Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mission Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,657 records · Page 92

Galileo Europa Mission (GEM) Tour Design

Galileo has received approval for a two-year follow-on mission, called the Galileo Europa (GEM). A three-phase tour has been designed for GEM that includes eight Europa encounters, four Callisto flybys, and two Io encounters to end the GEM in Decemger 1999. Although science desires for the satallite encountes were of primary importance to the tour design, the flyby conditions were also necessarily selected on the basis of the gravity assist they contributed to the trajectory. The tour design was heavily influenced by the requirement to return to Io, since the radiation exposure that acompanies such a flyby may serverely degrade the health of the spacecraft.

Galileo↗

Earth Orbit Raise Design for the ARTEMIS Mission

ARTEMIS is a mission to send two spacecraft from Earth orbit to libration orbits around the Moon Lagrange points and then into lunar orbit. Lunar flybys were used early in the mission to send the spacecraft into low-energy lunar transfers which were designed libration orbits for minimal deltaV. ARTEMIS began by raising the Earth orbits of each spacecraft to achieve the planned lunar flybys. Spacecraft conguration and operation constraints made the Earth orbit raise phase of the mission a signicant mission design challenge by itself. This paper describes the process used to and trajectories that achieved mission goals and the resulting series of Earth orbits that culminated in successful lunar flybys.

lunar transfer↗

Advance Approach to Concept and Design Studies for Space Missions

Recent automated and advanced techniques developed at JPL have created a streamlined and fast-track approach to initial mission conceptualization and system architecture design, answering the need for rapid turnaround of trade studies for potential proposers, as well as mission and instrument study groups.

Team X Team A Missions Design Proposal Development↗

Galileo Europa Mission (GEM) Tour Design

The orbital tour trajectory that was selected for the Galileo mission includes ten close flybys of the Galilean satellites Europa, Ganymede, and Callisto, additional distant flybys of these satellites, lo torous observations, and many other events that provide broad opportunities for scientific observations.

Galileo↗

Status of The James Webb Space Telescope

The James Webb Space Telescope (JWST) is a large aperture (6.5 meter), cryogenic space telescope with a suite of near and mid-infrared instruments covering the wavelength range of 0.6 pm to 28 pm. JWST's primary science goal is to detect and characterize the first galaxies. It will also study the assembly of galaxies, star formation, and the formation of evolution of planetary systems. We will present an overview of the Observatory's current design following the Mission Preliminary Design Review, (PDR). Recent progress in hardware development for the observatory will be presented, including a discussion of the status of JWST's optical system and Beryllium mirror fabrication, progress with sunshield prototypes, and recent changes in the integration and test configuration. We also review the expected scientific performance of the observatory based on the mission PDR design.

Clampin, Mark↗

Lessons Learned in Concurrent Mission and Systems Design at NASA Glenn Research Center: Almost Fifteen Years of the Compass Team

This paper is a retrospective of the lessons learned during the almost 15-year history of the Compass concurrent mission and systems design team at NASA’s Glenn Research Center (GRC). It examines the key factors in the team’s evolution from a temporary group gathered to perform a single study to the successful, sustainable team it is today. Compass is a matrixed team of experts with various technical backgrounds and personalities. They collaborate over a two-week period either physically in a dedicated meeting space, or virtually to design a space system (Spacecraft, stage, science package, etc). Over the years, because of the rapid nature of the design studies, the team leadership has iterated on the optimal team member personality makeup, facility elements and tools as well as NASA GRC management support necessary to lead to sustained success.

systems engineering↗

Double lunar swingby and Lissajous trajectory design for the WIND mission

Two alternative mission profiles are presented for the WIND mission whose baseline design includes two years in a double lunar swingby (DLS) orbit followed by one year in a Lissajous orbit about the sun-earth L1 libration point. The first alternative uses a half-month high-inclination transfer orbit between two lunar gravity assists to change the initial sunward DLS orbit to a DLS orbit in the geomagnetic tail region. The second alternative uses a direct insertion from launch into a large-amplitude Lissajous orbit followed by a sunward DLS orbit.

Sharer, P. J.↗

Integrating Safety and Mission Assurance in Design

This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safety and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

Cianciola, Chris↗

Design concept for an IR mapping spectrometer for the Pluto fast flyby mission

The design of an IR mapping spectrometer that exceeds all the criteria of the Pluto Fast Flyby Mission will be presented. The instrument has a mass of approximately 1700 g and uses less than 4 W of power. The design concept is based on an f/3 spectrograph using an aberration-corrected concave holographic grating. Up to four spectral regions can be covered simultaneously by dividing the grating into two to four sections, each imaging the entrance slit on a different area of the array. The spectrography will be fed by a lightweight 5 in. f/3 telescope based on SDIO precepts. In order to provide spectroscopic access to the fundamental molecule frequencies, an extended-range NICMOS array to approximately 3.5 microns and an InSb array going to 5.8 microns will be considered.

