard, risk assessment methods based upon the Taxonomy-Based Questionnaire, and the application of reverse engineering CASE tools to produce original design documents for legacy systems.

Hill, Janice↗

Assessment of an In Silico Mechanistic Model for Proarrhythmia Risk Prediction Under the Ci PA Initiative

The International Council on Harmonization (ICH) S7B and E14 regulatory guidelines are sensitive but not specific for predicting which drugs are pro‐arrhythmic. In response, the Comprehensive In Vitro Proarrhythmia Assay (Ci PA ) was proposed that integrates multi‐ion channel pharmacology data in vitro into a human cardiomyocyte model in silico for proarrhythmia risk assessment. Previously, we reported the model optimization and proarrhythmia metric selection based on Ci PA training drugs. In this study, we report the application of the prespecified model and metric to independent Ci PA validation drugs. Over two validation datasets, the Ci PA model performance meets all pre‐specified measures for ranking and classifying validation drugs, and outperforms alternatives, despite some in vitro data differences between the two datasets due to different experimental conditions and quality control procedures. This suggests that the current Ci PA model/metric may be fit for regulatory use, and standardization of experimental protocols and quality control criteria could increase the model prediction accuracy even further.

59 BASIC BIOLOGICAL SCIENCES↗

Validating a Dynamic PWR Safety and Security Model?

Nuclear power plants (NPPs) are assessed for safety and security using separate models that cannot capture how an attacker's decisions and a plant's response unfold together in real time, leaving regulators and operators without a complete picture of true plant vulnerability. Traditional probabilistic risk assessment (PRA) methods treat adversarial events as fixed initiators with predetermined outcomes, and are structurally incapable of representing the time-dependent interplay between physical security events, safety system response, and operator mitigative actions. At Idaho National Laboratory (INL), I contributed to the development and validation of Modeling and Analysis for Safety and Security using the Dynamic EMRALD Framework (MASS-DEF). Where static PRA relies on event-tree logic that cannot evolve mid-scenario, MASS-DEF couples a time-dependent dynamic PRA tool EMRALD (Event Modeling Risk Assessment using Linked Diagrams) with attack simulation software, allowing attacker behavior, plant system states, and operator actions to interact across time. My work focused on validating a general Pressurized Water Reactor (PWR) model. I traced model logic against PWR plant to identified errors in logic and confirm accuracy. I then built and tested attack scenarios against a general PWR model to verify that the model produced expected outcomes across all logical pathways. I also contributed a section to a related technical paper applying the same EMRALD platform to radiation dose modeling. Results show that MASS-DEF can quantitatively demonstrate that many plants exceed their regulatory security thresholds. This demonstrated margin provides a technically defensible basis for reducing the number of guards without compromising regulatory compliance. Physical security costs represent roughly 10% of annual operating budgets, making such reductions directly meaningful to INL's mission of sustaining existing commercial NPPs. This internship strengthened my understanding of nuclear systems, probabilistic modeling, and technical writing, and has solidified my pursuit of a career at a national laboratory.

98 - NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL↗

New York City Panel on Climate Change 2019 Report Chapter 1: Introduction

While urban areas like New York City and its surrounding metropolitan region are key drivers of climate change through emissions of greenhouse gases, cities are also significantly impacted by climate shifts, both chronic changes and extreme events. These are already affecting the New York metropolitan region, including the five boroughs of New York City through higher temperatures, more intense precipitation, and higher sea levels, and will increasingly do so in the coming decades. The City of New York has embarked on a flexible adaptation pathway (i.e., strategies that can evolve through time as climate risk assessment, evaluation of adaptation strategies, and monitoring continues) to respond to climate change challenges. This entails significant programs to develop resilience in communities and critical infrastructure to observed and projected changes in temperature, precipitation, and sea level. The first NPCC Report laid out the risk management framing for the city and region via flexible adaptation pathways. The second New York City Panel on Climate Change Report (NPCC2) developed the “climate projections of record” that are currently being used by the City of New York in its resilience programs . The NPCC3 2019 Report co-generates new tools and methods for the next generation of climate risk assessments and implementation of region-wide resilience. Co-generation is an interactive process by which stakeholders and scientists work together to produce climate change information that is targeted to decision-making needs. These tools and methods can be used to observe, project, and map climate extremes; monitor risks and responses; and engage with communities to develop effective programs. They are especially important at “transformation points” in the adaptation process when large changes in the structure and function of physical, ecological, and social systems of the city and region are undertaken.