Fink, U.↗

Overview of the Spacecraft Design for the Psyche Mission Concept

In January 2017, Psyche and a second mission concept were selected by NASA for flight as part of the 14th Discovery mission competition. Assigned for an initial launch date in 2023, the Psyche team was given direction shortly after selection to research the possibility for earlier opportunities. Ultimately, the team was able to identify a launch opportunity in 2022 with a reduced flight time to its destination. This was accomplished in large part to crosscutting trades centered on the electrical power subsystem. These trades were facilitated through the Psyche mission's planned use of Solar Electric Propulsion (SEP), which enables substantial flexibility with respect to trajectory design. In combination with low-thrust trajectory analysis tools, the team was able to robustly converge to solutions with a higher fidelity and accuracy of results. These trades also took advantage of the 1300 series product line produced by Space Systems Loral (SSL), which enabled power growth while maintaining strong system-level heritage through its modular design that has been utilized on a large number of geostationary (GEO) communications satellites. This paper presents an overview of the Psyche mission concept, and the unique architecture that enables the use of commercially developed electric propulsion and space power systems from Space Systems Loral to provide flexibility in mission design. This paper then discusses the trades that allowed the Psyche team to meet a 2022 launch date.

Prikl, Zachary↗

Cupid's Arrow: An Innovative Nanosat to Sample Venus' Upper Atmosphere

In NASA's Discovery 2014 AO, the opportunity to propose a Technology Demonstration Opportunity (TDO) to enhance the primary mission was specified. For the Venus Emissivity, Radio Science, InSAR, Topography, and Spectroscopy (VERITAS) mission, we elected to include the Cupid's Arrow nanosat TDO to sample and measure the abundances of noble gases and their isotopic ratios in Venus's upper atmosphere below the homopause. This paper will provide a basic overview of the VERITAS mission, with a focus on the Cupid's Arrow concept including a description of the mission, spacecraft design, and JPL's quadrupole ion trap mass spectrometer (QITMS) instrument specifications and design. In previous planetary entry probe mission designs, particularly at Venus, engineers w ere focused on entry and descent. A landed probe was also proposed for the New Frontiers SAGE mission. For Cupid's Arrow, the nanosat is designed to skim through the upper atmosphere, just below the homopause, in order to sample the atmosphere, perform the analysis, and then exit the atmosphere to transmit its data to the orbiting VERITAS spacecraft. Cupid's Arrow is a compelling addition to the VERITAS geology mission. A key missing link in our understanding of Venus' evolution is the noble gas abundances and their isotopic ratios. Not since Pioneer Venus have these measurements been made in the Venus atmosphere and never in the upper atmosphere, just below the homopause, to the degree of accuracy that will be accomplished by VERITAS' Cupid's Arrow nanosat.Such measurements were ranked as the number 1 investigation of the number 1 objective of the goal "Atmospheric Formation, Evolution, and Climate History ".

Discovery↗

Space Infrared Telescope Facility mission and cryogenic design

The Space Infrared Telescope Facility is the last of the Great Observatory missions. It is presently scheduled for launch in 2001. The mission will study the infrared spectrum from 2 to 1200 microns with three imaging and spectral instruments. The observatory will have a 5 year lifetime and will be placed in a 100,000 km earth orbit. The cryogenic system is based on a 4000 I superfluid helium cryostat. The mission and the cryogenic system are described, and the cryogenic technology issues are discussed.

Mason, P. V.↗

Shuttle mission simulator hardware conceptual design report

The detailed shuttle mission simulator hardware requirements are discussed. The conceptual design methods, or existing technology, whereby those requirements will be fulfilled are described. Information of a general nature on the total design problem plus specific details on how these requirements are to be satisfied are reported. The configuration of the simulator is described and the capabilities for various types of training are identified.

Burke, J. F.↗

Asteroid Crewed Segment Mission Lean Development

The next generation of human spaceflight missions presents numerous challenges to designers that must be addressed to produce a feasible concept. The specific challenges of designing an exploration mission utilizing the Space Launch System and the Orion spacecraft to carry astronauts beyond earth orbit to explore an asteroid stored in a distant retrograde orbit around the moon will be addressed. Mission designers must carefully balance competing constraints including cost, schedule, risk, and numerous spacecraft performance metrics including launch mass, nominal landed mass, abort landed mass, mission duration, consumable limits and many others. The Asteroid Redirect Crewed Mission will be described along with results from the concurrent mission design trades that led to its formulation. While the trades presented are specific to this mission, the integrated process is applicable to any potential future mission. The following trades were critical in the mission formulation and will be described in detail: 1) crew size, 2) mission duration, 3) trajectory design, 4) docking vs grapple, 5) extravehicular activity tasks, 6) launch mass and integrated vehicle performance, 7) contingency performance, 8) crew consumables including food, clothing, oxygen, nitrogen and water, and 9) mission risk. The additional Orion functionality required to perform the Asteroid Redirect Crewed Mission and how it is incorporated while minimizing cost, schedule and mass impacts will be identified. Existing investments in the NASA technology portfolio were leveraged to provide the added functionality that will be beneficial to future exploration missions. Mission kits are utilized to augment Orion with the necessary functionality without introducing costly new requirements to the mature Orion spacecraft design effort. The Asteroid Redirect Crewed Mission provides an exciting early mission for the Orion and SLS while providing a stepping stone to even more ambitious missions in the future.