Rosenzweig, Cynthia↗

NASA Risk Management Handbook: Version 2.0, Part 1

The purpose of this handbook is to provide an in-depth reference for the practice of risk management in NASA, updating the guidance offered in its original version, NASA/SP-2011-3422 (November 2011), and closely aligning the updated guidance with the current NASA Procedural Requirements for Agency Risk Management, NPR 8000.4, and the parent NASA Policy Directive for NASA Governance and Strategic Management, NPD 1000.0. NPD 1000.0 introduces with emphasis the concept of “Risk Leadership,” making it a fundamental tenet and pillar of the risk management culture that it advocates for the Agency. NPR 8000.4 applies this concept and establishes Risk Management (RM) requirements for the Agency as an integrated enterprise, as well as the RM requirements for portfolio elements within the enterprise. Such elements include the various programs and projects that contribute to the Agency’s objectives and the various institutional activities carried out by entities that contribute to mission support. The present version of the handbook also emphasizes the integration of risk management processes across activity and project life cycles and their coordination and interaction with day-to-day programmatic and organizational functions. Areas of application of risk assessment and management that were not covered with specific guidance in the preceding version are addressed in this version with in-depth examples. The handbook is structured into two parts, whose chapters are in turn organized in a sequential order intended to facilitate a gradual and progressive introduction of the reader to risk management principles and practices. Part 1 of the handbook is dedicated to the introduction of the basic foundations of the NASA integrated risk management framework, the related fundamental risk concepts, the description of the risk management and decision processes that are to be implemented within the framework, the discussion of the risk assessment techniques that should be utilized in support of such processes, and the management and organizational interactions and interfaces that should be enabled to implement an effective integration of risk management activities within the Agency. Part 2 provides self-contained, end-to-end examples of application of the processes and techniques introduced in Part 1, in the context of both programmatic (i.e., project and/or mission related) and institutional activities.

Uncertainty↗

NASA Risk Management Handbook: Version 2.0, Part 2

The purpose of this handbook is to provide an in-depth reference for the practice of risk management in NASA, updating the guidance offered in its original version, NASA/SP-2011-3422 (November 2011), and closely aligning the updated guidance with the current NASA Procedural Requirements for Agency Risk Management, NPR 8000.4, and the parent NASA Policy Directive for NASA Governance and Strategic Management, NPD 1000.0 (January 2020). NPD 1000.0 introduces with emphasis the concept of “Risk Leadership,” making it a fundamental tenet and pillar of the risk management culture that it advocates for the Agency. NPR 8000.4 applies this concept and establishes Risk Management (RM) requirements for the Agency as an integrated enterprise, as well as the RM requirements for portfolio elements within the enterprise. Such elements include the various programs and projects that contribute to the Agency’s objectives and the various institutional activities carried out by entities that contribute to mission support. The present version of the handbook also emphasizes the integration of risk management processes across activity and project life cycles and their coordination and interaction with day-to-day programmatic and organizational functions. Areas of application of risk assessment and management that were not covered with specific guidance in the preceding version are addressed in this version with in-depth examples. The handbook is structured into two parts, whose chapters are in turn organized in a sequential order intended to facilitate a gradual and progressive introduction of the reader to risk management principles and practices. Part 1 of the handbook is dedicated to the introduction of the basic foundations of the NASA integrated risk management framework, the related fundamental risk concepts, the description of the risk management and decision processes that are to be implemented within the framework, the discussion of the risk assessment techniques that should be utilized in support of such processes, and the management and organizational interactions and interfaces that should be enabled to implement an effective integration of risk management activities within the Agency. Part 2 provides self-contained, end-to-end examples of application of the processes and techniques introduced in Part 1, in the context of both programmatic (i.e., project and/or mission related) and institutional activities.

Risk Leadership↗