Gard, Joe↗

Design of multihundred-watt dynamic isotope power system for robotic space missions

The design of a multihundred-watt dynamic isotope power system (DIPS) based on the US Department of Energy (DOE) general-purpose heat source (GPHS) and small (multihundred-watt) free-piston Stirling engine (FPSE) is described as a potential lower cost alternative to radioisotope thermoelectric generators (RTGs). The design is targeted at the power needs of future unmanned deep space and planetary surface exploration missions. Since the competitive potential of FPSE as an isotope convertor was first identified, work has focused on the feasibility of directly integrating GPHS with the Stirling heater head. Thermal modeling of various radiatively coupled heat source/heater head geometries has been performed using data furnished by the developers of FPSE and GPHS. The analysis indicates that, for the 1050 K heater head configurations considered, GPHS fuel clad temperatures remain safe operating limits under all conditions including shutdown of one engine on a twin engine unit. Based on these results, preliminary characterizations of multihundred-watt units have been established. They indicate that, per electrical watt, the GPHS/small Stirling DIPS will be roughly equivalent to MOD RTG in size and mass but will require about a third the amount of isotope fuel.

Bents, D. J.↗

Terrapin technologies manned Mars mission proposal

A Manned Mars Mission (M3) design study is proposed. The purpose of M3 is to transport 10 personnel and a habitat with all required support systems and supplies from low Earth orbit (LEO) to the surface of Mars and, after an eight-man surface expedition of 3 months, to return the personnel safely to LEO. The proposed hardware design is based on systems and components of demonstrated high capability and reliability. The mission design builds on past mission experience, but incorporates innovative design approaches to achieve mission priorities. Those priorities, in decreasing order of importance, are safety, reliability, minimum personnel transfer time, minimum weight, and minimum cost. The design demonstrates the feasibility and flexibility of a Waverider transfer module.

Amato, Michael↗

Design and performance of an arcjet nuclear electric propulsion system for a mid-1990's reference mission

The design and performance of an arcjet nuclear-electric-propulsion spacecraft, suitable for use in the Space Nuclear Power System (SNPS) reference mission, are outlined. The vehicle design was based on a 30-kW ammonia arcjet system operating at an Isp of 1050 s and an efficiency of 45 percent. The arcjet/gimbal system, power-processing unit, and propellant-feed system are described. A 100-kWe SNPS was assumed, and the spacecraft mass was baselined at 5250 kg (excluding the propellant-feed system). A radiation/arcjet efflux diagnostics package was included in the performance analysis. This spacecraft, assuming a Shuttle launch from KSC, can perform a 50-deg inclination change and reach a final orbit of 35,860 km with a 120-d trip time providing a 4-mo active load for the SNPS. Alternatively, a Titan IV launch would provide a mass margin of 120 kg to a 10,000-km, 58-deg final orbit in 74 d. This spacecraft meets the reference-mission constraint of low developmental risk, and is scalable to power levels projected for future space platforms.

Deininger, William D.↗

A GNM mission and system design proposal

Here, the author takes an advocacy position for the proposed Mars Global Network Mission (GNM); it is not intended to be an objective review, although both pros and cons are presented in summary. The mission consists of launches from earth in the '96, '98, and '01 opportunities on Delta-class launch vehicles (approx. 1000 kg injected to Mars in 8 to 10 ft diameter shroud). The trans Mars boost stage injects a stack of small independent, aeroshelled spacecraft. The stack separates from the boost stage and each rigid (as opposed to deployable) aeroshell flies to Mars on its own, performing midcourse maneuvers as necessary. Each spacecraft flies a unique trajectory which is targeted to achieve approach atmospheric interface at the desired latitude and lighting conditions; arrival times may vary by a month or more. A direct entry is performed, there is no propulsive orbit capture. The aeroshelled rough-landers are targeted to achieve a desired attitude and entry flight path angle, and then follow a passive ballistic trajectory until terminal descent. Based on sensed acceleration (integrated to deduce altitude), the aft aeroshell skirt is jettisoned; a short later a supersonic parachute is deployed. The ballistic coefficient of the parachute is sized to achieve terminal velocity at about 8 km. However the parachute is not deployed until a few Km above the surface to minimize wind-induced drift. The nose cap descent imaging begins, a laser altimeter also measures true altitude. Based on range and range rate to the surface, the parachute is jettisoned and the lander uses descent engines to achieve touchdown velocity. A contact sensor shuts down the motors to avoid cratering, and the lander rough-lands at less than 5 m/sec. The remaining aeroshell and a deployable bladder attenuate landing loads and minimize the possibility of tip over. Science instruments are deployed and activated, and the network is established.

Bailey, Stephen↗